Loading...
080294 Planning 5.1 5.2 6. 6.1 7. 7.1 7.2 7.3 AGENDA PLANNING COMMISSION MEETING OF AUGUST 2, 1994 CITY OF NEW HOPE, MINNESOTA 7:00 p.m. CALL TO ORDER ROLL CALL CONSENT PUBLIC HEARINGS Case 94-20 Request for Final Plat Approval and Development/Final Stage Planned Unit Development Approval to Allow Building Addition, 3920 Winnetka Avenue, 3941/3961 Quebec Avenue North, Kellison Company/Don Harvey, Petitioners COMMITTEE REPORTS Report of Design and Review Committee Report of Codes and Standards Committee OLD BUSINESS Miscellaneous Issues NEW BUSINESS Approval of Planning Commission Minutes of July 12, 1994. Review of City Council Minutes of June 27, 1994. Review of EDA Minutes of June 27, 1994. ANNOUNCEMENTS ADJOURNMENT * Petitioners are requested to be in attendance Planning Case: Request: Location: PID No: Zoning: Petitioner: Report Date: Meeting Date: CITY OF NEW HOPE PLANNING CASE REPORT 94-20 Request for Final Plat Approval and Development/Final Stage Planned Unit Development Approval to Allow Building Addition 3920 Winnetka Avenue North, 3941/3961 Quebec Avenue North 17-118-21-34-0003 I-1 Kellison Company/Don Harvey (Winnetka Properties) July 27, 1994 August 2, 1994 BACKGROUND The petitioner is requesting Final Plat approval and Development/Final Stage Planned Unit Development approval to allow building addition on the west building pursuant to Chapter 13 - New Hope Code of Ordinances and Sections 4.039A(1), 4.19, 4.194, and 4.196(3) - New Hope Code. The petitioner is proposing the platting of property known as Don Harvey Second Addition, Block 1, Lot 1, which currently contains two industrial buildings of approximately 26,880 square feet each (2 buildings on one lot). In conjunction with the Final Plat the petitioner is requesting Development/Final Stage PUD approval to construct a 41,640 square foot addition to the building at 3943 Quebec Avenue North where Versa Die Cast, Inc. is the tenant. The Planning Commission and City Council approved the Preliminary Plat and Planned Unit Development General Concept Plan approval at their July 12th and July 25th meetings, respectively, subject to the following conditions: Preliminary Plat be revised to incorporate recommendations of Hennepin County, City Attorney, City Engineer and Planning Consultant and be re-submitted to City. B. Final Plat to incorporate all recommendations and be submitted to Planning Commission for review/approval. Submission of a revised landscape plan that responds to landscaping recommendations outlined in the Planning Consultant's July 7th report. D. Continuous concrete curbing be provided around the entire parking lot and drainageway areas. .. E. Curb stops be provided in the parking stalls abutting the existing buildings. F. Applicant demonstrate truck maneuvering patterns for trucks accessing the northerr, loading areas. G. Truck traffic accessing the site be directed to the secOnd curb cut via the use of directional signs. H. Subject to the City Engineers comments of site grading, drainage and utilities. I. All roof top equipment must be enclosed or painted to match the principal structure. J. All trash receptacles must be enclosed. Trash enclosures must be designed to complement the principal structure. K. Overall site clean up, Elimination of all outdoor storage from the site. L. Submission of detailed signage plan which comPlies with City sign regulations. M. Specific painting program for the existing buildings and repair schedule be made part of the PUD Agreement. A revised Preliminary Plat was submitted that incorporated the majority of the recommended changes. The site is zoned I-1, Limited Industrial, and manufacturing, warehouse and related offices are a permitted use in the district. The site is surrounded primarily by I-1 zoned property, with an I-1 warehouse and B-3 Auto- Oriented use to the north, Quebec Avenue and an I-1 (Winnetka Properties) warehouse to the east, Quebec Avenue and an R-O zone (church) and I-1 zone (Paddock Laboratories) to the sough, and Winnetka Avenue and R-1 zoned property to the west. The topography of the subject site slopes 25 feet down from the west to the east. There are about five large trees at the west end of the property and one 30" oak at the east end. Property owners within 350 feet of the request have been re-notified about Final Plat and Development/Final Stage PUD and staff have received no comments on the request. ANALYSIS FINAL PLAT The Final Plat meets the zoning code requirements for lot size and width requirements in the I-1 zoning district, which are one acre and 150 feet, respectively, as the single lot contains 292,224 square feet (6.8 acres) and has a width on Quebec Avenue of over 12,000 feet. Per routine procedure, the Final Plat was submitted to Department Heads, City Attorney, City Engineer, Hennepin County and other appropriate agencies for review and comment. Hennepin County reviewed the Final Plat and stated that their recommendations were the same as made on the Preliminary Plat review: The developer should dedicate 40 feet of right of way from and along the CSAH 156 centerline (this is shown on Final Plat). All access from the plat to CSAH 156 must be limited to Quebec Avenue. The existing driveway located approximately 220 feet north of Quebec Avenue must be removed and the area within County right of way restored. The developer must have an approved Hennepin County entrance permit before beginning any access construction or driveway removal (this access is to be removed, per the grading/drainage plan). All proposed construction within County right of way requires an approved Hennepin County utility permit prior to beginning construction. This includes, but is not limited to drainage and utility construction, trail development and landscaping. The developer must restore all areas, within County right of way, disturbed during construction. 4. The City Attorney reviewed the Final Plat and made the following comments: I have reviewed the proposed final plat of Don Harvey 2nd Addition and find the plat to be in order from a legal standpoint. I have not yet received an Abstract of Title or Registered Property Abstract for the subject property. This updated evidence of title must be supplied to our office prior to approval of the plat by the Council, or else the plat should be approved "subiect to the requirements contained in the title opinion of the City Attorney." Co In addition, the property owner should be aware that the entire real estate taxes due and payable in 1994 must be paid before the final plat will be accepted for filing by the County. So if the owner expects the final plat to be filed before October 15th, the owner must make arrangements for prepayment of their second half~eal estate taxes. 5. The City Engineer reviewed the Final Plat and made the following comments: The Final Plat properly shows all drainage and utility easements along all lot lines and the pond. Removal of the existing drive on Winnetka Avenue and Quebec Avenue shall be done in accordance with Hennepin County and City standards. The integrity of the existing sidewalk along Winnetka Avenue shall be constructed after removal of the existing drive. 6. Minnegasco reviewed the Final Plat and made the following comments: With reference to the plat of Don Harvey 2nd Addition, Minnegasco currently has an easement near the north line of the plat. I have enclosed a copy of Minnegasco's easement number 76-8, recorded with the Hennepin County recorder as document number 4256368. I request that this easement be referred to on the Final Plat. 7. The Planning Consultant also reviewed the Final Plat. Please refer to his comments in the attached report. RECOMMENDATION Staff recommends approval of the Final Plat subject to the following conditions: Removal of the existing drive on Winnetka Avenue and Quebec Avenue shall be done in accordance with Hennepin County and City standards. The integrity of the existing sidewalk along Winnetka Avenue shall be constructed after removal of the existing drive. 2. Appropriate Hennepin County permits be obtained. 3. Final Plat be revised to include Minnegasco easement. 4. Updated Evidence of Title be submitted to City Attorney. DEVELOPMENT/FINAL STAGE PUD The purpose of the Planned Unit Development is to provide for the grouping of land parcels for development as an integrated, coordinated unit as opposed to traditional parcel by parcel, piecemeal, sporadic and unplanned approach to development. The PUD is intended to introduce flexibility of site design and architecture for the conservation of land and open space through clustering of buildings and activities. It is further intended that PUD's are to be characterized by central management, integrated planning and architecture, joint or common use of parking, maintenance of open space an other similar facilities, and harmonious selection and efficient distribution of uses. The processing steps for a PUD are intended to provide for an orderly development and progressions of the Plan, with the greatest expenditure of developmental funds being made only after the City has had ample opportunity for informed decisions as to the acceptability of the various segments of the whole as the Plan affects the public interest. The various steps are: A. Application Conference. Preliminary discussions. B. General Concept Plan. Consideration of overall concept and plan. C. Development Stage Plan. One or more details plans as part of the whole final plan. Final Plan. The summary of the entire concept and each Development Stage Plan in an integrated complete and final plan. The purpose of the Development Stage Plan is to provide one or more specific and particular plans upon which the Planning Commission will base its recommendation to the Council and with which substantial compliance is necessary for the preparation of the Final Plan. The Development Stage Plan shall refine, implement and be in substantial conformity with the approved General Concept Plan. 4. Development Stage Plan Review Criteria. The evaluation of the proposed Development Stage Plan shall include but not be limited to the following criteria: Individual Rights. Adequate property control is provided to protect the individual owners' rights and property values and the public responsibility for maintenance and upkeep. Traffic Plan. The interior circulation plan plus access from and onto public right-of- ways does not create congestion or dangers and is adequate for the safety of the project residents and the general public. C. Open Space. A sufficient amount of useable open space is provided. Do Privacy and Property Values. The arrangement of buildings, structures and accessory uses does not unreasonably disturb the privacy or property values of the surrounding residential uses. D. Compatibility. The architectural design of the project is compatible with the surrounding area. Drainage. The drainage and utility system plans are submitted to the City Engineer and the final drainage and utility plans shall be subject to his approval. Go Sound Development. The development schedule insures a logical development of the site which will protect the public interest and conserve land. Platting Code. The development is in compliance with the requirements of the New Hope Subdivision Code. District Requirements. Dwelling unit and accessory use requirements are in compliance with the district provisions in which the development is planned. The Final Plan is to serve as a complete, and permanent public record of the PUD and the manner in which it is to be developed. It shall incorporate all prior approved plans and all approved modifications thereof resulting from the PUD process. It shall serve in conjunction with other provisions of the City Code as the land use regulation applicable to the PUD. The Planning Consultant has prepared the attached report on the Development/Final Stage~_ PUD application. Please refer to it, as it is not staff's intent to repeat the analysis in this report. The Design & Review Committee met with the petitioner on July 19th and a number of issues were discussed, including trash enclosures, the ponding/drainage plan, setback of retaining wall on northwest corner of property, elimination of Winnetka Avenue curb-cut, sidewalk requirement, wing wall elevations, roof-top equipment, landscaping and irrigation, separation of truck and auto access, truck maneuverability, traffic directional signs, signage, lighting, building materials and architectural style of building. Revised plans were submitted by the petitioner as a result of the meeting which include the following changes (per the petitioner's letter)' The retaining wall at the northwesterly corner of the new parking area has been addressed and resolved so that it does not encroach into the easement area and is sufficiently set back from the property lines to meet City codes. Full elevations of the south side of the buildings and major portion of the site have been included in the drawings. The petitioner agrees to paint all roof top equipment on the new and existing buildings. The landscape plans have been redesigned to incorporate some of the comments made: at the meeting as regards the screening from Winnetka Avenue and the foundation plantings. (The foundation plantings have been reduced to a certain extent in order to provide space for over-story trees adjacent to the west elevation of the building.) The petitioner agrees to provide irrigation for the foundation planting areas of the building and adjacent lawn areas. It has been determined that the two grade level doors on the north elevation will not be used for entry of vehicles but will only be used for fork lift maneuvering of materials off trailers to be moved into the building. The smaller of the overhead doors would also be utilized by UPS for parcel pick-up should such a need occur. The petitioner will sign the property to exclude trucking from the westerly driveway and allow it only to occur at the easterly driveway on Quebec Avenue for access between the two buildings and additional access to the north side of the new building by back-up maneuvering. Additional, the petitioner will provide one way arrowing and signage to limit access along the north side of the new building. The petitioner agrees to remove the curb cut, sidewalk, curbs, and asphalt at Winnetka Avenue and replace the curb and sidewalk to City requirements. I. The revised drawings now reflect lighting for security and parking purposes. J. The elevations of the building have been revised to reflect the perspective drawing and the pilasters have been redrawn to a new design for greater protection from damage at the auto parking areas and for more aesthetic appeal. 9. The petitioner has indicated that, as a part of the expansion project, they will be renovating the existing buildings in the following manner: A. Repair the existing block as necessary and repaint all exterior surfaces. The painting will be coordinated to match the new building and blend properly around the east side of the east building. B. Repair/replace man doors, overhead doors, stairs and rails as necessary and paint to match new building. C. Repair/replace dock bumpers and dock equipment as necessary. D. Paint all roof top equipment on existing building. E. Clean the asphaltic material from the loading docks on the east building. F. Repair/replace broken light fixtures on building exterior. G. Patch, repair, seal coat, and restripe all asphalt parking and drive surfaces. H. Install new curb (B-6/12) at the east boundary of the auto parking lot for the east building. I. Provide a complete general clean-up of all stored materials, landscaping, addresses, and signage. 10. The petitioner further states that all of the above work shall be accomplished in one continuous construction procedure; however, it may be phased in to properly accommodate the new construction and the time of season for the work. It is anticipated that all of the work will be accomplished in 1994; however, some landscaping may hold over until the Spring of 1995. This work obviously would also incorporate the installation of the storm water drainage system to provide for the new construction as well as the ~xisting facilities. 11. The original and revised landscaping plans are compared below: TOTALS Original Revised 14 14 15 21 5 5 11 20 33 24 7 6 2 4 6 6 70 55 53 52 8 8 16 7 224 238 Summit Seedless Ash Black Hills Spruce Red Splendor Crab Red Twigged Dogwood Techny Arborvitae Skyline Locust Amur Maple Mint Julep Juniper Broadmoor Juniper Gold Drop Potentilla Japanese Tree Lilac Clump Maney Juniper River Birch-Clump Form 12. Project data for the revised plans is listed below: Total Site Total Existing Building Total Existing Building Total Phase I Addition Total Buildings w/Addition (31.7%) Total Impervious (71.9%) Total Parking 292,224 square feet 26,880 square feet 26,880 square feet 41,640 square feet 95,400 square feet 214,350 square feet 169 (includes 7 handicap & 1 handicap van parking) 13. The City Engineer has reviewed the revised plans and has made the following recommendations: The site plan has not been reviewed by the Shingle Creek Watershed at this time. It is anticipated the site plan will be reviewed at the August 1 1th meeting. The pond shall be designed to satisfy all quantity and quality requirements in accordance with the Watershed and City. An outlet skimmer structure is required. The pond and lot shall be sized to provide'maximum storage while the storm sewer s~tall be located 10 feet behind the existing concrete curb. The new concrete curb construction along the existing south pavement shall be located to comply with the required setback requirements from Quebec Avenue. The curb along the existing east pavement may warrant storm sewer and a catch basin to collect and convey storm water to the pond. The pavement restoration shall account for traffic loading, subgrade conditions and the existing section. Total reconstruction is warranted in certain areas. The recommended five foot wide concrete sidewalk (minimum 4 inches thick) along Quebec Avenue shall be located five feet back from the existing curb providing a five foot wide boulevard. In the event the sidewalk is not required at this time, the boulevard grading along Quebec Avenue and irrigation construction as part of the site improvements shall account for a sidewalk being constructed in the future. The retaining wall in the northwest corner of the new parking area shall be properly designed and comply with setback requirements. 14. The Building Official has reviewed the revised plans and has made the following recommendations: B. C. D. Delete the confusing "one-way" parking layout at north. Correct the dimension errors at north setback. Clarify building interior use in building code terms. Submit traffic signage for all three driveways and the north end of the trucking driveway. Illustrate five foot wide public sidewalk along Quebec frontage set back five feet from the street curb on revised site plan. Submit tenant leasehold plan for both buildings, including areas and "uses". Submit evidence of Shingle Creek Watershed Commission approval before building permit application. Provide signed Development Agreement and required bond before building permit. I. J. K. L. Submit retaining wall details. Provide exterior lighting details, NOT shown on plans. East oak tree protection'to extend to the tree crown. Signed architectural plans must be provided. 15. The only major point of contention between the petitioner and staff is the sidewalk installation issue. Staff will be recommending that the PUD be approved subject to the installation of a sidewalk on Quebec Avenue and the Planning Commission and City Council will need to determine if this improvement should be financed entirely by the petitioner or not. RECOMMENDATION Staff recommends approval of the Development/Final Stage Planned Unit Development Plans, subject to the following conditions (these include recommendations of City Engineer, Planner, and Building Official)' Approval of the plans by the Shingle Creek Watershed Commission prior to the issuance of a building permit. The pond shall be designed to satisfy all quantity and quality requirements in accordance with the Watershed and City. An outlet skimmer structure is required. The pond and lot shall be sized to provide maximum storage while the storm sewer shall be located 10' behind the existing concrete curb. The new concrete curb construction along the existing south pavement shall be located to comply with the required setback requirements from Quebec Avenue. The curb along the existing ease pavement may warrant storm sewer and a catch basin to collect and convey storm water to the pond. The pavement restoration shall account for traffic loading, subgrade conditions and the existing section. Total reconstruction is warranted in certain areas. Installation of a 5' wide concrete sidewalk (minimum 4" thick) along Quebec Avenue located 5' back from the existing curb providing a 5' wide boulevard to be shown on the revised site plan. In the event the sidewalk is not required at this time the boulevard grading along Quebec Avenue and irrigation constructed as part of the site improvements shall account for a sidewalk being constructed in the future. 4. The retaining wall in the northwest corner of the new parking area shall be properly designed and comply with setback requirements and retaining wall details must be submitted. Removal of the existing drive on Winnetka Avenue and Quebec Avenue in accordance with Hennepin County and City standards. The integrity of the existing sidewalk along Winnetka Avenue shall be constructed after removal of the existing drive. 6. Delete the "one-way" Parking layout at north. 7. Correct the dimension errors at north setback between the lot line and the building. 8. Submit traffic signage for all three driveways and the north end of the trucking driveway. 9. Provide exterior lighting details, NOT shown on plans. 10. East oak tree protection (fence) to extend to the tree crown (drip line). 1 1. Signed architectural plans for the PUD must be provided. 12. Submit tenant leasehold plan for both buildings, including areas and "uses". 13. Clarify building interior used in building code terms. 14. Continuous concrete curbing be provided around the entire parking lot. 15. Elimination of all outdoor storage from the site. 16. Submission of detailed signage plan which complies with City sign regulations. 17. Developer must enter into a PUD Development Agreement with the City, to be prepared by the City Attorney, and submit the appropriate bond with amount to be determined by City Engineer and Building Official. Development Agreement must be executed and bond submitted prior to the issuance of a building permit. Attachments: Final Plat Revised Preliminary Plat Revised Site Plan Project Data Revised Landscaping Plan Plant Schedule Foundation Planting Detail Floor Plan Revised Building Elevations South Elevation with Wing Walls Revised Grading/Drainage Plan Petitioner's July 22nd Correspondence Petitioner's July 12th Correspondence Planning Consultant's Report Building Official Comments July 27th City Approval Letter City Attorney Final Plat Letter City Engineer Final Plat/Plan Letter Minnegasco Final Plat Letter Final Plat Distribution Letter July 12th Staff/Consultant Reports DON HARVEY 2ND ADDITION 0 0 BLOCK , ........ ~ ~'~ ~ j c-' .... -QUEBEC AVE. N.. VILLAS[{ al ~1 iNDUS'(F~AL PARK o KALE ltmo~re D ffemma 0 b < rq < ', 5ITE PLAN, ,5NEET INDEX L,ANDSC,APfNG PLAN FLOOR PL/~,N ELEb'ATION5 ELEVATION Pf~OJECT iDAT~ TOTAL SITE TOT.i~L EXhSTIN~ ~IILDIN~ TOTAL Eb<:I,STIN~ tSt, IILDIN~ TOTAL PI4~ I ADDITI<:::::IN TQT,,~.. 15UILDINC.~ l, Ll/ADDITIC~N TOTAL Jl"'JPEl~httlCll.l~ ('11.'5~) TOT,,~L. (IN~LUDE~ '1 i~.~ ~ IN.C,. vAN ~/INNE-TKA AVENUE A 55' (~T U R B P L N G · DES I G N M A R K E T R S E A R CH PLANNING REPORT TO: FROM: DATE: RE: FILE NO: Kirk McDonald Cary Teague/Alan Brixius 28 July 1994 New Hope - Winnetka Properties - PUD Development Stage 131.01 - 94.20 BACKGROUND Winnetka Properties is requesting to plat property known as Don Harvey Second Addition, Lot 1, Block 1. The subject property contains two industrial buildings of approximately 26,880 square feet each. The applicant is further requesting to construct a 41,640 square foot addition to the western building (Versa Die Cast, Inc.). Section 4032 (2) (e) of the New Hope Zoning Ordinance requires a Planned Unit Development (PUD) if more than one principal building shall be located on the lot. Due to the existing conditions and the applicant's desire to expand one of the buildings, the applicant is also requesting a planned unit development conditional use permit as identified within the Limited Industrial Zoning District. The subject property is zoned I-l, Limited Industria~ Zoning District which allows manufacturing as a permitted use and PUD/CUP. The following report evaluates both the requested subdivision and planned unit development against the applicable City development standards. At the July Planning Commission and City Council meeting, Winnetka Properties received concept approval for their conditional use- planned unit development. The applicant is now requesting PUD development stage approval. With this request, they have submitted revised construction drawings as well as a written narrative that responds to the approval conditions outlined with the concept stage approval. 5775 Wayzata Blvd.-Suite 555-St. Louis Park, MN 55416. (612) 595-9636. Fax. 595-9837 Attached for reference: Exhibit A - Site Location Exhibit B - Site Plan Exhibit C - Landscape Plan Exhibit D - Grading & Drainage Plan Exhibit E - Floor Plan Exhibit F - Building.Elevations Exhibit G - Development Narrative RECOMM NDATIONS Subdivision Based on the information contained herein, our office recommends approval of the proposed subdivision subject to the following conditions: A revised plat is submitted to provide drainage and utility easements along all lot lines. Drainage easement be provided over the proposed drainage pond. Said plan is subject to review and approval of the City Engineer. The grading and drainage plan is reviewed and approved by the City Engineer. PUD/CUP Our office further recommends approval of the proposed conditional use permit for a development stage planned unit development subject to the following conditions: Continuous concrete curbing be provided around the entire parking lot. 2. Elimination of all outdoor storage from the site. o Submission of detailed signage plan which complies with City sign regulations. ~ A sidewalk shall be installed along Quebec Avenue within the road right-of-way· The manner in which the sidewalk is constructed will be determined at the time of final approval and written into the developers agreement· 2 To ensure development in accordance with approved plans and to guarantee payment of special assessment for plat improvements, the developer will be required to enter into a PUD agreement with the City. Subject to comment of other City staff, Commission members and City Council. ISSUES AND ANALYSIS Subdivision The site currently exists as an unplatted property as a condition of any development approval the City requires that the site be platted. With the extension of Quebec Avenue, the site was previously subdivided, creating a single lot to the east of the new street. The parcel in question was not platted at that time. In 1992, a preliminary plat was considered for the subject site. City staff recommended approval of the preliminary plat that showed two separate lots being created. This preliminary plat was never pursued to final plat. The current subdivision proposed for the site is to plat the subject property into a single industrial lot and block. The processing of the plat is straight forward in that the parcel exceeds the lot area and width standards of the I-1 Zoning district. The applicant submitted a revised site drainage plan which is subject to review and approval of the City Engineer. The site is accessed via the improved Quebec Avenue. Utilities are available to the site from Quebec Avenue. The only issue that the plat does not address is the provision of drainage and utility easements. Said easement must be (10) feet wide and centered on rear or other lot lines. PUD/CUP The applicant is requesting a conditional use permit for an industrial planned unit development as allowed under Section 4.144 (3) of the New Hope Zoning Ordinance. This is necessary to accommodate_ the integrated site design of having two principal buildings on a single lot. The review process for a PUD occurs in three stages: concept stage, development stage and final stage. Last month, the City reviewed and approved the concept plan. Based on that review, the applicant has submitted a formal development plan for the development stage. Zoning. The site is zoned I-l, General Industrial. This zoning district allows for manufacturing businesses and also allows for industrial PUD by conditional use permit. The existing businesses and the expansion of Versa Die Cast are uses allowed within the I-1 zoning district. Site Size. The proposed project site consists of 6.85 acres located east of Winnetka Avenue and North of Quebec Avenue. The site exceeds the minimum lot area and lot width requirements of the I-1 zoning district. The site also exceeds the 200 foot frontage requirement established for industrial planned unit developments. Set. backs. The site contains two existing 26,880 square foot buildings. The applicant is proposing to construct a 41,640 square foot addition to the western building. Both buildings and the proposed building addition comply with I-1 District setbacks as follows: Required Setbacks within the I-1 District Front (Quebec-South) Front (Winnetka) Side Required Proposed 50' 62' 50' 216' 20' -~i 47' Lot Coverage, The I-1 Zoning District does not allow more than 40 percent of the lot to be covered by buildings. The applicant has indicated that the total building floor area on the site will be 94,560 square feet. This represents 31.7% of the total site area. Green Area. Per Section 4.145 (3) of the New Hope Zoning Code, at least 20% of the lot must remain as a green area,' including shrubbery, plantings or fencing, and shall be landscaped. The site plan indicates 1.8 acres of green space on the 6.8 acre lot, therefore, 26% of the lot contains green space. LandscaDin=. The City staff has noted historical problems with site upkeep and appearance. Outdoor storage, loading area exposure and overall site appearance has been a problem in the past, as a result, site appearance and landscaping have become a critical element of the site pla~ review. As the 10t exists, there is virtually no screening and landscaping. The existing loading area between the two buildings is not screened, nor have trees been planted in the boulevard of Quebec Avenue. Also, due to the fact that the elevation of Winnetka Avenue is 20 feet above the foundation of the buildings, the rooftop equipment is highly visible to traffic on Winnetka. Several landscaping issues were discussed during review of the concept stage review. As a result of those discussions, the following is a list of the concerns that have been addressed by the developer in the revised landscape plan: Additional coniferous trees have been added along Winnetka Avenue to supplement the proposed deciduous plantings. o Concern has been raised that the proposed building is large and architecturally limited in exterior features. In an effort to break up the building mass, a row of Junipers have been added to the west side of the Proposed addition to offer some vertical dimension to the foundation plantings. On the south side of the building facing Quebec Avenue foundation plantings have been added to supplement the over story trees in the green areas between the sidewalk and building. On the east side of the building, a row of Junipers and Arborvitae trees will be planted to provide screening to the east. The developer is proposing to save the 30 inch Oak tree at the east end of the lot, by erecting a plastic safety fence in 15 feet diameter circle around the tree to prevent disturbance to the tree and root system. o The retaining wall to be located in the northwest corner of the lot has been relocated to meet the required five (5) foot setback requirement. Between the two existing buildings, the developer is proposing to construct two solid walls with several Juniper trees planted in front to provide screening of the alley and loading area from properties to the south. The existing asphalt surfacing and concrete curb and gutter on the west side of the property facing Winnetka Avenue will be removed. o The developer has indicated that they will provide irrigation for foundation planting areas of the building and adjacent lawn areas. In review of the revised landscape plan, staff believes that the applicant has responded to the issues identified with concept plan approval. Trail/S~dewalk. At the' concept stage of the proposed P~D/CUP a need was identified by the City to complete a pedestrian trail from Winnetka, along Quebec Avenue to 42nd Street. Said trail may be developed in one of two ways: First, the developer construct the trail during the construction of the site improvement, or second, the developer provide an escrow to cover the cost of the City to construct the public improvement. Off-Street Loading. For industrial districts, the number of loading berths required is one (1) per building, and one (1) additional berth for each additional one hundred thousand (100,000) square feet. Based on these requirements, the applicant must provide for two (2) loading berths on the site. Currently, there are six existing berths on the site, and three additional loading area are proposed as part of the new addition. Three overhead doors are proposed along the north side of the new building addition. The site plan shows only 47 feet of bituminous paving north of the new building. This raised issue as with regard to adequate maneuvering area for semi-trucks with trailers. However, Versa Die Cast will be using the two on-grade level doors for entry of small vehicles or for fork lift maneuvering of materials off trailers to be moved into the building. The smaller of the overhead doors would also be utilized by UPS for parcel pick-up should such a need occur. The single north loading berth is angled to the east to provide truck maneuvering space at the north end of the existing building. Off-street Parking Requirements. As stated within the New Hope Municipal Code the following parking spaces are required: Required Proposed Manufacturing Warehousing Office Company Truck I space per 350 s.f. floor-area 1 space per 1,000 s.f. floor area 3 spaces + 1 for each 200 s.f. 1 space for each company owned truck stored outside 34,000 s.f.* 30,000 s.f. 4,000 s.f. 0 trucks *Floor area - The term "floor area" for the purpose of calculating the number of off-street parking spaces required shall be determined on the basis of the exterior floor area dimensions of the'buildings, structure or use, times the number of floors, minus ten (10) percent. Based on the above table, 135 parking stalls are required. The applicant has provided proof of parking on the site for 165 spaces. The parking stalls and driveway aisles are properly dimensioned. the existing parking stalls along the existing building~present some concern in that there is no physical barrier betWeen the building and parking stall. To avoid damage to the building or automobiles~ curb stops should be provided for these parking stalls. The applicant's site plans illustrate that all parking and loading areas will have bituminous surfacing and striped stalls. The site plan must provide for continuous concrete curbing around the entire parking lot. Trash. The trash handling areas will be located in enclosed concrete masonry dumpsters with steel gate entrances, therefore, will be screened from view. Lighting. The site plan does indicate that lighting is to be provided to illuminate off-street parking areas. The Zoning Ordinance stipulates that any lighting used to illuminate off- street parking areas must be arranged to reflect light away from adjoining property, and public rights-of-way. Said lighting plan shall be reviewed by the City Engineer. Access. Ail site access is to be provided via Quebec Avenue. The site plan shows three curb cuts along the 1,000 foot frontage~ One of the existing curb cuts is being removed in exchange for a new curb cut located along the west side of the new building addition. The number, location and width of curb cut comply with City performance standards. Efforts will be made to segregate truck and automobile traffic as much as possible. As such, the applicant has agreed to sign the property to exclude trucking from the westerly driveway and allow it only to occur at the easterly driveway on Quebec Avenue for access between the two buildings and additional access to the north side of the new building by back-up maneuvering. Also, one way arrowing and signage to limit access along the north side of the new building will be added. Gradinq and Drainaqe. The applicant has submitted a grading and drainage plan. As shown the proposed parking area is 20 feet lower than the street elevation of Winnetka Avenue. To address a continuous site drainage problem and increased runoff from the new building addition and parking area, the applicant proposes to direct site drainage to a new on-site storm water ponding prior to releasing it north to 01d Dutch Pond via a storm sewer in the Quebec Avenue right-of-way. The grading and drainage plan shall be subject to the review and comment of the City Engineer. Buildinq Desiqn. The property owner's intention is to create an addition which will aesthetically blend with existing buildings after they are renovated and repainted. The design of the existing buildings establishes the design motif which they intend ~o carry around on the south and-west portio of the new addition. The building elevation illustrates an exterior facade that is a continuation of the existing building. Concrete blocks with decorative block trim along the building roof line. In response to comments from the City Building Official and Design and Review Committee, they have added some windows to the south side of the building. They also attempted to break up the horizontal mass of the building with vertical columns of decorative brick. 7 As indicated in the development narrative, the existing building will be renovated in the following manner: Repair/replace man doors, overhead doors, stairs and rails as necessary and paint to match new building. o Repair the existing block as necessary and repaying all exterior surfaces. The painting will be coordinated to match the new building and blend properly around the east side of the east building. o Repair/replace dock bumpers and dock equipment as necessary. o Paint all roof top equipment on existing building. Clean the asphaltic material from the loading docks on the east building. o Repair/replace broken light fixtures on building exterior. Patch, repair, seal coat, and re-stripe all asphalt parking and drive surfaces. Install new curb (B-6/12) at the east boundary of the auto parking lot for the east building. Provide a complete general clean-up of all stored materials, landscaping, addresses, and signage. The applicant development narrative address the building appearance issues raised in the PUD concept plan approval. Buildinq Heiqht. No structure within the I-1 zoning district may exceed three (3) stories. The proposed two (2) story building is proposed to be twenty-nine (29) feet tall,therefore, will comply with the City regulations. Si.crna=e. The submitted site plan does not indicate a sign at this time, however, any signage is required to meet all City sign regulations outlined in the New Hope Sign Code Sections 3.4 through 3.485. PUD Agreement. The City will require the PUD,agreement that will outline the_terms of PUD approval. The agreement will include the approved plans and written narrative as well as a financial security to insure performance. 8 CONCLUSION It appears that with the development stage submissions, that the applicant has been responsive to the City's concerns expressed with concept stage approval. Based on the information contained within this report our office recommends approval of the proposed plat and planned unit development subject to the conditions outlined in the Recommendation section. pc: Doug Sandstad Dan Donahue Steve Sondrall James Kellison 9 RE~L ESTATE IrdS;LLISON CO. DEVELOPMENT' AND CONSTRUCTION'SERV'I-CES 3880 LAVERNE AVENUE NORTH, LAKE ELMO, MN 55042 July 22, 1994 OFFICE 612-777-8646 · FAX 6121-777-8673 Mr. Doug Sandstad City of New Hope 4401 Xylon Ave. N. New Hope, MN 55428 RE: Planning case #94-20 Versa Die Cast Expansion Don Harvey 2nd edition Dear Mr. Sandstad: In response to the planning commission design and review meeting held at New Hope City Hall on July 19, 1994, 3:30 p.m., we have prepared the following narrative to supplement the drawings which will be submitted on July 25, 1994. This information, per our meeting, is requisite to the planning commission meeting to be held on August 2, 1994 for further submission to the City Council on August 8, 1994. The information, along with all other documentation presented in our previous application and at previous planning commission meetings, is in anticipation of development and approval for the construction of the expansion on the above referenced project to commence as quickly after City Council approval as the City will permit. We understand that the final developer's agreemem will by necessity be completed after the City Council meeting and we will agree to assume any risks that we may incur due to us commencing construction prior to the final developer's agreemem being executed. Also, per the planning commission design and review meeting, we anticipate making application to start the mass grading portion of this project prior to City Council approval. This application, of course, would be dependent upon your review and approval and would also be subject to owner's full risk for any liability, damages, or reparations that would need to be made should the construction project not proceed. The following items, I hope, will answer your regards with respect to the expansion/new construction portion of the .project: · The retaining wall at the northwesterly comer of the new parking area has been addressed and resolved so that it does not encroach into the easement area and is sufficiently set back fi.om the property lines to meet city codes. · Full elevations of the south side of the buildings and major portion of the site have been included in' the drawings. We agree to paint all roof top equipment on the new and existing buildings. Planning case tl94-20 -/,Ady 22, 1994 Page 2 ~The land,ape plans have been redesigned to incorporate some of-the commentsmade at~, the meeting as regards the screening from W'metka Avenue and the foUndation plantings. We have reduced to a certain extent the foUndation plantings in order to provide space for over-story trees adjacent to the west elevation of the building. · We will provide irrigation for the foUndation planting areas of the building and adjacent lawn areas. · In conversation with Versa Die Cast, it has been determined that the two grade level doors on the north elevation will not be used for entry of vehicles but will only be used for fork lift maneuvering of materials off trailers to be moved into the building. The smaller of the overhead doors would also be utilized by UPS for parcel pick-up should such a need occur. We will sign the property to exclude trucking from the westerly driveway and allow it only to occur at the easterly driveway on Quebec Avenue for access between the two buildings and additional access to the north side of the new building by back-up maneuvering. Additionally, we will provide one way an-owing and signage to limit access along the north side of the new building. · We agree to remove the curb cut, sidewalk, curbs, and asphalt at Winnetka Avenue and replace the curb and sidewalk to city requirements. · The revised drawings now reflect hghting for security and parking purposes. · The elevations of the building have been revised to reflect the perspective drawing and the pilasters have been redrawn to a new design for greater protection from damage at the auto parking areas and for more aesthetic appeal. As a part of the expansion project, we will be renovating the existing buildings in the following manner: · Repair the existing block as necessary and repaint all exterior surfaces. The painting will be coordinated to match the new building and blend properly aroUnd the east side of the east building. · Repak/replaco man doors, over. head doom, stairs and rails as necessary and paint,tO match new building. · Repak/replace dock bumpers and dock equipment as necessary. · Paint all rooftop equipment on existing building. · Clean the asphaltic material from the loading docks on the east building. · Repair/replace broken light fixtures'on building exterior. · Patch, repak, seal coat, and restripe all asphalt parking and drive surfaces. · ln.qtall new. curb (tl-6/12) at the east boundary bf the auto parking lot for'the east building. Planning case ~t94-20 July 22, 1994 · . · ~page 3 " · ..Provide a complete general clean,up of all stOred:materials, landscaping; addresses, and..i sianaae. ,:. '. ~.:..-'.: . All of the above work shall be accomplished in one continuous construction pr°Cedure;h°wever, it may be phased in to properly accommodate the new' construction and the time of SeasOn for the work. It is anticipated that all of the work will be accomplished in 1994; hOWever, Some landscaping may hold over until the Spring of 1995. This work obviously would also incorporate the installation of the storm water drainage system to provide for the new construction as well as the existing facilities. We hope that this information along with our previously submitted information will be sufficient for your needs of review at the Planning Commission and City Council level. Should you require any additional information or clarification please feel fi'ee to call me directly. Respectfully submitted, ames E. Kellison cc: Greg Harvey, Winnetka Properties KELLISON CO. REAL ESTATE DEVELOPMENT AND CONSTRUCT[ON SERVer'S- ~ 388[) [.~VEt~X/E AVENUE NORTtt, LAKE ELMO, MN 55t)42 · OFFICE 6i2 777 8646 July 12, 1994 Mr. Doug Sandstad City of New Hope 4401 Xylon Avenue North New Hope, MN 55428 Planning Case 94-20 Versa Die Cast 3943 Quebec Avenue North Don Harvey 2nd Addition Dem' Mr. Sandstad: We have received a copy of the Planning Case Report that you had developed for the above- referenced planning case from Mr. Don Harvey. I thought it would be appropriate to take an opportunity to respond in writing to some of the comments in that report. It is of paramount importance to us that the Planning Commission meeting for July 12, 1994, be inclusive of the PUD approval process for concept and development stages. This matter was discussed at great length at the Design and Review Committee meeting held June 23, 1994. As discussed at that meeting, we have very serious time constraints with respect to being able to deliver a building suitable for equipment delivery to Vea'sa Die Cast by October 17, 1994. It was our impression that we had concurrence from all patties at the meeting that we would be under review for pre 'lmainary plat ~ well ~ the ~onc~-pt and development ~es of the PUD process at the Planning Commission on ~Iuly 12. However, much ofthe dooaaemafion in the Planning Report refers to the fact that we are. omen*dy applying only for concept approval. This obviously is not the case and there mu~t be a aerious minmderstandin8 aa to our intent. We have made every effort to aul~lY ail oftl~ iafommtim~ that would be required for concept as well as developmmt ~~ and' ha.v. been operating un6ar the pr~ni~ that that was. the case. - the ~,I~would lii~ to talin a few momema to point out a few itema that are discrepancies in tl~ r~port in our opinion. · Site utilizafon percentages Total site area Building area Impervious suffac 298,OOO sq. ft. 95,400 sq. ft. 32% 107,621 sq. ft. 36% 94,979 sq. it. 32% The City Planner's Report. states on page 6 at the top in item 5 that 'Plans for site irrigation must be identified as pan of the PUD development stage.' The PUD Chapter 4.19 does not require in any language an irrigation plan be submitted and I cannot find any reference in the zoning code to an irrigation system being required for an industrial project. · We are not clear on why there is a request for an additional 7' wide easemem along Winnetka Boulevard. We require clarification on this item. The City Planning consultant has indicated that the 165 spaces on the site plan are for the Versa Die Cast space only. The 165 parking spaces are to cover the entire building area which is inclusive of the two existing building of 26,880 sq. ff. each and the new addition of 41,640 sq. ff. Of the total stalls approximately 62 are located adjacent to the existing building to the east of the project which allows for one parking stall per 433 sq. ff. on average. The balance of the parking stalls (103) are adjacent to and for the use of Versa Die Cast. This allows for parking on an average of one stall per 665 sq. ft. Versa Die Cast has informed me that the maximum number of people that would be on duty at any one shift would be 75 persons. This allows then for an excess of approximately 30 stalls for visitors and other invitees. There is the potential for additional parking to the west of the proposed new parking area should a need occur in the future for more parking. However, during the history of the building the spaces that have been currently provided have never been fully parked and we don~ anticipate that there would be a parking problem in the future. Although there are issues which I am ~ will n~-..~l to be dimmsed at the meeting, the above are the saliem points which I feel are appropriate to respond to in this letter. We look forward to the opportunity to discuss this project with you and the Planning Commission'members. Respectfully submitted, DATE: TO: FROM: SUBJECT: JULY 28, 1994 KIRK McDONALD. DOUG SANDSTAD ~~ " VERSA DIE CAST/DON" HARVEY PUD DEVELOPMENT STAGE Since the PUD Concept has been approved and some changes have been incorporated, into the plans, ! recommend a firm, specific agreement on each of the following issues: * Delete the confusing "one-way" parking layout at north. * Correct the dimension errors at north setback. * Clarify building interior use in building code terms. ,. * Submit traffic signage for all three driveways and the north end of the trucking driveway. * Illustrate 5 foot wide public sidewalk along Quebec frontage set back 5 feet from the street curb on revised Site plan. * Submit tenant leasehold plan for both buildings, including areas and "uses". * Submit evidence of Shingle Creek Watershed Commission approval before building permit application. * Provide signed Development Agreement and required bond before building permit. * Submit retaining wall details. * Provide exterior lighting details, NOT shown on plans. · * East oak tree protection to extend to the tree crown. I note that a number of the suggestions of Design-Review have been taken into account with the revisions. Staff recommends approval, with the reminder that signed architectural plans for a PUD must be provided for permanent records. The city attorney and I will label appropriate PUD exhibits to correspond to the development, agreement. cc: file ',e'.~ ~ose %flzne$ota 55~28-~'098 -re~eorone. 6'£-53'-5!00 TDD L,ne' 6'2-53~-5109 July 27. 1994 Mr. James Kellison Kellison Company 3880 Laverne Avenue N. Lake Elmo, MN 55042 Mr. Don Harvey Winnetka Properties 7145 Sandburg Road Minneapolis, MN 55427 Subject: REQUEST FOR PRELIMINARY PLAT APPROVAL, SITE & BUILDING PLAN REVIEW/APPROVAL AND PLANNED UNIT DEVELOPMENT GENERAL CONCEPT PLAN APPROVAL TO ALLOW BUILDING ADDITION, PLANNING CASE 94-20 Dear Mr. Kellison and Mr. Harvey: Please be advised that On July 25, 1994, the New Hope City Council approved the request for Preliminary Plat approval, site and building plan review/approval, and Planned Unit Development general concept plan approval, as submitted in Planning Case 94-20, subject to the following conditions: Preliminary Plat be revised to incorporate recommendations of Hennepin County, City Attorney, City Engineer and Planning Consultant and be re-submitted to City. Final Plat to incorporate all recommendations and be submitted to Planning Commission for review/approval. Submission of a revised landscape plan that responds to landscaping recommendations outlined in the Planning Consultant's July 7th report. Continuous concrete curbing be provided around the entire parking lot and drainageway areas. 5. Curb stops be provided in the parking stalls abutting the existing buildings. Applicant demonstrate truck maneuvering patterns for trucks accessing the northern loading areas. Family Styled City ~ For Family Living Mr. Kellison and Mr. Harvey Juls' 27. 1994 Page 2 9. 10. 11. 12. 13. Truck traffic accessing the site be directed to the second curb cut via the use of directional signs. Subject to the City Engineers comments of site grading, drainage and utilities. All roof top equipment must be enclosed or painted to match the principal structure. All trash receptacles must be enclosed. complement the principal structure. Trash enclosures must be designed to Overall site clean up. Elimination of all outdoor storage from the site. Submission of detailed signage plan which complies with City sign regulations. Specific painting program for the existing buildings and repair schedule be made part of the PUD Agreement. If you have any questions, please feel free to contact me at 531-5119. Sincerely, Daniel J. Donahue City Manager Kirk McDonald Management Assistant/ Community Development Coordinator CC: Dan Donahue, City Manager Steve Sondrall, City Attc/rney z ,z Mark lt~zzon, City Engineer Doug Sandstad, Building Official Valerie Leone, City Clerk Property File (3920 Winnetka Avenue North, 3941/3961 Quebec Avenue North) Planning Case File 94-20 NED "~'~ July 27, 1994 CORRICK & $ONDRALL. P.A. ATTORNE¥~ A~ LAw Edinburgh Executive Off/ce Plaza //525 Edinbrook Crossing Suite #203 Drvvklyn P~k. Minnc~ota FAX (S~ 2} 42~-~7 Kirk McDonald Management Asst. City of New Hope 4401 Xylon Avenue North New Hope, MN 55428 Don Harvey 2nd Addition Final Plat Our File No. 99.15030 Dear Kirk: I have reviewed the proposed final ~la% of Don Harvey 2nd Addition and find the plat to be in order from a legal standpoint. However, I have not yet received an Abstract of Title or Registered Property Abstract for the subject property. Thi~ updated evidence of title must be supplied CO our office prior to approval of the plat by the council, or else the plat ~hould be approved "~ubject to the requirements contained in the title opinion o~ the City Attorney." In addition, the property owner should be aware that the entire rea] estate taxes ~ue and payable in ~994 must be paid before the final plat will be accepted for filing by the Coullty. $o if the owner expects the final plat %0 be filed before October 15th, the owner mu~t make arrangements for prepayment of ther second half real estate taxes. Contact me if you have any questions. Vet7 truly Martin P. Malecha s3t2 cc: Daniel J. Donshue, City Manager Steven A. Sondrall, Esq. 07-~8-~994 14:21 612 636 1311 BONESTRO0 & ASSC. P.02 Bonestmo Rosene Anclerlik & Associates Engineers & Architects July 28, 1994 city of New Hope 4401 Xylon Avenue N. New Hope, MN 55428 Att'n: Kirk McDonald Don Harvey 2nd Addition (Final Plat/Site Plan) File No. 34GFJ~ Dear Kirk: We have reviewed the above final plat and site plan and recommend the following. The final plat properly shown all drainage and utility easements along all lot lines and the pond. The site plan has not been reviewed by the Shingle Creek Watershed at this time. It is anticipated the site plan will be reviewed at the August 11 meeting, The pond shall be designed to satisfy all quantity and quality requirements in accordance with the Watershed and City. An outlet skimmer structure is required. The pond and lot shall be ~ to provide maximum storage while the storm sewer shall be located 10' behind the existing concrete curb. The new concrete curb construction along the existing south pavement shall be located to comply with the required set back requirements from Quebec Avenue. The curb alon~ the existing east pavement may warrant storm sewer and a catch basin to collect and convey storm water m the pond. The pavement restoration shall account for traffic loading, subgrade conditions and the existing section. Total reconstruction is warranted in certain areas. The recommended 5' wide concrete sidewalk (minimum 4" thick) along Quebec Avenue shall be located 5' back from thc existing curb providing a 5' wide boulevard. In the event the sidewalk is not required at this time the boulevard grading along Quebec Avenue and irrigation constructed ns part of the site improvements shall account for a sidewalk being constructed in the future. 2335 West Highway 36 * st. Paul, MN S5113 · 612-636-4600 07-28-1994 14:22 612 636 1311. BONESTRO0 & ASSC, P.03 City of New Hope Page 2 Re: Don Harvey 2nd Addition Removal of the existing drive on Winnetka Avenue and Quebec Avenue shall be done in accordance with Hennepin Co, and city standards. The integrity of the existing sidewalk along Winnetka Avenue shall be constructed after removal of the existing drive. The retaining wall in the northwest corner of the new parking area shall be properly designed and comply with setbsck requirements. · The bond amount shall include all site improvements summarized below, 4500 SY 58OO SY 1500 LF 840 LF 2500 CY Lump Sum 5600 SF 40O SF New bituminous surface (h~ $10.00/sq. yd. Rehabilitated bituminous surface Ca) $5.00/sq yd Concrete Curb @ $10.00/ln ft Storm Sewer @ $35,00/1n ft Pond excavation @ $6.00/cu yd Landscape @ $10,000/ls Sidewalk @ $2.00/~q fl Retaining Wall @ $15.00/sq ft + 50% Bond Increase Total $45,000 29,000 15,000 29,400 15,000 10,000 11,200 6,000 $160,600 77.400 $232,000 If yOU have any questions, please contact this office. Yours very truly, BONF~VrRoo, ROSENE, ANDERLIK & ASSOCIATES, INC. Mark A. Hanson A Division of Arkie., Iae. Kirk McDonald Mana~emen5 Assistant Community Development Coordinator 4401 Xylon Avenue North New Hope, 5/N. 55428 by fax ~531-5174 July 26, 1994 RE: Final Plat of Don Harvey 2nd Addition Dear Mr. McDonald: With reference to the plat of Don Harvey 2nd Addition, Minnega~co, currently has an easement near the North line of the plat. I have enclosed a copy o~ Minnegasco's easement number 76-8, recorded with the Hennepin County recorder as document number 4256368. I reql/est that this easement be referred to on the final plat. Thank you for the advance notice and could you please send me a copy of the final plat when it is approved. Sincerely, Steven Von Bargen Real Estate Specialist Mi~egasco 700 '~V~al, l,inaen Ay.hue L'.O. Rox 1165 Minnealx)lis, MN 5,5440-116,~ TO MINNESOTA GA~ COMP~ ~N~, ~ par~nerahip T~ canei~Cin~ of ~nald L. ~ey~ ~ene Chri~en~e,. ~ber~ Do~m. J~h~ Scocc ~arv~ and Gr~go~ L. ~y, AN~ ~ J~ ~UI~G CO~ ~. a ~ar~n~rahim coneis~in~ o~ Laor~nce F. LeJ~ne..amd Tho~a~. E. geJ~,e.. here~after c~ted "G~OR," nnd Minn~ta G~ Com~y, ~ ~[aw~ ~t~tation. be~innf~r 1. GR~TOR. ~n ~er~tian o~ t~ ~ of ~ Do~r (S 1.~) an~ o~nr g~d ~d ~bl~ co.side,orion to G~TOR ~ h~4 9~ by G~, ~e reco~t of whi~ ~ he.by d~s he.by ~ant to G~E, l~ m~ a~ a~a, fm~r, ~e ~ d~t ~d e~t nt n~ timm m cons~ct, operate, ~tam. ~r, r~a~ ~d rede ~s tt~ a~/oc ~tl~U~ ~. ~ p~pe- , ~he S~uCh 15 feeC o£ the North 45 feec of ch g~c 850 ~e~ of the u~c 1/4 of S~ct~ 17. ~e~ lLS, ~Me ZL, Zytn~ g~t o~ Chi S~Ch ~ fM~ ~er~f. Uso C~C ~ of sam ~u~ ~0 on ~ ~ v~Ch a ~u of A~ feec co a ~ ~ t~ E~C' X~e of" is m<~n on the atttch~d pitt which is hereby Incoqx~rtt~ by ~fE~ ~ ~E n ~n ~. ~ ~a~ ' f~ CEe'pur~Ms heraiflbf~or~ cxpre~. [io.~. ct:etlon of buddings o~ permanent enclosures which would infcrfc~ with ~e Sas factEd=s located theTein or W~ch ~uld othe~vtse obstruct acce~ thereto ia any ~nner what.ever: pm~, howe~t, that GR~OR have t'~ zi~l to u~ the st, r[oc¢ of the premises for ~nrder, s'. lhntb$. [:ndscnpi.8, ~rbln~. gutters, side.lEs and pavi~B, p~evi~;d thai ~ch ust by GRANTOR due: not initiate with th~ ri~ts ;ieen by O~TOR to G~EE to ~ ~e pttmile~ [o~ Iht ~ herein G~ s~ have the t~[, but not the duty, %o enter u~ ~e p~m~ an~ re~ ~l ~ any eonion of the ~ [~t~ w~ch ~ve ~ ~c~ ~ the presto by G~T~. ~d a~ne~ ~mo ~4 ~ ~opd to ~d ~ b~ u~ G~R, G~TOR'S hei~, ST. ~O~ ~S : ~A~OF ~~A ) ' ~ ~, ~J~oeT n..partner ~ ~ld ~. ~y, ~.~r~eteM~. ~ert O~ent ~obn seo~r ~rvey ) 'rH~ IN_%TRLf~T %VAS DRA~ED BY ~iINN~SOTA GAS C~IPANY, 733 M~RQU~[ A%~-,, MINNE~LIS. ~tlNNE~OTA 5540: Form ~ ' Mmne[las , ' ~ Div'lai~n o~ Azi~. Inc. FAX TRANSMISSION TO: AT: FAX PHONE NO: FROIq: DIRECT PHONE: DATE: CONI, IEHTS: Number of paces to follow: Unden Fax Machine Number (612) CITY OF NEW HOPE MEMORANDUM DATE' July 22, 1994 TO' Hennepin County Public Works Minnegasco Northern States Power Co. U.S. West Telephone King Cable Television *New Hope Director of Public Works *New Hope Director of Finance/Administrative Services *New Hope City Attorney *New Hope City Engineer *New Hope Building Official FROM: Kirk McDonald, Management Assistant/Community Development Coordinator SUBJECT: Final Plat of Don Harvey 2nd Addition Enclosed you will find the Final Plat for Don Harvey 2nd Addition. Please review and return your comments by 4:30 p.m. Wednesday, July 27th. If you have questions, please feel free to contact me at 531-5119. * (I am also enclosing a copy of the revised Preliminary Plat, which includes the requested changes.) Planning Case: Request: Location: PID No: CITY OF NEW HOPE PLANNING CASE REPORT 94-20 Requests for Preliminary Plat Approval, Site/Building Plan Review/Approval and Concept Planned Unit Development Approval to Allow Building Addition 3920 Winnetka Avenue North, 3941/3961 Quebec Avenue North 17-118-21-34-0003 Zoning: Petitioner: Report Date: Meeting Date: I-1 Kellison Company/Don Harvey July 6, 1994 July 12, 1994 BACKGROUND The petitioner is requesting preliminary plat approval, site/building plan review/approval and concept planned unit development approval to allow building addition on the east building pursuant to Chapter 13 - New Hope Code of Ordinances and Sections 4.039A(1), 4.19, 4.194, and 4.196(3) - New Hope Code. The petitioner is proposing the platting of property known as Don Harvey Second Addition, Block 1, Lot 1, which currently contains two industrial buildings of approximately 26,880 square feet each (2 buildings on one lo0. In conjunction with the preliminary plat the petitioner is requesting "General Concept Stage" PUD approval to construct a 41,640 square foot addition to the building at 3943 Quebec Avenue North where Versa Die Cast, Inc. is the tenant. The petitioner states in the application that "there are two structures currently on the property which are approximately 26,880 square feet each which were originally designed for use as multi-tenant industrial type facilities and were constructed about 18 years ago. One tenant, Versa Die Cast, Inc. now occupies the westerly building of the two and also has one bay (approximately 5,000 square feet) of the easterly building. Two other tenants occupy the balance of the space in the easterly building with one of them occupying approximately 15,000 square feet and the other occupying approximately 7,000 square feet. Versa Die Case has made a request of the owners to provide an additional 40,000+ square feet for their manufacturing~ needs or they will have to vacate the building and move to another city. We are requesting that the City of New Hope grant us the platting of the property and the permission to construct approximately 40,000 square feet as an addition to the westerly building so that we may maintain the Versa Die Cast Company as a tenant in the building and as a business within the City of New Hope. Versa Die Cast currently employs approximately 60 people and will increase their employment with the new facility to approximately 100. These are manufacturing level jobs and have an average salary approaching $30,000 per year." The petitioner further states that "there will be minimal amounts of additional trucking to and from the site and there will only be approximately 40 additional automotive trips to and from Planning Case Report 94-20 July 6, 1994 Page 2 the site for new employees. There will be no additional needs for sewer and water connections. The property will continue to be owned by Winnetka Properties for the foreseeable future, and as a part of the new addition to the Versa Die Cast building, it is the intent of Winnetka Properties to renovate both of the existing buildings including refurbishment of the docks, doors, re-painting of the walls, landscaping, and other necessary features to enhance the aesthetic appeal of the buildings." The petitioner states that due to commitments made by Versa Die Cast prior to their coming to the owner with the request for the addition, we are under a time constraint to provide them with a facility to house new equipment by sometime in October to early November. Therefore, from our respect, time is obviously of the essence. We are asking for input and assistance from the planning commission, city council, and staff for the City of New Hope to help us provide a facility that will be in keeping with the requirements of New Hope but will also meet the schedule and economic requirements of Versa Die Cast." Lastly, the petitioner states in the application that "the long-standing situation of drainage from this site across private property will be resolved as a part of this approval. We intend to create a retention/sedimentation pond in the area of Outlot A at the east end of the property to accept all drainage water from this site. All water will be directed to the same general location where it currently exits the property at approximately 300 feet west of the northeasterly comer of the property. Currently this water drains across private property to the pond area approximately 150 feet north of the subject property. In replacement of that system, we intend to install catch basins and a storm sewer system to carry on-site water to the new retention/sedimentation pond on Outlot A. This pond would subsequently drain an amount not to exceed what had previously been going to the pond to the north of the property by means of a storm sewer across public right of way along Quebec Avenue and then outfalling into the pond. Newly created excess water above the amount that has been draining from the site will be taken off by means of a storm drain system from the retention pond to the catch basin in the street at the southeasterly curve of the property and subsequently to the sedimentation pond southeast of the property across Quebec Avenue. This method, we believe, is the best solution to a long standing problem in that it eliminates any drainage across private property and provides for diversion of the newly created excess drainage to an existing city system thereby not increasing the amount of runoff to the natural pond at the north of the property." The site is zoned I-1, Limited Industrial, and manufacturing, warehouse and related offices are a permitted use in the district. The site is surrounded primarily by I-1 zoned property, with an I-1 warehouse and B-3 Auto- Oriented use to the north, Quebec Avenue and an I-1 (Winnetka Properties) warehouse to the east, Quebec Avenue and an R-O zone (church) and I-1 zone (Paddock Laboratories) to the south, and Winnetka Avenue and R-1 zoned property to the west. Planning Case Report 94-20 July 6, 1994 Page 3 The topography of the subject site slopes 25 feet down from the west to the east. There are about five large trees at the west end of the property and one 30" oak at the east end. 10. Property owners within 350 feet of the request have been notified and staff have received no comments on the request. ANALYSIS PRELIMINARY PLAT The plat meets the zoning code requirements for lot size and width requirements in the I-1 zoning district, witch are one acre and 150 feet, respectively, as the single lot contains 292,224 square feet (6.8 acres) and has a width on Quebec Avenue of over 12,000 feet. Per routine procedure, the plat was submitted to Department Heads, City Attorney, City Engineer, Hennepin County and other appropriate agencies for review and comment. 3. Hennepin County reviewed the plat and made the following conunents: mo As shown on the preliminary plat, dated June 15, 1994, the developer should dedicate an additional seven feet of right of way for a total of 40 feet of right of way from and along the CSAH 156 centerline. All access from the plat to CSAH 156 must be limited to Quebec Avenue. The existing driveway located approximately 220 feet north of Quebec Avenue must be removed and the area within County right of way restored. The developer must have an approved Hennepin County entrance permit before beginning any access construction or driveway removal. All proposed construction within County right of way requires an approved Hennepin County utility permit prior to beginning construction. This includes, but is not limited to drainage and utility construction, trail development and landscaping. The d~veloper must restore all areas, within County fight of way, disturbed during construction. 4. The City Attorney reviewed the preliminary plat and made the following comments: The legal description on the preliminary plat includes not only the land to be included in Don Harvey Second Addition, but also includes the land previously planned as Don Harvey Addition. The legal description needs to be changed to include only the land being planned as Don Harvey Second Addition. Planning Case Report 94-20 July 6, 1994 Page 4 The following information, as required by City Ordinance §13.041, is not included in this Preliminary Plat: o Scale (and bar scale) of the plat Existing zoning classification (property appears to be zoned I-i and is described in New Hope City Ordinance §4.34(4) Sewer, water main and other details. The property owner must supply our office with a Registered Property Abstract or an Abstract of Title extended to date for the property to be included in the plat of Don Harvey Second Addition. Do The property owner should also be aware that the entire real estate taxes due and payable in 1994 must be paid before the Final Plat will be accepted for filing by the County. So if the developer expects the Final Plat to be filed before October 15th, arrangements should be made for prepayment of the second half real estate taxes. 5. The Minnesota Department of Transportation had no comment on the plat. 6. The City Engineer reviewed the plat and made the following comments: The sewer and water service to the new building addition is not shown. A sewer and water service stub does exist opposite the new building addition in Quebec Avenue. Water main extension for fire protection should be considered in accordance with the Fire Department. Bo The grading of the site proposes a retaining wall in the northwest comer of the site. The estimated height of the retaining wall is seven feet, which warrants reinforcement fabric if modular block is used. Therefore, the setback requirement for the retaining wall from the property line must be 10 feet or greater to comply with New Hope's ordinance and requirements for reinforcement. The drainage on the sit6' is intended to be collected and conveyed to a pofiding area on the east side of the site. Specifics for the pond are not provided; however, it's recommended its normal water level (NWL) be 908, while its high water level (HWL) be 915. Approximately two acre feet of storage can be provided. The outlet pipe can be reduced from the proposed 27 inch to 15 inch. It is also recommended the pond be excavated to 904 approximately four feet below the NWL. An outlet skimmer shall be constructed at the discharge pipe. The plan shall be reviewed by Shingle Creek Watershed and comply with their water quality requirements. The secondary pond outlet pipe is not recommended. Planning Case Report 94-20 July 6, 1994 Page 5 Concrete curbing and improvements to the existing parking/drive isles is recommended. Eo Sidewalk exists on the south side of Quebec Avenue abutting the church. It is recommended sidewalk be considered on the south and east sides of Quebec Avenue abutting this property. Fo The existing bituminous pavement and driveway at Winnetka Avenue shall be removed and properly restored. The Planning Consultant also reviewed the plat. Please refer to his comments in the attached report. RECOMMENDATION Staff recommends approval of the Preliminary Plat subject to the following conditions: Preliminary Plat be revised to incorporate recommendations of Hermepin County, City Attorney, City Engineer and Planning Consultant and be re-submitted to City. Final Plat to incorporate all recommendations and be submitted to Planning Commission for review/approval. GENERAL CONCEPT STAGE PUD The purpose of the Planned Unit Development is to provide for the grouping of land parcels for development as an integrated, coordinated unit as opposed to traditional parcel by parcel, piecemeal, sporadic and unplanned approach to development. The PUD is intended to introduce flexibility of site design and architecture for the conservation of land and open space through clustering of buildings and activities. It is further intended that PUD's are to be characterized by central management, integrated planning and architecture, joint or common use of parking, maintenance of open space and other similar facilities, and harmonious selection and efficient distn'bution of uses. The processing steps for a PUD are intended to provide for an orderly development and progressions of the Plan, with the greatest expenditure of developmental funds being made only after the City has had ample opportunity for informed decisions as to the acceptability of the various segments of the whole as the Plan affects the Public interest. The various steps are: A. Application Conference. Preliminary discussions. B. General Concept Plan. Consideration of overall concept and plan. Planning Case Report 94-20 July 6, 1994 Page 6 C. Development Stage Plan. One or more detailed Plans as part of the whole final plan. Final Plan. The summary of the entire concept and each Development Stage Plan in an integrated complete and final plan. The General Concept Plan provides an opportunity for the applicam to submit a plan to the City showing his basic intent and the general nature of the entire developmem before incurring substantial cost. This Concept Plan serves as the basis for the public hearing so that the proposal may be publicly considered at an early stage. The following elemems of the proposed General Concept Plan represent the immediately significam elemems which the City shall review and for which a decision shall be rendered: A. Overall Maximum PUD Density_ Range. B.. General Location of Major Streets and Pedestrian Ways. C. General Location and Extend of Public and Common Open Space. General Location of Residential and Non-Residential Land Uses with Approximate Type and Intensities of Development. E. Staging and Time Schedule of Development. F. Other Special Criteria for Development. The Planning Consultant has prepared the attached report on the PUD application. Please refer to it, as it is not staff's intent to repeat the analysis in the report. The Design & Review Committee met with the petitioner on June 23rd and a number of issues were discussed, including the PUD process, the building expansion, drainage issues, parking and traffic concerns, the aesthetics of the buildings, landscaping, and the plat. Revised plans were submitted as a result of that meeting. The Committee was concerned about the lack of detail, however were reminded that this is only "concept approval" and the d~tails will be addressed in the later PUD phases. 6. Project data for the site is listed below: Total Total Total Total Total Total Site Existing Building Existing Building Phase I Addition Phase II Addition Buildings w/Phase I & II (31.7%) 298,000 square feet 26,880 square feet 26,880 square feet 20,400 square feet 20,400 square feet 94,560 square feet Planning Case Report 94-20 July 6, 1994 Page 7 Total Impervious (71.9%) Total Parking Phase I (includes 7 H.C. & 1 H.C. van parking) Total Parking Phase II (includes 7 H.C. & 1 H.C. van parking) 214,350 square feet 208 251 (The petitioner originally planned the building addition in two phases, however, this has been changed to construct the entire addition at one time.) 7. Staff's main concerns are: A. The aesthetics of the buildings: materials, maintenance, etc. B. Traffic movement: trucking C. Landscaping: staff would like to see significant landscaping improvements on the site Do Drainage: The City Engineer feels that the petitioner's solution to the drainage problem is acceptable and staff would like to get this problem resolved. A landscaping plan has been submitted showing the addition of 244 trees and shrubs to the site, as listed below: 14 Summit Seedless Ash 2 15 Black Hills Spruce 6 5 Red Splendor Crab 70 11 Red Twigged Dogwood 53 33 Techny Arborvitae 8 7 Skyline LocUst Amur Maple Mint Julep Juniper Broadmoor Juniper Gold Drop Potentilla Japanese Tree Lilac Clump Staff is supportive of granting approval of the Concept Stage PUD, pending comments from the Planning Consultant and Commission. Because this filing is "CONCEPT STAGE PUD" only, it is not appropriate tb focus on the normal detail review. At Such time as "Development Stage PUD" approval is sought, all the normal schedules and detailed blueprints must be submitted. Among the few issues raised by the "Concept" are these: Floor plans of all buildings with approximate warehouse/manufacturing/office square footages identified and calculated for staff review of parking loading needs, including tenant separation (demising) walls. Planning Case Report 94-20 July 6, 1994 Page 8 Unusual asphalt design surrounding all sides of both buildings, reducing many options for repair/upgrade of the buildings and reducing the clarity of separating cars and trucking. Co Revised building architecture has added some glass which was encouraged. Detailing that seems a little odd appears near the new "entry" and requires a more thoughtful rework. RECOMMENDATION Staff recommends that the Concept PUD approval be granted, subject to a conference at City Hall with architect and staff exploring additional building shapes and elevations that might improve the traffic design and aesthetic value of the entire property, while allowing the same approximate building footprint and function. This conference must occur at least 14 days prior to the submittal of "Development Stage PUD" plans. Staff also recommends approval subject to the conditions in the Planning Consultant's report. Attachments: Planner's Report Petitioner Correspondence/Project Description Zoning/Site Maps Revised Site Plan Revised Grading/Drainage Plan Landscape Plan/Schedule Building Elevations Floor Plan Exterior View Preliminary Plat City Engineer Correspondence City Attorney Correspondence Hermepin County Correspondence MnDOT Correspondence Plat Distribution Letter C Northwest Associated U R B A N P L A N N I N G DE S I G N Consultants, Inc. MARKET RESEARCH PLANNING REPORT TO: FROM: DATE: re: FILE NO; Kirk McDonald Cary Teague/Alan Brixius 7 July 1994 New Hope - Winnetka Properties - PUD 131.01 94.20 BACKGROUND Winnetka Properties is requesting to plat property known as Don Harvey Second Addition, Lot 1, Block 1. The subject property contains two industrial buildings of approximately 26,880 square feet each. The applicant is further requesting to construct a 41,640 square foot addition to the western building (Versa Die Cast, Inc.). Section 4032 (2) (e) of the New Hope Zoning Ordinance requires a Planned Unit Development (PUD) if more than one principal building shall be located on the lot. Due to the existing conditions and the applicant's desire to expand one of the buildings, the applicant is also requesting a planned unit development conditional use permit as identified within the Limited Industrial Zoning District. The subject property is zoned I-l, Limited Industria~.~ Zoning District which allows manufacturing as a permitted use and PUD/CUP. The following report evaluates both the requested subdivisioh and planned unit' development against the applicable City development standards. Attached for reference: Exhibit A - Site Location Exhibit B - Site Plan Exhibit D - Landscape Plan Exhibit E - Floor Plan 5775 Wayzata Blvd.-Suite 555-St. Louis Park, MN 55416-(612) 595-9636-Fax. 595-9837 RECOMMENDATIONS Subdivision Based on the information available, we would recommend approval of the proposed subdivision provided the following items are addressed: Drainage and utility easements are provided along the lot lines. Additional easements provided per City Engineer recommendations. ¸2. City Engineer review and approval of site grading and drainage plan. PUD/CUP The applicant is currently pursing only PUD concept approval. In review of the applicant plans we would recommend concept approval subject to the applicant addressing the following issues in the subsequent development stage application: Submission of a revised landscape plan that responds to landscaping recommendations outlined in this report. Continuous concrete curbing be provided around the entire parking lot and drainageway areas. o Curb stops be provided in the parking stalls abutting the existing buildings. Applicant demonstrate truck maneuvering patterns for trucks accessing the northern loading areas. Truck traffic accessing the site be directed to the second curb cut via the use of directional signs. Subject to the City Engineers comments of site grading, drainage and utilities. All roof top equipment must be enclosed or painted to match the principal structure. Ail trash receptacles must be enclosed. Trash enclosures must be designed to complement the principal structure. Overall site clean up. from the site. Elimination of all outdoor storage 2 10. Submission of detailed signage plan which complies with City sign regulations. 11. Subject to comment of other City staff, Commission members and City Council. ISSUES AND ANALYSIS Subdivision. The site currently exists as an unplatted property as a condition of any development approval the City requires that the site be platted. With the extension of Quebec Avenue, the site was previously subdivided, creating a single lot to the east of the new street. The parcel in question was not platted at that time. In 1992, a preliminary plat was considered for the subject site. City staff recommended approval of the preliminary plat that showed two separate lots being created. This preliminary plat was never pursued to final plat. The current subdivision proposed the site to be platted into a single industrial lot and block. The processing of the plat is straight forward in that the parcel exceeds the lot area and width standards of the I-1 Zoning district. The site is accessed via the improved Quebec Avenue. Utilities are available to the site from Quebec Avenue. The only issues that the plat must address is the provision of easements and the management of on-site storm water drainage. The City requires easements at least 10 feet wide centered on rear or other lot lines and where utilities are necessary. The city may require a utility and drainage easement be dedicated over the proposed drainage pond on the east end of the lot. The City Engineer should review and comment on the acceptability of the site drainage plan and appropriate size and location of necessary easements. PUD/Conditional Use Permit. The applicant is requesting a conditional use permit for an industrial planned unit development as allowed under Section 4.144 (3) of the New Hope Zoning Ordinance· This is necessary to accbmmodate the integrated site design of having two principal buildings on a single lot. The review process for a PUD occurs in three stages: concept stage, development stage and final stage. Based on the information submitted and the applicant's development schedule, the Planning Commission is only conducting concept stage review at its July public hearing. Development stage is anticipated to be submitted for August consideration. 3 The PUD Concept Plan provides an opportunity for the applicant to submit a plan to the City showing his basic intent and the general nature of the entire development before incurring substantial cost. This Concept Plan serves as the basis for the public hearing so that the proposal may be publicly considered at an early stage. The PUD Concept Plan presents the immediately significant development elements which the city shall review and for which a decision shall be rendered. Zoning. The site is zoned I-l, General Industrial. This zoning district allows for manufacturing businesses and also allows for industrial PUD by conditional use permit. The existing businesses and the expansion of Versa Die Cast are uses allowed within the I-1 zoning district. Site Size. The proposed project site consists of 6.85 acres located east of Winnetka Avenue and North of Quebec Avenue. The site exceeds the minimum lot area and lot width requirements of the I-1 zoning district. The site also exceeds the 200 foot frontage requirement established for industrial planned unit developments. Setbacks. The site contains two existing 26,880 square foot buildings. The applicant is proposing to construct a 41,640 square foot addition to the western building. Both buildings and the proposed building addition comply with I-1 District setbacks as follows: Required Setbacks within the I-1 District Required Proposed Front (Quebec-South) Front (Winnetka) Side 50' 62' 50' 216' 20' 47' Lot Coverage, The I-1 Zonin9 District does not allow more than 40 percent of the lot to be covered by buildings. The applicant has indicated that the total building floor area on the site will be 94,560 square feet. This represents 31.7% of the total site area. Green Axea. Per Section 4.145 (3).of the New Hope Zoning Code, at least 20% of the lot must remain as a 9reen area, includin9 shrubbery, plantings or fencing, and shall be landscaped. The site plan indicates 1.8 acres of green space on the 6.8 acre lot, therefore, 26% of the lot contains 9reen space. Landscaping. The City staff has noted historical problems with site upkeep and appearance. Past problems with outdoor storage,load area exposure and overall site appearance was discussed at the June 23rd Design and Review Committee meeting. In regard to these past issues, site appearance and landscaping have become a critical element of the site plan review. The applicant has submitted a landscape plan. Several concerns must be addressed in regard to the landscaping and screening. As the lot exists, there is virtually no screening and landscaping. The existing loading area between the two buildings is not screened, nor have trees been planted in the boulevard of Quebec Avenue. Also, due to the fact that the elevation of Winnetka Avenue is 20 feet above the foundation of the buildings, the rooftop equipment is highly visible to traffic on Winnetka. therefore, the applicant must supply significant screening and landscaping along Winnetka Avenue and Quebec Avenue. In review of the landscape plan, we offer the following comments: The landscape plan does not provide adequate screening of rooftop equipment from Winnetka Avenue. The building is located at an elevation approximately 20 feet below street grade. The proposed plantings along the west side of the building provide marginal screening due to plant location and type. We would recommend that coniferous trees such as Colorado Spruce be added along Winnetka Avenue to supplement the proposed deciduous plantings. the proposed building is large and architecturally limited in exterior features. As such, the landscape plan should attempt to break up the building mass with landscaping. The foundation planting is reliant on shrubs. While the Red Twigged Dogwood offers some planting height at maturity, we would recommend additional plantings that offer some vertical dimension to the foundation planting. This is particularly an issue for the west side of the building. On the south side of the building facing Quebec Avenue the foundation plantingsmay be supplemented by additional over story trees in green areas between the sidewalk and building. The existing buildings offer little landscape amenity along the building foundation. These buildings present a concern with regard to site appearance and upkeep. If foundation plantings are not practical, additional landscape ~features should be provided at the site periphery to screen the building loading and activity areas. Additional landscaping should be provided along the south and east parking areas. The City Building Official noted the existence of a significant 30 inch Oak tree at the east end of the lot. The grading plan should be adjusted to provide the proposed storm water drainage pond without losing this significant tree. Tree preservation measures should be defined as part of the PUD approval which outline precaution to be used during construction to protect this tree. 5 The applicant should indicate how the landscaping will be maintained. Plans for site irrigation must be identified as part of the PUD development stage. Off-street Parking Requirements. As stated within the New Hope Municipal Code the following parking spaces are required: Manufacturing Warehousing Office Required 1 space per 350 s.f. floor area 1 space per 1,000 s.f. floor area 3 spaces + 1 for each 200 s.f. Proposed 34,000 s.f. 30,000 s.f. 4,000 s.f. Company Truck 1 space for each company owned truck stored outside 0 trucks *Floor area The term "floor area" for the purpose of calculating the number of off-street parking spaces required shall be determined on the basis of the exterior floor area dimensions of the buildings, structure or use, times the number of floors, minus ten (10) percent. Based on the above table, 135 parking stalls are required. The applicant has provided proof of parking on the site for 165 spaces. The parking stalls and driveway aisles are properly dimensioned. the existing parking stalls along the existing building present some concern in that there is no physical barrier between the building and parking stall. To avoid damage to the building or automobiles, curb stops should be provided for these parking stalls. The applicant's site plans illustrate that all parking and loading areas will have bituminous surfacing and striped stalls. The site plan must provide for continuous concrete curbing around the entire parking lot. Off-StreetLoadinu. For'industrial districts the number o~loading berths required is one (1) per building, and one (15 additional berth for each additional one hundred thousand (100,000) square feet. Based on these requirements, the applicant must provide for two (2) loading berths on the site. Currently, there are six existing berths on the site, and three additional loading area are proposed as part of the new addition. Three overhead doors are proposed along the north side of the new building addition. The site plan shows only 47 feet of bituminous paving north of the new building. This raises issues as with regard to adequate maneuvering area for semi-trucks with trailers. As part of the PUD development stage, the applicant should demonstrate how trucks will maneuver to utilize these northern loading areas. Access. Ail site access is to be provided via Quebec Avenue. The site plan shows three curb cuts along the 1,000 foot frontage. One of the existing curb cuts is being removed in exchange for a new curb cut located along the west side of the new building addition. The number, location and width of curb cut comply with City performance standards. Efforts should be made to segregate truck and automobile traffic as much as possible. As such, truck traffic serving the site should be directed to the second curb cut through the use of signage. This takes the truck traffic directly to the loading bay corridor. Due to the site circulation layout, we would not envision that trucks would exit the site exclusively from the second curb cut, however, channeling the inbound truck traffic will serve to eliminate traffic conflicts both internally and with adjacent properties. Grading and Drainage. The applicant has submitted a grading and drainage plan. As shown the proposed parking area is 20 feet lower than the street elevation of Winnetka Avenue. To address a continuous site drainage problem and increased runoff from the new building addition and parking area, the applicant proposes to direct site drainage to a new on-site stormwater ponding prior to releasing it north to Old Dutch Pond via a storm sewer in the Quebec Avenue right-of-way. The grading and drainage plan shall be subject to the review and comment of the City Engineer. Building Design. The property owner's intention is to create an addition which will aesthetically blend with existing buildings after they are renovated and repainted. The design of the existing buildings establishes the design motif which they intend to carry around on the south and west portio of the new addition. The applicants are currently investigating the use of Fabcon pre- stressed pre-cast insulated sandwich panel construction which they believe would give them more flexibility in design of the new addition. However, Fabcon has indicated that their production schedule is such thaf' it could .not possibly meet the time constraints of this project in this building season. Due to commitments., made by Versa Die Cast prior to their coming the property owner with the request for the addition, they are under a time constraint to provide them with a facility to house new equipment by sometime in October to early November. Therefore, from the applicant's perspective, time is obviously of the essence. They have asked for input and assistance from the Planning Commission, City Council, and staff of the City of New Hope to help provide a facility that will be in keeping with the requirements of New Hope, but will also meet the schedule and economic requirements 7 of Versa Die Cast. The building elevation illustrates an exterior facade that is a continuation of the existing building. White concrete blocks with tan decorative blocks trim along the building roof. In response to comments from the City Building Official and Design and Review Committee, they have added some windows to the south side of the building. They also attempted to break up the horizontal mass of the building with vertical columns of decorative brick. In addition to the applicant's architectural efforts, the following aesthetic elements should be pursued as part of the development stage approval: Expand landscape plan to address the recommendations presented earlier in this report. Ail roof top equipment must be enclosed or painted to match the building. Ail trash dumpsters must be enclosed or located inside the building. Trash receptacle enclosures must be designed in a manner that is compatible and complementary to the principal structure. Overall site cleanup. Elimination of all outdoor storage from the site. Buildinq ~eiqht. No structure within the I-1 zoning district may exceed three (3) stories. The proposed two (2) story building is proposed to be twenty-nine (29) feet tall,therefore, will comply with the City regulations. Si~na~e. The submitted site plan does not indicate a sign at this time, however, any signage is required to meet all City sign regulations outlined in the New Hope Sign Code Sections 3.4 through 3.485. CONCLUSION The City is currently evaluating a requested plat and PUD concept plan. Based on information available, the plat is recommended to be approved. The PUD concept plan offers the city review opportunity on a preliminary basis. The applicant must subsequently pursue development stage approval. From a land use perspective, the proposed application is appropriate. With regard to site specific issues, we believe that the concept approval may be given provided site issue identified in this report are adequately addressed in the subsequent development stage submission. pc: Doug Sandstad Dan Donahue Steve Sandral REAL ESTATE IGSLLISON CO. DEVELOPMENT AND CONSTRUCTION 3880 LAVERNE AVENUE NORTIt, LAKE ELMO, MN 55042 · OFFICE 612-777 8640 · F.~X 612-777-8673 June 20, 1994 Mr. Doug Sandstad City of New Hope 4401 Xylon Avenue North New Hope, MN 55428 Application to Planning Commission Winnetka Properties 3943 Quebec Avenue North Dear Mr. Sandstad: We offer the following information in support of our Application for platting of the property known as Don Harvey Second Addition, Block 1, Lot 1 which currently supports two industrial buildings of approximately 26,880 sq. ft. each, and for the approval of a planned unit development under Chapter 4.19 for the addition of approximately 20,400 sq. fL to the building addressed as 3943 Quebec Avenue North. Property ownership is: W'mnetka Properties Donald Harvey, Managing Partner 7145 Sandburg Road Minneapolis, MN 55427 Telephone: 544-2790 Fax: 544-9942 Applicant is: Kellison Company Telephone: 777-8646 James E. Kellison Fax: 777-8673 3880 Lav~rne Avenue North, Suite 270 Lake Elmo, MN 55042 Consultants: Architect DBA Architects Telephone: 770-9922 Don Baker Fax: 777-8673 3880 Laveme Avenue North, Suite 270 Lake Elmo, MN 55042 Sul-veyor Schoell and Madson Dave Toenies 10550 Wayzata Blvd. Minnetonka, MN 55348 Telephone: 546-7601 Fax: 546-9065 Civil Engineer Stevens Engineers, Inc. Pat Carpenter 1301 Coulee Road Hudson, WI 54016 Telephone: 715-386-5819 Fax: 612-436-2075 Kellison Company has been retained by Donald Harvey, Managing Partner for Winnetka Properties, to provide design/build general contracting services for the platting of the above- referenced property and for the production of drawings relevant to the addition of 20,400 sq. ft. to the existing building and thereafter to provide construction services for the work required to accomplish that addition and other site-related work. As the project progresses through the city process and the design process, the city will be apprised of the addition of other consultants and engineers for the project. The project consists of approximately 6.85 acres (298,000 sq. ft.) located east of Winnetka Avenue and north of Quebec Avenue North. There are two structures currently on the property which are approximately 26,880 sq. ft. each which were originally designed for use as multi-tenant industrial type facilities and were constructed about 18 years ago. One tenant, Versa Die Cast, Inc. now occupies the westerly building of the two and also has one bay (approximately 5,000 sq. ft.) of the easterly building. Two other tenants occupy the balance of the space in the easterly building with one of them occupying approximately 15,000 sq. ft. and the other occupying approximately 7,000 sq. ft. Versa Die Cast has made a request of the owners to provide an additional 20,000-a: sq. ft. for their manufacturing needs or they will have to vacate the building and move to another city. We are requesting that the City of New Hope grant us the platting of the property and the permission to construct approximately 20,400 sq. ff. as an addition to the westerly building so that we may maintain the Versa Die Cast Company as a tenant in the building and as a business within the City of New Hope. Versa Die Cast currently employs approximately 60 people and will increase their employment with the new facility to approximately 100. These are manufacturing level jobs and have an average salary approaching $30,O00/yr. The legal description of the property is attached for your review. The property is currently zoned as Industrial-1 and is in compliance with the requirements of the comprehensive plan for the city. The plans; and the data thereon, more adequately describe the size of the project, the nature of the construction, and the land use data better than I can in a narrative description. Since the project is surrounded on three sides by industrial zoned land and is across the street ~om the only residentially zoned land, we do not feel that this project will have any additional significant impact on the comprehensive planning for the city or on the adjacent property owners. The adjacent roads and utilities have been designed and sized to ac~mmodate the types of vehicular activity and utility services that have been occurring at this site and that will continue to occur. There will be minimal amounts of additional trucking to and from the site and there will only be approximately 40 additional automotive trips to and from the site for new employees. There will be no additional needs for sewer and water connections. The property .will continue to be owned by Winnetka Properties for the foreseeable future which will have ultimate responsibility for the maintenance of the property subject to the terms and conditions for maintenance and repair that are included in the leases with the tenants. As a part of the new addition to the Versa Die Cast building and due to the fact that one of the "less desirable" tenants of the east building has recently vacated, it is the intent of Winnetka Properties to renovate both of the existing buildings including refurbishment of the docks, doors, re-painting of the walls, landscaping, and other necessary features to enhance the aesthetic appeal of the buildings. Versa Die Cast's requirements for the addition are for a simple manufacturing facility which, due to their needs, is economically driven by the lease rate. The oCvner's intention is to create an addition which will aesthetically blend with existing buildings after they are renovated and re- painted. The design of the existing buildings establishes the design motif'which we intend to carry around on the south and west portion of the new addition. We are currently investigating the use of Fabcon pre-stressed pre-cast insulated sandwich panel construction which we believe would give us more flexibility in design of the new addition. However, Fabcon has indicated that their production schedule is such that it could not possibly meet the time constraints of this project in this building season. Due to commitments made by Versa Die Cast prior to their coming to the owner with the request for the addition, we are under a time constraint to provide them with a facility to house new equipment by sometime in October to early November. Therefore, from our respect, time is obviouslyofthe essence. We are asking for input and assistance from the planning commission, city council, and staffofthe City of New Hope to help us provide a facility that will be in keeping with the requirements of New Hope but will also meet the schedule and economic requirements of Versa Die Cast. The long-standing situation of drainage from this site across private property will be resolved as a part of this approval. We intend to create a retention/sedimentation pond in the area ofOutlot A at the east end of the property to accept all drainage water from this site. All water will be directed to the same general location where it currently exits the property at approximately 300 feet west of the northeasterly comer of the property. Currently this water drains across private property to the pond area approximately 150 feet north of the subject property. In replacement of that system, we intend to install catch basins and a storm sewer system to carry onsite'water to the new retention/aedimentafion pond on Ouflot A. This pond would subsequently drain an amount not to exoeed what had previously been going to the pond to the north of the property by means of a storm sewer across public right of way along Quebec Avenue and then outfalling intO the pond. Newly created excess water above the amount that has been draining from the site will be taken 9ffby means ora storm drain system from the retention pond to the catch basin in the street at the southeasterly curve of the property and subsequently to the sedimentation pond southeast of the property across Quebec Avenue. This method, we believe, is the best solution to a long standing problem in that it eliminates any drainage across private property and provides for diversion of the newly o'eated exc~s drainage to an existing dry ~stem thereby not increasing the amount of runoff to the natural pond at the north of the property. Thank you in advance for your consideration of our application. We look forward to discussing this project with you and considering any suggestions you might have for its improvement. Respectfully submitted, cc: Don Harvey B'4 i R'-4 ! : 281 R.4 I-1 NATIVITY LUTHERAN CHURCH I-1 R-O 42-t/2 B-4 LIONS PAI~K ~ 'tH I I:q-4.: I ! 1'2 : I ~S T/ON 32-00I No. i! ~ .IPLD. ~ 17-118-2~-23-OCX31 P~RCEL No. INDUSTRI> 8LC P~R K Z~ c,e~. ec~-~o, e, ....... WINNETKA AVENUE DIE C~-$T LAVE~'~ AVE. SUITE 2'I~ LAKE EL.~O, L,~~ F=t. AN 'l iii-'. d ~?-~8-~994 12:~ 612 6~6 1~11 80NEST~OO & ASSC. P.~2 Bonestroo Rosene m-m Anderllk & Associates Engineers & Architects Su~ $, 1994 Mr. Kirk McDonald City of New Hope 4401 Xylon Avenue N. New Hope, MN 55428 Re: Winneth Properties 3943 Quebec Avenue Our File No. 34-GEN (G94-12) I~ar Kirk: We have reviewed the proposed site plan and platting for the property at 3943 Quebec Avenue. The following is recommended for consideration: O The sewer and water selyice to the new building addition is not shown. A sewer and water service stub does exist opposite the new building addition in Ouebec Avenue. Water main extension for fire protection should be eonlidered in accordance with the Fire Department. O The grading of the site proposes a retaining wall in the northwest corner of the site. The estimated height of the retaining wall is ? feet, which warrants reinforcement fabric ff modular block il used. Therefore, the setback requirement for the retainiug wall from the property line must be 10 feet or greater to oomply with New Hope's ordinance and requirements for reinforcement. The draJnqe on the site is intended to be collected and conveTcd to a pond,ag area on the cut side of the site. Specifics for the pond are not provided; however, it's recommended JU normal wateF level (NWL) be ~08, while its high wuter level ~WL) be 915. Approximately 2 ~cre feet of storage can be provided.. The outlet pipe can be reduced from the proposed 2'~' to 15", It's also recommended the pond be excavated to ~R)4 approximately 4' below the NWL. An outlet skimmer shall be constructed at the discharge pipe. The plan shah be reviewed by Shingle Creek Watershed and comply with their water quality requirements. The secondary pond outlet pipe is not recommended. o Concrete curbing and improvements to the existing parking/drive isles is recommended. 2335 West Highway 36 · St. Paul, MN 55113 · 612-6364600 Page 2 Re: ~,fnnetlm Properties 3943 Quebec Avenue Sidewalk exis~ on the south side of Quebec Avenue abutting the church. It's recm~mended sidewalk be considered on the south and east sides of Quebec Avenue abutting this property. The existing bituminous pavement and driveway at Winnetka Avenue shall be removed and properly restored. If you have any questions, please contact this office, Yours very truly, BO~OO, ROSENE, ANDERLIK & ASSOCIATES, INC. Mark A. Hanson MAH:jlm STEVEN A. SONORALL MICHAEl. R. LaFLEUR MARTIN P. MALECHA WI~.LJAM C. STRAIT June 30, 1994 CORRICK ~ SONDRALL, P.A. ATTORNEYS AT LAW Edinburgh Execut/ve Office Plaza 8525 Edinbrook Crossing Suite #203 Brooklyn Park, Minnesota 55443 TELEPHONE (612) 425-5671 FAX (612) 425-5867 LAVONNE E. KESKE SHARON D. DE~BY Kirk McDonald Management Asst. City of New Hope 4401Xylon Avenue North New Hope, MN 55428 RE: Don Harvey 2nd Addition Preliminary Plat Our File No: 99.15030 Dear Kirk: I have reviewed the proposed preliminary plat of Don Harvey 2nd Addition and have the following comments: 1. The legal description on the preliminary plat includes not only the land to be included in Don Harvey 2nd Addition, but also includes the land previously platted as Don Harvey Addition. The legal description needs to be changed to include only the land being platted as Don Harvey 2nd Addition. 2. The following information as required by City Ordinance §13.041 is not included, in this preliminary plat: Scale (and bar scale) of the plat; Existing zoning classification (property appears to be zoned I-1 and is described in New Hope City Ordinance §4.34(4); Sewer, water main and other details. 3. The property owner must supply our office with a Registered Property Abstract or an Abstract of Title extended to date for the property to be included in the plat of Don Harvey 2nd Addition.- 4. The property owner should also be aware that the entire real estate taxes due and payable in 1994 must be paid before the final plat will be accepted for filing by the County· So if the developer expects the final plat to be filed before October 15th, arrangements should be made for prepayment of the second half real estate taxes. Mr. Kirk McDonald June 30, 1994 Page 2 Contact me if you have any questions. Very truly yours, Martin P. Maleach s3t2 cc: Daniel J. Donahue, City Manager Steven A. Sondrall, Esq. ' C ennep n ounty An Equal Opporrumtv Employer Kirk McDonald Management Assistant/Community Development Coordinator City of New Hope 4401Xylon Avenue North New Hope, MN 55428 June 28, 1994 RE: Proposed Plat - Don Harvey 2ND Addition CSAH 156, east side approximately 1300 feet south of CSAH 9 Section 17, Township 118, Range 21 Hennepin County Plat No. 2157 Review and Recommendations Dear Mr. McDonald: Minnesota Statutes 505.02 and 505.03, Plats and Surveys, require County review of proposed plats abutting County roads. We reviewed the above plat and make the following comments: As shown on the preliminary plat, dated June 15, 1994, the developer should dedicate an additional 7 feet of right of way for a total of 40 feet of right of way from and along the CSAH 156 centerline. · All access from the plat to CSAH 156 must be limited to Quebec Avenue. The existing driveway located approximately 220 feet north of Quebec Avenue must be removed and the area within County right of way restored. The developer must have an approved Hennepin County entrance permit before beginning any access construction or driveway removal. The developer should contact Dave Zetterstrom at 930-2548 for access information and entrance permit forms. · All proposed construction within County right of way requires an approved Hennepin County utility permit prior to beginning construction. This includes, but is not limited to drainage and utility construction, trail development and lands6aping. Contact our Permits Section at 930-2550 for utility p~rmtt forms. The developer must restore all areas, within County right of way, disturbed during construction. Department of Public Works 320 Washington Avenue South Hopkins, Minnesota 55343-8468 (612)930-2500 FAX:(612)930-2513 Recycled Kirk McDonald June 29, 1994 Page 2 Please direct any response to Doug Mattson. Sincerely, Thomas D. Johnson, P.E. Transportation Planning Engineer TDJ/DBM Minnesota Department of Transportation Metropolitan Division Waters Edge Building 1500 West County Road B2 Roseviile, Minnesota 55113 June 28, 1994 Kirk McDonald Community Development Coo~dh~ator City of Golden Valley 7800 Golden Valley Road Golden Valley MN 55427-4588 Dear Kirk McDonald: Thank you for submitting the Don Harvey 2nd Addition preliminary plat for our review. Since the proposal is not adjacent to an existing or proposed state trunk highway, Mn/DOT has no comment regarding the development of this property. We thank you again for the opportunity to provide comments on the preliminary plat. If you have any questions please contact me at 582-1387. Sincerely, Cyrus Knutson Transportation Planner An Equal Opportunity Employer CITY OF NEW HOPE MEMORANDUM DATE: June 24, 1994 TO: Hennepin County Department of Transportation Minnesota Department of Transportation Minnegasco Northern States Power Co. U.S. West Telephone King Cable Television New Hope Director of Public Works New Hope Director of Finance/Administrative Services New Hope City Attorney New Hope City Engineer New Hope Building Official FROM: Kirk McDonald, Management Assistant/Community Development Coordinator SUBJECT: Preliminary Plat of Don Harvey Addition Enclosed you will find the Preliminary Plat for the Don Harvey Addition. Please review and forward comments to me prior to 4:30 o.m. on Friday, July 1, 1994. The Preliminary Plat will be considered by the New Hope Planning Commission at their July 12, 1994, meeting. If you have questions, please feel free to contact me at 531-5119. CITY OF NEW HOPE MEMORANDUM DATE: TO: FROM: SUBJECT: July 28, 1994 ~ Planning Commission Members Kirk McDonald, Management Assistant, Community Development Coordinator Miscellaneous Issues July 25th City Council Meetine - At the July 25th Council meeting, the City Council took the following action on planning cases and other related issues: Ao Planning Case 94-14, Request for Conditional Use Permit Amendmem and Site and Building Plan Review/Approval to Allow Expansion of School Uses in an R-1 Zoning District, 8230 47th Avenue North. At the request of the School District, the City Council tabled this request until August 8th (see enclosed correspondence). Bo Planning Case 94-18, Request for Conditional Use Permit Amendment to Allow Educational Classes at Beautiful Savior Lutheran Church, 3351 Independence Avenue North. After a lengthy discussion, the Council approved the request for a Conditional Use Permit Amendment subject to the conditions recommended by the Commission. A Conditional Use Permit Agreement is in the process of being prepared by the City Attorney. Planning Case 94-19, Request for Site and Building Plan Review/Approval for Building Expansion, 7849 42nd Avenue North. The Council approved the request for Country Kitchen's expansion. Do Eo Planning Case 94-20, Request for Preliminary Plat Approval, Site and Building Plan Review/Approval, and Planned Unit Development General Concept Plan Approval to Allow Building Addition, 3920 Winnetka, 3941/3961 Quebec. The Council approved the request subject to the conditions recommended by the Commission. -~ Release of Letter of Credit for Paddock Laboratories, The City Council authorized the release of the Letter of Credit for the Paddock Laboratories Project, as all site improvements have been completed. Fo Approve Ouote to Prepare Preliminary_ and Final Plats for City-Owned Properties at 6073 Louisiana Avenue and 42nd/Nevada Avenues, The City Council approved the low quotes from Hy-Land Surveying to prepare preliminary and final plats for the City-owned property at 42nd & Nevada Avenues (which is now on the market) and at 7109 62nd Avenue/6073 Louisiana Avenue (to create a new buildable residential lot). These plats will be considered by the Planning Commission and City Council this fall. 1994 Second Quarter Reports - Enclosed for your information are the 1994 Second Quarter Reports for Planning/Developmem, Engineering and Housing. Outdoor Storage - The Planning Consultam has prepared the enclosed memorandum on possible code amendmems to address the outdoor storage issue in the I-1 and I-2 Zoning Districts. Staff would like to discuss this matter, along with the I-1 from yard parking restriction, with the Codes & Standards Committee this fall. (Perhaps the Committee could schedule a meeting for early September?) Development Agreement/Performance Bond Requirements for Kimball Addition - The Developmem Agreemem and Performance Bond requirements for Kimball Addition have been completed and forwarded to the developer for execution. Attachments: District 281 Correspondence Paddock Letter of Credit Preliminary/Final Plat Quotes 2nd Quarter Reports: Planning/Development Engineering Housing Outdoor Storage Memorandum Kimball Development Agreement INDEPENDENT S~HOOL DISTRICT July 22, 1994 New Hope City Council 4401 Xylon Avenue North New Hope, MN 55428 Attn: Dan Donahue, City Manager This is to confirm our telephone conversation that we wish to postpone discussion and action on the Cooper High School Athletic Facility until the August 8, 1994 city council meeting. The school district needs more time to prepare its presentation to the council and will not be represented at the July 25th council meeting. This will also confirm that there will be no discussion of this matter in our absence. Jim Dahle Superintendent ~D/sr 4148 Winnea~a Avenue North New Hope. Minnesota .~$427 (612) $33-2781 · FAX ! (612) .~37-0947 COUNCIL REQUF.~T FOR ACTION By: Approved for Agenda Agenda Section Consent  7-25-94 Item No. By:. 6.13 Originating Department City Manager Kirk McDonald Management Assistant RESOLUTION AUTHOR/ZING RELEASE OF LETTER OF CREDIT FOR PADDOCK LABORATORIES DEVELOPMENT AT 3960 QUEBEC AVENUE NORTH, IN THE AMOUNT OF $67,200 The City has held a bond/letter of credit in the mount of $67,200 on the Paddock Laboratories development at 3960 Quebec Avenue North for the installation of on-site exterior amenities. This amount was held to insure that specific improvements were made, including concrete curb, bituminous parking, driveway apron, storm sewer, boulevard trees and sod and grading. A portion of the bond was also held for the installation of sidewalk, however, subsequent to the approval of the plans staff determined that sidewalk was not necessary on the site, because there were no connecting sidewalks on adjacent properties and staff and the City Engineer felt that a sidewalk for pedestrians was more appropriate on the north side of Quebec Avenue. The Building Official inspected this property for completion of all work covered by the bond and recommends release of the bond, as does the City Engineer. The enclosed resolution authorizes the release of the Letter of Credit for Paddock Laboratories. Staff recommends approval of a motion to'release the Letter of Credit in the amount of $67,200. MOTION BY TO: SECOND BY Administration: Finance: RFA-O01 CITY OF NEW HOPE RESOLUTION NO. 94- RESOLUTION AUTHORIZING RELEASE OF LETTER OF CREDIT FOR PADDOCK LABORATORIES DEVELOPMENT WHEREAS, certain work under the Development Contract for property known as Paddock Laboratories Development was secured by Savings Certificate No. 4300054211, drawn on the account of Paddock Laboratories; and_. WHEREAS, all work under the Development Contract and secured by the Savings Certificate/Letter of Credit has been completed. NOW, THEREFORE, BE IT RESOLVED, by the City of New Hope as follows: The Savings Certificate/Letter of Credit No. 4300054211, drawn on the account of Paddock Laboratories, is hereby released in full by the City of New Hope. Adopted by the City Council of the City of New Hope, Hennepin County, Minnesota, this 25th day of July, 1994. Mayor Attest: c ty TO: FROM: DATE: SUBJECT: BOND AMOUNT: TOTAL NUMBER OF LOTS: PLANN I NG PLAT BOND REVIEW City Manager Doug Sandscad July 20, 1994 Paddock Labs. (Lot 2, Block 1, Village Industrial Plat) Curbing Sod Trees Driveway Sidewalks Grading Structures FACILITIES/LANDSCAPING REQUI~D: Ocher ~ Describe: I have, on Chis day 7-15-94 , inspected the plat for 1 work covered by the bond we retain. Ic is appropriate co HOLD chis amount: $~. I have consulted with the City Engineer on this. cc: City Engineer City Clerk File 005 8/91 REQUF.~T FOR ACTION originating Department Approved for Agenda Agenda Section City Manager Consent Kirk McDonald 1] ff 7-25-94 Item No. By: Management Assistant By:Z 6.14 'MOTION APPROVING QUOTE F HY-LAND SURVEYING TO PREPARE PRELIMINARY AND FINAL PLATS FOR CITY-OWNED PROPERTIES AT 6073 LOUISIANA AVENUE AND 42ND/NEVADA AVENUES IN THE AMOUNTS OF $900 AND ~I_500_ RESPECTTVEI.y City staff desires to proceed with the platting Of two City-owned properties at 6073 Louisiana Avenue and at 42nd/Nevada Avenues. The City recently acquired the rear portion of 7105 62nd Avenue North and desires to combine it with the rear portion of property at 7109 62nd Avenue to create a new bulldable residential lot for the scattered site housing program. The EDA also recently approved a listing agreement with Thorpe Bros., Inc. to market the City property at 42nd/Nevada Avenues. This property needs to be surveyed so the exact size of the parcel is known for marketing purposes and to combine the multiple parcels into one plat. Quotes were solicited on these two platting projects and the following quotes were received: Hy-Land Surveying Lot Surveys Plat 6073 Louisiana $ 900 $1,400 Plat 42nd/Nevada 1,500 2,400 Total '$2,400 $3,800 Hy-Land Surveying submitted the lowest quote for both projects and stuff recommends approval of a motion accepting the quote from Hy-Land surveying in the amount of $2,400 for both projects. ~ MOTION BY SECOND BY TO: Review: Administration: Finance: RFA-O01 ~ HY-LAND SURVEYING, P.A. LAND SURVEYORS July 14, 1994 Bonestroo, Rosene, Anderlik & Associates Engineers & Architects 2335 West Highway 36 St. Paul, Minnesota 55113 Re: Proposed Plat for 62nd/LoUisiana Proposed Plat for 42nd/Nevada Attn: Mark Hanson Dear Mark, Thank you for the opportunity of giving you an estimate on the above referenced plats. I estimate the cost of the Preliminary and Final Plat on the property located on 62nd and LOuisiana to be approximately $900.00. e I estimate the cost of the Preliminary and Final Plat on the property located on 42nd and Nevada to be approximately $1,500.00. I will need a legal description for both properties prior to the preliminary work. '- Thank you for considering Hy-Land Surveying for your project. look forward to working with you. ~Sincerelyt I 7845 Brooklyn Blvd. · Brooklyn Park, Minnesota 55445 · 560-1984 RAYMOND A. PRASCH MINN. REG. NO. 8743 LOT SURVEYS COMPANY LAND SURVEYORS REC',~ST~*RE.D U'h.~TDEK ~ OF STATE OF ~TA 7~. 73~ A~. NO. July 18~ 1994 Hp. Mark Han~on Bonestpoo Rosene Rnderlik & Associates ~335 West Highway 36 ~'* St. Paul~ MN 5~5113 REt 6E~ & Louisiana site (~ lo~ plat) Deap Mapk ~ I have looked into the coat of the following ~oek o~ the above si~e. 1. Boundary Topogpaphy 6. Photoplats The cos~ of the above ~ items ~ill not e~cee~ $1~00.00. RRP/l p Post-It' Fax Note 7671 RAYMOND A. PRA$CN MtNN RE(~. NO. 6743 LOT SURVEYS COMPANY LAND SURVEYORS RI~GISTERE:D UNL','EF I.AW$ OF STATE O,= IVJ,,N'~E.qOTA 7~01 · 73rd Ave. NO. Minn~l~, Mlnae~3{a 55426 July ~8, 1994 2335 West Highway 36 St. Paul, MN 55113 RE: 4~nd & Nevada mite (1 large lot) I have looke~ into the cost of the following work on the 1. Boundae¥ mupvey Topography Ppepape ppeltminapy plat Ppepape final plat The coif of the above 6 items will ~ot exQeed 6~400.00. Plat checking fees a~ Hennepin County are not included. RAP/Ip X 972, · Q Q B Q Q Qn 861.4 8?0.4 /,Oil 6073 l.,oubiini Avenu ZS'oo -~ : , ( (HCS-Ag · LO! ! m LOT ~CNE~GE PLANNING AND DEVELOPMENT Second Quarter 1994 Report .City Council Synopsis Overall, the activity in the planning and development area has been high during the second quarter. Undoubtedly the greatest amount of staff time was spent on the application of District 281 to amend the existing conditional use permit to allow the construction of an athletic field complex at Cooper High School. Staff has conducted many meetings with the District on a va#ety of issues related to the proposal, including traffic management, an overall operational plan, watershed issues and zoning code criteria; aside from the design and review of the physical layout of the site. There was an overflow crowd at the June Planning Commission meeting and this request will be continued into the third quarter when it will be considered by the City Council. Two planning issues from previous quarters were resolved during the second quarter, with a decision being made on the Ponderosa well sign and the Wrobel rezoning issue finally resolved through a Residential/Office PUD Agreement and code text amendment. Two new construction projects also kept the staff busy, with SuperArnerica coming back for approval to construct a new convenience store/gas facility at 62nd and Broadway and Brad Hoyt's subdivision of his 19 acre parcel on 49th Avenue. The new 80,000 square foot office/warehouse being constructed for Navarre Corporat/on is the beginning of the development of the last major industrial zoned parcel in the City. Also during the second quarter, staff assisted with the subdivision of the largest undeveloped residentially zoned parcel in the City with the preliminary and final plat approvals for Kimbell Adtfitfon on 36th Avenue. Lastly, staff is looldng forward to working with Thorpe Bros., Inc. on the marketing of the City. owned pro~ ~ 42m~ ~ Nevada Avenues to bring a quality development to the City. Kirk McDonald Management Assistant/ Community Development Coordinator PLANNING AND DEVELOPMENT Second Quarter 1994 Report The Planning Commission reviewed the following cases during the f'n'st quarter: No. of Cases Notices Sent April 4 137 May 4 75 June 6 269 Month April May Jun~ Tyne of Request Avproved Final Plat 1 1 Variance-MC Side Yard 1 1 PUD 1 1 Prel. Plat I 1 Site/Bldg Plan Rev/Aprvl 1 1 Varian~-~t Width 1 1 CUP-Outdoor Storage 1 Variance-A/C Rear Yard 1 1 Site/Bldg Plan Rev/Aprvl I 1 CUP-Conv. Str. w/Gas 1 1 Variance-A/C Side Yard 1 1 Code Text Amendment-PUD Area 1 Final Plat 1 1 Rezone Property 2 1 Preliminaxy Plat I 1 CUP Amendment 2 Site/Bids Plan Rev/Aprvl TOTALS 19 14 Number Denied Withdraw._.___.___nn Tabled 2 YEAR TO DATE TOTAI~ cUP- Text Amend. -Off-Street Parking Site/Bl Text ~~as Can. Si~nage Zone Dist. Um SttMy Final Plat Variance-Setback PUD Variance-Lot Width CUP-Cony. Store w/Gas Text Amend.-PUD Area CUP Amendmem TOTALS 1 1 2 1 1 3 3 1 1 1 2 3 1 1 1 1 22 2 1 1 2 PLANNING/DEVELOPMENT ISSI~'ES ~i~{~i~!{i~i.i~- The Planning Commission approved the Final Plat for the Northwest Church Addition at their April 5th meeting. At the April l lth City Council meeting, the Council approved the Final Plat subject to the conditions recommended by the Planning Commi.~sion. o ~~!!~:ii~i!!il i~- At the April Sth Planning Commission meeting, the Commission approved a variance to allow an air conditioner in the side yard, 3432 Ensign Avenue North, with several conditions. This variance was tabled by the City Council at the April llth meeting because the petitioner was not in attendance. At the April 2$th City Council meeting, the petitioner asked that this matter be tabled since he was looking for an alternative placement of the air conditioner that would be within code and not require a variance. At the May 9th City Council meeting, the Council approved a motion accepting the withdrawal of the request, per the petitioner's request. !0:::::.::i ................... ::ililliiiiiiili~:: ...................... .'::,?.i: .-a::::: .................................................................... :::::::::::::::::::::::::::: ................. i:i:i:i:i:i:i~ii~iiii!i!i::.:.:..+::~.:i~:~ii~ii~:i!i:i:i:?iiii5 .......... ~ - At the April 5th Planning Commi~ion iiiee~g~' 'the Commission approved a request for a Residential/Office PUD rezoning to allow an existing use to remain in place, subject to a number of conditions. At the April llth City Council meeting, the Council tabled ~ request, per staff's recommendation, subject to further study on the PUD Zoning District are~ requirement~ since it was discovered that the minimum pUD area r~luirement was five acr~. Staff requested that the Planning Commission and City Council consider adoption of Ordinance 9406 "~ the New Hope Zoning Code by Establi.~hing a Residential/Office PUD Zoning District and Eliminating the Area Requirement for Mixed Use PUD Districts." The Planning Commi~ion, at the May 3rd meeting, approved a change in the area requirement in a PUD Residential/Offi~ Di~"ict. At the May 9th City Council meeting, the Council approved the ordinance, which elimirm~ th~ PUD minimum area requirement. At the same time the Council approved th~ Wrobel R~identi~Office PUD rezoning request. ~~ - Th~ ~ for site/building plan review, preliminary plat to subdivici~ tl~ 19 acr~ pardi into thr~ lots and variaa~ m lot ~ m ~ow ~~fion of a 78,~ ~ f~ ~~ on ~t 1 w~ ~mv~ ~ m ~v~ ~fiom at ~e ~ 5~ ~ ~ ~. ~ ~~ ~ ~ ~~~ for Nav~e C~~ a ~ of ~~ ~, ~ ~ ~~ ~ ~ 75 ~loy~. ~is ~ ~ ~~ ~ ~ 11~ CiW C~fi ~. ~ ~ p~ ~ ~mv~ by the Ci~ C~~~~ ~ ~ P~ Commi~ion a~ m w~ve i~ ~ew of ~e fi~l p~ m p~. ~ b~ ~ ~w ~r ~~on. - At the April 5th Planning Commi.~ion meeting, the ' r~.omm~mlod denial of Ponderosa's request for a variance from the sign code to allow a 484 squm~ foot pictorial sign to remain in place, after a six-month study of the issue. At th~ April 11th Council meeting, the Council votmt 3-2 to allow th~ exi~ing mural to remain in phum, subj~t to th~ removal of the lettering within th~ mural. :~ . . .............. - At th~ April 1 lth EDA meeting, a request for aa interest rate reduction on th~ Autolum~ loaa w~ comidm'ed and tabled to a future meeting so staff could research variable rate option. At th~ May 9th meeting, the EDA agreed to reduce the interest rate to one ~ above prim~. 7. ~ - At the April l lth meeting, the EDA authorized an independent consultant to perform a f'mancial analysis on the cash flows of the City's six tax increment financing districts. ~ii~iii~ - At the April 25th Council meeting, the Council passeu a resolution accepting the resignation of Todd Lifson from the Planning Commission and extended their appreciation for his service. Lifson moved out of the City, necessitating his resignation. New applications are in the process of being solicited. !:~:~ i!.i '3piAe ~t~ i. i~!:' ....... ii~.ii!'J'."'i i" 'i'i ......... i~e~;iiN'~ ..................... - The EDA authorized the staff to pursue the acquisition of property at 6073 Louisiana Avenue North for the City's scattered site housing program. This is the rear portion of the Carol James property and the intent is to combine it with the rear portion of the adjacent City-owned property at 7109 62nd Avenue to create a new residential buildable parcel. 10. ~~ - At the May 3rd Planning Commission meeting, the Commission approved the rear yard setback variance, site/building plan review/approval, and conditional use permit to allow construction of a convenience store with gasoline subject to several conditions. The decision was made at the May 9th City Council meeting to refer this matter to the City Attorney for preparation of "findings of fact" for approval. At the May 23rd City Council meeting, the Council approved the "f'mdings of fact' and the planning case request. 11. ?:~:d~i~!~!~ - At the May 3rd Planning Commission meeting, the Commission approved a variance to allow an air conditioning unit in the side yard at 3352 Boone Circle with the condition that several shrubs be planted to screen the unit from the street. The City Council concurred with the Commi~ion and approved the request on May 9th. 12. ~ii~~ - The filing of the Final Plat for $.R. Sones Addition was granted an extension until October 31st by the City Council on lune 13th, as the property owner felt that it was a hardship to have to pay the second half of the property taxes five months early. 13. 15. a ponding easenm~ from Collins Electric at 4990 Highway 169, which was a condition of their previous condifioml use permit approval. ~.?.~.~~ - At the June 7th Planning Commi~ion meeting and the June 13th City Council meeting, the Final Plat of Carol James Addition, 7105 62nd Avenue North, was approved. ~into 9 lots, and variauce from the right-of-way width ~ was apl~oved at the June 7th Planning Commi~ion meeting. The Commission recommended appmwa[ stlbject to several conditions, and agreed to waive review of the Final Plat to expedite the development. The City Cou _neil approved the Preliminary Plat at their June 13th meeting. The Final Plat was approved by the City Council at the June 27th meeting. 16. - At the June 7th Planning Commission meeting, the Commi-~ion failed to approve the rezoning from I-1 to R-l, on a 3-3 split vote, as several of the Commi~ioners were not in favor of spot rezoning. This matter proceeded to the City Council on June 13th and was approved by the Couneil, as the Council felt the nature of the area had changed, the lots were too small for indusu~ development and it is possible a mistake had been made in the original zoning. 17. 18. 19. 20. 21. 22. 23. 25. 26. 27. ~~iiii~ii~!~ii~- At the June 7th Planning Commission meeting, the Commission approved the request for rezoning 5009 Winnetlo Avenue North from R-I, Single Family Residential, to R-2, Single and Two-Family Residential, Zoning District to facilitate the City's development of an accessible twin home for low/moderate income residents. The City Council also approved this rezoning request at their June 13th meeting. : ~~!i:~!iI ii~i~j~ - At the June 13th EDA meeting a request for an increased loan amount was considered for the Broadway Village Community Center project, as the building plans needed to be modified after utility (storm sewer) problems were discovered. This discussion was continued until the June 27th meeting when the request for additional funding was approved. ~iii~ii~~i!ii~ii~i!ii~- At the June 27th meeting the EDA passed a motion approving a listing agreement with Thorpe Bros., Inc. to market the City-owned property at.7300 42nd Avenue North. ~~ii~ - At the June 27th meeting the EDA considered a request by All Star Sports for City f'mancial assistance with site improvements. This discussion will continue in July and staff will meet with the property owner to clarify the request and describe the EDA's intent. ~i~~~[~~i~ - During the second quarter a considerable amount of staff time was devoted to the analysis of the Cooper High School Athletic Field Complex and a number of meetings were held with District 281 officials. At the Sune 7th Planning Commission meeting, the Commi~ion tabled this request until the Suly 12th meeting. ~~i~i~ ' This request was tabled at the Sune 7th Planning Commission meeting so the petitioner has time to submit more detailed plans and provide details for several additional issue. The petitioner also agreed to conduct an informational meeting with the neighborhood prior to the Suly Planning Commission meeting. ~~- During the second quarter staff continued to work with Gethsemane C~ officials on n Developngm 'Agreement and bond. The outstanding consultant fees were ~- In lune Country Kitchen, on 42nd Avenue, submitted a plan for expandi~tllm.~ restaurant and sim/building plan review/approval will be considered at the ~.~i~,, ' Don Harvey has submitted a Preliminary Plat and ~'{e'"i~iiflding on the Quebec Avenae extension and will be requesting PUD Concept approval at the July 12th Planning Commi~ion meeting. ~ - On May 24th the City hosted the TwinWest "State of the City" program in conjunction with the Ray Smith Insurance Agency and the City Manager presented a program on current development projects. ~~ - Staff continued to be busy during the second quarter with participation in the Business Retention Program coordinated by the North Metro Mayors Association/Community Resource Parmerships. The surveying of businesses continued during the second quarter and will extend throughout 1994. The program aggressively works to foster a 28. to actively participate on the TwinWest Business Development Sub-C.ommittee which is in the process of updating the demographic data and community profiles of all TwinWest Cities. 29. ~~ii~ii~~ - During the second quarter staff also continued to actively participate on the TwinWest Bank Consortium Sub-Committee and hosted the meeting in June in conjunction with Park National Bank and made a presentation on current development projects. 30. ~ii~~{ilg~!i~ - Staff continued to participate in the TwinWest Executive Call Program during the second quarter and a call was made on Ben Franklin Distribution, Inc. Overall, the activity in the planning and development area has been high during the second quarter, with 24 applications being made through the end of June and a good deal of staff time devoted to the Cooper High School, Wrobel PUD, Hoyt Development, Kimball Addition and rezoning issues. Kirk McDonald Management Assistant/Community Development Coordinator ENGINEERING Second Quarter 1994 Report City Council Synopsis VWth the onset of spring and summer, a variety of engineering projects got underway during the second quarter. Two major projects, that the Council and staff have worked on for the past several years, that moved forward were the City-W/de Retaining Wall Project and the 36th Avenue Railroad Bridge and Street Reconstruction Project. Public hearings were held on both of these projects and final plans and specifications either ordered or approved, with bids/contracts to be considered later this summer. The City was also successful in obtaining a variance from the Department of Transportation on the bridge ownership issue, which means that the City can utilize MSA funds for a portion of the project without owning the bridge. Two other projects also were initiated to improve the overall aesthetics of 42nd Avenue. The contract was awarded for the repainting of the 42nd Avenue Railroad Bridge and that work will be completed in July. A considerable amount of staff time was spent by the City Forester meeting with property owners to review plans for the 42nd Avenue Landscape/ Maintenance Improvements Project. This project is also currently underway, with the contract awarded and the work started. This project has generated a cooperative working relationship between 42nd Avenue business owners and the City and both projects will have a very positive impact on the City Center area. Two other major projects related to site/building improvements for City facilities also progressed from the planning to implementation stages. The contract was awarded for the Public Works Site Improvements and Salt Storage Building Construction and work on ~that project is currently underway. Also, under the direction of the Director of Finance and Administration, work progressed on Phase II of the City Hall Remodeling Project, with final plans being approved. Bids on this project will be sought and presented to the Council in August and construction is expected to begin in September. These projects, along with a variety of other park improvement projects and water-related projects, kept staff busy in the engineering area during the second quarter. Respectfully submitted, Kirk McDonald Management Assistant/ Community Development Coordinator ENGINEERING PROJECTS Second Quarter 1994 Report Progress took place on the following major engineering projects during April, May, June, 1994: conducted a Public Hearing for the 36th Avenue Street Improvements between Winnetlm and Louisiana Avenues and the Reconstruction of 36th Avenue Railroad Bridge. The project will include utility and street improvements and it is intended to build the project in two phases. The fin'st contract will include all work associated with the railroad bridge reconstruction and the street utility work approximately 250 feet either side of the bridge, but not including the final bituminous surface. Contract No. 2 will include all remaining work including the final bituminous surface not constructed as pan of Contract No. 1. Contract No. 1 is proposed to be constructed during the 1994 construction season and it is anticipated that Contract No. 2 will be constructed during the 1995 construction season. The Council adopted a resolution ordering construction of the project and the preparation of final plans and specifications. At the April 25th meeting, the City Council passed a motion approving changes to the project by eliminating the construction of a temporary bridge and including the construction of a roll-in bridge. It was also determined that the railroad was agreeable to retaining ownership of the bridge and that MnDOT may grant a variance on the ownership issue, due to the hardship of the insurance premium. A resolution requesting a variance from the ownership requirement for reconstruction of the 36th Avenue Railroad Bridge was approved at the May 23rd City Council meeting. This variance request was made to .the Commissioner of Transportation to allow reimbursement of project costs to the City. After learning that the ownership variance was approved, at the June 27th meeting the City Council passed a resolution approving the plans and specifications and ordering advertisement for bids. It is anticipated that the State will approve the plans the fu'st part of July. on the City-wide Retaining Wall Project and ordered the preparation of a Feasibility Report at the April 25th meeting. A resolution was adopted at the June 13th City Council meeting providing for public hearing on the retaining wall project to be held on June 27th. The Public Hearing was held on June 27th and the Council approved a motion ordering construction of the project and authorizing the preparation of final plans and specifications. ~ - At the April llth Cotmcil meeting, the City Coumfll ~lpproved the final pay request to Hardrives, Inc. for the 1992 Local Street Resurfacing ~ Utility Project in the amount of $4,811.08. ~~{i. ~- At the May 9th City Council meeting, the Council approved a resolution awarding contract for construction of Public Works Salt Storage Building and Site Improvements to C.S. McCrossan in the amount of $329,416.37. The bid for the conveyor and conveyor pit was $94,320.00 and was removed from the contract. Staff was directed to obtain a second bid for the conveyor portion. ~~}~- At the June 27th Council meeting, the City Engineer presented the Northwood Lake Drainage Improvements Feasibility Report. o After considerable discussion, the Council directed staff to come back with other options at a future meeting. ~j~iii!~i~!!~ii~ii~iii~ii~iii~iiiii~ili~- A presentation was given to the Council at the May 23rd meeting regarding the project status of Phase II City Hall interior remodeling. The purpose of the Phase II remodeling project is: 1) to provide work areas more conducive to the organizational structure 2) to 3) to 4) to 5) to 6) to 7) to 8) to 9) to provide provide provide provide provide provide provide flexible work areas that can adjust to future needs adequate work space for the Dept. of Protective Inspections adequate locker room space for Police Dept. personnel a more functional squad room for police personnel adequate space in the clerical area of the Police Dept. the public with a more "user friendly" reception area an environment that is conducive to technological changes meet ADA requirements. At the June 27th meeting, a resolution was passed approving the plans and specifications and authorizing advertisement for bids. awarding the contract to Rainbow, Inc. for the preparation and painting of the 42nd Avenue Raikoad Bridge in the mount of $55,775. At the May 9th City Council meeting, the Couhcil approved a resolution awarding contract for 42nd Avenue Landscaping/Maintenance Improvements to C.S. McCrossan for $261,997.15. The resolution was approved excluding the $20,000.00 for the clock tower. After further discussion on the 42nd Avenue Landscaping/ Maintenance Project at the June 13th meeting, the Council approved the signage and clock tower. ~ii~i~~i~- At the April 25th City Council ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::: ~ ::::::: ~ :::~::'>.'::::::::::::::::~:i$~:~.... ~:~:;::-... .:: meeting, the Council approved a resolution awarding contract to Aero Asphalt for basketball court improvements in the amount of $58,750. ~ - At the April 25th meeting, the City Council approved a resolution awarding contract to Morcon Construction for Liberty Park Shelter roof repairs in the amount of $14,444. At the June 27th meeting, the City Council accepted the project and authorized final payment. ~~"~:'"~'":~?'"":q ' "*':'"":"~ '" "~: '~:"":::'::"~" ........ ~ '~:~' - After discussion at the May-gth City Council meeting re~ the storage building at Lighted Field, the resolutions awarding the contract and adjustin~ ~ 1994-95 cna authorizing transfer of funds was tabled for further study. At the May 23rd City Council meeting, the Council approved a resolution awarding contract to Western Construction Co. for the new storage building for Lighted Field in the amount of $13,140. This bid does include the overhang as originally proposed. Kirk McDOnald Management Assistant/Community Development Coordinator HOUSING AND REDEVELOPMENT AUTHORITY Second Quarter Report -- City Council Synopsis During the second quarter City staff continued to meet with Metro HRA representatives to finalize discussions on a new contract, which will be presented to the City later this summer. The new proposed contract will increase the reimbursement for each contract from the current $16.56 per voucher on certificates to $21.00, as the cities have long felt that a higher reimbursement was justified. The contract also includes an "options" package where the City could assume more responsibility including taking on additional contracts from other cities to increase the amount of revenues received. Lastly, Metro HRA recently conducted a study of "fair market rents" which the staff will be analyzing and responding to during the third quarter. Also during the second quarter, the City has been working on a number of housing and redevelopment activities. Two City owned residential lots are currently being redeveloped. The old house located at 5009 Winnetka Avenue North has been burned down in a Fire Department training exercise and the site is being cleared. A handicap accessible twin home will be built on the site during the second half of 1994. A small home at 7109 62nd Avenue North is also being rehabilitated and should be finished by July 31. At that time it will be put up for sale to a Iow/moderate income buyer. The City also purchased a vacant lot at 6073 Louisiana Avenue North and anticipates development of this site sometime in 1995. Beginning this spring the City is participating the Minnesota City Participation Program (MCPP). The MCPP is a program through the MHFA in which the MHFA sells mortgage revenue bonds on behalf of participating cities to meet locally-identified housing needs. The proceeds from the bonds provide below-market interest rate mortgage loans for Iow and moderate income first time home buyers. The MCPP is a six month program beginning in early July. For the first four months, participating cities have exclusive use of their individual allotment. During the final two months, the individual allotment will go into a statewide pool that will be available to all MCPP participating cities. The City received $849,000 for 1994. The funds will be available to qualifying buyers at an interest rate of 7.5 %. The City has also bccn working with Habitat for Humanity to develop housing on three vacant lots located at 4003-4015 Oregon. The lots are Hennepin forfeited land and have never been det~. Habitaf is currently looking at the lots to determine-if they are suitable buildin~.~ attes. Respectfully submitted, Kirk McDonald Management Assistant/ Community Development Coordinator Sarah Bellefuil Administrative Analyst HOUSING AND REDEVELOPMENT AUTHORITY Second Quarter 1994 Report The New Hope HRA continues to be busy with the management of housing programs and redevelopment activities in the City. Section 8 Rental Assistance Program Currently, the Section 8 Rental Assistance Program is providing assistance to 251 New Hope low income families. This is down from the 282 families that were being served in March. During this same time period in 1993, New Hope was providing assistance to 275 families, so overall the program is serving a lesser number of families in 1994 as in 1993. The difference is due to the new portability policy adopted by Metro HRA which allows families with vouchers/certificates to move from one jurisdiction to another. The breakdown is as ~llows: Certificates Vouchers Total April 183 70 253 May 184 70 254 June 181 70 251 The number of housing inspections has increased compared to the same time period in 1993. During the second of quarter of 1994 a total of 192 inspections were completed, as compared to 146 for the same time period in 1993. A breakdown of housing unit inspections is contained in the following table: Initial ReinsDect Total Year to Date Section 8 100 92 192 372 Metro HRA has continued conducting quarterly meetings with the local housing representatives to listen to complaints, work out procedures/problems, and to determine how clients can be served more efficiently. New Hope's representative actively participates in these meetings. Also, during the second quarter City staff continued to meet with Metro HRA representatives to f'malize discussions on a new contract, which will be presented to the City later this summer. The new proposed contract will increase the reimbursement for each contract from the current $16.56 per voucher or certificate to $21.00, as the cities have long felt that a higher reimbursement was justified. The conlxact also includes an "options" package where the City could assume more responsibility, inghlding taking on additional contracts from other cities, to increase the amount of revenues receiv~ .Lastly, Metro HRA recently conducted a study of "fair markeOeents" which the staff will be ~ and responding to during the third quarter. Commnnitv Dev~_~ Block Grant Program ~- Hennepin County manages the program for the City and maintains a waiting list. The funds assist low income persons in making basic repairs to homes that they own. Currently there is one residential household in the process of being assisted, with one being rehabilitated and three on the waiting list. At this time all 1992/93 funds have been expended or committed. There is approximately $35,000 in funds currently available in 1993/94 and $26,400 available in 1994/95. Scattered Site Housing Program -- During the second quarter the City continued to pursue several projects which will be funded in part by previous years CDBG moneys for scattered site housing programs. Projects which used scattered site housing funds include the following: 5009 Winnetka Avenue North -- An Environmental of the property was accepted by Hennepin County on May I0, 1994. It was also necessary to publish a notice in the local paper stating that CDBG funds will be released from HUD in late June. The City purchased the lot in February and will build a new handicap accessible twin home on the site. The house located on the lot was burned down on June 19 by the Fire Department for training purposes. At the lune 27 City Council meeting a contract was awarded to Thomas Contracting to clear the site and prepare it for development. The City is currently advertising for buyers from among the disabled population and visiting builders who specialize in constructing housing for the disabled. This project will be financially supplemented with other grant funds. 7109 62nd Avenue North -- An Environmental of the property was accepted by Hennepin County on April 11, 1994. Hennepin County did not require further action on this property. Specifications for rehabilitation of the property were published in early May, and a contract was awarded at the June 13 City Council meeting to Flag Builders. The cost for rehabilitation will be $25,085 and will be paid for with CDBG funds. Rehabilitation of the house will be completed by July 31, 1994. This project will be f'mancially supplemented with MHFA grant funds. 6073 Louisiana Avenue North -- An Environmental of the property was accepted by Hennepin County on April 29, 1994. It was also necessary to publish a notice in the local paper stating that CDBG funds will be released from HUD in mid June. The City purchased this property on June 27 for the development of a low/moderate income handicap accessible twin home. The property cost $17,402 plus appraisal and attorney fees of $711.97. These costs are covered by CBDG funds. It is the intent of the City to join this property with the rear 100 feet of the adjacent property located at 7109 62nd Avenue North. The City does not intend to build on the site until 1995. 5501 Boone Avenue North - An Environmental of the property was accepted by H~in County on June 16, 1994. It was also necessary to publish a notice in the 14 ~ statin~ tl~at CDBG funds will be released from HUD in 1~ July. The City of New Hope EDA acquired 5501 Boom Avenue North and the northern 75 feet of 5425 Boone Avenue North through the eminent domain/condemnation process to facilitate the construction of the Care Break Adult Day Care Center to be operated by Senior Outreach Services. At the present time the New Hope ED A owns a portion of 5425 Boone Avenue North and is proceeding in an ongoing condemnation action for 5501 Boone Avenue North. The total estimated cost of the project is 3.2 million dollars. The City will contribute approximately $800,000 in tax increment assistance to this project, including land, site preparation (pilings) and other site improvements. In addition, the City has committed a total of $100,000 in CDBG funds to the project over the next three years beginning in year 1993. Minnesota Housine Finance Agency Grants A. Blighted Residentiat ~rtY Acquisition Pr°gr~ - In 1992 the City, was awarded a $60,000 grant for the 62nd Avenue/West Broadway neighborhood to finance the acquisition of a blighted property and to provide gap financing for either rehabilitation of demolition/new construction to provide affordable housing for low/moderate income New Hope residents. During 1993 staff identified an eligible property at 7109 62nd Avenue North and the City Council authorized the purchase of the property at the September 27th Council meeting. The City acquired the site and closed on the property in November. During the second quarter of 1994 specs for rehabilitation of the property were developed and bids sought for the work. At the June 13 City Council meeting Flag Builders was awarded the project. Rehabilitation will be completed by July 31, 1994. The project will be finance with MHFA and CDBG grant funds. ii~iii~i!i~ - On August 30th, 1993, staff was notified that the MHFA had awarded the City funding in the amount of $45,000 for a Land Trust Grant Application. The MHFA drafted a loan commitment document which was approved by the City Council at the November 22, 1993 EDA meeting. These funds, in conjunction with HOME and CDBG grant funds, were utilized to acquire the property at 5009 Winnetka Avenue North in February, 1994. The Land Trust Grant expired on June 3, 1994, but the City has received an extension until December 30, 1994. On June 19, 1994 the house located on the property was burned down as a Fire Department training exercise. At this time debris is being removed from the site and it is being made ready for development of a handicap accessible twin home. MHFA Minnesota Cit? Participation Pro_re'am The MCPP is a program through the MI-IFA in which the MI-IFA sells mortgage revenue bonds on behalf of participating cities to meet locally-identified housing needs. The proceeds from the bonds provide below-market interest rate mortgage loans for low and moderate income first time home buyers. The MCPP is a six month program beginning in early July. For the first four months, participating cities have exclusive use of their individual allotment. During the final two months, the individual alloImem wiU go into a statewide pool that will be available to all MCPP participating citie~ The City received $847,000 for 1994. The funds will be availableet_ o qualifying buyers at an ~ rate of 7.:5 %. During the past two months the program has been advertised through a variety of sources including the Sun-Post and the City newsletter. A letter was also sent to area realtors informing them about the program. CO-OP Northwest A. ~i!ii~ - During the fall of 1993, staff was notified that Hennepin County had approved a $274,100 5-City grant application for Federal HOME funds. New Hope will utilize its portion of the funds, in conjunction with other grant moneys, to acquire property at 5009 Winnetka Avenue North and demolish the sub-standard home and construct a new handicap accessible twin home on the site. 5-CRy MUlti4ur~ti~i Housing/Human Services Group -- Staff continues to participate in these groups which seeks programs to integrate human services with multi- family housing complexes. Seven action groups have been formed and staff serves as Co- chair for the Housing and Family Services Action Group. Besides serving on this Action Group and reporting to/attending Executive Committee meetings, staff also continues to serve on the Planners' Sub-Group, which meets on an informal basis to coordinate housing programs and new initiatives. Habitat for Humanity Due to the City's interest in having Habitat for Humanity construct a home in the city of New Hope, the City presented Habitat for Humanity with three vacant lots located at 4003-4015 Oregon. The lots are Hennepin forfeited land and have never been developed because of subsurface conditions. Habitat for Humanity is currently looking at these lots and others in the Northwest suburbs to determine which sites are buildable and appropriate for their activities. Multi-Family Housing Financial Assistance Policies At the July 26, 1993, EDA meeting a consultant agreement was approved with Public-Private Ventures, Inc. to assist staff in formulating policies to address requests for funding assistance, for building rehabilitation/renovation work from owners of multi-family buildings in the City. Staff worked with the consultant throughout the third quarter and the policies were presented to and approved by the EDA on September 13, 1993. In conjunction with the development of these policies, staff and the consultant also met with the owners/managers of two complexes seeking assistance during the third and fourth quarters: New Hope Apartments and Park Square Apartments. Staff presented a loan proposal to the EDA for the New Hope Apartments in February, 1994, and the first multi-family financial assistance project was approved. The closing was completed in June and the rehab work will be underway in July. Kirk McDonald Management ~ : Community De~ Coordinator Sarah Bellef~il--~ ~ Administrative Analyst ort wes ssoci Consul ants, Inc. R B A P L A N G D N M A R K E R E S E A R C H TO: FROM: DATE: RE: FILE NO: Kirk McDonald Dan Licht/Alan Brixius 21 July 1994 New Hope Industrial Outdoor Storage 131.00 - 94.04 BACKGROUND At your request, we are providing you with suggested Zoning Ordinance language regarding outdoor storage as a permitted use. ~SUES Currently, the City of New Hope Zoning Ordinance stipulates that a conditional use permit is required for outdoor storage within the City's Limited Industrial District (I-l) and General Industrial District (I-2). However, within these districts, there are many instances of non-compliance, where outdoor storage is being utilized on the property without a conditional use permit being issued. In order to eliminate this non-compliance, the City may seek to amend the Zoning Ordinance to make outdoor storage an accessory use. To amend t~e Zoning O~din~nce requirements to allow ~or open storage within the I-1 and I-2 Districts without CUP, and to set standards regarding the storage, following language is offered to be integrated into the New Hope Ordinance. 5775 Wayzata Blvd.-Suite 555-St. Louis Park, MN 55416. (612)595-9636-Fax. 595-9837 4.033 (9) Exterior Storage. (e) Accessory outdoor storage within the I-1 and I-2 Zoning Districts is allowed under the following conditions: (i) The outdoor storage is accessory to a permitted or conditional principal use of the site. (ii) The outdoor storage must meet the required setback of the respective zoning district. (iii)The area is fenced, screened and landscaped according to a plan approved by the Zoning Administrator and a landscape guarantee as determined by the Zoning Administrator is provided. (iv) The storage area is surfaced to control dust. (v) The exterior storage must be exclusive of required parking and/or loading space. To fully address this issue, it is suggested that the exterior storage standards (Section 4.033 (9)) be expanded to include outdoor storage as a permitted accessory use within the I-1 and I-2 Districts. Additionally, the open storage standards within the conditional use sections of the I-1 and I-2 Districts (Sections 4.144 (1) and 4.154 (1)) would be repealed. pc: Doug Sandstad ,¢,¢01 Xylon Avenue North New Hope, Minnesota 55428-4898 Telephone: TDD L¢ne: 612-531-5100 612-531-5109 City Hall Fax: #~12-$$1-$ ~ Police Fax: #612-531 -$ Public Works Fax: #612-533- July l, 1994 Mr. David Kimball 8901 36th Avenue North New Hope, MN 55427 Subject: DEVELOPMENT AGREEMENT/PERFORMANCE BOND FOR CONSTRUCTION OF KIMBALL ADDITION, PLANNING CASE 94-15 Dear Mr. Kimball: On June 27, 1994, the New Hope City Council approved the final plat of Kimball Addition, as submitted in Planning Case 94-15, subject to specific conditions. One of the conditions was that a Development Agreement and suitable bond concerning site improvements be executed with the City. I notified you that the City would draft the Development Agreement and notify you regarding the appropriate security to be posed. Enclosed please find three copies of the Development Agreement. The City Engineer and Building Official have estimated the cost to install the site grading, sanitary sewer, watermain, street/storm sewer, boulevard trees and sod, and driveway apron to be $89,000 and the total bond to be posted is 150% of the cost of the work, or $133,500. On page 6 of the agreement, the various types of financial guarantees that are acceptable to the City are outlined under #14F. The performance bond or other type of guarantee is released upon completion and acceptance of all the site improvement work by the City. Please review-~ ~nclosed agreements, and sign all three copies in the appropriate place on page 7 and have ~ lli~atures notarized. Please return all three executed copies of the agreement to the City with the appropriate type of financial guarantee. I will have the appropriate City officials sign the agreements and will return one fully executed copy to you for your files. Family Styled City ~~'~ For Family Living Mr. David Kimball July 1, 1994 Page 2 Please contact me if you have any comments or questions. Sincerely, Kirk McDonald Management Assistant/ Community Development Coordinator KM:lk Enclosures: Three Copies Development Agreement and Bond Letter cc: Dan Donahue, City Manger Steve Sondrall, City Attorney Mark Hanson, City Engineer Doug Sandstad, Building Official Valerie Leone, City Clerk Property File (8901 36th Avenue) Planning Ca~ File 94-15 CITY OF NEW HOPE DEVELOPMENT CONTRACT THIS AGREEMENT, made and entered into on the date specified in paragraph 15d hereinafter, by and between the City of New Hope, a Municipal corporation of the State of Minnesota (hereinafter the City), and the Owners or Subdivider identified in paragraph 15a herein (hereinafter collectively the Developer whether singular or plural), W[TNESSETH: WHEREAS, the Developer has applied to the City for approval of a plat or subdivision of certain ]and within the City as identified in paragraph 15c herein, and WHEREAS, it is not presently feasible to complete such improvements, and the Developer is desirous of proceeding at once, and the City Counci] has approved or agreed to approve said plat on the conditions (1) that the Developer enter into this Development Contract, which Contract defines the work which the Developer undertakes to complete within the boundaries of said plat as described hereinafter and (2) that the Developer provide a bond or other collateral for an amount and with a surety and conditions satisfactory to the City, to secure the actual construction and installation of such improvements within the period specified by the City, NOW, THEREFORE, the City and Developer agree as follows: 1. The recitals above and the provisions of the Platting Chapter of the New Hope City Code, as amended to date hereof, are incorporated herein by reference. 2. The Developer agrees to complete the work provided for in this paragraph and in paragraph 14e in accordance with City specifications in all respects within one year from the date of this instrument, except as this period of time is extended by resolution of the Council, or by the City taking no a~tion to require ccml~l'etion herednde~on a timely basis. It is unaerstood and agreed ~b&t failure of the City to promptly take action to draw upon t~ bond or other collateral to enforce this agreement after the expiration of the time in which the work is proposed to be completed hereunder will not waive, estop or release any rights of the City and the City can take action at any time thereafter to require completion of the specified work, and payment for same, and the term of the contract shall be deemed to be automatically extended until such time as the City elects by its Council to declare the Developer in default thereunder pursuant to the provisions of paragraph 5, and that the statute of limitations shall not be deemed to commence running until the City Council has been notified in writing by the Developer that the Developer has either complied with the contract, or that it refuses to for any reason. These provisions shall be applicable to any person who shall give security as required by paragraph 8. The Developer shall provide, pursuant to approved City Specifications the following: Lump Sum 350 LF 420 LF 400 LF 9 EA 1200 SY 9 EA Site grading a $25,000 Sanitary sewer · $36/lf Watermain a $35/lf Street/storm sewer e $70/lf Boulevard trees a $200 ea Boulevard sod a $2/sy Driveway apron a $500 ea bm The Developer shall construct drainage facilities adequate to serve the addition, as directed by the City Engineer, to conform with the overall City storm sewer plan. Such construction shall be subject to inspection and approval of the City, and may include drainage swales, which shall be sodded in the same manner as boulevards. The parties understand and agree that sufficient data is not now available to fully prescribe the standards for said drainage and that the City may require such additional facilities at a later date which it may deem necessary. The Developer shall grade and construct all boulevard driveways to the City approved grades and cross sections, as required by the City Engineer and the City specifications. (See Chapter 13.084, the platting Ordinance of the City as amended to date hereof.) Any existing curb and gutter which is damaged shall be replaced with concrete curb and gutter, to City specifications. The Developer shall install street signs and non- mechanical and non-electrical traffic control signs at the street intersections within or abutting the subdivision, if any. Such signs shall be of a type approved by the City, and shall be placed as directed by the. City. 2 The Developer shall lay quality sod in boulevards in the entire subdivision, and shall install one tree per lot pursuant to the City specifications, and shall replace any tree which the City finds does not conform to said specifications, provided that demand shall be made before release of the bond or other security pertaining to this Development Contract. The Developer shall maintain reasonable access to any occupied structure within the addition, including such temporary grading and graveling as is necessary during the course of construction of buildings within the plat to provide said reasonable access, from the time of final approval of the plat until the finished streets are accepted by the City, all in accordance with City specifications. Within one year from the date of this Agreement, unless otherwise extended in writing, pursuant to Resolution of the City Council, but after the installation of sewer, water and gas utilities in the streets of said plat, the Developer shall bring said streets up to design grade and specifications and install a wearing course, consisting of three inches of bituminous material (Plant mixed, 200 lbs. per square yard) of a grade and type approved by the City and in accordance with City specifications, and shall thereafter apply a seal coat in accordance with City specifications· The Developer shall construct concrete curb and gutter on all streets within the addition, subject to inspection and approval by the City. 3. Upon the completion of the work and construction required to be done hereunder, said improvements shall become the property of the City, without~further notice or action on the part of either party heretO, other than acc~eptance by usage. '~ 4. T~e Developer shall pay for all costs of' persons doing work or furnishing skill, tools, machinery or materials, or insurance premiums or equipment or supplies and all just claims for the same, and the City shall be under no obligation to pay the 3 Developer or any contractor or subcontractor any sum whatsoever on account thereof, whether or not the City shall have approved the contract, Contractor, subcontract or subcontractor, and the Developer and its surety shall hold the City harmless against any such claims, and provide the City with all necessary lien waivers. 5. In the event of default by the Developer as to any of the work to be performed hereunder, the City may, at its option, perform said work and the Developer shall promptly ,reimburse the City for any expense incurred therein by the City, provided the Oeveloper is first given written notice by United States Mail of the work in default and required to be done by the Developer, not less than 7 days being given thereby to the Developer to remove the default status, said notice being addressed to the Developer at the address shown in paragraph 14b herein, notice given in this manner being sufficient as described, by agreement of the parties hereto. Notice to the Developer shall also constitute without further action, notice to any contractor or subcontractor, whether they are approved and accepted by the City or not. In the event of emergency, as determined by the City'Engineer, the 7 day notice requirement to the Developer shall be and hereby is waived in its entirety by the Developer, and the Developer shall reimburse the City for any expense so incurred by the City in the same manner as if mailed notice as described hereinbefore had been given. It is understood by the parties, however, that the responsibility of the Developer for completion of the work to be performed hereunder is limited by strikes and force majeure. 6. The Developer agrees to hold the City harmless from any and all claims which may arise from third parties, including contractors or subcontractors, for damages sustained resulting from the performance or failure of performance of the above-described work or the work required in paragraph 14e. 7. The Developer agrees to reimburse the City for all costs incurred by the C~ty ~n the enforcement of this contract, or any portion thereof, ~nc]ud~ng court costs and reasonable engineering and attorney's fees. 8. The D®veloper shall deposit with the,,C~ty a satisfactory Subd~vJsioi~, ,,Blall~ for the work specified hereinbefore, wh~h shall be in thereat descr~bed~in paragraph 14f, securJng The full performan,¢.~', ~this Development Contract. The term Subdivision Bond as u,~ herein-shall also include any type of collateral agreement o¢ security accepted by the City. 9. The Developer unconditionally guarantees to the City all work required to be performed hereunder for a period of one year 4 subsequent to acceptance of same by the City against poor material, faulty workmanship, or any other failure of the work, whether or not all or any portion of the Subdivision Bond shall have been released by the City. 10. The Developer shall clear any soil, earth or debris from the streets within the addition resulting from building on the land within the addition by the Developer or its agents, successors or assigns, and shall restore any gravel base deteriorated by mixing construction or excavation debris or earth, and repair any damage to bituminous surfacing resulting from the same causes. 11. The parties agree the breach of any terms of this Agreement by the Developer shall be grounds for suspension or denial of building permits for building within the addition until such breach is corrected, either by the City or the Developer, as the case may be. 12. If any portion, section, subsection, sentence, clause, paragraph or phrase of this Development Contract is for any reason held to be invalid, such decisions shall not affect the validity of the remaining portion of this Agreement. 13. This Contract shall be binding upon the parties, their heirs, successors or assigns as the case may be. The parties understand and agree that the Developer is responsible under the terms of this Contract for the acts or omissions of any of its agents and successors in title other than the purchaser and occupant of a home built upon any of the lots included in the Subdivision. 14. a. The term "Developer" as used herein refers to: David Kimball bm The address of the Developer, for purposes of this Develol3ment Contract is as follows, and any notice mailed by the City to this address shall be deemed 'sufficient n_otice under this Contract, unt~l notice of a change of address is given to the City in writing: David Kimball 10801 Wayzata Blvd., Suite 140 Minnetonka, MN 55305 Phone: (612) 595-0932 The legal description of the premises to which this Development Contract applies consists of premises in the State of Minnesota, County of Hennepin, to- wit: Tract A, Registered Land Survey No. 157, Hennepin County, Minnesota, and is proposed to be known as Kimball Addition. The date of this Development Contract is: Requirements additional to those paragraph 2 are as follows: None. listed in The total amount of the Subdivision Bond required to secure the performance of this contract is initially set at One Hundred Thirty-Three Thousand Five Hundred Dollars, {$133,500.00), and is agreed to by the Developer, and shall be in the form of: / Cash deposited with City at no interest. / / Irrevocable Letter of Credit for one year, cancellable on 30 days' written notice to City thereafter· / Corporate Surety Bond. Assigned Savings Certificate, Interest to Developer. The parties agree that from time to time, but not more frequently than annually, the Developer may request that the City Engineer evaluate the work remaining to be done hereunder by the Developer, and the amount of bond may be reduced by City Council :action to such dollar amount a~ deemed necessary for the City by the Engineer. The parties agree that formal action taken by the City Council in reducing the amount of .the bond as initially set herein shall constitute sufficient evidence, as public record, of the change i'n bond amount and the parties waive written modification of this Development Contract as to such reduced bond requirement. IN WITNESS WHEREOF, we have hereunto set our hands and seals, CITY OF NEW HOPE By I t s Mayor By Its City Manager David Kimball STATE OF MINNESOTA ) ) ss, COUNTY OF HENNEPIN ) The foregoing instrument was acknowledged before me this day of , 1994, by EDW. J. ERZCKSON and DANIEL J. DONAHUE, the Mayor and Manager, respectively, of the City of New Hope, a municipal corporation of the State of Minnesota, on behalf of said municipal corporation. Notary Public STATE OF MINNESOTA ) ) SS. COUNTY OF ~EPIN The f~tng instrument was acknowledged before me this day of , 1994, by David Kimball. c\ w pS 1\Chh\ kimball, dc Notary Public Bonestroo Rosene m-m Anderlik & Associates Engineers & Architects June 29, 1994 Mr. Kirk McDonald City of New Hope 4401 Xylon Ave. N. New Hope, MN '55428 Re: Kimball Addition Final Plat / Bond Amount Our File No. 34 Bond Dear Kirk: We have reviewed 'the final plat for the above referenced project and find all items in order. In addition, we have determined the bond amount which is listed below: Lump Sum Site grading @ $25,000 $ 25,000 350 LF Sanitary sewer @ $36~ 12,600 420 LF Watermain @ $35/ff 14,700 400 LF Street/storm sewer @ $70/1f 28,000 9 EA Boulevard trees @ $200 ea 1,800 1200 SY Boulevard sod @ $2/sy 2,400 9 EA Driveway apron @ $500 ea 4,500 Subtotal $ 89,000 + 50% Bond Increase 44,500 Total $133,500 The proposed bond amount is $133,500. office. Yours very ~ If you have any questions, please contact this ANDERLIK & ASSOCIATES, INC. MAil:pr ce: Marty Malecha - City'Attorney . 2335 West Highway 36 · St. Paul, MN 55113 · 612-636-4600