AGENDA
PLANNING COMMISSION MEETING OF JULY 12, 1994
CITY OF NEW HOPE, MINNESOTA
7:00 p.m.
CALL TO ORDER
ROLL CALL
CONSENT
PUBLIC HEARINGS
Case 94-18 Request for Conditional Use Permit Amendment to Allow Educational
Classes at Beautiful Savior Lutheran Church, 3351 Independence
Avenue North, Hope Alliance Chapel, Petitioner
Case 94-19
Request for Site and Building Plan Review/Approval for Building
Addition, 7849 42nd Avenue North, Country Kitchen of New Hope,
Petitioner
Case 94-20
Request for Preliminary Plat Approval, Site and Building Plan Review/
Approval and Concept Planned Unit Development Approval to Allow
Building Addition, 3920 Winnetka Avenue, 3941/3961 Quebec
Avenue North, Kellison Company/Don Harvey, Petitioners
Case 94-14
Request for Conditional Use Permit Amendment and Site/Building
Plan Review/Approval to Allow Expansion of School Uses in an R-1
Zoning District, 8230 47th Avenue North, Independent School
District No. 281 (Cooper High School), Petitioner
COMMITTEE REPORTS
Report of Design and Review Committee
Report of Codes and Standards Committee
OLD BUSINESS
Miscellaneous Issues
NEW BUSINESS
Approval of Planning Commission Minutes of June 7, 1994.
Review of City Council Minutes of May 23 and June 13, 1994.
Review of EDA Minutes of May 23 and June 13, 1994.
ANNOUNCEMENTS
ADJOURNMENT
* Petitioners are requested to be in attendance
xnning Case:
Request:
CITY OF NEW HOPE
PLANNING CASE REPORT
94-18
Conditibnal Use Permit Amendment to Allow Educational Classes at Beautiful Savior
Lutheran Church
Location:
PID No:
3351 Independence Avenue North
19-118-21-23-0001
Zoning:
Petitioner:
Report Date:
Meeting Date:
R-1
Hope Alliance Chapel
July 6, 1994
July 12, 1994
BACKGROUND
At the June 7th planning Commission meeting staff recommended, and the Commission concurred,
that this request be tabled for one month so that the petitioner could address the building code issues,
prOvide more detailed plans, meet with the Design & Review Committee, and conduct a
neighborhood meeting. The petitioner has completed all of these items and staff is recommending
that the Commission now proceed to consider the request.
The petitioner is requesting a conditional use permit amendment to allow Hope Alliance
Chapel/Beautiful Savior Lutheran Church to lease space to District No. 287 for purposes of
conducting educational classes (grades K-6) at 3351 Independence Avenue North, pursuant to
Sections 4.054(1) and 4.21 of the New Hope Code of Ordinances.
°
This conditional use permit amendment is being requested by the board members of Hope Alliance
Chapel as a joint effort with Beautiful Savior Lutheran Church, and Intermediate School District 287.
Intermediate School District 287 has identified a need to locate educational facilities outside the local
schools to aid in the learning of students with special needs. The total number of students and
staff for the facilities will be 50 individuals. Research by Intermediate School District 287 has
identified Beautiful Savior Lutheran Church as the preferred facility to meet the needs of their
program. A brochure from the district highlighting the program has been attached for reference.
Implementation of this conditional use permit amendment is contingent upon sale of the subject
property to Hope Alliance Chapel and a lease agreement with Intermediate School District 287.
The petitioners state in their application that currently special needs students from New Hope and
other adjacent suburbs are being transported by busses to a facility in Richfield. This cooperative
agreement between the Intermediate School District 287 would allow local students to attend school
in their home area. In addition, use of an existing tax exempt facility by the school district would
prevent another facility from being removed from the tax rolls to accommodate district needs. The
members of Hope Alliance feel that this agreement, if approved, will be of mutual benefit to the
community and to the City as a whole.
5. The petitioner has provided the following summary of issues for the existing site and its intended use:
Planning Case Report 94-18
July 6, 1994
Page 2
EXTERIOR
A. The existing parcel is a 4.2 acre site with a sanctuary and educational wing. Parking
facilities include a total of 181 stalls with 5 of those stalls being designated for
handicapped parking.
Bo
Students enrolled in the program will be bussed to the facility by single unit busses (minibus
vehicles) or vans. It is anticipated that a total number of 7 busses will be used for daily
transport of students.
Busses will load and drop off students at the northeast comer of the educational wing of the
facility in accordance with attached drawing labeled A-1. Students and staff will have direct
access to the classrooms.
Do
These busses are anticipated to utilize 36th Avenue North and HiHsboro Avenue to enter
and leave the facility on the north side of the parcel. In addition, it is anticipated that
approximately 15 staff members of the school district and visiting parents, will utilize the
off-street parking lot during the normal business hours of the school. It is expected that
there will be one delivery of food per day utilizing the same traffic route as the busses.
INTERIOR
A. The existing facility has a total area of 20,400 square feet, and is divided into two areas:
Assembly/Sanctuary 6,880 sq. ft.
Educational Wing 13,520 sq. ft.
The school district will be utilizing only the educational wing of the facility. There will
not be simultaneous use of the facility by Hope Alliance and the School District.
At this time, Hope Alliance does not anticipate any major interior or exterior renovation. If
issues arise during negotiations with the School District that would require any renovations,
Hope Alliance will submit architectural or structural drawings to the City for review as part
of the building permit and inspection process.
The program is designed to serve K-6 grade Emotionally/Behaviorally Disordered (E/BD) students
needing a Level V service who are referred by their school districts. After all local district program
options have beenexplored, students are served based on a need for a more restrictive setting. The
students attend self-contained Classrooms at a segregated site in which educational, behavioral, and
social needs are .addressed. This is a special alternative school environment, structured to meet
individual educational, behavioral, social and psychological needs of E/BD students and their
families. Services are provided during the school year. Summer services are available, based on
funding. A full range of academic, behavioral, and mental health services are available through
appropriately licensed staff. The emphasis of the program is for the students to acquire appropriate
social, behavioral, and academic skills to allow them to succeed. Transition to mainstream within
the host school is encouraged. Special education services are provided by appropriately licensed
staff.
Planning Case Report 94-18
July 6, 1994
-'age 3
The church site is zoned R-1 Single Family Residential and is allowed under a previously granted
conditional use permit. The added school use would require an amendment to the existing CUP.
The site is surrounded by R-1 Zoning District single family homes on the north, east and south and
the site abuts Highway 169 on the west. The existing site was rezoned from commercial to
residential in 1960.
The topography of the property is flat on the north half, sloping downhill to the south 14 feet over
a distance of 500 feet. Trees exist on the west side of the site.
Property owners within 350' of the request were notified about the June public hearing, at which time
it was announced that this request would be tabled until July 12th. The surrounding property owners
have not been re-notified by the City. Several adjacent property owners have contacted the staff and
indicated that they were concerned about this type of use in their neighborhood. It is staff's
understanding that a petition has been circulated in the neighborhood opposing this use, however, it
has not been presented to the City at this time.
ANALYSIS
Public, Educational, and Religious Buildings. (Public or semi-public recreational buildings and
neighborhood or community centers; public and private educational institutions limited to elementary_,
junior high and senior high schools; and religious institutions such as churches, chapels, temples, and
synagogues) are allowed by conditional use in the R-1 Zoning District provided that:
Side Yards. Side yards shall be double that required for the district, but no greater than 30
feet.
Parking. Adequate off-street parking and access is provided on the site or on lots directly
abutting directly across a public street or alley to the principal use and that such parking is
adequately screened and landscaped from surrounding and abutting residential uses.
Off-Street Loading. Adequate off-street loading and service entrances are provided and
regulated where applicable by City Code.
The purpose of a Conditional Use Permit is to provide the City with a reasonable and legally
permissible degree of discretion in determining suitability of certain designated uses upon the
general welfare, public health, and safety. In making this determination, whether or not the
conditional use is to be allowed, the City may consider the nature of adjoining land or buildin
gs, whether or not a similar use is already in existence and located on the same premises or on
other lands close by, the effect upon traffic into and from the premises, or on any adjoining
roads, and all such other or further factors as the City shall deem a requisite for consideration in
determining the effect of such use on the general welfare, public health, and safety.
Planning Case Report 94-18
July 6, 1994
Page 4
Other general criteria to be considered when determining whether to approve of deny a conditional
use permit include:
Comprehensive Plan. The proposed action has been considered in relation to the specific
policies and provisions of and has been found to be consistent with the official Comprehensive
Municipal Plan of the City.
Compatibility. The proposed use is compatible with its adjacent land uses.
Performance Standards. The proposed use conforms with all applicable performance
standards contained in the Code.
No Depreciation in Value. The proposed use will not tend to or actually depreciate the area
in which it is proposed.
Zoning District Criteria. In addition to the above general criteria, the proposed CUP meets
the criteria specified for the various zoning districts:
1. In Residential Districts, R-1,2,3,4,5, R-O:
a. Traffic. Non-residential traffic is channeled into thoroughfares or onto a street
abutting business or industrial uses leading directly to thoroughfares, and not
onto minor residential streets.
b. Screening. The proposed use will be sufficiently separated by distance or
screening from adjacent residentially zoned land so the existing homes will not
be materially depreciated in value and there will be no deterrence to
development of vacant land.
c. Compatible Appearance. The structure and site shall have an appearance that
will not have an adverse effect upon adjacent residential properties.
4. The Building Official has conf'umaed that all building code related issues have been or will be
resolved, therefOre, this previous concern is no longer an issue for City staff. The architect for the
project has issued the attached letter stating that they will meet all applicable building code
requirements for the area designated as E-2 Occupancies (schools).
5. A neighborh~:me~ting was conducted on June 22nd and all of the property owners noticed by the
City were in~ to attend. Four persons attended the meeting and they were primarily adjacent
property owners. A synopsis of the questions asked/issues discussed is enclosed and this synopsis
was mailed back out to all property owners originally noticed. Staff commends the petitioner for the
efforts they have made to inform the neighborhood about this program.
Major concerns that were discussed or clarified included the following:
Ao
Age of Students - The age of the children will range from 5 - 12 years old and will not
include any students older than that because the building does not meet the requirements for
secondary students.
Planning Case Report 94-18
July 6, 1994
~age 5
Bo
Increased Traffic - Five or six vans will be used to transport students and there will be no
large school buses except for an occasional day field trip.
Also, the congregation size of Hope Chapel (170) is considerably smaller than Beautiful
Savior (1200), so after the change of ownership the overall flow of traffic (even with the
school) will be greatly decreased.
Supervision - The student/adult ratio is about 2 1/2 students for one adult and professional
staff meet the vans and escort the students into school.
Do
Maximum Students/Staff- The program will start with 25 and the maximum limit for people
in the program is 50 (students and staff).
E. Length of Lease - It is anticipated that the school will lease the church space for five years.
Fo
Screening - A hedge of shrubs will be planted on the north and south ends of the property to
help screen residential views.
South Entrance - The question of closing the south entrance to slow down divers who speed
through the parking lot is being explored.
The petitioners met with the Design and Review Committee on June 23rd and the following issues
were discussed: explanation of program and shared use, number and ages of students, transportation/
traffic issues, hours of operation, outdoor recreation area, landscaping, signage, south driveway gate,
refuse storage, snow storage, and neighborhood meeting.
7. Site plan data is listed below:
Lot Size
Building Area:
Green Area
Asphalt Area
Concrete w~
= 182,950 square feet = 4.2 acres
= 20,400 square feet = 11%
= 90,300 square feet = 50%
= 68,160 square feet = 37%
= 4,090 square feet = 2%
8. The landscap~plan includes the planting of 74 new shrubs/trees on the site, as listed below:
Arrowwood Viburnum
Andorra JuniPer
Welchi Juniper
Red Prince Weigela
Snowmound Spirea
60 each 36" ht.
5 each 24" sprd.
2 each 48" hr.
2 each 24" hr.
5 each 24" ht.
A hedge of 27 shrubs each would be planted on the north and south ends of the site to screen the
parking lot from the adjacent residential homes. Other landscaping will be placed along the south
exit onto 33rd Avenue and around the site sign, and on the north side of the recreation area.
Planning Case Report 94-18
July 6, 1994
Page 6
o
The plans show two site signs, one each at the north and south entrances. Both signs currently exist
and only the metal panel face on each sign will be replaced to state "Hope Alliance Chapel and
Independent School District No. 287". The lettering will be painted (black) on a painted (tan) metal
panel. The signs are in compliance with the Sign Code.
10. The revised plans include the following other details:
the private resident locations near the site are shown
- snow storage is addressed in the plan notes
- trash enclosure nd existing storage building are shown
- four handicapped parking stalls with signs are shown on the west side of the building
- a 40 foot x 50 foot outdoor recreation area surrounded by a 4 foot fence is shown on the
southwest side of the building, which will have a shock-absorbing surface such as sand or wood
chips
- the plans clearly indicate the portion of the building to be used by School District 287 and the
portion of the building to be used exclusively by the church
- the plans clearly indicate the anticipated on-site school bus and delivery van route using the 34th
Avenue entrance, with students entering the school on the east, and the vans exiting out onto 34th
Avenue.
11.
In regards to the existing gates at the south exit, staff have enclosed prior minutes where these gates
were discussed. If the residents in the area want the gate closed and the church is agreeable, perhaps
that should be a condition of approval.
12.
Staff feels that the petitioner has done a good job in addressing the numerous issues that were
highlighted in the previous staff report. The Commission will want to carefully take into
consideration the comments made by the neighboring property owners.
13.
If the Commission approves the request, staff recommends that the petitioner be required to enter
into a Conditional Use Permit Agreement with the City that establishes the conditions of approval
and on-going operation of the facility, including but not limited to: hours of operation, age limit,
limit on number of staff/students, etc. Staff also would recommend annual review.
RECOMMENDATION
Pending public input, staff recommends approval of the conditional use permit amendment, subject to the
following conditions:
Conditional Use Permit Agreement be executed between petitioner and City that establishes
conditions of approval and on-going operation of facility, including hours of operation, age limit,
limit on number of staff/students, etc. to be drafted by City Attorney..
2. Annual review by staff.
Planning Case Report 94-18
July 6, 1994
?--'~.ge 7
Attachments:
Section/Topo/Zoning Maps
Revised Site/Landscape Plan
Revised Floor Plans
Sign Plans
Plant Material List
Site Plan Notes:
Lot Coverage
Bus Route
Snow Storage
Building Code Letter
Petitioner's Letters
Program Description
Notice/Synopsis of Neighborhood Meeting
1982 Minutes re: gate and site plan/elevations
ST:, JOSEPH'S
.CATHOLIc
CHURCH
~Ol
SONNESYN
ELEMENTARY
SCHOOL
HIODEN
VALLEY
.II)ARK
NORTHWO00
PARK
NONTHWOOO
PARK
/
S~. JOSEPH'S
CATHOLIC
CHURCH
SONNESYN
ELEYEN?ARY
SCHOOL
34TH ~
HIDDEN
VALLEY
P~qK
972,4
X
970.5
979.7
978.5
X
X
978.2
). X 977.7
980.6
979.2
978.6
970.9
X
972.9
964.2
33RD
964.2
961.8
,~ NOTES: DOTH 516N5 'A' ANP '1~' ARF EXISTINg,. ONLY THE METAL
( ' F'ANL=I.- i=ACE ON EACH 51~,N WILL DE REPLACED.
51&:,N 'D' LOCATED AT THE PAIRKIN~, LOT ENTIRY TO THE
50UTH ~C/IL..L. DE 51MIL.-AIR' EXCEPT IT 15 I0'-0' L. ON~.
LETTER5 ARE TO DE PAINTEP (DL. ACK) ON i::'AINTEP (TAN)
METAL PAI".,L=I... ~TH PL-.Y~/OOD DAGKUP PANEL.
I PAINTEP ~O01P TIRI'vl AND
' ~...-/. 51OE PANE-L5 TO REMAIN.
I=R'ONT VIE~ 51DE VIE~
ENTHE08 Del I gn Group I'r,le,t Title Oate
141S II o e cwo o d L ~ n e HOPE AL.L..IANGE CHAPEL.. G/9-1/q4 ,
PI JJJJOJJJJ, II JJ~lJJjJ 11441 4~.0~ L. ANCASTER c,,,. ~,.
A-
E:L.I=VATION¢0 Oi= i=×TI=R'IOR' 51TE: 51~N~
t
II
/ /
JUL
Ar?H2rO$ Desiln Group
July '1, 1994
Mr. Doug Sandstad
Building Official
City of New Hope
4401Xylon Avenue North
New Hope, Minnesota 55428
Re:
Conditional Use Permit for Hope Alliance Chapel
3351N. Independence Avenue
New Hope, Minnesota
Dear Mr. Sandstad:
In response to your request, we are issuing this letter to
inform you that our intent is to meet all applicable building
code requirements for the area designated as E-2 Occupancy
in the project referenced above.
If you have further questions please feel free to call me.
Sincerely,
Michael S. Buettner, AIA
C:
Wayne Steege
File
HOPE ALLIANCE CHAPEL
4205 Lancaster Lane North
Plymouth, MN 55441
May 18, 1994
Mr. Doug Sanstad
Building Official
City of New Hope
4401 Xylon Avenue North
New Hope, MN 55428
Conditional Use Permit Application
3351 North Independence Avenue
New Hope, Minnesota
Submitted by Hope Alliance Chapel
Dear Mr. Sanstad:
Enclosed for your consideration, please find the following:
Conditional Use Permit Dated 5/17/94 (for reference)
School District 287 Elementary School Specialized
Education Description
Site Plan
Floor Plan Indicating Occupancy Use
Lot Survey
A meeting was held at the city offices on Monday May 16, 1994
regarding the application for conditional use permit. The
following people were in attendance:
Doug Sanstad
Vince Svaldi
Brent Nelson
Wendell Nelson
Wayne Steege
City Building Official
District 287 Director of Special
Education
Realtor for Beautiful'Savior
Pastor of Hope Alliance Chapel
Trustee of Hope Alliance Chapel
Page !
HOPE ALLIANCE CHAPEL
4205 Lancaster Lane North
Plymouth, MN 55441
In accordance with that meeting, a completed conditional use
application and a check from Hope Alliance for the amount of
$450.00 was submitted on that date. The following is the
additional material required for the permit application.
BACKGROUND
This permit is being submitted by the board members of Hope
Alliance Chapel as a joint effort with Beautiful Savior Lutheran
Church, and Intermediate School District 287.
Intermediate School District 287 has identified a need to locate
educational facilities outside the local schools to aid in the
learning of students with special needs. The total number of
students and staff for the facilities will be 50 individuals.
Research by Intermediate School District 287 has identified
Beautiful Savior Lutheran Church as the preferred facility to
meet the needs of their program. A brochure from the district
highlighting the program has been attached for your reference.
Implementation of this conditional use permit is contingent upon
sale of the subject property to Hope Alliance Chapel and a lease
agreement with Intermediate School District 287
The fee title owner of the subject property is Beautiful Savior
Lutheran Church. The certificate of title is not included in this
submission since Hope Alliance has not purchased the building at
this time. Beautiful Savior is acting in cooperation with Hope
Alliance, and is willing to provide a copy of the title when
required.
Currently special needs students from New Hope and other
adjacent suburbs are being transported by busses to a facility in
,~',~;.,,~~. This cooperative agreement between the
Intermediate School District 287 would allow local students to
Page 2
HOPE ALLIANCE CHAPEL
4205 Lancaster Lane North
~-': plYmouth,.MN 55441
attend school in their home area. In addition, use of an existing
tax exempt facility by the school district would prevent an other
facility from being removed from the tax rolls to accommodate
district needs. The members of Hope Alliance feel that this
agreement, if approved, will be of mutual benefit to the
community and to the city as a whole.
EXTERIOR SITE PLAN
The following is a brief summary of issues for the existing site
and it's intended use.
The existing parcel is a 4.2 acre site with a sanctuary and
educational wing. Parking facilities include a total of 181 stall
with 5 of those stalls being designated for handicapped parking.
Students enrolled in the program will be bussed to the facility by
single unit busses (minibus vehicles) or vans. It is anticipated
that a total number of 7 busses will be used for daily transport
of students.
Busses will load and drop off students at the '~~ast comer of
the educational wing of the facility in accordance with attached
drawing labeled A-1. Students and staff will have direct access
to the classrooms.
These busses are anticipated to utilize 36th Avenue North and
Hillsboro Avenue to enter and leave the facility on the north side
of the parcel, In addition, it is anticipated that approximately 15
staff members of the school district and visiting parents, will
utilize the off street parking lot during the normal business hours
of the school. It is expected that there will be one delivery of food
per day utilizing the same traffic route as the busses.
Page - 3
HOPE ALLIANCE CHAPEL
4205 Lancaster Lane North
Plymouth, MN 55441
INTERIOR USE OF BUILDING
The existing facility has a total area of 20,400 square feet, and is
divided into two areas:
Assembly/Sanctuary 6,880 sq. ft.
Educational Wing 13,520 sq. ft.
The current occupancy group, according to the Uniform Building
Code, for the Assembly/Sanctuary area is A-2.1 and is B-2 for
the Educational Wing . No change to the Assembly/Sanctuary
area code is requested because this area will be used for church
use only. A change to the Educational Wing is requested to E-2 to
accommodate the school district.
The school district will be utilizing only the educational wing of
the facility. There will not be simultaneous use of the facility by
Hope Alliance and the School District.
At this time, Hope Alliance does not anticipate any major
interior or exterior renovation. If issues arise during
negotiations with the school district that would require any
renovations, Hope Alliance will submit architectural or
structural drawings to the city for review as part of the building
permit and inspection process.
CONCLUSION
As mentioned earlier in this report, Hope Alliance Chapel is
submitting this application request in cooperation with
Intermediate' School District 287 and Beautiful Savior Lutheran
Church. It. is. the belief of Hope Alliance Chapel, that if approved,
this joint venture is an opportunity to serve the community,
the school district and the City of New Hope.
Thank you for your time and consideration, If you have any
questions, or need additional information, please do not hesitate
to contact Pastor Wendell Nelson at 553-2855 during normal
business hours.
Page - 4
· HOPE ALLIANCE CHAPEL
4205 Lancaster Lane NOrth
Plymouth, MN 55441
Sincerely,
Pastor Wendell Nelson
Hope Alliance Chapel
Vince Svaldi
tM-rerc-tm-~- Special Education
School District 287
Page - 5
612 931 6363 ~
JUN-06-199~ 1~:~9 ALLIANT TECHSYSTEMS-SYSEN 612 9~1 6363 P.O1
HOPE ALLIANCE CHAPEL
4205 Lancaster Lane North
Plymouth, MN 55441
June 6, 1994
Mr. Doug Sandstad
Building Official
City of New HOpe
4401 Xylon Avenue North
New Hope, MN 55428
RE:
Conditional Use Permk Application
3351 North Independence Avenue
New Hope, Minnesota
Submitted by Hope Ai1ianee Chapel on 5/16/9t
(Ref. Hope Alliance Plans to New Hope date 5/18/94)'
(Ref. Site Plan dated 6/2/94 and Floor plan date 5/26/94)
Dear Mr. Sandstad:
We apprc~;iatc thc time you have spent over thc last few weeks
reviewing the referenced Conditional Use Permit AppLication
and Plans with our architect Mike Buetmer. Per your request
thc following elarifieation's are submitted for your review.
This permit is being submitted by Hope Alliance Chapel
(proposed owne0 ~ a joint effort with Beautiful Savior
Lutheran. Church (the current owner), and Intermediate School
District,,2~' (the proposed tenants).
Intermediate School District 287 has identified a need to locate
educational facilities outside the local schools to aid in the
learning of students with special needs. The program they
would like to house in this facility is limited to K-6 grade only.
The total number of District 287 students and staff in the
facilities at any given time will be limited .o 50 individuals.
There is a high staff to student ratio, one (1) to two(2) , in this
Page 1
~ JUN-0G-199~ 1~:~9 ALLIANT TECHSYSTEMS-SYSEN 612 9~1 6~6~
HOPE Ai,LIANCE CHAPEL
4205 Lancaster Lane North
Plymouth, MN ~$441
program which ensure general welfare, health and safety to the
students and the public. These students are usually in this'
program for a short period of time to get special training and
assistance m~d are then returned to mainstreamed public
schools. District 287 would like to start classes in this faciiity this
fall, August 1994.
These changes from an existing very large church membership
to a medium size church membership and a very small school
would result in about a 40% reduction in occupancy intensity
(the average number of people per hour in the building and the
associated traffic), once the transition of the existing church out
of the facility is compDted.
School District 287 brings in students primarily from Hennepin
county. The majority of the students are from Robbinsdal
District # 281 and Wayzata School District g284. There are a few
students from Westonka District #277, Orono District # 278,
Osseo District #279, Brooklyn Center School District #286, and
St. Louis Park District #283. Locating this program in the
proposed facility would allow local students to attend school in
their home area.
Students enrolled in thc program will bc transported to the
facility by single unit minibus or vans with a capacity load of 6 to
15 people per vehicle. On an average there, would be about 4 to
$ people on each minibus or vans. It is anticipated that a total
number of 7 vehicles will be used for daily transportation of
students,
Minibus ~d_ van~ will load and drop off students 'at the
Northeast corner of the educational wing of the facility in
accordance with the referenced sight plan. Students and staff
will have direct access to the classrooms.
These vehicles are anticipated to utilize 36th Avenue North and
Hillsboro Avenue to enter and leave the facility on the north side
Page - 2
JUN-06-1994 12:40 ALLIANT TECHSYSTEMS-SYSEN 612 9]i 6~63 P.O7 ~
HOPE ALLIANCE CHAPEL
4205 Lancaster Lane North
Plymouth, MN 55441
of the parcel. There will be one delivery of food per day utilizing
the same traffic route.
The school district will be utilizing only the educational wing of
the facility. There will not be simultaneous use of the facility by
Hope Alliance Church and the School D/strict in this area of the
building.
Hope Alliance Chapel is submitting this application request in
cooperation with Intermediate School District 287 and Beautiful
Savior Lutheran Church.
Use of a,u enisthzg tax exempt facility by the school district would
prevent an other facility from being removed from the tax rolls
to accommodate district needs. This joint venture is an
opportunity to serve the community, the school district and the
City of New Hope.
Implementation of this conditional use permit is contingent upon
sale of the subject property to Hope Alliance Chapel and a lease
agreement with Intermediate School District 287.
Thank you for your time and consideration. If you have any
other questions, or need additional information, please do not
hesitate to contact Wayne Steege at 931-7613 or Mike Buettner
at 593-5391 during normal business hours.
Wayne Steege
Trustee of Hope Allbmee Chapel
Page 3
TOTAL P.8~
DiStrict 28~ ............. i_
Hennepm Technical College
,~- We~t Metro Edu_cation Center -- Eliot
SL Louis Par~ MN 55426-2817
{6t2) 593-1181
INTERMEDIATE DISTRICT 287
WEST METRO EDUCATION CENTER
OVERALL PROGRAM DESIGN
WHO
The program is designed to serve K-6 grade Emotionally/Behaviorally
Disordered (E/BD) students needing a Level V service who are referred
from member and other referring districts.
After all local district program opuons have been explored, students
are served based on a need for a more resrricuve setting.
WHAT
WMEC is a special alternative school environment, structured to meet
individual educational, behavioral, social and psychological needs of
F_JBD students and their families.
Level V services for elementary students are currently housed at
Southwood School in Bloomington and Lincoln Hills School in
Richfield.
WHEN
Services are provided during the school year. Summer services are
available, based on funding.
HOW
Special education services are provided by appropriately licensed
staff, paraprofessionals, Family Networks therapists, and a Hennepin
County general,is[ Licensed staff include: Emotionally/Behaviorally
Disorderixi (E/BD), Learning Disabled (LD), Developmental Adapted
PhYsical Education (PE) instructors, nurse, speech clinician(s),
occupational therapist and other staff as appropriate. Mental health
servmes are available from licensed social workers, psycholo~sts,
consulting psychologist and/or psychiatrist to enable students to
benefit from special education. The program is managed by a Special
Education Administrator and Administrative Assistant(s) working
collaboratively with Family Networks clinical and administrative staff.
HOPE
ALLIANCE CHAPEL
Worshiping at Plymouth Middle School
Dew Neighbors of Beautiful'SaVior Lutheran Church,
June 9. 1994
............. Hope Chapel has been' meeting in Plymouth Middle School for the past 7 years;"' During ' '
the past three years, our board of trustees has been active in seeking a permanent place for our
congregation to worship. Currently negotiations are underway to pumhase Beautiful Savior
." Lutheran Church.
Last month you received a letter from New Hope'City Hall regarding'our interest in
: . 'purchasing that property.': It is the desire' of our congregation tO serve.the community .where we ~.,.
'* ..-/" ,,.' ' 'w°rShip~-:*?O~ Of this desire~:;~Ve have. had'.~'onve~ation With* Dist'rict #287 to' make ~:~rt. of the !.."'=~. --
: '?. ,'.: .... .facilities' available for a special education p..rogram limited to thi.rty five' eiement.ary school ' .-
,.- --= .=Children. ndergarten throu e six. - ..
I invite you to attend a neighborhood meeting which will have several purposes:
*to get acquainted with the residents of the community
*to clari~ the specific nature of the special education program being considered
*to give Information and to.respond to any questions you may have. .
Representatives from District #287, Hope Chapel and Beautiful Savior Lutheran Church'
will be in attendance.
You are invited to attend an informational meeting in the Parish Hall of Beautiful Savior
Lutheran Church on
Wednesday,..June 22 at 7:00P M.
' am looking '~orward to meeting you at that time. '.~ ·
Pastor Wendell Nelson
Building & Equi~in~ Pe~ to S~re Li~ with Ot~
~ L~c~er Ln. N.
~outk ~ 55~1
ALLIANCE CHAPEL
Worshiping at Plymouth Middle School
PI~ 553-2855
Dear Neighbors of Beautiful Savior Lutheran Church,
June 29, 1994
In mid May you received a letter from New Hope City Hall regarding our interest in purchasing
Beautiful Savior Lutheran Church, and leasing part of this facility to School Distdct # 287. in
an effort to give you information regarding this possibility, we invited you to an 'informatioh-
al meeting" a't Beautiful Savior Lutheran Church three weeks ago. That meeting was held
Wednesday, June 22. Four people attended that meeting from your neighborhood.
The neighbors who attended this meeting thought it would be helpful to record the information
given and the discussion that followed for your benefit. Thus, inclosed in this packet you will
find some information about Hope Chapel, abbut the students from School District # 287,
traffic, type of supervision and other minor changes that will take place if this transition
becomes a reality.
Hope Chapel has been meeting in Plymouth Middle School for the past 7 years. During the past
three years, our board of trustees has been active in seeking a permanent place for our
congregation to worship. We made offers on two other facilities prior to negotiating with
Beautiful Savior Lutheran Church.
It is the desire of our congregation to serve the community where we worship. We want to be
good neighbors. In an effort to be sensitive to your needs, we would like to leave with you our
phone number and a number where you can contact Intermediate School District # 287 officials
for further clarification or interaction. The number for Hope Chapel is 553-2855. The
telephone number for Intermediate School District #287 is 593-1181
Sincerely,
Pastor Wendell Nelson
Building & Equi.tnn. 'ng Pe~. le to Share Li~ with Othern
4205 Lancaster Ln. N.
Plymouth, 1VIN 55441
~Neighborhood Meeting O. uestion and Answer Session -
Beautiful Savior Lutheran Church - Wednesday, .lune 22~
1994
Present: Pastor Wendell Nelson, Chair; Vince Svaldi, Administrator
for Special Education for Intermediate District #287; Bob Manning,
Director of Special Education, for Intermediate District #287; Mike
Buettner, Architect from Hope Chapel; Wayne Steege, Chair of
Trustees, Hope Chapel; Brent Nelson, Realtor; Chuck and Marllyn
Weldin; four community residents.
An informational meeting was called to communicate with the
neighbors facts related to the possibility of Hope Chapel buying
Beautiful Savior Lutheran Church and leasing part of the church
building to Intermediate School District #287 for purposes of housing
a special education program.
A petition containing misinformation had been circulated in the
community and twelve families signed it opposing the school coming
into the building.
The community was invited to the information meeting to receive
accurate facts and to give them the opportunity to ask questions and
to share concerns.
The information shared at the neighborhood meeting is being mailed
to all sixty families who received an invitation to attend the meeting
held on Wednesday, June 22. Adherents of Hope Alliance Chapel will
also receive this document. It is hoped that this information will
answer most questions and concerns the community may have
regarding the special education program with Intermediate District
#287.
A brief introduction was given regarding the Christian and
Missionary Alliance by Pastor Wendell Nelson. Handouts were
distributed whtch gave information about the Christian and
Missionary Alliance and Hope Chapel's Core Values.
Vince Svaldi, Administrator for Special Education for Intermediate
District #287 presented information about the EBD program. The
program works with children who have not been able to fit into a
regular classroom experience. Strategies are designed to assist the
student to gradually work his/her ~aY ba~k to the neighborhood
classroom setting.
The session of questions and answers followed his presentation.
Q, Why doesn't Intermediate School District rent from the
building once used by Robbinsdale High School?.
A. The only space available there is on the second or third floor.
Children who are in lower primary, (Kindergarten and grade one)
must be housed on the ground level floor for instruction according to
State Education Requirements.
The district did Investigate this possibility~ There is a need for a
more northern location because a number of families livIng in the
northern and western suburbs use this program.
The program was located at Sunny Hollow Elementary School until
four or five years ago when increased enrollment made it necessary
for the group to find another location.
Q, What is the age of the children who will be coming to
this school?
A. The age of the children attending this elementary school will
range from five to twelve years.
Qt What about the age at a later .date? What is to prevent
t_he school from bringing in older students?
A. Requirements for facilities for secondary students (grade 7
through grade 12) are different than for elementary students. This
building will not meet the requirements for secondary students.
Q.. Increased traffic in the area is a big concern.. How many
busses will be involved in transporting students here?
Small children play in the areal we are concerned for their
safety~
A~ There will be no large school busses except for an occasional field
trip day. Five or six vans will be used to transport students.
Sometimes, because of distance, a taxi cab is used for transportation.
Vans will arrive around 8:45 AM and will leave around 3:30 PM.
Drivers have special training regarding safety of students on and off
the van.
Teachers hours are 8:00 AM through 4:00 PM.
Hope Chapel is a congregation of under 170. Beautiful Savior
Lutheran Church has over 1200 participants. After the change of
ownership of the building, the overall traffic flow, even with the
school occupying the site, will be greatly diminished during the week
days and especially on week ends.
Q.~ Will students be running around the neighborhood?
What about supervision?
A. Professional staff meet the vans and escort the students into the
school. Students are closely supervised at all times. Each class of six
or seven has a teacher and two para-professionals. The student
adult ratio is about 2 1/2 students for one adult.
Qt How many professionals will be working in the school?
A. There will be four full time teachers, a nurse, three mental
health professionals, a lead teacher, administrator. Some of the
other professionals are part time. Every professional employed in
the school has undergraduate and graduate work in the field of
behavior disorders.
How many .students will be enrolled?
A. The plan for fall Is to start with 25. The maximum limit for
people in the program including students and staff ts 50. We will not
go beyond the number 50. This is because some of the requirements
for use of the building are different for more than 50 people in a
school :~:::..:
Wh J/:~a::the:~?~' ' -- rocess to deal with a roblem if one
occurs?
A. The school will conduct monthly meetings for the community to
deal with any concerns. Staff from the school and Hope Chapel want
to work with the Community to have a pleasant relationship. Phone
numbers of the person in charge °f the Sch°°l and Hope Chapel will
be available.
Q. How long, a lease will be signed?
A. The school has indicated an interest in staying at the church for
five years. This interest is verbal as well as in writing. However,
because of state law regula.ting school board procedure, a lease can
only be signed for one year. It is assumed by both parties that the
lease will be renewed each year.
Q, If the school leaves~ will you rent to a business?
A.. This area is not zoned for business. A lease will not be considered
for a business.
Q. I have heard that the reason the program is leaving
Lincoln. Hills in Richfield is that the students have caused
damage to the property in that building. Is that so?
A. That is not so. Some students in a secondary program in that
building have caused some damage. Our students have never caused
damage to property.
Will a fence be put up?
A. Presently, plans are to plant a hedge of shrubs on the north and
south end of the property. Exploration of costs of a fence verses the
shrubs will be made.
Q. Will the neighborhood children be able, to continue to
use the parking lot as a' play area?
A. The basketball hoops will be available to the neighborhood
children~ they are now. We do plan to design a playground ~ area
with som~.P!ayground equipment. There will be a fence around the
play ~,-Neighborhood children will have access to the playground
after school hours and on week ends.
Q: Is it possible to close the south entrance and exit to
slow down speed drivers who go through the parking lot
a hlgh rate of speed?
A. This possibility will be looked into and counsel will be sought
from our architects and the City Hall.
O. When will the school start?
A. Staff reports on the 1Sth of August. School will start on
Wednesday, September 7th.
at
Respectfully Submitted,.
Charles Weldin, Hope Chapel Secretary
l L'
NORTH ELEVATION
SOUTH ELEVA~
WEST ELEVATION
RE~X~T FO~ AMENDmeNT TO CONDITIONAL USE PERMIT AND VARIARCEs AT ~dT~/INDEPE}~DENCE .
BEAUTIFUL SAVIOR LUTHERAN CHURCH, PETITIONE~
Allan Eetsrberg, Co-Chairman of the Building ,Ccunittee for Beautiful Savior Lutheran Church was present.'
M w~s accompanied by Vernon Gunderman the senior pastor, Curt Pohl tho Chairman of the congregation and
~he architect Darrel LeBarron. Mr. LeBarr0n made the presentation. Q~. [--~-~ ~ f-~
~ a~ated they had been retained by the church last spring. The firm is now initiating working drawings
but they would like ~o do this with some confidence. The original building was built in 1962, fronting
o~ Nighway %18. This is considered the front. In 1977 an addition wasput on the north side ~hich
added education and fellowship space. The existing space today is 13,000 square feet, on abo~t 174,000
square feet of la~d. The proposed addition is for worship and a narthex for gathering. It is about
7100 square feet for a worship addition that would seat about 482 people, with a potential of set ups
~aki~g the seating 524. The combined buildings would then be about 20,430 square feet.
A little parking has been removed from the original, but additional parking bas been provided. Even
with the proposed additional parking they would have 1/2 green space and 1/2 building and bituminous on
the site. There will be 92 spaces on the north and 74 to the south with 15 along #18. They thought
~hat about 106 stalls were required by code. They are proposing a new curb cut on 33rd. It was his
understanding that thi~ curb cut had been approved earlier by the city but the option had never been used
by the church. They recognize they are in a residential zone. It was their feeling that to continue
to use only the exit on 34th Avenue would be too restrictive with the building expansion.
They recognize that there is a problem with the existing driveway width. The other area of concern had
been height. They propose a steeple on the roof, but no bell is proposed. The original height of the
building wes within the cede limits.
The City Manager stated that there was no problem with height in terms of the cede. The steeple was
· permitted by code.
Mr. LeBarron stated that prior to their appearance before the Planning Commission the church had invited
the neighbors in for coffee and discussion of their plans.
~. LeBarron noted that the steeple height had been one of the concerns at the neighborhood meeting, as
w~11 as a concern that once the Second curb cut was opened, the lot might be used as a short cut or speed-
way by cars going through the neighborhood. One neighbor had been concerned whether the construction
w~ld cause major ground movement ~hat might affect her swimming pool.
C~ssioner Edwards expressed concern over the width of the drive by the new parking area, as had been
note~ also at the Design and Review meeting. He added that the biggest question of Design and Review
concerned the parking lot on the east side of =he property and ~he screening.
Mr. LeBarron said that presently there exists a fence which would be continued to cover the entire side.
It was their feeling it was preferable to have the parking at the rear of the residential lots rather
than at the residence side yards. They were also concerned that the existing green area to the south
would be the last space left in the event of a desire for a future expansion for an educational building.
Lengthy discussion followed between Commissioner Gustafson and the architect regarding the green space,
the proposed expansion and alternate parking areas, ad well as the most cost effective construction, in
regard to removing bituminous and relocating parking. Suggestion was made to reposition the parking
alon~ #18.
Commissioner Edwards noted that he would rather see additional parking along 918 also.
Mr. LeBarron noted that this would then completely surround the building with asphalt. He felt that with
the proposed configuration, they would preserve the largest Piece of green.
In answer to a question from Commissioner Edwards, it was noted that the heaviest use of the £acility
would be at Christmas an~ Easter. Those were the times when they might seat 524 in the sanctuary. Part
of the intent of the addition was ~o be able to house all worshippers at one service or at most two.
Mr. LeBarron stated that they wished to work closely with the staff in regard to parking and landscaping.
He felt the landscaping now on 34~h should be duplicated on 33rd. The entire east property line is an
opaque fence and the entire west property line has an approximately 12 foot high hedge of Russian olive.
Commissioner Gundershaug 'asked about tb~ fence on the east lot line and whether it was directly on the
property line. The answer was "yes". He asked whether a gate or something could be installed in the
parking lot to cut down the use of the parking lot as a raceway?
Commissioner F~wards concurred with this suggestion.
Mr. LeBarron said he felt this was an excellent suggestion. He asked about the width of the curb cut
to 34th Avenue, and was informed that a driveway for two way traffic must be 24 feet wide.
The City Manager noted that in his opinion it might be preferable to divide th~ parking in the middle,
rather than by the end. He added that there was no green area requir~ent for this zone.
Mrs. Lynn Andries, 3341 Hillsboro, said that her concern was with the traffic. The cars drag n~w. She
was co~lcerned about the straight sho~ through the parking lot. She wondered if they would have some type
of chain ~o preven% this. This is her concern. There. is also no stop sign at 33rd/Hillsboro. she said
o~ler neighbors she had ~alked to ~re also concerned with the traffic. She said there was no~ no
landscaping on the east boundary. She felt the lot should be blocked off other than for church services.
She £slt if the lot was split, the cars would just go around the church and come out again.~' J'~'~ ~ ~
Mr. Oohn ROthltetn, 3401 Independence, stated that his concern was that t~ey open the other curb cut. ~
If they do not, he will have even more ~raffic past his house ~han he does now. He felt ~hat a rumble
s=Lp and a gate would prettT much ~ake care of ~he problem i~ the parkin~ lot.
Karen Swan, 3317 Hillsboro, stated she lived directly east of the fence. The sanctuary as propose~
will be directly behind her back yard. She said she would like to see some shrubbery beside the fence.
They will be losiflg ~he present openness and will feel more closed in between the parking lot and fence.
Commissioner Bartos said his concern was the landscaping and keeping the parking lot from becoming an
Indy 500.
Commissioner Gulenchyn went along with those statements. He felt it was a matter of controlling the
traffic and adding shrubbery.
Commissioner Edwards said he had a tough time with this particular project. He wondered where the land-
scaping would go? There did not seem to be any room. He would also stop the traffi'c from going right
through the ~arking lot, and though it should go around the. west side of the building.
The architect said there was five feet between the parking lot and the fence. Discussion followed be-
tween the architect and Mrs. Swan about the possibility of som~ shrubbery being planted that would be
visible from her lot.
The architect said they want to work with both the staff end the neighbors. They would lik· to bid the
project in Fenruary or March but would not begin ac=ual construction until actual load limits were off
in May, with conclusion in Fall of 1982.
Discussion between the architect and the commissioners regarding the height of the fence (6 feet) the
possibility of putting landscaping against the fence for the neighbor's view, the straight through ~raf-
fic and the possibility of repositioning the parking to split the traffic and the need for screening
on the east.
.Commissioner Gustafson said he felt strongly that additional parking should be along #18 and the buildin~
moved to the east.
The architect was concerned that the parking lot remain as is. He felt the entry and its esthetics as is,
were important. He felt it was important also for the handicapped entrance, since there were many handi-
capped members of the congregation. He felt that it was important for the entrance to be in the morning
Commissioner Gundershaug said his main concern was the parking lot on Sunday night end az~er,'~ so that it
did not become a race track. He was also concerned with all of the parking on the east.
~ommissioner Gundershaug made a motion recommending approval of the Conditional Use Permit Amendment and
variances at Beautiful Savior Church in Case 82-4 wi~ the sti~ulation that additional landscapin~ be
~rovided along the entire eastern ~arking lot and that traffic be restricted in the parkin= lot other
than during church Services, with entrance only at the 34th Avenue side. Commissioner Gul~nch n second.
Voting in favor: Gulenchyn, Bartos, Cameron, Gundershaug
Voting against: Gus~afson, Edwards
MOtion carried.
nap-~,-_ r~, ~:,_ ~-~, request from .B.e~Ut~ ~.~ senti o~ [u*~~r.-6~*,..--~_t-h-~.a~~'h~e .Avenues,
for an %mend~ent to t~eir condi*rig~al u~e oe-~it to-acco,r~.:odate a 7~00 square foot addition and
variances in parking layout, was considered by Council.
Hr. Allen Esterberg. co-chairman of the Building Committee for Beautiful Savior Lutheran Church.
represented the petitioner. He said they are asking for an a~end.~ent to their conditional use permit
as necessary for the construction of a new sanctuary and narthex on the current site.
He then introduced Mr, Oarrell LeBarron,architect for the church. ~r. LeBarron presented a small, site
plan drawing sho~ing the location of the existing church and the proposed addition. He said that the
existing building is of t~o vintages, from the early and ~id-sixties and the 1977 addition. The exist-
ing size of t~e building is about 13,000 square feet. The ne~ addition is 7100 square feet, seating
approximately 484 to 524 people, depending on overflo~ and setups. The combined building area would
be about 20,430 square feet. LoOking at the uniform building code, the worst condition projected would
limit to 21,000. The building now is of heavy ti;bet with one-hour rating, which allows 27,000. The
addition is ~ithin order as far as the UBC is concerned.
When worship space with fixed seating is added as opposed to flexible, multipurpose worship/fellowship
they now have, the first thing to be checked is the parking. Presently,98 stalls exist. ~ith the new
addition, parking stalls ~°uld be reduced to 92 of the existing. Seven,y-four more are being added.
The ordinance requires about 166 stalls. However, additional parking spaces have also been added for
teachers to provide about 15 extra stalls.
Mr. LeBarron continued that, in adding the extra stalls, consideration must also be given to the ingress
and egress capability. Presently, all the cars enter and exit onto 34th Avenue. The building committee
is also asking for a new entmyway and exit onto 33rd. This would give the church two approaches and two
exits. Mr. LeBarron said that he understood that the 33r_d Avenuq curb cut had previously been approved
in 1970, but has not been utilized by the church family.CT~:,-~c~( ~-L~-~-% ~-~-~ .
~ .~arron commented that the curb cut on the~s'~u~n sloe woUlo Pe important to neighbors both on the
~ ~ a~d the north. The parking as laid out is from 2 inches to 22 inches too narrow between the stall
~. A variance is needed for this.
The architect continued that the front yard of the property had been defined as County Road 18 when the
property was purchased. Since then, County. Road 18 h~aS~been closed off. The main strip of parking
along the entire eastern property line is the church's rear yard. The majority of that parking is also
abutting the rear yards of a half dozen single family homeowners. There is a thick hedge of Russian
Olives toward County Road 18 which conceals the building almost entirely. The eastern property, the
most critical because it abuts a residential zone, has a fence along two-thirds of it. It is the pro-
posal of the building committee to extend that fence down to 33rd and to continue the opaqueness to
avoid headlights shining into backvards. Mr. LeBarron stated that the landscaping which should be
developed properly is that alonq 3~rd Avenue. This area is seen as a "book-end" and should be a
matching part for 34th Avenue. Green ash is suggested along that edge the caliper to be worked out
with the city.
Mr. LeBarron said they were just entering the working drawing stage and that they do intend to work
out the finer details on both of the edqes. The plans had been discussed with the neighbors at an
informal gathering prior to the Plannin~ Comn)ission hearing. A concern that came Op at [hat time was
cars cutting through the lot. Suggestions were n;ade to chain the southern entry and to put a rumble
strip in the middle. Hr. LeBarron said he thought it might be better to move the driveway slightly
and perhaps put an island backing it up so that one has to do an "S" curve to get in or out. This
might be safer than a chain which could be up or down depending on human behavior. The island might
also afford more landscaping buffer space to the parking.
also a concern of the neiqhbors ~ F_N Additiona) landscaping along the fence was
Upon request for further clarification, Mr. LeBarron Said that the new curb cut on 3$rd, which is pro-
posed in Connection with the extension of the parking lot, had been approved in 1970.
The city manager agreed that this was correct; the curb cut on 33rd had been previously approved.
Hr. LeBarron then said that, because the owner had been lead to believe that there could be a curb cut
on 33rd Avenue, the design had been built around that possibility. Because the church is in a residen-
tial zone,approval is needed to add onto the building. The variance relates to the slant parking,
with the driving lanes being a little undersize, either 2 inches or 22 inches.
Upon discussion as to the possibility of the church requesting permission for ~re building space at
a later time, Mr. Esterberg stated that this would no: happen for at least I5 years, until the mortgage
was retired.
Discussion then turned to control of traffic through the 33rd Avenue opening by use of a*chai~,, rumble
~.'--i~tr~p and an "S" curve, landscaping, and the possibility of a church outgrowing a residential neighbor-
~ hooa.
Discussion was opened to the floor.
Mrs. Karen Swan, 3317 Hillsboro Avenue, asked for landscaping along the fence line.
Mr. Russell Conzet, 3209 Independence, expressed concern with the drainage from the site. He said he
haq had a water problem for 15 years. The water runs fro~ 34th all the way down to Independence.
The architect was directed to resolve the d*rainage problem in conjunction with the city engineer prior
to presentation of the building plans.
Councilmember Daly inquired as to arrangement for snow removal, one of his concerns being that the fence
not be damaged. He also asked that as much landscaping as possible be given along the east side because
the cars are so close to the houses.
Upon question as to ~hether the fence was right on the property line,
was on the property, line.
Councilmember Otte~ inquired as to how the revised plan would affect the green area.
The architect replied that there would be about 20,000 square feet of building and 71,000 square feet
of parking lot. The lot, in total, is about 174,000 square feet. The building and bituminous covering
is 52~ leaving 48~ as green area. He said he had checked these figures out since the Planning Com~ission
meeting.
Councilmember Otten inquired as to whether there was any possibility of a green strip to the east of
the parking lot with shrubbery between that area and the fence.
The architect said that, as shown, it is a continuation cf the existing five foot setback, t~hile the
model showed almost solid plantings on the east edge, the project has been cut back by one-third. They
are now working with 2/3 budget a~d are atten~oting'to fulfill as ~uch of the church need as possible.
He said it appears as if the planting along the eastern e~qe has been cut back too far and some planting
will have to be added back in~o the project. They would like to show the increased plantings in an
informal review before coming back to building inspection. ~tow there is quite a bit of planting on the
single family property side. If the church were to fill in the holes, it would be the ideal situation.
The architect stated that there was a good slope to the site and that, if a catch basin is needed for
stom waters to be gathered at the bottom of the hill, this will be worked out with the city engineer.
C~
The city manager pointed out-that the construction would be before council at & later date.
Counctlmen~er Williamson asked if any thought had been given to aaalng a easement and leveling tne~
parking area.
The
architect
replied
was the first thing to go in the cutback. The church wanted
that
the
basement
a walkout basement under the worship space buC it was not financially possible at this time. lie said
there is a hump on the land that will be taken out in order to make the parking lot more level than it
iS presently. The proposed building, upon completion, will be a one level building. Part of the goal
is to keep it totally barrier-free because of the large nunbers of handicapped people that use this
church. To put in a basement means to put in elevators. The basement was not a priority iteJn as far
as worship space. It was to be for future educatioml or youth program purposes.
Upon question, the architec~ explained how an island could be used to control traffic at the 33rd
entrance. He again stated that he thought the island would be more effective than a chain because you
would not have to depend on human behavior to qet the chain uo and down.~C~-~'~ ~-!'~ ~
Counctlmember Enck inquired as to whether any consideration had been given to moving to another loca-
tion. He said he was concerned with additional building and the church actually creating an adverse
impact on the residential neighbo~ood.
Mr. Esterberg said that they had done a study involving the question of moving. At this particular
time, it appeared to be prohibitively costly, so it was not pursued further. At the same time, the
church did have additional space on the site for at least this one addition. He said he thought this
a;dttton appeared quite reasonaole ~n terms of the space on the site.
Upon further inquiry, ~r. Esterberg responded that they do not own any additional property adjacent
to the site. At one time they had had preliminary discussions about buying a couple of the adjoining
hems, but no plans have been laid for such action. They had anticipated some classrooms to the south
aS a potential, last addition to ~he site. ~e said he did not know what the feasibility was for the
classroom addition at a later date. They tend to think that it would be feasible. At this time the
. educational programs supplement space by the use of space in classrooms 'in District 281 schools.
Mr. Esterberg sa~d this seems to work out fairly well.
Otscussion followed concerning continued availability of'#2~1 facilities with closing of schools, etc.
Mr. Esterberg then stated that they do have the desire to undertake education on the church premises.
The question of additional construction will not come up for at least five years into t~e future.
Counctlmember £nck commented that he foresaw a significant traffic problem with further expansion of
the church facility.
~ounctlmember Wi lltamson inqu~rea as to whether the addition of classrooms would impact the parking
spaces.
The city manager said that the Council would be able to review the actual parking needs if such needs
were thought to exceee code requirements.
Upon question as to t~e size of the congregation, ~r. Esterberg said it was about 1,175 (members over
age 14).
~ounctlmember Oaly then stated that he thought a chain or a barricade at the 3~rd entrance was essential
even if an island or "S" curve was used. People are still going to find that route shorter than driving
around. Unless something is there, other than during services, it will become a thoroughfare. He said
he wanted the chain or barricade to be a condition of the permit.
COuncilmember Enck sooke in favor of utilizing design to restrict flow of traffic. If it becomes a
problem, then require the chain or barricade. He s~oke against use of the chain from a liability stand-
point for the church. Placement of chain or barricade could be left as an option for later, if needed.
Further discussion followed concerning whether a chain or barricade should be installed at this time
with Councilmember Oaly speaking in favor.
Mrs. Linda Buchele, 3~57 Hillsboro Avenue, said that she did not think an island would stop the teenage
drivers. She said she favored a barricade.
~e mayor spoke in favor of requiring the rumble strip, the island and the barrier.
Mr. Esterberg said that if they are required to have a barrier, they would need to have it open on
Wednesday night, which is church school night.
Responsive comment was that the problem of cars racing through would occur primarily when the parking
lot was empty.
Mr. John Rothstetn, 3401 Independence Avenue North, spoke in favor of the curb cut on 33rd Avenue so
as to divide the traffic. He sa~d the second opening wou~a improve t~e situation in his area. He
also said there might be a need for a stop sign on 33rd to slow traffic down.
Mr. Bob Schultz, congregation ment~er, spoke in support of the addition to the church, noting the need
for the space to accommodate the present attendance. He also noted that future expansion was limited
by financial ability. ~~, i (_ ~_ c~::~ f,. ~
further cements were offered.
~.~ Y cilme bar Otten, second by Councilmember Daly to ap~.r-u,~ ama
;¥ ~se.~mitand granting variances for Beau[~f,,~ c,,,~., ........ -~. Lna~nt.to_~he conditional
~~L~llhi~f fn fka e~f4e~ ....... - . _y ..... ~'~r..~u~nu,ran_~nu~cR as reauested und~-
lJne,~trefffc control at 33r~ ~.-~ ...... ~ drainage problems, landscaping alon the s~gfen
g co~[ee 8s
a gate tn addJLJon to Lhe "S" curve. The building co~ni[[ee decision ~ould be shared ~J[h Lhe neighbor-
hood,
One of ~he neighbors imm ~ne norLh end suggested ~ha~ ~he ga~e no~ be placed J~edfe~el~ ~o give the
opporcuni~ [o see h~ ~ ~r~s ~JLhou~ one.
The ma~o~ sa~d ~ha~ ~he ma~e~ of ~he gale should be ~orked out ~f~h ~he ~arfshfoners and nefghbom and
at the time of consLruc~fon plan aPProve1, Council ~11 make ils f~nal decision, Counc~]member
Jnd~ca[ed concurrence ~JL~ ~h~s a~proach.
~eed for J~ed~a~e access for e~rg~c~ vehicles ~as mentioned b~ CouncJl~e~ [rick.
Vote ~as then ~aken on [he ~uesL~on es follows:
~ottng tn favor: Erfckson, Dal~, [nck OC~en W~ll~amson
Yotlng aga, nst: ~ ' ,
Councilmember Williamson said that ~9_~te in the .parkinK lot of Beautiful Savior
Lutheran Church was not being kgp~ ~osg~.as promised to the neighbor, p. The
cite manaKeT is to look into this matteT. ~C[~ ~-~-~ ~ 1'7
DATE:
TO:
FROM:
SUBJECT:
CITY OF NEW HOPE
MEMORANDUM
July 8, 1994
Planning Commissioners
Kirk McDonald, Managemem Assistant, Community Developmem Coordinator
Beautiful Savior Petition
The attached petition regarding educational classes at Beautiful Savior was submitted on Friday,
· July 8th. Please attach to Planning Case Report 94-18.
NOTICE OF PUBLI~ HRI~RING
THIS PETITION IS OF CONCERN TO THE NEIGHBORHOOD AROUND THE AREA
OF BEAUTIFUL SAVIOR LUTHEI~ CHURCH, LOCATED AT 3351 INDEPENDENCE
AVE N., IN NEW HOPE.
THE CONCERN IS OF THE CONDITIONAL USE PERMIT AMENDMENT TO ALLOW
EDUCATIONAL CLASSES AT BEAUTIFUL SAVIOR LUTHERAN CHURCH.
PLANNING CASE 94-18.
WE OF THE AREA SUP~OUNDING BEAUTIFUL SAVIOR LUTHERAN CHURCH
FEEL THAT IT IS IN THE BEST INTEREST OF THE NEIGHBORHOOD NOT TO
HAVE A SCHOOL LOCATED IN THAT BUILDING.
DISTRICT NO. 287 WISHES TO RENT SPACE FROM HOPE ALLIANCE,
PROSPECTIVE BUYERS OF THE CHURCH. DISTRICT NO. 287 WOULD USE THE
CLASSROOMS TO EDUCATE CHILDREN WITH SPECIAL NEEDS (WHICH
INCLUDES BEHAIOR PROBLEMS VARIOUS DEGREES). THOSE WHO SIGN THIS
PETITION ARE NOT IN FAVOR OF THIS REZONING PLAN FOR THE AREA. IT
IS ZONED FOR A CHURCH AND SHOULD STAY ZONED FOR A CHURCH. THIS
RESIDENTIAL AREA, INCLUDES MANY FAMILIES WITH YOUNG CHILDREN.
THIS AREA IS NOT ABLE TO HANDLE THE EXTRA TRAFFIC OF CARS AND
BUSES DURING CRUCIAL HOURS, WHEN YOUNG CHILDREN WOULD BE COMING
AND GOING TO SCHOOL.
p ,./.¢ /
3¢,,"7
ADDRESS
Planning Case:
Request:
Location:
CITY OF NEW HOPE
PLANNING CASE REPORT
94-19
Request for Site/Building Plan Review/Approval for Building Addition
7849 42nd Avenue North
PID No:
17-118-21-23-0001
Zoning:
Petitioner:
Report Date:
Meeting Date:
B4
Country Kitchen of New Hope
July 6, 1994
July 12, 1994
BACKGROUND
The petitioner is requesting site/building plan review/approval for remodeling and building
addition pursuant to Section 4.039A - New Hope Code of Ordinances.
Country Kitchen is proposing to construct a 4,240 square foot addition on the east and south
sides of the existing 3,250 square foot restaurant, along with interior remodeling and other site
improvements.
o
The petitioner states on the application that the purpose of the request is to remodel the inside
and outside of the current facilities after 15 years of use, to increase restaurant capacity to
meet demand, and to present a more attractive appearance in the City.
The restaurant is located on a 47,200 square foot (1.08 acres) parcel on the south side of 42nd
Avenue between the School District//281 Administration Building and Autohaus.
The site is zoned B4, Community Business, as is the majority of property on 42nd Avenue.
The school property to the west and south is zoned B4 (administration building) and I-1,
Limited Industrial (bus garage), the property to the east is zoned B-3, Auto-Oriented, and the
property to the north across 42nd Avenue is zoned B4. Restaurants are a permitted use in
the B,4 Zoning District.
The property?s-zoning history is as follows:
1956-~ COmmercial
1960- Heavy Industry
1961 - Limited Industry
1990 - Community Business (B-4)
This parcel is located in the City Center Planning District #17 of the Comprehensive Plan,
where special emphasis is placed on pedestrians and aesthetic features.
o
The topography of the site is flat, except for the southwest comer where it rises seven feet.
Several nice trees exist at the west side.
10.
Property owners within 350 feet of the request have been notified and staff have received no
comments on the request.
ANALYSIS
This is a routine site and building plan review/approval request, as the project meets all
minimum standards and no variance or conditional use permit is required.
The existing northwest comer of the building is located 45 feet from the front property line
at 42nd Avenue and is an existing non-conformity due to the County taking of right-of-way
for the widening of 42nd Avenue (the required setback is 50 feet). Staff does not feel that a
variance is required to expand the building, as the taking of the property was beyond the
property owner's control.
The proposed addition on the east will include a new front entry/lobby facing east and will add
additional seating. Extensive interior remodeling will take place in conjunction with the
exterior addition. The addition and existing building exterior will be new and will consist of
a gable entrance on the east, vinyl siding, cedar trim and lattice, and asphalt shingles. The
windows in the addition will be insulated/glazed to match the existing. The east elevation
would have a covered concrete slab porch with decorative railing.
The plans include expansion of the parking lot at the rear (south side) of the building to
correct minor parking lot problems. The number of parking spaces provided with the
expansion totals 83 and exceeds the Zoning Code requirements of 75. The expansion at the
rear will provide additional customer parking and the plan includes the removal of asphalt to
close to the property line at the northeast comer near the driveway. The parking area will be
paved with bituminous and have bituminous curb to match existing.
Other site improvements will include a new light 'pole in the rear parking area to match -
existing, new fence to screen the exterior walk-in cooler, new trash enclosure, and new
handicapped parking stalls/signage.
The existing pylon sign will remain in place.
Landscaping improvements around the perimeter of the site are also proposed and will include
27 trees and 8 shrubs.
The hours o~°pemtion for the restaurant will remain unchanged: 6:00 a.m. to midnight.
The Design and Review Committee met with the petitioner on June 23rd and discussed general
items including building materials, parking, landscaping, signage, lighting, trash enclosure,
etc. The petitioner confirmed that the roof top equipment would be enclosed. A landscape
schedule was submitted subsequent to the meeting, per the committee's request.
The City Engineer has reviewed the plans for the improvements and has no significam
conceITlS.
11.
Staff only has a couple minor suggestions/revisions for the plans:
Correct fence problems revealed by survey. The split rail fence at the south lot line
is more than 10 feet onto the School District property. If it was installed by Country
Kitchen, it should be removed.
Bo
The barrier posts along the east side at the rear of the property are unsightly, serve no
purpose, and should be removed.
RECOMMENDATION
Staff recommends approval, subject to the two items noted above.
Attachments:
Zoning/Section/Topo Maps
Certified Survey
Site Plan
Floor Plan
Elevations
Landscape Plan (Attachment A)
Landscape Schedule
Drainage Plan
Plan General Notes
Fence Plan (Attachment B)
I
/
42nd. AveM
GEORGE HE:BERT ' '.
COUNTY ROAD - NO. 9
(ROCKFORD ROAD) -~,"~e'~ ~ ~,~
BA~HMAN'$
I H HI/i IHI
LANDSCAPE DEPARTMENT
6010 LYNDALE AVE. SOUTH
MINNEAPOUS, MN 55419-2289
612-861-7696
6/29i94 ORDER NO.: L009?62'4-00 ~
DATE: PLAN:
6/29/94 gEO.--' 94
DESIGNER PttONE: ~6~-765~
HOME 000-93~-~6~4 ~
WORK: 000-~3T-2062
NAME:
S
OT
LO
D
(COUNTRY ~ZTCH£H OF g£g HP
TT#.: GEORGE HEBERT~
849 42N0
dEg ~OPE NM 5~4~7
S
HT
IO
P
CO~NTRY KXTCHE# OF NEW NP
~TTN.: ;EOR&E HE~ERT
?849
NE~ HOPE ~# $5427
YEM, JAP~NES~ UPRZGgT
HOCKORA#CE, ~!R. GNOUFLAK
ASH, PA;~GRE
HONEYLGC~:$T. ~KYLZNE
0~- P~# '"'"
~EL~VERY-SQXL/~AHO/HU~H
t2. C0gT
tS CGNT
CU Y~
~lOV£ THE OF
FOUH~T[0#
THI$ ESTINATE HAY BE }ITHDRAI 8Y ~CHN
ACCEPTANCE OFORDER:
THE
'gE
g'9
2:.95
27[.00
25.00
6~.00
20. '~0
583.00
t~4.00
tO2.00
792.00
~44.00
9:6.00
926.00
a§.O0
2t~.OO
274.45
206,~$
45.?0
500.00
~30,00
t62.50
~S,00
.00
ACCEP ED ~]:TH!N 30
SUBTOTAL 3~ t 4. so
53.00
3~.00
5~.00
~i.O0
396,00
423.00
4~.00
95.00
390.00
/
/
. .. j
GENERAL NOTES:
Legal DeSCription:
2. Zone: I-1 Limited Industrial Distdct
Building.Type: Assembly/Restaurant
(Conditional'Use)
Building Size: Existing: 3250 S.F.
Proposed: 4240 S.F.
5. Property Size:
6. Lot Coverage:
J
Setbacks; Front: 50'*
Rear-. 35'
-Side: 20'
Dinir~ 2535' S.F. Gross+ 40
S.F./Person = 63
spaces
Kitchen: 1705 S.F. Gross + 80
S.F./Person -- 21
spaces
Parking Shown: 83 spaces including 2
handi¢~
TyPical Spac~. 8°.9' wide x 19~,0' long'
-N
Planning Case:
Request:
Location:
PID No:
CITY OF NEW HOPE
PLANNING CASE REPORT
94-20.
Requests for Preliminary Plat Approval, Site/Building Plan Review/Approval
and Concept Planned Unit Development Approval to Allow Building Addition
3920 Winnetka Avenue North, 3941/3961 Quebec Avenue North
17-118-21-34-0003
Zoning:
Petitioner:
Report Date:
Meeting Date:
I-1
Kellison Company/Don Harvey
July 6, 1994
July 12, 1994
BACKGROUND
The petitioner is requesting preliminary plat approval, site/building plan review/approval and
concept planned unit development approval to allow building addition on the east building
pursuant to Chapter 13 - New Hope Code of Ordinances and Sections 4.039A(1), 4.19, 4.194,
and 4.196(3) - New Hope Code.
The petitioner is proposing the platting of property known as Don Harvey Second Addition,
Block 1, Lot 1, which currently contains two industrial buildings of approximately 26,880
square feet each (2 buildings on one lot). In conjunction with the preliminary plat the
petitioner is requesting "General Concept Stage" PUD approval to construct a 41,640 square
foot addition to the building at 3943 Quebec Avenue North where Versa Die Cast, Inc. is the
tenant.
The petitioner states in the application that "there are two structures currently on the property
which are approximately 26,880 square feet each which were originally designed for use as
multi-tenant industrial type facilities and were constructed about 18 years ago. One tenant,
Versa Die Cast, Inc. now occupies the westerly building of the two and also has one bay
(approximately 5,000 square feet) of the easterly building. Two other tenants occupy the
balance of the space in the easterly building with one of them occupying approximately !5,000
square feet and the other occupying approximately 7,000 square feet. Versa Die Case has
made a request of the owners to provide an additional 40,000-t- square feet for their
manufacturing needs or they will have to vacate the building and move to another city. We
are requesting that the City of New Hope grant us the platting of the property and the
permission to construct approximately 40,000 square feet as an addition to the westerly
building so that we may maintain the Versa Die Cast Company as a tenant in the building and
as a business within the City of New Hope. Versa Die Cast currently employs approximately
60 people and will increase their employment with the new facility to approximately 100.
These are manufacturing level jobs and have an average salary approaching $30,000 per year."
The petitioner further states that "there will be minimal amounts of additional trucking to and
from the site and there will only be approximately 40 additional automotive trips to and from
Planning Case Report 94-20
July 6, 1994
Page 2
the site for new employees. There will be no additional needs for sewer and water
connections. The property will continue to be owned by Winnetka Properties for the
foreseeable future, and as a part of the new addition to the Versa Die Cast building, it is the
intent of Winnetka Properties to renovate both of the existing buildings including
refurbishment of the docks, doors, re-painting of the walls, landscaping, and other necessary
features to enhance the aesthetic appeal of the buildings."
The petitioner states that due to commitments made by Versa Die Cast prior to their coming
to the owner with the request for the addition, we are under a time constraint to provide them
with a facility to house new equipment by sometime in October to early November.
Therefore, from our respect, time is obviously of the essence. We are asking for input and
assistance from the planning commission, city council, and staff for the City of New Hope to
help us provide a facility that will be in keeping with the requirements of New Hope but will
also meet the schedule and economic requirements of Versa Die Cast."
Lastly, the petitioner states in the application that "the long-standing situation of drainage from
this site across private property will be resolved as a part of this approval. We intend to
create a retention/sedimentation pond in the area of Outlot A at the east end of the property
to accept all drainage water from this site. All water will be directed to the same general
location where it currently exits the property at approximately 300 feet west of the
northeasterly comer of the property. Currently this water drains across private property to
the pond area approximately 150 feet north of the subject property. In replacement of that
system, we intend to install catch basins and a storm sewer system to carry on-site water to
the new retention/sedimentation pond on Outlot A. This pond would subsequently drain an
amount not to exceed what had previously been going to the pond to the north of the property
by means of a storm sewer across public right of way along Quebec Avenue and then
outfalling into the pond. Newly created excess water above the amount that has been draining
from the site will be taken off by means of a storm drain system from the retention pond to
the catch basin in the street at the southeasterly curve of the property and subsequently to the
sedimentation pond southeast of the property across Quebec Avenue. This method, we
believe, is the best solution to a long standing problem in that it eliminates any drainage across
private property and provides for diversion of the newly created excess drainage to an existing
city system thereby not increasing the amount of runoff to the natural pond at the north of the
property."
The site is zoned I-l, Limited Industrial, and manufacturing, warehouse and related offices
are a permitted use in the district.
The site is surrounded primarily by I-1 zoned property, with an I-1 warehouse and B-3 Auto-
Oriented use to the north, Quebec Avenue and an I-1 (Winnetka Properties) warehouse to the
east, Quebec Avenue and an R-O zone (church) and I-1 zone (Paddock Laboratories) to the
south, and Winnetka Avenue and R-1 zoned property to the west.
Planning Case Report 94-20
~aly 6, 1994
Page 3
The topography of the subject site slopes 25 feet down from the west to the east. There are
about five large trees at the west end of the property and one 30" oak at the east end.
10.
Property owners within 350 feet of the request have been notified and staff have received no
comments on the request.
ANALYSIS
PRELIMINARY PLAT
The plat meets the zoning code requirements for lot size and width requirements in the I-1
zoning district, witch are one acre and 150 feet, respectively, as the single lot contains
292,224 square feet (6.8 acres) and has a width on Quebec Avenue of over 12,000 feet.
Per routine procedure, the plat was submitted to Department Heads, City Attorney, City
Engineer, Hennepin County and other appropriate agencies for review and comment.
3. Hennepin County reviewed the plat and made the following comments:
Ao
As shown on the preliminary plat, dated June 15, 1994, the developer shouM dedicate
an additional seven feet of right of way for a total of 40 feet of right of way from and
along the CSAH 156 centerline.
All access from the plat to CSAH 156 must be limited to Quebec Avenue. The
existing driveway located approximately 220 feet north of Quebec Avenue must be
removed and the area within County right of way restored. The developer must have
an approved Hennepin County entrance permit before beginning any access
construction or driveway removal.
All proposed construction within County right of way requires an approved Hennepin
County utility permit prior to beginning construction. This includes, but is not limited
to drainage and utility construction, trail development and landscaping.
The developer must restore all areas, within County right of way, disturbed during
construction.
4. The City Attorney reviewed the preliminary plat and made the following comments:
Ao
The legal description on the preliminary plat includes not only the land to be included
in Don Harvey Second Addition, but also includes the land previously platted as Don
Harvey Addition. The legal description needs to be changed to include only the land
being platted as Don Harvey Second Addition.
Planning Case Report 94-20
July 6, 1994
Page 4
The following information, as required by City Ordinance §13.041, is not included in
this Preliminary Plat:
Scale (and bar scale) of the plat
Existing zoning classification (property appears to be zoned I-1 and is described
in New Hope City Ordinance §4.34(4)
Sewer, water main and other details.
Co
The property owner must supply our office with a Registered Property Abstract or an
Abstract of Title extended to date for the property to be included in the plat of Don
Harvey Second Addition.
Do
The property owner should also be aware that the entire real estate taxes due and
payable in 1994 must be paid before the Final Plat will be accepted for filing by the
County. So if the developer expects the Final Plat to be filed before October 15th,
arrangements should be made for prepayment of the second half real estate taxes.
5. The Minnesota Department of Transportation had no comment on the plat.
6. The 'City Engineer reviewed the plat and made the following comments:
The sewer and water service to the new building addition is not shown. A sewer and
water service stub does exist opposite the new building addition in Quebec Avenue.
Water main extension for fire protection should be considered in accordance with the
Fire Department.
Bo
The grading of the site proposes a retaining wall in the northwest comer of the site.
The estimated height of the retaining wall is seven feet, which warrants reinforcement
fabric if modular block is used. Therefore, the setback requirement for the retaining
wall from the property line must be 10 feet or greater to comply with New Hope's
ordinance and requirements for reinforcement.
Co
The drainage on the site is intended to be collected and conveyed to a ponding area on
the east side of the site. Specifics for the pond are not provided; however, it's
recommended'its normal water level (NWL) be 908, while its high water level (HWL)
be 915. Approximately two acre feet of storage can be provided. The outlet pipe can
be reduced from the proposed 27 inch to 15 inch. It is also recommended the pond
be excavated to 904 approximately four feet below the NWL. An outlet skimmer shall
be constructed at the discharge pipe. The plan shall be reviewed by Shingle Creek
Watershed and comply with their water quality requirements. The secondary pond
outlet pipe is not recommended.
Planning Case Report 94-20
luly 6, 1994
_.~age 5
D. Concrete curbing and improvements to the existing parking/drive isles is
recommended.
Sidewalk exists on the south side of Quebec Avenue abutting the church. It is
recommended sidewalk be considered on the south and east sides of Quebec Avenue
abutting this property.
The existing bituminous pavement and driveway at Winnetka Avenue shall be removed
and properly restored.
The Planning Consultant also reviewed the plat. Please refer to his comments in the attached
report.
RECOMMENDATION
Staff recommends approval of the Preliminary Plat subject to the following conditions:
Preliminary Plat be revised to incorporate recommendations of Hennepin County, City
Attorney, City Engineer and Planning Consultant and be re-submitted to City.
Final Plat to incorporate all recommendations and be submitted to Planning Commission for
review/approval.
GENERAL CONCEPT STAGE PUD
The purpose of the Planned Unit Development is to provide for the grouping of land parcels
for development as an integrated, coordinated unit as opposed to traditional parcel by parcel,
piecemeal, sporadic and unplanned approach to development. The PUD is intended to
introduce flexibility of site design and architecture for the conservation of land and open space
through clustering of buildings and activities. It is further intended that PUD's are to be
characterized by central management, integrated planning and architecture, joint or common
use of parking, maintenance of open space and other similar facilities, and harmonious
selection and. efficient distribution of uses.
The processing steps for a PUD are intended to provide for an orderly development and
progressions of the Plan, with the greatest expenditure of developmental funds being made
only after the City has had ample opportunity for informed decisions as to the acceptability
of the various segments of the whole as the Plan affects the Public interest. The various steps
are:
A. Application Conference. Preliminary discussions.
B. General Concept Plan. Consideration of overall concept and plan.
Planning Case Report 94-20
July 6, 1994
Page 6
C. Development Stage Plan. One or more detailed Plans as part of the whole final plan.
Do
Final Plan. The summary of the entire concept and each Developmem Stage Plan in
an integrated complete and final plan.
The General Concept Plan provides an opportunity for the applicam to submit a plan to the
City showing his basic intent and the general nature of the entire development before incurring
substantial cost. This Concept Plan serves as the basis for the public hearing so that the
proposal may be publicly considered at an early stage. The following elements of the
proposed General Concept Plan represent the immediately significant elements which the City
shall review and for which a decision shall be rendered:
A. Overall Maximum PUD Density Range.
B. General Location of Major Streets and Pedestrian Ways.
C. General Location and Extend of Public and Common Open Space.
General Location of Residential and Non-Residential Land Uses with Approximate
Type and Intensities of Developmem.
E. Staging and Time Schedule of Development.
F. Other Special Criteria for Development.
The Planning Consultant has prepared the attached report on the PUD application.
Please refer to it, as it is not staff's intent to repeat the analysis in the report.
The Design & Review Committee met with the petitioner on June 23rd and a number of issues
were discussed, including the PUD process, the building expansion, drainage issues, parking
and traffic concerns, the aesthetics of the buildings, landscaping, and the plat. Revised plans
were submitted as a result of that meeting. The Committee was concerned about the lack of
detail, however were reminded that this is only "concept approval" and the details will be
addressed in the later PUD phases.
6. Project data for the site is listed below:
Total
Total
Total
Total
Total
Total
Site
Existing Building
Existing Building
Phase I Addition
Phase II Addition
Buildings w/Phase I & II (31.7%)
298,000 square feet
26,880 square feet
26,880 square feet
20,400 square feet
20,400 square feet
94,560 square feet
Planning Case Report 94-20
~uly 6, 1994
Page 7
Total Impervious (71.9%)
Total Parking Phase I
(includes 7 H.C. & 1 H.C. van parking)
Total Parking Phase II
(includes 7 H.C. & 1 H.C. van parking)
214,350 square feet
208
251
(The petitioner originally planned the building addition in two phases, however, this has been
changed to construct the entire addition at one time.)
Staff's main concerns are:
o
A. The aesthetics of the buildings: materials, maintenance, etc.
B. Traffic movement: trucking
C. Landscaping: staff would like to see significant landscaping improvements on the site
Drainage: The City Engineer feels that the petitioner's solution to the drainage
problem is acceptable and staff would like to get this problem resolved.
A landscaping plan has been submitted showing the addition of 244 trees and shrubs to the
site, as listed below:
14 Summit Seedless Ash 2
15 Black Hills Spruce 6
5 Red Splendor Crab 70
1 ! Red Twigged Dogwood 53
33 Techny Arborvitae 8
7 Skyline Locust
Amur Maple
Mint Julep Juniper
Broadmoor Juniper
Gold Drop Potentilla
Japanese Tree Lilac Clump
Staff is supportive of granting approval of the Concept Stage PUD, pending comments from
the Planning Consultant and Commission. Because this filing is "CONCEPT STAGE PUD"
only, it is not appropriate to focus on the normal detail review. At such time as
"Development Stage PUD" approval is sought, all the normal schedules and detailed blueprints
must be submitted.
Among the few issues raised by the "Concept" are these:
Floor plans of all buildings with approximate warehouse/manufacturing/office square
footages identified and calculated for staff review of parking loading needs, including
tenant separation (demising) walls.
Planning Case Report 94-20
July 6, 1994
Page 8
Unusual asphalt design surrounding all sides of both buildings, reducing many options
for repair/upgrade of the buildings and reducing the clarity of separating cars and
trucking.
Revised building architecture has added some glass which was encouraged. Detailing
that seems a little odd appears near the new "entry" and requires a more thoughtful
rework.
RECOMMENDATION
Staff recommends that the Concept PUD approval be granted, subject to a conference at City Hall
with architect and staff exploring additional building shapes and elevations that might improve the
traffic design and aesthetic value of the entire property, while allowing the same approximate building
footprint and function. This conference must occur at least 14 days prior to the submittal of
"Development Stage PUD" plans. Staff also recommends approval subject to the conditions in the
Planning Consultant's report.
Attachments:
Planner's Report
Petitioner Correspondence/Project Description
Zoning/Site Maps
Revised Site Plan
Revised Grading/Drainage Plan
Landscape Plan/Schedule
Building Elevations
Floor Plan
Exterior View
Preliminary Plat
City Engineer Correspondence
City Attorney Correspondence
Hennepin County Correspondence
MnDOT Correspondence
Plat Dis~bution Letter
Northwest Associated Consultants, Inc.
U R B A N P L A N N I NG · DES I G N . M AR K E T R ES E A RC H
PLANNING REPORT
TO:
FROM:
DATE:
re:
FILE NO;
Kirk McDonald
Cary Teague/Alan Brixius
7 July 1994
New Hope Winnetka Properties
131.01 - 94.20
PUD
BACKGROUND
Winnetka Properties is requesting to plat property known as Don
Harvey Second Addition, Lot 1, Block 1. The subject property
contains two industrial buildings of approximately 26,880 square
feet each. The applicant is further requesting to construct a
41,640 square foot addition to the western building (Versa Die
Cast, Inc.).
Section 4032 (2) (e) of the New Hope Zoning Ordinance requires a
Planned Unit Development (PUD) if more than one principal building
shall be located on the lot. Due to the existing conditions and
the applicant's desire to expand one of the buildings, the
applicant is also requesting a planned unit development conditional
use permit as identified within the Limited Industrial Zoning
District.
The subject property is zoned I-l, Limited Industrial Zoning
District which allows manufacturing as a permitted use and PUD/CUP.
The following report evaluates both the requested subdivision and
planned unit development against the applicable City development
standards.
Attached for reference:
Exhibit A - Site Location
Exhibit B - Site Plan
Exhibit D Landscape Plan
Exhibit E - Floor Plan
5775 Wayzata Blvd.- Suite 555 · St. Louis Park, MN 55416 · (612) 595-9636.Fax. 595-9837
RECOMMENDATIONS
Subdivision
Based on the information available, we would recommend approval of
the proposed subdivision provided the following items are
addressed:
Drainage and utility easements are provided along the lot
lines. Additional easements provided per City Engineer
recommendations.
City Engineer review and approval of site grading and drainage
plan.
PUD/CUP
The applicant is currently pursing only PUD concept approval. In
review of the applicant plans we would recommend concept approval
subject to the applicant addressing the following issues in the
subsequent development stage application:
Submission of a revised landscape plan that responds to
landscaping recommendations outlined in this report.
Continuous concrete curbing be provided around the entire
parking lot and drainageway areas.
Curb stops be provided in the parking stalls abutting the
existing buildings.
Applicant demonstrate truck maneuvering patterns for trucks
accessing the northern loading areas.
Truck traffic accessing the site be directed to the second
curb cut via the use of directional signs.
Subject to the City Engineers comments of site grading,
drainage and utilities·
Ail roof top equipment must be enclosed or painted to match
the principal structure.
Ail trash receptacles must be enclosed. Trash enclosures must
be designed to complement the principal structure.
Overall site clean up.
from the site.
Elimination of all outdoor storage
2
10.
Submission of detailed signage plan which complies with City
sign regulations.
11.
Subject to comment of other City staff, Commission members and
City Council.
ISSUES AND ANALYSIS
Subdivision. The site currently exists as an unplatted property as
a condition of any development approval the City requires that the
site be platted. With the extension of Quebec Avenue, the site was
previously subdivided, creating a single lot to the east of the new
street. The parcel in question was not platted at that time.
In 1992, a preliminary plat was considered for the subject site.
City staff recommended approval of the preliminary plat that showed
two separate lots being created. This preliminary plat was never
pursued to final plat.
The current subdivision proposed the site to be platted into a
single industrial lot and block. The processing of the plat is
straight forward in that the parcel exceeds the lot area and width
standards of the I-1 Zoning district. The site is accessed via the
improved Quebec Avenue. Utilities are available to the site from
Quebec Avenue. The only issues that the plat must address is the
provision of easements and the management of on-site storm water
drainage.
The City requires easements at least 10 feet wide centered on
rear or other lot lines and where utilities are necessary.
The city may require a utility and drainage easement be
dedicated over the proposed drainage pond on the east end of
the lot.
The City Engineer should review and comment on the
acceptability of the site drainage plan and appropriate size
and location of necessary easements.
PUD/Conditional Use Permit. The applicant is requesting a
conditional use permit for an industrial planned unit development
as allowed under Section 4.144 (3) of the New Hope Zoning
Ordinance· This is necessary to accbmmodate the integrated site
design of having two principal buildings on a single lot.
The review process for a PUD occurs in three stages: concept stage,
development stage and final stage. Based on the information
submitted and the applicant's development schedule, the Planning
Commission is only conducting concept stage review at its July
public hearing. Development stage is anticipated to be submitted
for August consideration.
3
The PUD Concept Plan provides an opportunity for the applicant to
submit a plan to the City showing his basic intent and the general
nature of the entire development before incurring substantial cost.
This Concept Plan serves as the basis for the public hearing so
that the proposal may be publicly considered at an early stage.
The PUD Concept Plan presents the immediately significant
development elements which the city shall review and for which a
decision shall be rendered.
Zoning. The site is zoned I-l, General Industrial. This zoning
district allows for manufacturing businesses and also allows for
industrial PUD by conditional use permit. The existing businesses
and the expansion of Versa Die Cast are uses allowed within the I-1
zoning district.
Site Size. The proposed project site consists of 6.85 acres
located east of Winnetka Avenue and North of Quebec Avenue. The
site exceeds the minimum lot area and lot width requirements of the
I-1 zoning district. The site also exceeds the 200 foot frontage
requirement established for industrial planned unit developments.
Setbacks. The site contains two existing 26,880 square foot
buildings. The applicant is proposing to construct a 41,640 square
foot addition to the western building. Both buildings and the
proposed building addition comply with I-1 District setbacks as
follows:
Required Setbacks within the I-1 District
Required
Proposed
Front (Quebec-South)
Front (Winnetka)
Side
50' 62'
50' 216'
20' 47'
Lot Coveraqe, The I-1 Zoning District does not allow more than 40
percent of the lot to be covered by buildings. The applicant has
indicated that the total building floor area on the site will be
94,560 square feet. This represents 31.7% of the total site area.
Green'Area. Per Section 4.145 (3),of the New Hope Zoning Code, at
least 20% of the lot must remain as a green area, including
shrubbery, plantings or fencing, and shall be landscaped. The site
plan indicates 1.8 acres of green space on the 6.8 acre lot,
therefore, 26% of the lot contains green space.
Landscapinq. The City staff has noted historical problems with
site upkeep and appearance. Past problems with outdoor
storage,load area exposure and overall site appearance was
discussed at the June 23rd Design and Review Committee meeting. In
regard to these past issues, site appearance and landscaping have
become a critical element of the site plan review.
The applicant has submitted a landscape plan. Several concerns
must be addressed in regard to the landscaping and screening. As
the lot exists, there is virtually no screening and landscaping.
The existing loading area between the two buildings is not
screened, nor have trees been planted in the boulevard of Quebec
Avenue. Also, due to the fact that the elevation of Winnetka
Avenue is 20 feet above the foundation of the buildings, the
rooftop equipment is highly visible to traffic on Winnetka.
therefore, the applicant must supply significant screening and
landscaping along Winnetka Avenue and Quebec Avenue.
In review of the landscape plan, we offer the following comments:
The landscape plan does not provide adequate screening of
rooftop equipment from Winnetka Avenue. The building is
located at an elevation approximately 20 feet below street
grade. The proposed plantings along the west side of the
building provide marginal screening due to plant location and
type. We would recommend that coniferous trees such as
Colorado Spruce be added along Winnetka Avenue to supplement
the proposed deciduous plantings.
the proposed building is large and architecturally limited in
exterior features. As such, the landscape plan should attempt
to break up the building mass with landscaping. The
foundation planting is reliant on shrubs. While the Red
Twigged Dogwood offers some planting height at maturity, we
would recommend additional plantings that offer some vertical
dimension to the foundation planting. This is particularly an
issue for the west side of the building. On the south side of
the building facing Quebec Avenue the foundation plantings may
be supplemented by additional over story trees in green areas
between the sidewalk and building.
The existing buildings offer little landscape amenity along
the building foundation. TheSe buildings present a concern
with regard to site appearance and upkeep. If foundation
plantings are not practical, additional landscape features
should be provided at the site periphery to screen the
building loading and activity areas. Additional landscaping
should be provided along the south and east parking areas.
The City Building Official noted the existence of a
significant 30 inch Oak tree at the east end of the lot. The
grading plan should be adjusted to provide the proposed storm
water drainage pond without losing this significant tree.
Tree preservation measures should be defined as part of the
PUD approval which outline precaution to be used during
construction to protect this tree.
The applicant should indicate how the landscaping will be
maintained. Plans for site irrigation must be identified as
part of the PUD development stage.
Off-street Parking Requirements. As stated within the New Hope
Municipal Code the following parking spaces are required:
Required Proposed
Manufacturing
Warehousing
Office
space per 350 s.f. floor area
space per 1,000 s.f. floor area
spaces + 1 for each 200 s.f.
34,000 s.f.
30,000 s.f.
4,000 s.f.
Company Truck
I space for each company owned
truck stored outside
0 trucks
*Floor area -
The term "floor area" for the purpose of
calculating the number'of off-street parking spaces
required shall be determined on the basis of the
exterior floor area dimensions of the buildings,
structure or use, times the number of floors, minus
ten (10) percent.
Based on th~ above table, 135 parking stalls are required. The
applicant has provided proof of parking on the site for 165 spaces.
The parking stalls and driveway aisles are properly dimensioned.
the existing parking stalls along the existing building present
some concern in that there is no physical barrier between the
building and parking stall. To avoid damage to the building or
automobiles, curb stops should be provided for these parking
stalls.
The applicant's site plans illustrate that all parking and loading
areas will have bituminous surfacing and striped stalls. The site
plan must provide for continuous concrete curbing around the entire
parking lot.
Off-Street Loadfnq. For industrial districts the number of loading
berths required is one '(1) per building, and one (15 additional
berth for each additional one hundred thousand (100,000) square
feet. Based on these requirements, the applicant must provide for
two (2) loading berths on the site. Currently, there are six
existing berths on the site, and three additional loading area are
proposed as part of the new addition.
Three overhead doors are proposed along the north side of the new
.building addition. The site plan shows only 47 feet of bituminous
paving north of the new building. This raises issues as with
6
regard to adequate maneuvering area for semi-trucks with trailers.
As part of the PUD development stage, the applicant should
demonstrate how trucks will maneuver to utilize these northern
loading areas.
Access. Ail site access is to be provided via Quebec Avenue. The
site plan shows three curb cuts along the 1,000 foot frontage. One
of the existing curb cuts is being removed in exchange for a new
curb cut located along the west side of the new building addition.
The number, location and width of curb cut comply with City
performance standards.
Efforts should be made to segregate truck and automobile traffic as
much as possible. As such, truck traffic serving the site should
be directed to the second curb cut through the use of signage.
This. takes the truck traffic directly to the loading bay corridor.
Due to the site circulation layout, we would not envision that
trucks would exit the site exclusively from the second curb cut,
however, channeling the inbound truck traffic will serve to
eliminate traffic conflicts both internally and with adjacent
properties.
Grading and Drainaqe. The applicant has submitted a grading and
drainage plan. As shown the proposed parking area is 20 feet lower
than the street elevation of Winnetka Avenue. To address a
continuous site drainage problem and increased runoff from the new
building addition and parking area, the applicant proposes to
direct site drainage to a new on-site stormwater ponding prior to
releasing it north to Old Dutch Pond via a storm sewer in the
Quebec Avenue right-of-way. The grading and drainage plan shall be
subject to the review and commenu of the City Engineer.
Building Desiqn. The property owner's intention is to create an
addition which will aesthetically blend with existing buildings
after they are renovated and repainted. The design of the existing
buildings establishes the design motif which they intend to carry
around on the south and west portio of the new addition. The
applicants are currently investigating the use of Fabcon pre-
stressed pre-cast insulated sandwich panel construction which they
believe would give them more flexibility in design of the new
addition. However, Fabcon has indicated that their production
schedule is such that it could not possibly meet the time
constraints of this project in this building season. Due to
commitments made by Versa Die Cast prior to their coming the
property owner with the request for the addition, they are under a
time constraint to provide them with a facility to house new
equipment by sometime in October to early November. Therefore,
from the applicant's perspective, time is obviously of the essence.
They have asked for input and assistance from the Planning
Commission, City Council, and staff of the City of New Hope to help
provide a facility that will be in keeping with the requirements of
New Hope, but will also meet the schedule and economic requirements
of Versa Die Cast.
The building elevation illustrates an exterior facade that is a
continuation of the existing building. White concrete blocks with
tan decorative blocks trim along the building roof. In response to
comments from the City Building Official and Design and Review
Committee, they have added some windows to the south side of the
building. They also attempted to break up the horizontal mass of
the building with vertical columns of decorative brick.
In addition to the applicant's architectural efforts, the following
aesthetic elements should be pursued as part of the development
stage approval:
me
Expand landscape plan to address the recommendations presented
earlier in this report.
Ail roof top equipment must be enclosed or painted to match
the building.
Ail trash dumpsters must be enclosed or located inside the
building. Trash receptacle enclosures must be designed in a
manner that is compatible and complementary to the principal
structure.
Overall site cleanup. Elimination of all outdoor storage from
the site.
Buildin~ Height. No structure within the I-1 zoning district may
exceed three (3) stories. The proposed two (2) story building is
proposed to be twenty-nine (29) feet tall,therefore, will comply
with the City regulations.
Siqnage. The submitted site plan does not indicate a sign at this
time, however, any signage is required to meet all City sign
regulations outlined in the New Hope Sign Code Sections 3.4 through
3.485.
8
CONCLUSION
The City is currently evaluating a requested plat and PUD concept
plan. Based on information available, the plat is recommended to
be approved.
The PUD concept plan offers the city review opportunity on a
preliminary basis. The applicant must subsequently pursue
development stage approval. From a land use perspective, the
proposed application is appropriate. With regard to site specific
issues, we believe that the concept approval may be given provided
site issue identified in this report are adequately addressed in
the subsequent development stage submission.
pc:
Doug Sandstad
Dan Donahue
Steve Sandral
9
REAL
ESTATE
KELLISON CO. :.
DEVELOPMENT AND CONSTRUCTION S.ERVICE~fi.
3880 LAVERNE AVENUE NORTH, LAKE ELMO, MN 55042
· OFFICE 612-777-8646 · FAX 612,777-8673
June 20, 1994
Mr. DoUg Sandstad
City of New Hope
4401 Xylon Avenue North
New Hope, MN 55428
Application to Planning Commission
V~rmnetka Properties
3943 Quebec Avenue North
Dear Mr. San&tad:
We offer the following information in support of our Application for platting of the property
known as Don Harvey Second Addition, Block 1, Lot 1 which currently supports two industrial
buildings of approximately 26,880 sq. ft. each, and for the approval of a planned unit development
under Chapter 4.19 for the addition of approximately 20,400 sq. fL to the building addressed as
3943 Quebec Avenue North.
Property ownership is:
Winnetka Properties
Donald Harvey, Managing Partner
7145 Sandburg Road
Minneapolis, MN 55427
Telephone: 544-2790
Fax: 544-9942
Applicant is:
Kellison Company Telephone: 777-8646
James E. Kellison Fax: 777-8673
3880 Laveme Avenue North, Suite 270
Lake Elmo, MN 55042
Consultants:
Architect
DBA Architects Telephone: 770-9922
D(~n Baker Fax: 777-8673
3880 Laveme Avenue North, Suite 270
Lake Elmo, MN 55042
Surveyor
Schoell and Madson
Dave Toenies
10550 Wayzata Blvd.
Minnetonka, MN 55348
Telephone: 546-7601
Fax: 546-9065
Civil Engineer
Stevens Engineers, Inc.
Pat Carpenter
1301 Coulee Road
Hudson, WI 54016
Telephone: 715-386-5819
Fax: 612-436-2075
Kellison Company has been retained by Donald Harvey, Managing Partner for Winnetka
Properties, to provide design/build general contracting services for the platting of the above-
referenced property and for the production of drawings relevant to the addition of 20,400 sq. ft.
to the existing building and thereafter to provide construction services for the work required to
accomplish that addition and other site-related work. As the project progresses through the city
process and the design process, the city will be apprised of the addition of other consultants and
engineers for the project.
The project consists of approximately 6.85 acres (298,000 sq. ft.) located east of Winnetka
Avenue and north of Quebec Avenue North. There are two structures currently on the property
which are approximately 26,880 sq. ft. each which were originally designed for use as multi-tenant
industrial type facilities and were constructed about 18 years ago. One tenant, Versa Die Cast,
Inc. now occupies the westerly building of the two and also has one bay (approximately 5,000 sq.
ft.) of the easterly building. Two other tenants occupy the balance of the space in the easterly
building with one of them occupying approximately 15,000 sq. ft. and the other occupying
approximately 7,000 sq. ft. Versa Die Cast has made a request of the owners to provide an
additional 20,000-a: sq. ft. for their manufacturing needs or they will have to vacate the building
and move to another city. We are requesting that the City of New Hope grant us the platting of
the property and the permission to construct approximately 20,400 sq. ft. as an addition to the
westerly building so that we may maintain the Versa Die Cast Company as a tenant in the building
and as a business within the City of New Hope. Versa Die Cast currently employs approximately
60 people and will increase their employment with the new facility to approximately 100. These
are manufacturing level jobs and have an average salary approaching $30,000/yr.
The legal description of the property is attached for your review. The property is currently zoned
as Industrial-1 and is in compliance with the requirements of the comprehensive plan for the city.
The plans: and the data thereon, more adequately describe the size of the project, the nature of the
construction, and the' land use data better than I can in a narrative description. Since the project is
surrounded on three sides by industrial zoned land and is across the street from the only
residentially zoned land, we do not feel that this project will have any additional significant impact
on the comprehensive planning for the city or on the adjacent property owners. The adjacent
roads and utilities have been designed and sized to accommodate the types of vehicular activity
and utility services that have been occurring at this site and that will continue to occur. There will
be minimal amounts of additional trucking to and from the site and there will only be
approximately 40 additional automotive trips to and from the site for new employees. There will
be no additional needs for sewer and water connections. The property will continue to be owned
by W"mnetka Properties for the foreseeable futUre which will have ultimate responsibility for the
maintenance of the property subject .to the terms and conditions for maintenance and repair that
are included in the leases With the tenants. As a part of the new addition to the Versa Die Cast
building and due to the fact that one of the "less desirable" tenants of the east building has
recently vacated, it is the intent of W'mnetka Properties to renovate both of the existing buildings
including refurbishment of the docks, doors, re-painting of the walls, landscaping, and other
necessary features to enhance the aesthetic appeal of the buildings.
Versa Die Cast's requirements for the addition are for a simple manufactUring facility which, due
to their needs, is economically driven by the lease rate. The owner's intention is to create an
addition which will aesthetically blend with existing buildings after they are renovated and re-
painted. The design of the existing buildings establishes the design motif which we intend to carry
around on the south and west portion of the new addition. We are currently investigating the use
of Fabcon pre-stressed pre-cast insulated sandwich panel construction which we believe would
.give us more flexibility in design of the new addition. However, Fabcon has indicated that their
production schedule is such that it could not possibly meet the time constraints of this project in
this building season. Due to commitments made by Versa Die Cast prior to their coming to the
owner with the request for the addition, we are under a time constraint to provide them with a
facility to house new equipment by sometime in October to early November. Therefore, from our
respect, time is obviouslyofthe essence. We are asking for input and assistance from the planning
commission, city council, and staffofthe City of New Hope to help us provide a facility that will
be in keeping with the requirements of New Hope but will also meet the schedule and economic
requirements of Versa Die Cast.
The long-standing sitUation of drainage from this site across private property will be resolved as a
part of this approval. We intend to create a retention/sedimentation pond in the area of Ouflot A
at the east end of the property to accept all drainage water from this site. All water will be
directed to the same general location where it currently exits the property at approximately 300
feet west of the northeasterly corner of the property. Currently this water drains across private
property to.the pond area approximately 150 feet north of the subject property. In replacement of
that system, we intend to install catch basins'and a storm sewer system to carry onsite water to
the new retention/sedimentation pond on Ouflot A. This pond would subsequently drain an
amount not to exceed what had previously been going to the pond to the north of the property by
means of a storm sewer across public right of way along Quebec Avenue and then outfalling into
the pond. Newly created excess water above the amount that has been draining from the site will
be taken 9ffby means ora storm drain system from the retention pond to the catch basin in the
street at the southeasterly curve of the property and subsequently to the sedimentation pond
southeast of the property across QuebecAvenue. This method, we believe, is the best solution to
a long standing problem in that it eliminates any. drainage across private property and provides for
diversion of the newly created excess drainage to an existing city system thereby not increasing
the.amount ofrunoffto the natural pond at the north of the property.
Thank you in advance fo.r your consideration of our application. We look forward to.discussing
this project with you and considering any suggestions you might have for its improvement..
Respectfully submitted,
cc: Don Harvey
I'Z I
R.4
PARK
42-1/2
SCHOOL
I-1
NATIVITY
LUTHERAN
CHURCH
BETHEL
LION~
PARK
B-4
R-4
I-2
I
1
;
;
,dDDITION
OUTLOT ~
DNR WETLAND 6Z8W
C ~ -
I
I
I
I
I
I
I
I
I
I
I
I
I
~2-001
PAl?CEA NO.
NO. 17-118-ZI-23-0001
PA PCEL No I--~
VII L AGE
M H-104
OUTLOT
INDUSTt~tA
C~MH- 106
~1 (DBL.) C BMH- 107
CB-1OSA
BLOC
PA,e A"
LOT
Z~
VEt~A DIE
HOPE, r'IlNNE~TA
~ELI. I~ON
3~ LA~EF;~ A~E. ~JlTE 290
LAKE ELPIO, I"lN ,55~42
~,,millllllllllllillllllllllllll~
~ B..k'VA11ON
~ EI.L~'AllC~
......... tF ..... .4.
>
~7--e8-1994 iA:09 6lA 636 1311 BONESTRQO & ASSC, P.OA
Bonestroo
Rosene
m--re. Anderllk &
Associates
Engineers & Architects
July 8, 1994
MA. sar/am, RI,
~ A. ~ ~1.
M~h~ R ~,
Mr. ICirk McDonald
City of New Hope
4401 Xylon Avenue N.
New Hope, ~ 55428
Re: Winnetka Properges 3943 Quebec Avenue
Oar File No. 34-GEN (Eg4-12)
Dear Kirk:
We have reviewed the proposed site plan and platting for the property at 3943 Quebec
Avenue. The following is recommended for consideration:
O
The sewer and water service to the new building addition is not shown, A sewer and
water service stub does exist opposite the new building addition in Quebec Avenue.
Water main extension for fire protection should be considered in accordance with the
Fire Department,
The grading of the site proposes a retaining wall in the northwest corner of the site.
The estimated height of the retaining wall is ? feet, which warrants reinforcement
fabric ff modular block is used. Therefore, the setback requirement for the retaining
wall from the property line must be 10 feet or greater to comply with New Hope's
ordinance and requirements for reinforcement.
The drainage on the site is intended to be collected and conveyed to a pondlng area
on the east side of the site. Specifics for the pond are not provided; however, it's
recommended its normal water level (NWL) be 908, while its high water level (HWL)
be 915. Approximately 2 acre feet of storage can be provided.. The outlet pipe can
be reduced from the proposed 27" to 15". It's also recommended the pond be
excavated to 904 approximately 4' below the' NWL. An outlet skimmer shall be
constructed at the discharge pipe. The plan shall be reviewed by Shinl~le Creek
Watershed and comply with their water quality requirements. The secondary pond
outlet pipe is not recommended.
o Concrete curbing and improvements to the existing parking/drive isles is recommended.
2335 ',IVest Highway 36 · St, Paul, MN 55113 * 612-636~14K)0
P=~ 2
Re: ~,~nnetim Propert~ $P,13 {~uebec Avenue
0
Sidewalk exists on the south side of Quebec Avenue abutting the church. It's
recommended sidewalk be considered on the south and east sides of Quebec Avenue.
abuttins this property,
The existinB bituminous pavement and driveway at Winnetka Avenue shall be removed
and properly restored.
If you have any qu~tion~ please contact this office,
Yours very truly,
BONESTROO, ROSBNF_., ANDERLIK & ASSOCIATES, INC.
Mark A. Hnn~n
MAH:jlm
STEVEN A. ~ONDRALL
MICHAEL R. LXFLEUR
MARTIN P. MALECHA
WILLIAM C. STRAIT
June 30, 1994
CORRICK & SONDRALL, P.A.
ATTORNEYS AT LAW
Edinburgh Executive Office Plaza
8525 Edinbrook Crossing
Suite #203
Brooklyn Park, Minnesota 55443
TELEPHONE (612) 425-5671
FAX (612) 425-5867
LAVONNE E. KESKE
SHARON D. DERB¥
Kirk McDonald
Management Asst.
City of New Hope
4401 Xylon Avenue North
New Hope, MN 55428
RE:
Don Harvey 2nd Addition
Preliminary Plat
Our File No: 99.15030
Dear Kirk:
I have reviewed the proposed preliminary plat of Don Harvey 2nd
Addition and have the following comments:
1. The legal description on the preliminary plat includes
not only the land to be included in Don Harvey 2nd Addition, but
also includes the land previously platted as Don Harvey Addition.
The legal description needs to be changed to include only the land
being platted as Don Harvey 2nd Addition.
2. The following information as required by City Ordinance
§13.04i is not included in this preliminary plat:
Scale (and bar scale) of the plat;
Existing zoning classification (property appears to
be zoned I-1 and is described in New Hope City
Ordinance §4.34(4);
Sewer, water main and other details.
3. The property owner must supply our office with a
Registered P~operty Abstract or an Abstract of Title extended to
date for the property to be included in the plat of Don Harvey 2nd
Addition.
4, The property owner should also be aware that the entire
real estate taxes due and payable in 1994 must be paid before the
final plat will be accepted for filing by the County. So if the
developer expects the final plat to be filed before October 15th,
arrangements should be made for prepayment of the second half real
estate taxes·
Mr. Kirk McDonald
June 30, 1994
Page 2
Contact me if you have any questions.
Very truly yours,
Martin P. Maleach
s3t2
cc: Daniel J. Donahue, City Manager
Steven A. Sondra11, Esq.
Hennepin County
An Equal Opportunity Employer
Kirk McDonald
Management Assistant/Community Development Coordinator
City of New Hope
4401Xylon Avenue North
New Hope, MN 55428
June 28, 1994
RE: Proposed Plat - Don Harvey 2ND Addition
CSAH 156, east side approximately 1300 feet south of CSAH 9
Section 17, Township 118, Range'21
Hennepin County Plat No. 2157
Review and Recommendations
Dear Mr. McDonald:
Minnesota Statutes 505.02 and 505.03, Plats and Surveys, require County
review of proposed plats abutting County roads. We reviewed the above plat
and make the following comments:
· As shown on the preliminary plat, dated June 15, 1994, the developer
should dedicate an additional 7 feet of right of way for a total of 40
feet of right of way from and along the CSAH 156 centerline.
· All access from the plat to CSAH 156 must be limited to Quebec Avenue.
The existing driveway located approximately 220 feet north of Quebec
Avenue must be removed and the area within County right of way restored.
The developer must have an approved Hennepin County entrance permit
before beginning any access construction or driveway removal. The
developer should contact Dave Zetterstrom at 930-2548 for access
information and entrance permit forms.
· All proposed construction within County right of way requires an approved
Hennepin County utility permit prior to beginning construction. This
includes, but is not limited to drainage and utility construction, trail
development and landscaping. Contact our Permits Section at 930-2550 for
utility permit forms.
· The developer must restore all areas, within County right of way,
disturbed during construction.
Department of Public Works
320 Washington Avenue South
Hopkins, Minnesota 55343-8468
(612)930-2500 FAX: (612)930-2513
Recyc[i. i P:~pcr
Kirk McDonald
June 29, 1994
Page 2
Please direct any response to Doug Mattson.
Sincerely,
Thomas D. Johnson, P.E.
Transportation Planning Engineer
TDJ/DBM
Minnesota Department of Transportation
Metropolitan Division
Waters Edge Building
1500 West County Road B2
Roseville, Minnesota 55113
Sune 28, 1994
Kirk McDonald
Community Development Cootdhlator
City of Golden .Valley
7800 Golden Valley Road
Golden Valley MN 55427-4588
Dear Kirk McDonald:
Thank you for submitting the Don Harvey 2nd Addition preliminary plat for our review. Since
the proposal is not adjacent to an existing or proposed state trunk highway, Mn/DOT has no
comment regarding the development of this property. We thank you again for the opportunity
to provide comments on the preliminary plat.
If you have any questions please contact me at 582-1387.
Sincerely,
Cyrus Knutson
Transportation Planner
An Equal Opportunity Employer
CITY OF NEW HOPE
MEMORANDUM
DATE:
June 24, 1994
TO:
Hennepin County Department of Transportation
Minnesota Department of Transportation
Minnegasco
Northern States Power Co.
U.S. West Telephone
King Cable Television
New Hope
New Hope
New Hope
New Hope
New Hope
Director of Public Works
Director of Finance/Administrative Services
City Attorney
City Engineer
Building Official
FROM:
Kirk McDonald, Management Assistant/Community Development
Coordinator
SUBJECT: Preliminary Plat of Don Harvey Addition
Enclosed you will find the Preliminary Plat for the Don Harvey Addition. Please review
and forward comments to me prior to 4:30 p.m. on Friday, July 1, 1994. The
Preliminary Plat will be considered by the New Hope Planning Commission at their July
12, 1994, meeting.
If you have questions, please feel free to contact me at 531-5119.
Planning Case:
Request:
Location:
PID No:
Zoning:
Petitioner:
Report Date:
Meeting Date:
CITY OF NEW HOPE
PLANNING CASE REPORT
94-1¢
Request for Conditional Use Permit Amendment and Site/Building Plan
Review/Approval to Allow Expansion of School Uses in an R-1 Zoning
District
8230 47th Avenue North
07-118-21 41 0001
R-1
Independent SchOol District No. 281 (Cooper High School)
July 6, 1994
July 12, 1994
uPDATE
After the June 7th Planning Commission meeting, at which time this request was tabled so
that a number of issues could be clarified, the School District requested a meeting with City
staff and requested a list of issues which the City felt had not been addressed or needed
further explanation. City staff, the Planning Consultant, the City Engineer and a
representative from the Watershed District were present. The Planning Consultant stated that
Independent School District #281 should submit a detailed facility operation plan that
specifically addresses the following issues:
B.
C.
D.
E.
F.
G.
H.
I.
J.
Traffic control plan/parking plan
Proof of parking plan if lot capacity is exceeded
Bus parking description proof of parking
Shift shot put area further north
Address engineer's comments
Student clean up detail of site and neighborhood of events
Limitations on events, formal approval of additional events
No shared facilities
Parking lot improvements - paving/curbing/striping
Understory shrubs and ground cover to accent the berms
Planning Case Report 94-14
July 6, 1994
Page 2
Ko
Landscaping at west end of parking area, while maintaining traffic visibility triangle
at entrance
L. Noise abatement measures
M. Measures to reduce graffiti, trespassing, vandalism
2. City staff responded that there were four broad areas that needed to be addressed:
A. Ci~ Code Issues
Responding in writing as to how the plan meets the following Zoning Code criteria:
Comprehensive Plan. The proposed action has been considered in relation to
the specific policies and provisions of and has been found to be consistent
with the official Comprehensive Municipal Plan of the City.
2. Compatibility. The proposed use is compatible with its adjacent land uses.
Performance Standards. The proposed use conforms with all applicable
performance standards contained in the Code.
No Depreciation in Value. The proposed use will not tend to or actually
depreciate the area in which it is proposed.
o
Zoning District Criteria. In addition to the above general criteria, the
proposed CLIP meets the criteria specified for the various zoning districts:
a. In Residential Districts, R-1,2,3,4,5,R-O:
Traffic. Non-residential traffic is channeled into thoroughfares
or onto a street abutting business or industrial uses leading
directly to thoroughfares, and not onto minor residential streets.
Screening. The proposed use will be sufficiently separated by
distance or screening from adjacent residentially zoned land so
the existing homes will not be materially depreciated in value
and there will be no deterrence to development of vacant lan&
Compatible Appearance. The structure and site shall have an
appearance that will not have an adverse effect upon adjacent
residential properties.
Planning Case Report 94-14
July 6, 1994
Page 3
B. Traffic Control
Watershed/Engineer comments on drainage issues at Cooper High School and
New Hope Elementary
D. An operational plan that addresses how assorted nuisances will be addressed.
At that meeting the School District responded in writing to the 16 recommendations made
in the June 3rd Planning Consultant's report and those responses are attached.
At that meeting the District had an extensive discussion with the Watershed District on
drainage/stormwater issues and indicated that they would be applying for a variance from the
Watershed District regarding providing an on-site "wet" storage pond. That application was
considered at the July 7th Watershed meeting and it is staff's understanding that the request
was tabled. Please refer to the City Engineer's comments.
0
At the June 21st meeting, the District also presented draft copies of a Management Plan,
Operational Plan and an updated Traffic Management Plan, all of which address a number
of issues raised at the June 7th Planning Commission meeting. The New Hope Police Chief
was also present at the meeting to discuss traffic control issues and the use of New Hope
Police Reserves.
The Design & Review Committee met with the petitioners again on June 23rd and the issues
discussed included the Management/Operational/Traffic plans, mowing the fence south from
49th Avenue to provide an open field area, parking lot improvements, drainage issues,
additional landscaping on the northwest corner of the site and management of the parking
areas in back of the school.
Revised plans were submitted as a result of the meeting that included additional screening
at the west end of the parking lot, the elimination of the dead-end parking arrangement
behind the school, potential parking space for two additional fences, the perimeter fence has
been relocated to an area immediately north of the football field to provide more open space
for neighborhood use, and the location of trash receptacles have been indicated on the plans.
o
An Athletic/Physical Education Complex Management Plan has been submitted outlining the
use of the complex, lighting, sound and an education campaign - please refer to attached
plan.
An Operational Plan has been submitted which outlines litter clean-up procedures, snow
storage, traffic control, signage, and graffiti/trespassing/vandalism.
10. A schedule of site improvements for New Hope Elementary School has been provided.
Planning Case Report 94-14
July 6, 1994
Page 4
11.
The Traffic Management Plan has been updated to address issues raised at the June Planning
Commission meeting.
12. The City Engineer has reviewed the revised plans and has the following comments:
Traffic/Parkin~
mo
The School District has provided a written "Traffic Management Plan" stating they
will comply with the requirements of the City to direct and maintain traffic. Details
based on previous discussions are included.
Improvements to the New Hope Elementary School parking lot are not included. It
is stated parking lot improvements will come by September 1997. Improvements
being considered include a seal coat and possible curbing. It is also stated a small
section of curbing will be constructed in 47th Avenue at this time. Details are not
provided where the curb improvements are to be located.
Drainage
mo
The Shingle Creek Watershed reviewed the plan as submitted at its July 7~ 1994,
meeting. Details for the inlet/outlet structure in the detention basin, the
impact/expectations of the detention basin, the three grit chambers, drainage at New
Hope Elementary School, regional ponding for water quality, and conditions for the
variance from water quality standards were discussed. The condition of the detention
basin was discussed at length. It was stated its condition during wet periods may not
meet the expectations of the School District and nearby residents. It was stated a wet
pond in accordance with New Hope's Draft Comprehensive Storm Sewer Plan or a
cash contribution to a regional water quality pond would be more desirable. The on-
going maintenance associated with the grit chambers and the detention basin/outlet
structure were also discussed. It was pointed out the on-going maintenance for these
facilities will be much greater than a wet pond. The Commission tabled action until
its August. meeting because the information needed to prepare a variance request was
not submitted to allow time to prepare the request. The variance is required because
requirements, associated with water quality are not being met.
Drainage improvements for New Hope Elementary School are not included. It is
stated these drainage improvements will come by September 1997. Specific
improvements are not discussed.
Site
A. Site improvements discussed in our June 2, 1994, letter have been addressed, with the
Planning Case Report 94-14
July 6, 1994
Page 5
exception of Items e and f. Item e recommended all existing bituminous areas be
resurfaced (bituminous overlay, not seal coat), while Item f suggested the drive aisle
in front of the concession area be 28 feet wide, not 24 feet wide.
Conclusion
mo
The drainage plan shall comply with requirements of the Shingle Creek Watershed,
including all conditions included with the variance. The impact of a dry detention
.basin versus a wet water quality pond or a cash dedication towards a regional water
quality pond should be reviewed further by the school district.
Bo
Parking lot and drainage improvements for New Hope Elementary School shall be
specifically identified in writing at this time if the improvements are allowed to be
delayed until 1997. ~
13.
New Hope staff will be meeting with Plymouth staff on July 1 lth (at Plymouth's request)
so that both Cities are in open communication about the plans, issues, timetables, approvals,
etc.. in each respective City.
14.
The Planning Consultant has prepared the enclosed report which analyzes the revised
School District plans and documents . . . please refer to that report for detailed
explanations.
RECOMMENDATION
It is staff's opinion that the School District has addressed a number of the concerns raised at the
June Planning Commission meeting and has provided the information and revised plans, as requested
by City staff. There is a considerable amount of support Ibr and opposition to this request and
ultimately the Commission members need to determine whether the requested use complies with the
Zoning Code criteria and if the District has answered all issues to your satisfaction.
If the Commission votes to deny the request, the reasons for the denial should be clearly stated at
the time of the vote.
If the Commission votes to approve the request, staff recommends that it be subject to:
1. The 14 conditions outlined in the Planning Consultant's report.
2. The two conditions outlined in the conclusion of the City Engineer's comments.
o
Development Agreement be entered into between City and School District (to be prepared
by City Attorney) that incorporates all conditions and the commitments made in the
Operation/Management/Traffic Plans.
Planning Commission Report 94-14
July 6, 1994
Page 6
Performance bond be provided for site improvements (amount to be determined by Building
Official and City Engineer).
5. Annual review by City staff.
Staff encourages the Commission to make a decision at this meeting if you feel that you have
adequate information so that this matter can proceed to the City Council.
Attachments:
July 6th Planning Consultant's Report
Zoning Map
Revised Site Plan
Revised Grading/Drainage Plan
Revised Landscape Plan
Field Lighting Plan
Building Elevations
Stadium Cross-Sections
Petitioner's 7/1 Correspondence
Management Plan
Operational Plan
New Hope Elementary Site Improvements
Traffic Management Plan
New Hope Elementary Principal 6/20 Correspondence
Cooper High School Response to New Hope Planning Report 6/3
List of Issues Identified by City Staff & Planning Consultant
for 6/2 meeting with School District
Watershed Variance Application
City Engineer Comments re: Revised Plans
Jtme 7th Staff Report
June 3rd Planner's Report
Nort west ssociated Consultants, Inc.
U R B A P L A N NG · DES I G N · M A R K E T R ES E A RC H
PLANNING REPORT
TO:
FROM:
DATE:
RE:
FILE:
Kirk McDonald
Elizabeth Stockman / Alan Brixius
6 July 1994
New Hope - Cooper High School Athletic Complex
131.01 - 94.13
Background
On 7 June 1994, a public hearing was held by the Planning
Commission to consider a requesE by School District 281 for
construction of an athletic complex on the Cooper High School
property, located at the intersections of Zealand and 49th Avenues
North in the City. The hearing was tabled to allow the applicants
time to address issues brought up at the meeting as well as those
identified in the 3 June 1994 NAC Planning Report. Since that
time, the School District has submitted revised plans which are the
basis of this report.
The property is zoned R-i, Single Family Residential which requires
that a Conditional Use Permit be obtained because of its
association with the school as a public/educational structure.
The two existing high schools, Cooper and Armstrong, currently
share an athletic facility which is located off-site. The recent
sale of Mielke Field mandates the relocation of 'the athletic
complexes. The School District is requesting approval of this
project as well as a similar one in the City of Plymouth, So that
equal facilities, recreation opportunities and time are available
to both schools.
5775 Wayzata Blvd.-Suite 555 .St. Louis Park, MN 55416. (612) 595-9636.Fax. 595-9837
Attached for reference:
Exhibit A - Site Location
Exhibit B - Site Plan
Exhibit C - Grading and Drainage
Exhibit D - Landscaping Plan
Exhibit E - Floor Plans/Elevations
Exhibit F - Lighting Plan
Exhibit G - Section Drawings
Recommendation
With the sale of Mielke Field the school district has limited site
choices for the establishment of an athletic complex that will
serve the Cooper High School students. In evaluating the school
districts request for a CUP, the City must consider the benefits of
having a quality athletic facility for the students as well as the
New Hope residents. The eduCational and recreational opportunities
must, however, be weighed against the land use issues that are
presented by the site.
Based on the review of City Code requirements as discussed herein,
the proposed stadium complex has several outstanding issues
associated with it which are unique to the City and sensitive to
existing surrounding area property owners. At the forefront are
compatibility, noise, and visual concerns in addition to traffic
a~d parking considerations. The ISD has attempted to address the
land use issues through site design and an Operational/Management
Plan which identifies specific site uses and procedures. It is for
these reasons that we do not make recommendation on this matter,
but rather leave it as a policy decision to be decided by the
Planning Commission and City Council.
Should the City decide to approve the request, it is recorc~ended
that the following conditions be included as part of the
Conditional Use Permit/Site Management Plan.
1)
The project is found to comply with all Conditional Use Permit
criteria~as outlined herein.
2)
The drive lane between the two northern most rows of stalls in
P&rking Lot A is widened to the required width of 24 feet.
3)
The storage of snow within Parking Lot C occurs at the south
end of the lot rather than on the north side which is closest
to the building and activity areas.
4)
A definitive time frame is set for completion of parking lot
and storm drainage improvements at the elementary school site,
a performance agreement is entered into between the School
5)
6)
7)
S)
9)
zo)
ii)
i2)
District and the City, and a security deposit is posted to
ensure timely completion of scheduled work.
If, after the first year of operation, bus parking space
proves to be inadequate, additional spaces are provided to
accommodate them. In the event this becomes necessary, the
submitted plans should be revised to show where the additional
bus parking could be constructed. Buses shall be prohibited
from Using car parking spaces during varsity football games
and other events which are at or near capacity. All drive
lanes must be kept free of parked vehicles or buses at all
times to ensure proper circulation and emergency access.
The City finds the submitted Traffic Management Plan
acceptable for the control of vehicles and minimization of
impacts on surrounding area local streets. A determination of
the number of policemen, reservists, or attendants which will
be necessary is indicated as based on the number needed at
maximum capacity and is adhered to unless a smaller than
expected crowd is present.
The grading and drainage plan and all related issues,
including trench drainage, underground gri~ chambers, and the
proposed on-site ponding area, are reviewed by and subject to
the approval of the City Engineer.
Small shrubs and/or ground cover species are integrated into
the design of bermed areas to minimize mowing on steep slopes
and add to the visual character on site.
Am~y lighting used on site is arranged so as not to reflect
onto adjacent property. The types, sizes, and locations of
security lights are indicated on revised plans as a means to
avoid trespassing and vandalism.
Adjustment of decibel levels from the loud speaker system is
adjusted to be in conformance with City and Pollution Control
Agency standards at the time of installation. A Noise Impact
Statement is submitted if required by the City to further
address related concerns.
The litter control team will clean, up after game events, prior
to llam the next day, in areas designated but not limited to
the following: Zealand Avenue North, 49th Avenue North,
Virginia Avenue North, and 47th Avenue North. Any complaints
by property owners outside of these designated areas shall
also be the responsibility of the School District.
Ail signage which may be desired or necessary on site is
reviewed and subject to the approval of the City.
3
The proposed locations of service gates and access points are
considered to be satisfactory, but will also be subject to
review and comment by the City Engineer and Building Official.
Ail existing loading areas have been maintained appropriately.
Conditional Use Permit Review Criteria. The Planning Commission
and City Council will consider the possible adverse effects of the
proposed conditional use and in determining whether to approve or
deny a Conditional Use Permit, they must find that:
1)
Comprehensive Plan. The proposed action has been considered
in relation to the specific policies and provisions of and has
been found to be consistent with the official Comprehensive
Municipal Plan of the City.
· The New Hope Comprehensive Land Use Plan identifies the school
district site for public and semi-public land uses. While the
athletic facility falls into this land use category as an
accessory use, the Comprehensive Plan does not specifically
address this type of land use activity for the high school
si re.
The Cooper High School is located in Planning District 13 as
defined in the New Hope Comprehensive Plan. This district is
characterized by totally developed single family residential
sub-neighborhoods inter-connected by a large concentration of
school and church uses. Traffic generation experienced in
this district has been greater than that traditionally found
in single family neighborhoods. The following development
policies are applicable to the proposed stadium:
a)
b)
c)
d)
e)
f)
Preserve and protect property values.
Relate land use development to transportation needs,
desired development as identified in the Community
Development Plan and community priorities.
Ensure that intensification of land use activity and
development is accompanied by sufficient corresponding
increases in related supportive and service facilities.
Protect low density residential neig~hborhoods from
encroachment or intrusion of incompatible higher use
types and by adequate buffering and separation from other
use categories.
Plan transportation facilities to function in a manner
compatible with adjacent land use.
Ensure that the expansion of existing development
includes adequate off-street parking.
The introduction of the high school athletic facility must be
evaluated in relation to the residential character of the area and
the aforementioned planning policies~
5
14)
Games and. activities on the school site within the athletic
complex will be limited to the following without special
approval by the City: 4 home football games, 7 home soccer
games, post£season tournaments, daytime track meets, and the
Spring graduation ceremony. Any activity above and beyond
that which is initially approved by the City or usage of the
facility by any other school will require further consultation
and formal approval by the City Council.
The School District enter into a performance agreement to be
recorded with the CUP permit that includes all the provisions
of the Site Management Plan as well as terms for deferred site
improvements and appropriate financial securities.
Ordinance Issues
Zoning. The school property is currently zoned R-I, Single Family
Residential. A Conditional Use Permit is required to locate a
public/educational building within the district. The proposed use
must meet the following criteria as outlined under Section 4.054 of
the City Zoning Ordinance in order to be approved as a conditional
use.
1)
Side Yards. Side yards shall be double that required for the
district, but no greater than 30 feet.
The proposed side yard setback from the rear of the visitor
bleachers to the property line is 50 feet, thus exceeding the
minimum 30 feet required.
2)
Parking. Adequate off-street parking and access is provided
on the site or on lots directly abutting directly across a
public street or alley to the principal use in compliance with
Section 4.036 and that such parking is adequately screened and
landscaped from surrounding and abutting residential uses in
compliance with Section 4.033(4).
Based on the ratio of one parking space for every 4 seats, 625
spaces will be necessary to accommodate the expected crowds
(including 25 spaces for handicapped usage). As indicated in
subsequent sections of this report, revised site plans show a
total of 628 stalls inclusiv~ of 26 handicapped spaces. Thus,
adequate off-street parking has been provided in compliance
wi th City standards.
3)
Off-Street Loadinq. Adequate off-street loading and service
entrances are provided and regulated where applicable by
Section 4.037.
2)
3)
4)
5)
6)
Compatibility.
land uses.
The proposed use is compatible with adjacent
The high school si te is surrounded by single family
neighborhoods. The site is accessible via local streets. The
introduction of an athletic facility raises compatibility
issues with regard to site appearance, traffic, noise,
lighting, and evening events.
The school district has attempted to minimize the impacts of
the complex through site design features, extensive screening,
and parking lot improvements. Additionally, the school
district has indicated that the new activities being added to
the site are limited to varsity football, and girls and boys
varsity soccer. To limit the impact of the facility on
adjacent neighborhoods, the school district expressed a
willingness to limit the number of events. A more detailed
evaluation of the site design and land use concerns is
provided in subsequent sections of this report.
Performance Standards. The proposed use conforms with all
applicable performance standards contained in this code.
In subsequent sections of this report, detailed review of site
plans has been provided and outlines compliance wi th
applicable zoning regulations°
No Depreciation in Value. The proposed use will not tend to
or actually depreciate the area in which it is proposed.
While the introduction of the athletic complex to the high
school site will influence the character of the adjacent
residential properties, it will not be the sole determining
factor in decreased property values (assuming this is
possible). The individual likes and dislikes of a residence,
neighborhood, and City are typically the determining factors
for persons buying homes. The County Assessor supports this
statement and has stated that they do not place values on
homes based on the existence of this type of use, but rather
the buying and selling patterns of similar homes.
Zoning District Criteria. In addition to the above referenced
criteria, the proposed CUP meets the criteria specified in the
R-1 zoning district.
Ail criteria outlined under the R-1 District for conditional
uses have been met as discussed above under "Zoning".
In residential districts:
a)
Non-residential traffic is channeled into thoroughfares
or onto a street abutting business or industrial uses
6
b)
c)
leading directly to thoroughfares, and not onto-minor
residential streets.
Traffic from the existing high school parking lot is
channeled onto Zealand and 47th Avenues which are both
local streets. While parking for the proposed stadium
will be utilizing the same ingress and egress points as
those which currently exist, the stadium will likely
create a greater concentration of vehicles at one time
and at a time period spanning the evening rather than
daytime hours.
The proposed use will be sufficiently separated by
distance or screening from adjacent residentially zoned
land so that existing homes will not be materially
depreciated in value and there will be no deterrence to
development of vacant land.
The School District has proposed an extensive screen
utilizing berms and vegetative material along Zealand
Avenue which will be subject to review by the City in
terms of acceptability and the stadium structure meets
all required setbacks.
The structure and site shall have an appearance that will
not have an adverse effect upon adjacent residential
properties.
The proposed stadium represents a high quality design and
is consistent with the style/materials of the existing
high school building.
Site Design Issues
Setbacks. The following setbacks are applicable to the proposed
development.
Front Yard (47th Avenue)
Side Yard (Zealand Avenue)
Rear Yard (49th Avenue)
30 feet
30 feet
35 feet
The proposed stadium is setback greater distances on all three
sides than the minimum required. The setback from Zealand Avenue
is 50 feet, from 47th Avenue is 220+ feet, and from 49th Avenue is
330+ feet.
Vehicle Parking. The existing number of conforming parking stalls
on site at the current time totals 552. The breakdown for this is
as follows:
381 spaces on the high school site
+167 spaces on the elementary school site
+ 6 reserved spaces
- 10 spaces impacted by light poles
- 12 spaces lost due to the new design
552 total spaces which exist
The City previously indicated to the School District that the
existing stalls do not meet code requirements. Thus, the plans
reflect a revised parking lot layout with an increase in the total
number of stalls, parking spaces and drive aisle widths at the
appropriate sizes, and improved intersections. The following
breakdown reflects the proposed parking quantities as shown on
attached plans:
485 on high school site after changes
+153 on elementary school site after changes
- 10 spaces impacted by light poles
628 acceptable spaces as shown on submitted plans,
not including 33 overflow spaces on the north side
of the building
The current City parking standard indicates that a minimum of one
space per 8 seats should be provided, however, this number is
considered to be outdated and it will be necessary for the
applicant and City to come to an agreement on the minimum number of
spaces that should be provided. The traffic analysis which was
prepared by Westwood Professional Services, Inc. dated 26 May 1994,
utilizes a 1:4 ratio, thus necessitating a total of 625 parking
stalls. As a reference, other sources were checked to compare this
proposed standard. Specifically, research by Westwood indicated
that the cities of Brooklyn Park, Mankato, Plymouth, and Prior Lake
also use this ratio and the American Planning Association (1991,
PAS Report 432) supports a ratio of one space per 3 to 5 seats, as
varies between cities surveyed.
Based on this data, it is expected that one parking space for every
4 seats will be able to accommodate the expected crowds. This
necessitates a total of 625 parking spaces, including 25 for
handicapped usage. Since the time of original plan submittal,
changes have been made on-site to provide space for additional
parking which results in total of 629 spaces. Of the 629 spaces,
26 are handicapped parking stalls, which exceeds the 25 required.
In the unexpected event that more parking is needed at certain
athletic field gatherings, a park and ride service will be provided
by the School District from the School District 281 administration
building.
8
In the previous Planning Report, dated 3 June 1994, which prOvided
an evaluation of original plans, several factors were identified
related to parking on-site which needed clarification. These
included:
1) designation of the areas where snow is to be stored
Revised plans indicate that snow will be stored at the
north bay of Parking Lot C and the south end of Parking
Lot D and when necessary, will be hauled off-site by
truck. Concern has been raised with the use of the north
bay of Parking Lot C for snow storage because it takes up
designated parking space, thus reducing the number of
available stalls by 31 and utilizes the stalls closest to
the stadium and building. While the reduction of stalls
during the winter may not be an issue, it would be
preferable to store snow at the rear of the lot, farthest
from the building, rather than on the north side as
shown.
2)
indication of the grade of the parking area (which must
not exceed 5 percent)
The grade of parking areas appears to be in conformance
with the 5 percent requirement, however, verification of
this factor by the City Engineer will be necessary.
3)
indication that all parking areas will be surrounded by
a perimeter curb, paved, and striped
The School District has indicated that improvements to
parking areas will be accomplished as part of their
scheduled economic plan which is reasonable and feasible
with regard to timeliness and cost dispersion.
Restriping of the parking lot would be done before
completion of the athletic complex, however, upgrading of
the elementary school parking lot through seal coating
and possible curbing is not anticipated for 2-5 years.
This raises concerns with the City in that a means by
which to ensure completion of such tasks has not been
specifically identified. In this regard, it is
recommended that a definitive time frame be set for the
required improvements which must include curbing around
all parking lots and the School District enter into a
performance agreement with the City in conformance with
Section 4.233 of the Zoning Ordinance. Additionally, the
City may require a security deposit on deferred
improvements, the amount to be negotiated and determined
by City Staff.
Additionally, the City Code requires that parking areas be screened
and landscaped from view of surrounding area properties. In the 3
June 1994 PlanniDg Report it was recommended that supplementary
plantings be required in the large median area on the west end of
the parking lot and along the south/east side where residents
access their homes via Dell Drive. Revised plans appropriately
show additional screening via a berm and Norway Maple trees at the
west end of the parking lot, while a screen fence presently exists
along the back lot lines of Dell Drive homes which will be further
enhanced by the planting of 4 deciduous trees in this vicinity.
A final issue related to parking is the design of the new parking
area to the north of the existing building. While the dead-end
parking arrangement for 33 spaces has been eliminated from the
required count of 625 spaces and will be used only as overflow
parking, the drive aisle width between the two northern-most rows
of parking measures only 20 feet, instead of the 24 foot width
required.
Bus Parking. The original site plans indicated two designated bus
parking spaces which measure 13 x 40 as is required. While the
applicants feel that two bus parking spaces is adequate, it is
recommended as a precautionary measure to include a proof of
parking clause which would require the provision of additional
spaces if it is deemed necessary during varsity football games
after evaluation of the first year of operation. It is mandatory
that buses do not utilize vehicle parking areas. Revised site
plans show the potential parking of two buses along the drive aisle
to the north of Parking Lot B. This would not be adequate if
additional bus parking were deemed necessary after the first year
of operation because it takes up required drive lane width and
allows less than 20 feet for the passing of vehicles. An
alternative site for the parking of two buses should be indicated;
potential options include using the loading dock area which would
only'be possible at off-times or along the north drive lane of
Parking Lot A.
Traffic Generation. The proposed stadium has a total seating
capacity of 2500 persons and an estimated maximum vehicle count of
625 per varsity football game (the activity with the most
attendance). As indicated previously, these vehicles must utilize
47th and Zealand Avenues to access the major thoroughfares of 49th
Avenue and Winnetka Avenue. While this is in opposition to the
intent of the CUP criteria, the existing high school parking
facility currently accommodates similar levels of traffic which use
the same streets to exit the site but the number of vehicles
leaving after games would most likely be within a shorter, more
intense time period. The traffic study indicated that the
intersections of Winnetka at 47th and 49th as well as the
intersections of Boone at 47th and 49th are able to accommodate the
levels of traffic anticipated on game nights. Ample consideration
was not, however, given to the effect that traffic will have on
i0
surrounding area local streets. It was indicated that an
additional 95 vehicles would utilize Virginia Avenue north of 47th
Avenue and an additional 50 vehicles would traverse Zealand Avenue,
but others were not specifically addressed.
Since the original application, a Traffic Management Plan has been
submitted which is intended to minimize impacts on neighboring
properties by implementing the following:
1)
The School District has stated that an educational campaign,
approved by City Staff, will be used to advise proper methods
of access and parking for home and visiting teams, students,
faculty, and parents.
2)
The School District shall provide a schedule of major events
to each home in the residential area surrounding the school.
3)¸
Scheduling of events at the High School and Elementary School
will be coordinated so as to avoid parking and vehicular
maneuvering conflicts on site which would otherwise result
from multiple events on the same night.
4)
Use of the athletic facility will be limited to regular Cooper
High School activities and athletic events, and will not be
utilized by other schools or for non-school related events.
5)
No parking will be allowed on residential streets during major
facility events. Covers will be placed over street signs
which otherwise allow on-street parking.
6)
A team of attendants will be utilized to direct vehicles to
and from the site both before and after the event or game.
7)
If requested, under the direction of the Chief of Police,
barricades will be placed at the entrances of neighborhood
streets.
8)
During the first year of operation, attendance, parking lot,
and turning movement counts will be conducted if requested by
the City and submitted for City Staff review.
9)
Review and necessary modification to the Traffic Management
Plan will be conducted after the first, few events and annually
thereafter.
Review of the proposed Traffic Management Plan reveals a well
thought out procedure in general which is anticipated to address
concerns of neighboring homeowners and City Staff. One issue,
however, does remain outstanding in this regard and that is the
determination of the number of policemen, reservists, or attendants
that will be necessary to control the flow of pedestrians and
traffic. It is recommended that a specific number of people be
!1
scheduled at event times as based on the number needed at maximum
seating capacity. Should a smaller than expected crowd occur,
attendants may be dismissed accordingly.
Grading and Drainage. A grading and drainage plan has been
submitted, as required under Section 4.032 (4). The berm which has
been proposed along the west side of the stadium measures 8 to 10
feet in height and has a maximum slope of 25 percent (1:4) which is
in compliance with Zoning Ordinance criteria for turf slopes. At
this time berms are to be sodded to control erosion and planted
with spruce trees. However, as is recommended in subsequent
sections of this report, shrubs and/or ground covers may be better
suited for the steepest sloped areas and may also add to the visual
quality on site.
Secondly, the School District is planning to regrade the existing
football/track facility to prepare it for the proposed improvements
and improve surface drainage overall. A trench drainage system
will be utilized within the track oval and will be diverted to an
existing 15 inch storm sewer located east of the existing track.
To improve the quality of stormwater runoff, the District is
proposing to construct underground grit chambers as suggested by
Mr. Dale Claridge, engineer for the Shingle Creek Watershed
District. The grit chambers will be located immediately downstream
of the existing parking lot which is located south of the
football/track facility. Design of the chambers will be in
accordance with the Pollution Control Agency's "Best Management
Practices" guidelines.
Lastly, the School District is still working to determine the best
location for an on-site ponding area which is scheduled for
completion within 0-2 years. Deferment of this and other
improvements will require that a performance agreement be entered
.into with the City and securities be posted to ensure the timing
and completion of specified work. Stormwater and other
grading/drainage issues will be subject to review and comment by
the City Engineer, and the final plan will be subject to his
written approval.
Fencing. An eight foot high black coated chain link fence has been
proposed around the periphery of the stadium. Since the original
plan submission the fence has been relocated to an area immediately
.north of the football field. This revision provides for more open
space to the north of the stadium for shared neig.hborhood use. It
is in compliance with City standards in that it is more than five
percent open for passage of air and light, does not exceed eight
feet in height and does not encroach into the required front yard
building setback area.
Landscaping. As required in the City's Zoning Ordinance, the lot
area remaining after providing for off-street parking, off-street
loading, sidewalks, driveways, or other building site requirements,
12
shall be landscaped using ornamental grass, shrubs, trees, or other
treatment generally used in landscaping. The proposed vegetative
.plantings shown on submitted plans are acceptable with regard to
species selection, size, and spacing. All proposed plantings
exceed the minimum size required at the time of installation. The
Spruce tree species is an excellent screening tree and is able to
withstand more dry conditions than some other evergreens. It is
estimated that at the time of planting screening will be provided
to a height between 10 and 18 feet. Judging from the existing
topography as show-non submitted section drawings, this is adequate
to buffer the views from adjacent split level and rambler homes. It
will take approximately 20 years for the trees to reach a height of
35 to 50 feet (45 to 60 feet as measured from the base of the
berm). Additionally, it is recommended that some small shrubs and
ground cover species be integrated into the design on berms or at
the front of the stadium to add to the visual character on site.
Lighting. Any lighting used to illuminate stadium, parking, signs
or other site uses must be arranged to deflect light away from
adjoining residential uses and from public streets. ~y lights or
combinations of lights must not cast light on a public street in
excess of one foot candle as measured from the center line of the
street. Lights reflecting onto residential property must not
exceed four foot candles as measured at or on the adjoining
property. While the proposed light poles are to extend a distance
of 80 feet into the air as measured from the field surface, the
submitted plans indicate a maximum measurement of .85 foot candles
at the curb line of Zealand Avenue which is in compliance with the
above specified requirements. The lights are to be turned ofl one-
half hour after the completion of an event.
It has also been indicated that security lighting will be provided
to deter trespassers and vandaliSm. The types, sizes and locations
of security lights must be indicated on plans and submitted for
review by City Staff.
Noise. Chapter 9 of the New Hope City Code stipulates the
following maximum noise levels permitted by receiving land use
districts.
Receiving District
Day Night
(7am-10pm) (10pm-Tam)
L10 L50 L10 L50
R-1 65 60 55 50
The School District has indicated that after installation of the
public address system adjustments to the decibel level will be made
to be in conformance with Pollution Control Agency and City
guidelines. The City may require a noise impact statement to be
completed if the proposed project is considered to be a potential
noise source.
13
Refuse/Storage. Ail materials, equipment, and refuse must be
stored within a building or be fully screened so as not to be
visible from adjoining properties. The locations of trash
receptacles have been indicated on submitted plans and are
appropriately placed throughout the site. The receptacles will be
emptied the day after the event and trash will be deposited in the
School District's central dumpster system off site. In addition,
the School District will send a litter control team through nearby
neighborhoods after game events and prior to llam the next day.
The litter control team will include the following streets: Zealand
Avenue North, 49th Avenue North, Virginia Avenue North, and 47th
Avenue North. The methods for handling and controlling waste as
specified herein are viewed as acceptable in relation to Zoning
Ordinance requirements, however, as a condition of approval the
Operational Plan should indicate that the School District will also
respond to specific littering complaints by property owners outside
of the designated areas.
Signage. The submitted plans do not indicate whether property
identification, directional, or temporary/portable signage will be
changed from that which exists or additional signage will be
necessary given the increased site usage. While the applicants
have indicated that all signage will comply with established
provisions, a signage plan must be submitted for review by the City
and should be in conformance with Section 3.40 (Signage) of the
City Code.
Events. The exact number of games and types of activities which
will take place on site have been defined as follows: 4 home
football games and 7 home soccer games exclusive of post-season
competition as well as track meets during the day and the
graduation ceremony in the Spring. Any activity above and beyond
that which is initially approved by the City will require further
consultation and formal approval by the City Council.
CUP Agreement. Approval of the Conditional Use Permit request made
by the School District is inclusive of approval of the Site
Management and Operational Plans and shall be part of the
Performance Agreement to be entered into between the applicant and
the City. As such, the Management/ Operational Plans must be
recorded at the County with the required recording of the CUP and
any violation of said plans would constitute violation of the CUP.
The Performance Agreement must address the issues as outlined
herein to the satisfaction of the City.
14
Conclusion
Based on the review of City Code requirements and identification of
several issues as discussed herein, decision on this request to
construct a new high school stadium is a sensitive one. There are
positive and negative factors that will exist both with or without
the stadium location on the Cooper High School site. In one
regard, the schools long time standing in the community and
existing site uses very similar in nature to the proposed use may
justify granting the request in addition to the limited site usage
on a yearly basis and lack of neighbors/activity during off-times.
However, there are negative factors which also have to be evaluated
in further detail such as compatibility, noise and traffic
concerns. It must be proven, either through additional studies,
revised design, or other means that the positive factors outweigh
the negative ones. While there are typically negative factors
associated with any development, the underlying, decision must
always be that which affords the greatest benefit to the community
as a whole.
pc:
Dan Donahue
Doug Sandstad
Steve Sondrall
Roy Anderson
Whitey Johnson
15
City
of
New. Hope
S~NGLE FAM[Ly RESIDENTIAL
SINGLE AND TWO FAMILY RESIDENTIAL
MEDIUM DENSITY RESIDENTIAL R-$
HIGH DENSITY RESIDENTIAL
SENIOR CITIZEN RESIDENTIAL R-5
RESIDENTIAL OFFICE R-O
LIMITED NEIGHBORHOOD BUSINESS 1~-I
RETAIL BUSINESS
AUTO ORIENTED BUSINESS B'~
COMMUNITY BUSINESS B-4
LIMITED INDUSTRIAL
GENERAL INDUSTRIAL ! -
FLOOD PLAIN FP
WET LAND W
'Associated
"~ Consultants, .inc.
~ ~ tliil
~"
t
! I
! t
'i
'*ills
COOPER HIGH IGHOOL ATHLITIG COMPLIX
itll I
0
II! !
$OOPIll HIGH I~ItOOL ATHLITIG ~OIPLIX
'-t
I!
! !
t !
...... '~ ! I I' t ~
I ! I I ! ~ I i i
COOP~ IH IC~ AT~IT~ COM~IX
il
i
]' }: J.
'""Il
:' PII' :~:::.:i['~ .::::,:'.:
I
I ll~,T*r!-*l-l~.l :'I:1~::~;::~1 31
.I Ii i ,: e o .I t '--'l:l::::~:l il
i . :la, i'-~
Il:
GOOPII~ HiGH 1GHOOL ATHLITIG COMFLIX
['- I
COOPIII HI~# ICHOOL ATHLITIC COMPLEX
HIGH BCHOOL ATHLETIC 4)OMpmEX
July 1, 1994
ANDERSON-JOHNSON
ASSOCIATES, -- ~ __
INC. ~ ' -
Landscape Architecture · Site Planning · Civil Engineering
Mr. Kirk McDonald
Management Assistant /
Community Development Coordinator
City of New Hope
4401 Xylon Avenue North
New Hope, MN 55428
Re;
Proposed Football / Track Improvement
Cooper High School
New Hope, Minnesota
Dear Mr. McDonald,
We appreciated the oppodunity to again review the project with the Design Review Committee
recently and feel that this submittal properly addresses each of the concerns that were voiced at
that meeting.
We look forward to a productive meeting with the City Planning Commision.
If you have any questions or require additional information at this time, please call me.
Sincerely,
AND~OCIA TES, INC.
Daniel L. Johnson,"P.E.
DLJ:cjj
Enc.
CC:
James Dahle/lSD No. 281
Whitey Johnson / lSD No. 281
VALLEY SQUARE OFFICE CENTER · SUITE 250 · 7575 GOLDEN VALLEY ROAD · MINNEAPOLIS, MN 55427
PH (612) 544-7129 · FAX (612) 544-0531
INDEPENDENT SCHOOL DISTRICT 281
~bbiasdale Area ~h~
~ami~ f~ a i~time ~ ~m~i~
COOPER HIGH SCHOOL
ATHLETIC/PHYSICAL EDUCATION COMPLEX
MANAGEMENT PLAN
June 30, 1994
Complex events at Cooper High School shall be managed according to the following
plan:
Complex Use
The Cooper~High School Athletic/PE complex will not be shared with Armstrong. or
Any additiona) special non-schoo) events wi)) require City of New Hope staff
approval.
The normal night-use of the complex will be four home football games and seven
home soccer dates. These eleven contests will end by 9:30 p.m. and are
exclusive of any post-season competition. During the Spring there will be track
meets during the day and the normal graduation program as scheduled in the past.
Li qhti ng
The lighting system shall be designed and operated in a manner to prevent
reflected glare or spill light to meet the City'Code of one foot candle at the
street center line. Lighting is to be turned off within one-half hour after the
completion of an event.
Sound
After installation of the public address system the school distr'ict will adjust
the decibal level to comply with Minnesota Pollution Control Agency and City of
New Hope.
Educational Campaign
The School District shall conduct an educational campaign approved by city
staff, to advise proper methods of access, parking and behavior for both
visiting teams and home/~team students, faculty and parents ification
is also addressed i~ T~.~~t_P!)n. . This not
R. "Whitey" J~, Project Director Date
4148 Winnetk~ Avenue North
New Hope, Minnezota 5542 7
(6121 533-2781 [] FAX ! (6/2) 537-0947
OPEEATIONAL PLAN
The following operational plan will be in effect for major complex events
including home football contests and graduation:
The School District shall manage e~ents so that other substantial visitor
events within the campus will not be scheduled at the same time.
Trash receptacles are to ~e 16cated throughout the site as shown on the
Plans. The receptacles will be emptied the day after a major field activity
and the refuse deposited in the School District's central dumpster system.
The School District will send a litter control team through nearby
neighborhood streets after game events and prior to 11 a.m. of the next day.
The litter control team will be District 281 maintenance staff and will
include the following streets:
Zealand Avenue North; 49th Avenue North; Virginia Avenue North; and
47th Avenue North.
Snow storage will bi accomplished at the North bay of Parking Lot "C" and
the South end.of Parking Lot "D". An abnormal amount of snow will be'
dealt with using trucks to remove the excess.
Traffic. The School District will hire off-duty police officers to direct
traffic and perform other duties as needed. An annual meeting will be held
between school representatives, neighborhood representatives and the Police
Chief to determine a mutually agreed-upon number of officers or police
reservists if available. The recommended placement of police to help direct
traffic after events are: 47th Avenue North and Zealand; 49th Avenue North
and Zealand; 47th Avenue North and Virginia and 47th Avenue North and Winnetka.
The School District shall install and remove barricades under the direction
of the Chief of Police at the locations mentioned in the attached traffic
management plan. The barricades will permit local traffic only and advise
that no parking is allowed on residential streets during game events.
In the event of a need for additional parking; a plan would be put into
place to include remote parking at District 281 Administration building
with shuttle .bussing and/or overflow parking west of the New Hope Elementary
site.
For additional traffic information please refer to a management plan which
is attached to this report.
All signage will meet City ordinances.
S ol Dis~r'c~ a ter several
Submitted by: -~~
R. "Whitey" :ect Director
Graffiti, trespassing and vandalism will be reduced by security lighting,
building materials that resist or make easier the removal of graffiti, and
an effort by the District to educate students and apprehend possible violators.
Plan Review. CitY staff shall have the opportunity to review the management
plan with the S( events have occurred.
June 30, 1994
TO:
FROR:
RE:
New Hope City Staff
School District
New Hope Elementary site Improvements
The purpose of the following information is to clarify School District 281's
position relative to any parking lot or drainage improvements to the New Hope
Elementary School site:
1. The New Hope Elementary parking lot will be used for school activities in
conjunction with the new Athletic/PE Complex.
2. Upgrading of the parking lot to include a sealcoat and possible curbing is
sched~ed as per the 1994 District Facilities Report by September of 1997.
3. Restripi~g of the parking lot would be accomplished before completion of the
new Athletic/PE Complex.
4. Attention to any drainage concerns is also scheduled for completion as per
the 1994 District District Facilities Report by September, 1997.
5. The District agrees to install a small section of curbing facing 47th Avenue
North at the north end of the New Hope Elementary parking lot.
6. The District would like to adhere to the facility report timelines in order
to maintain an economic plan which is reasonable and feasible.
New Hope Elementar,y
Independent School District #281
· Th~ ~¢ ar~a totals 14 acr~ adjacr, nt to Cooper and Higtwi~-w High
SchooLs.
Near the we.~ entries of tho ~.hooL :hero are s~veral areas of pondia&
on bltnmlnous s~Ce~
· The concrctc walks at the cast entrics arc in good ~tpe.
Aa ~en~ of all parking lo~s and playground suffac~ was
conducIed ~ Inspec, lac. Their ~ndi~s are a~ follows:
-The south and west playgroUnd ar~as mu.s~ b~ overlaid; 2~°70.square
yards.
-8,580 square yards of bi~minotts in thc cast parking lot must b~
gal coate, d.
· PlaygroUnd cquipmen~ nee. ds impro~men~s.
IssUes
1.. Overlay playground areas.
Deferr~ Priority lb Cost $ 17,300
Seal coat thc ca,st parL4ng lot.
Deferred Priority 2b Cost $ 15,200
3. Upgrade playground equipmen~
See A~ ~eces_ sibilit7
4. Add a catch basin to solv~ dr~;--g~ problem.
Deferred Priortt7 lb Cost
Pa~ 316
TRAFFIC MANAGEMENT PLAN
COOPER HIGH SCHOOL ATHLETIC FACILITY
I hereby certify that this plan was prepared by me or under my direct supervision and that I am a
duly Registered Professional Engineer under the laws of the State of Minnesota.
Allan S. Klugman
Westwood Professional Services, Inc.
14180 West Trunk High~y 5
Eden Prairie, MN 55344
612/937-5150
REGISTRATION No. DATE
Traffic,,~{ events at the Cooper High School Athletic Facility shall be managed according to the
following plan:
Facility Use
Use of the Cooper Athletic Facility without City approval shall be limited to regular school
activities and athletic events. City Staff approval shall be required for any use of the facility for
non-school related events.
Educational Campaigns/Notifications
The School District shall conduct an educational campaign, approved by City Staff, to advise
proper methods of access and parking for home and visiting teams, students, faculty and parents.
Annually, as far in advance as practical, the School District shall provide a schedule of major
facility events to each home in the residential area surrounding the school. The notification area
shall be as depicted on the attached map.
Schedule Coordination
The School District shall coordinate events so that substantial visitor events at Cooper High
School or the New Hope Elementary School will not be scheduled concurrently with major events
at the athletic facility.
Operational Management
There shall be no parking on residential streets near the athletic complex during major facility
events. The no-parking area shall be as depicted on the attached map. One and one-half hours
prior to the start of events, School District personnel shall place covers over existing signs that
would otherwise allow parking during the major facility events. The covers shall state "No
Parking." After the event traffic has cleared, School District personnel shall be responsible for
removing the covers.
The School District shall use a team of attendants to direct entering vehicles into appropriate
parking lot areas and to direct exiting vehicles onto the City streets. The attendants shall wear
identifiable, reflective vests. '
If requested, under the direction of the Chief of Police, the School District will install and remove
barricades at the entrances of neighborhood streets. Potential barricade locations are listed
below:
a)
b)
c)
d)
e)
Aquila Avenue, south of 47th Avenue North'
Del Drive, south of 47th Avenue North
Utah Avenue, south of 49th Avenue North and north of 47th Avenue
Nort~h
Virginia Avenue North, south of 49th Avenue North and north of 47th
-Avenue North
Zealand Avenue North, south of 49th Avenue North and north of 47th
Avenue North
48th Avenue North, west of Winnetka Avenue North and east of Virginia
Avenue North
The barricades will be installed one and one-half hours prior to the start of events. Each barricade
will contain a flashing light and a sign stating "Local Traffic Only" and "No Event Parking."
Enforcement will include ticketing and towing.
Data Collection
During the first year of facility operation, for all major events, the School District shall collect
attendance (paid and non-paid) and parking lot usage counts. A summary report of the
attendance and parking counts shall be submitted for City Staff review.
During the first year of facility operation, if requested by the City, the School District will collect
intersection turning movement counts for a representative event, at the intersections of Winnetka
Avenue North and 49th Avenue North; Winnetka Avenue North and 47th Avenue North; Boone
Avenue North and 49th Avenue North; and Boone Avenue North and 47th Avenue North. The
traffic counts would be used to determine intersection "level of service."
Annual Review of Traffic Management Plan
City Staff and the School District shall review the management plan after several events have
occurred. Afterwards the plan shall be reviewed annually. The City and School District may
amend the plan if traffic operations relative to the athletic facility create impacts not contemplated
at the time of adoption of this plan. If crowds to major events consistently do not approach
capacity levels, the School District may submit proposed revisions to the plan to reduce or
eliminate elements while maintaining proper control of event traffic.
JR. HIGH
MIELKE:
NEW HOPE ELEMENTARY SCHOOL
National ;g~hO6l 6f EYcc~ll~n'~-e · ....
8301 47th Avenue North
New Hope MN 55428
(612) 533-5301 · FAX (612) 533-3099
June 20, 1994
Mr. Kirk McDonald
City of New Hope
4401 Xylon Avenue North
New Hope, MN 55428
Dear Mr. McDonald:
I recently was informed of proposed plans to extend 47th
Avenue through the Cooper High School parking lot. I further
underst~a~nd this plan is being considered to accommodate potential
traffic related to athletic events at Cooper High School.
I have a number of concerns about this proposal. New Hope
Elementary School students who walk to and from school each
day would encounter more traffic and possible injury from
automobiles driving at a higher speed than happens currently
in the parking lot~.
Furthermore, our school busses would have to contend with
more traffic as they arrive or depart from our school each
day.
Our school patrol members would be at higher risk for injury
as they perform their duties to assist our K-5 students walking
to and from school.
Finally, our upper grade students who ride bicycles to school
would face greater danger from automobiles using the Cooper
High School parking lot as a thoroughfare.
Please reconsider the proposal and its potential impact on
our students and staff.
Thank you.
Sincerely,
Robert d:~'Ziegler, Principal
RJZ/b
INDEPENDENT SCHOOL DISTRICT 281
Robbinsdale Area Schools
Leaming $or a lifetime of growing
COOPER HIGH SCHOOL
Response to New Hope Staff Review
Refer to Planning Report Dated June 3, 1994.
1. The School District will make eveYy effort to comply with all conditional
use permit criteria as outlined in City's recommendations dated June 3, 1994.
2. A minimum of 625 parking spaces are provided on site in conformance with
City standards excluding dead end parking, narrow lanes, and those impacted
by light poles. In actuality 638 units are being provided as shown on Site
Plan.
Snow storage will be accomplished at the north bay of Parking Lot "C" and
the south end of Parking Lot "D" and these areas are designated on the
Site Plan.
e
Additional screening has been provided in the large median area at the
west end of the parking lot. This will be accomplished by constructing an
attractive earth mound and the placement of overstory trees.
A 'scree~ fence presently exists at the back lot line of Dell Drive residences
for the full length of the Elementary School parking lot. Further detail
to the south end of the lot will be addressed with plantings when the
entire parking lot project is completed by September, 1997.
If, after the first year of operation, bus parking space proves to be
inadequate, two additional spaces can be provided as shown on the revised
Plan. These additional spaces do not use designated spaces which are
intended for use during varsity football games and other events.
Traffic control measures will be utilized by the School District to minimize
impacts on neighboring properties. A separate Traffic Management Plan is
attached herewith.
7. Refer to attached letter regarding extension of 47th Avenue.
8. The Grading Plan, as submitted, indicates no slopes greater than 3:1.
Most slopes are to be 4:1 or flatter.
10.
The Grading and Drainage Plan continues to be studied in an effort to
develop an effective and prudent means of addressing storm water management.
A Field Lighting Plan has been submitted. A light level computer printout
also has been submitted indicating that the light levels are well in
conformance with the City requirements.
11.
The sound system design and operation shall meet the requirements of the
Minnesota Pollution Control Agency and the City of New Hope.
Trash receptacles are to be located throughout the site as shown on Plans.
The receptacles will be emptied the day after a major field activity and
the refuse deposited in the School District's central dumpster system.
1:3.
14.
15.
16.
Collection of trash, which may occur off-site, will be collected by School
District personnel the day after a major field activity.
All signage will meet City Ordinances.
Traffic control measures will be~tilized by the School District to
minimize impacts on neighboring properties. A separate Traffic
Management Plan is attached herewith.
The intended number of games and types of activities which will take place
on the site are indicated and attached herewith.
The Cooper High School athletic facility will not be shared with Armstrong
or any other school on a regular basis except for scheduled program events.
Special additional events will be reviewed with the City.
Recommendation
With the sale of Mielke Field the school district has limited site
choices for the establishment of an athletic complex that will
serve the Cooper High School students. In evaluating the school
districts request for a CUP, the City must consider the benefits of
having a quality athletic facility for the students as well as the
New HOpe residents. The educational and recreational opportunities
must, however, be weighed against the land use issues that are
presented by the site.
Based on the review of City Code requirements as discussed herein,
the proposed stadium complex has several outstanding issues
associated with it which are unique to the City and sensitive to
existing surrounding area property owners. At the forefront are
compatibility, noise, and visual concerns in addition to traffic
and parking considerations. It is for these reasons that we do not
make recommendation on this matter, but rather leave it as a policy
decision to be decided by the Planning Commission and City Council.
Should the City decide to approve the 'request, it is recommended
that the following conditions be included as part of the
Conditional Use Permit.
1)
.The project is found to comply with all Conditional Use Permit
criteria as outlined herein.
2)
A minimum of 625 parking spaces are provided on site in
conformance with City standards, exclusive of dead-end
parking, narrow drive lanes, and those spaces impacted by
light poles.
3)
Snow storage areas and parking lot grades are indicated on
revised plans.
4)
Additional screening is provided in the large median area at
the west end of the parking lot and along the south/east side
adjacent to Dell Drive and the residential area.
5)
If, after the first year of operation, bus parking space
prove~ ~O be inadequate, additional spaces are provided to
accommodate them. In the event this becomes necessary, the
submittedplans should be revised to show where the additional
bus parking could be constructed. Buses shall be prohibited
from using car parking spaces during varsity football games
and other events which are at or near capacity.
Additional study is given to the effect traffic will have on
the surrounding area local streets to the satisfaction of the
City Council..
7)
8)
City decision on the potential extension of 47th Avenue is
determined prior to approvalOf the school district CUP, so as
not to crea~e a parking shortage or place unnecessary burdens
upon the school district to relocate parking in future years.
Ail slopes in excess of 1:1~ are planted with materials other
than turf andsuch slope protection measures are indicated on
revised site plans. '
9)
The grading and drainage plan is reviewed by and subject to
the approval of the City Engineer.
Any lighting used on site is arranged so as not to reflect
onto adjacent property.
A Noise Impact Statement is submitted if required by the City
to further address related concerns.
12)
The location of trash receptacles on site and the ability of
refuse trucks to collect rubbish must be indicated on revised
plans, Additionally, the school district will be considered
responsible for the collection of trash in surrOUnding areas
off-site after events, thus the means by which this will occur
should be indicated.
15)
All signage which may be desired or necessary on site is
reviewed and subject to the approval of the City.
Traffic control measures are utilized by the school district
to minimize impacts on neigD~oring properties pursuant to that
deemed necessary by the City.
The exact number of games and types of activities which will
take place on site are defined by the school district and
incorporated as a condition herein. Any activity above and
beyond that which is initially approved by the City will
require further consultation and formal approval by the City
Council.
16)
The Cooper High School athletic facility is not shared with
Armstrong or any other school on a regular basis. Special
events my be approved by the City.
Issues Analysis-
Zoning. The school property is currently zoned R-l, Single Family
Residential. A Conditional Use Permit is required to locate a
public/educational building within the district. The proposed use
must meet the following criteria as Outlined under Section 4.054 of
the City Zoning ordinance in order to be approved as a conditional
use.
U R B A P L N G D E S N · M A R K E R E S E A R P'"~
TO:
FROM:
DATE:
RE:
FILE NO:
Kirk McDonald
Alan Brixius
21 June 1994
New Hope - Cooper High School Site
131.01 94.13
We believe that ISD 281 should submit a detailed facility operation
plan that specifically addreSses the following issues:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Traffic control plan/parking plan
Proof of parking plan if lot capacity is exceeded
Bus parking description proof of parking
Shift shot put area further north
Address engineer's comments
Student clean up detail of site and neighborhood of events
Limitations on events, formal approval of additional events
No shared facilities
Parking lot improvements paving/curbing/stripin~
Understory shrubs and ground cover to accent the berms
Landscaping at west end of parking area, while, maintaining
traffic visibility triangle at entrance
Noise abatement measures
Measures to reduce graffiti, trespassing, vandalism
5775 Wayzata Blvd.-Suite 555. St. Louis Park, MN 55416. (612) 595-9636.Fax. 595-9837
CITY OF NEW HOPE
June 21 st Meeting RE:
COOPER ATHLETIC FIELD ISSUES
City Code Issues
Responding in writing as to how the plan meets the following Zoning Code criteria:
Comprehensive Plan. The proposed action has been considered in relation to the
specific policies and provisions of and has been found to be consistent with the
official Comprehensive Municipal Plan of the City.
Compatibility_. The proposed use is compatible with its adjacent land uses.
performance Standards. The proposed use conforms with all applicable
performance standards contained in the Code.
No Depreciation in Value. The proposed use will not tend to or actually
depreciate the area in which it is proposed.
Zoning District Criteria. In addition to the above general criteria, the proposed
CUP meets the criteria specified for the various zoning districts:
1. In Residential Districts, R-1,2,3,4,5, R-O:
a. Traffic. Non-residential traffic is channeled into thoroughfares or
onto a street abutting business or industrial uses leading directly to
thoroughfares, and not onto minor residential streets.
b. Screening. The proposed use will be sufficiently separated by
distance or screening from adjacent residentially zoned land so the
existing homes will not be materially depreciated in value and
there will be no deterrence to development of vacant land.
c. Compatible Appearance. The structure and site shall have an
appearance that will not have an adverse effect upon adjacent
residential properties.
o
Engineering Issues
Traffic Recommendations
The Traffic Management Plan as submitted shall be enforced with one addition.
Item No. 4 shall also include monitoring the four major intersections 47th and
49th Avenue at Winnetka and Boone Avenue). Special attention shall be given
to 47th Avenue west of Winnetka Avenue where a permanent right mm lane may
be required for east bound traffic going south onto Winnetka Avenue. In the
event permanent improvements are required at any of these intersections, it is
recommended the School District assist in the cost of these improvements.
-1-
A detailed intersection layout has not been provided for the entrances from New
Hope Elementary School Parking Lot and Cooper High School Parking Lot onto
47th Avenue. It is recommended the layout be provided
Cooper High School, on a daily basis, is served by residential streets constructed
to residential standards (street width, right-of-width, street section). The daily
traffic counts on 47th Avenue east of the school and 49th Avenue at Winnetka
Avenue and Boone Avenue are clearly higher than residential streets constructed
to residential standards can accommodate. The City of New Hope, the residents
in the neighborhood, and School District No. 281 hopefully can work together to
accomplish as much as possible when street improvements are considered in this
area. The impact from traffic for football games with a capacity crowd is
substantial for a short time, however, the daily impact Cooper High School has
on the immediate streets in this area is a major concern. It is recommended the
School District work with the City and assist in the cost of street improvements
considered in this area.
Drainage Recommendation
Ao
Shingle Creek Watershed has not reviewed the plan for conformance. It is
recommended the plan be submitted to Shingle Creek Watershed and comply with
their requirements.
Bo
Hydraulic calculations shall be submitted for the detention basin to determine its
efficiency. Modifications to the existing storm sewer system may be required
based on the results of the calculations.
The parking lot improvements at New Hope Elementary School shall include
storm sewer extensions from 461/2 Avenue and Xylon Avenue including storm
water retention/detention. In addition, water quality improvements shall be
inclUded in accordance with Shingle Creek Watershed.
Do
The storm sewer/grading improvements required immediately north of Cooper
located east of the expanded parking lot are not shown. It is recommended the
improvements in this area be identified (curbs, grades, storm sewers, etc.).
Eo
The southwesterly comer of the New Hope Elementary School site does not have
adequate drainage. It is recommended drainage improvements for this area be
considered as part of the improvements for the New Hope Elementary School
parking lot.
Site Improvements
Site improvements in the existing parking area are shown and comply with City
requirements (parking stall widths/lengths and driving aisle widths). Concrete curbs and
curb medians are shown defining parking lanes and driving aisles. The grading plan
provides for constructing a berm to hide the visitor bleacher~ Substantial grading is also
-2-
proposed north of the football field to accommodate the discus area.
Site Improvement ReCommendations
All slopes intended to be maintained and planted with landscape shall be no
steeper than 4:1.
The area beneath the home and visitor bleachers shall be reviewed to determine
if paving is required. It is not clear whether the area beneath the home bleachers
will be fenced to prevent foot traffic beyond the storage building.
Co
Sanitary sewer and water services are not shown to either concession or storage
building. Utility services shall be constructed in accordance with City standards
including proper water meters, backflow preventor for irrigation, etc.
Do
The hydrant located north of the discus area due to grading must be raised. The
need for a hydrant and water main in this area shall be reviewed.
It is not clear whether the new curb construction in parking area will
accommodate a bituminous overlay or seal coat. Due to the new curb
construction, much of the existing bituminous pavement will have to be removed
to provide proper grades. It is recommended a bituminous overlay be constructed
in all parking areas including stripping.
The drive aisle width in front of the concession area is identified as 24 feet wide.
Due to the congestion in this area, it is suggested this driving aisle be 28 feet
wide to allow temporary parallel parking (school bus, delivery, etc.) and still
allow two-way through traffic. The wider drive aisle will also align better with
the drive aisle in front of the main school.
Building Official recommendation that parking lot island design be revised to allow for
turning of busses as shown on "attachment B."
Address in writing how assorted nuisances will be addressed. Team rivalries can result
in disputes and loud activities during evening hours. Trespass, graffiti and vandalism are
possible at night with 2,000 people getting excited. Trash, littering incidents are
guaranteed with a stadium. The ability and willingness of the School District to provide
adequate staff and volunteer supervision and clean-up is a major unknown. The School
District has verbally addressed how some of these issues will be handled, but there
should be a written plan.
If there is graffiti sprayed on the new stadium, what will be the procedure for
having it removed?
Bo
Many of the residents complain of garbage that comes from the school. How will
garbage be addressed? Will a "garbage brigade" made up of students clean up
neighbors yards? How will District 281 enforce such clean up procedures?
-3-
5. Parking Issues
A~
currently some parking stalls are not the required size.
address, this situation?
B. Will motorcycle and/or bicycle parking be available?
Co
How will District 281
Where will additional bus parking be placed if, after the first year of operation,
it is found to be necessary?
Eo
The parking lot to the north of Cooper High School is a dead-end area and has
an inadequate driveway dimension. How will District 281 address that situation?
The District has indicated that off-site parking areas or shuttles may be used.
Where are the sites located/is there a written plan?
Traffic Control Issues
District 281 mentioned putting "Local Traffic Only" signs up after football
games. Where would those be placed and who would put them up?
Who will District 281 designate to direct traffic? Is there a verbal or written
agreement with the New Hope Police Department?
Lighting
How many 80 foot light poles will there be and can they be drawn on an
elevation?
Planning Consultant Original Recommendations
A minimum of 625 parking spaces are provided on site in conformance with City
standards, exclusive of dead-end parking, narrow drive lanes, and those spaces
impacted by light poles.
B. Snow storage areas and parking lot grades are indicated on revised plans.
Additional screening is provided in the large median area at the west end of the
parking lot and along the south/east side adjacent to Dell Drive and the residential
area.
If, after the first year of operation, bus parking space proves to be inadequate,
additional spaces are provided to accommodate them. In the event this becomes
necessary, the submitted plans should be revised to show where the additional bus
parking could be constructed. Busses shall be prohibited from using car parking
spaces during varsity football games and other events which are at or near
capacity.
Do
-4-
10.
11.
12.
A Noise Impact Statement is submitted if required by the City to further address
related concerns.
Fo
The location of trash receptacles on site and the ability of refuse trucks to collect
rubbish must be indicated on revised plans. Additionally, the School District will
be considered responsible for the collection of trash in surrounding areas off-site
after events, thus the means by which this will occur should be indicated.
Go
All signage which may be desired or necessary on site is reviewed and subject to
the approval of the City.
The exact number of games and types of activities which will take place on site
are defined by the School District and incorporated as a condition herein. Any
activity above and beyond that which is initially approved by the City will require
further consultation and formal approval by the City Council.
The Cooper High School athletic facility is not shared with Armstrong or any
other school on a regular basis. Special events may be approved by the City.
Armstrong Complex
Submit proof to City that School District is pursuing application process in Plymouth
(copy of plans/application) and keep New Hope posted on progress and schedule of
approvals in Plymouth.
Refuse/Storage
All materials, equipment, and refuse must be stored within a building or be fully
screened so as not to be visible from adjoining properties. The locations of trash
receptacles and the ability of refuse trucks to collect such must be indicated on submitted
plans.
Signage
The submitted plans do not indicate whether property identification, directional, or
temporary/portable signage will be changed from that which exists or additional signage
will be necessary given the increased site usage. A signage plan must be submitted for
review by the City and should be in conformance with Section 3,40 (Signage) of the City
Code.
Events
The exact number of games and types of activities which will take place on site must be
defined by the School District and incorporated as a condition herein. Any activity above
and beyond that which is initially approved by the City will require further consultation
and formal approval by the City Council.
-5-
13. Planning Commission Issues
Co
D.
E.
F.
New Hope Elementary drainage problems.
Firm commitment needed for after event traffic control ("no parking" signs on
residential streets/barricade residential streets).
Double use of site if Armstrong denied.
Trash and littering/clean-up after games.
Extension of berm.
More coniferous landscaping on 49th Avenue.
Enclosures:
Planner's Report
Engineer's Letter
June 7th Planning Commission Minutes
-6-
06/30/1934 06:34 5440531 A.SA ASSOC., INC.
June 29, 1994
ANDERSON-JOHNSON
ASSOCIATES, ~
INC.
L,andtc~e Architecture · Sit~ Ptanm'ng · Civil Engineering
Mr. Dale Claridge
Shingle Creek Watershed Management Commission
c/o Montgomery Watson
545 Indian Mound
Wayzata, MN 55391
Re:
Cooper High School
Athletic ComPlex
New Hope, Minnesota
Dear Mr. Claridge,
Pursuam to your instruction, I am forwarding this letter to apply for a variance regarding
Shingle Creek Watershed District's (SWCD's) regulations pertaining to stormwater management.
It has been suggested by the City and yourself that, regardless of proposed construction limits,
the mandated treatment of stormwater runoff regulations apply to the entire site. Generally,
SWCD's criteria involves construction of a ponding area, or areas, sized to store the runoff from
a 2-inch rainfall event based on a fully developed site. Further, ponding areas are required to
provide minimum permanent pool depths of 2 feet. It is our opinion that it is not financially,
nor practically, feasible to require this site to strictly comply with this criteria. Our concerns
are as follows:
The area of the High School site is approximately 36 acres, whereas the
area of proposed construction (grading limits) is only 11 acres. It would
not be practical to collect and route stormwater runoff from the overall
site to a central facility.
Obviously, the School District is very concerned about public safety as it
would relate to a permanent pond of water within the confines of a school
site.
Programmatically, the School District can not afford the loss of land
associated with a "wet" treatment pond. A Surface Water Management
Plan (SWMP), dated February 7, 1994, was prepared for' the City of New
Hope by Bonestroo, Rosene, Anderlik & Associates. The SWMP (not yet
adopted by the City), recommends construction of a regional "Stormwater
and Sediment" type pond (SC-P6.12), 1.40 acres in size (at high water
level) on the New Hope High School site. This "regional" pond is
proposed to be located directly north of the proposed running track.
VALLEy SQUARE OFFICE CENTER . SUITE 250 - 7575 GOLDEN VALLEY ROAD . MINNEAPOLIS, MN 55427
PH (612) 544-7129 · FAX (612) 544-053'1
06/30/1994 06:34 5440531 ~J~ ~,SSEtC., ]'NC. PP~GE L~3
June 29, 1994
Cooper High School
Athletic Complex
New Hope, Minnesota
Page 2
Please refer to the attached exhibit drawings noting the School District's proposed "dry" pOnd
vs. the City's proposed "wet" pond.
1SD No. 281 is proposing to treat the stormwater runoff resulting from the immediate project
limits, an area of 11 acres. In lieu of SCWD's standard requirements, treatment will consist of
construction of three grit chambers, strategically located along the existing storm sewer
alignment. The grit chambers are designed to exceed the design parameters for Oil/Grit
Separators as detailed by MPCA's manual titled "Best Management Practices for Minnesota".
Also, the School District is proposing to construct an Extended Detention Basin, "dry" pond,
for the purpose of controlling the rate of stormwater runoff fi.om the proposed facility.
It is our opinion that, given the existing constraints and ongoing utilization of the high school
site, a variance should be granted for this project. ISD No. 281 feels that stormwater
management is significant concern and, as such, is willing to make a reasonable cash dedication
to cover its prorata share of the construction of a regional stormwater pond to be located outside
the limits of school property.
If you have any questions, please call me.
Sincerely,
ANDERSON-JOIINSON ASSOCIATES, INC.
Daniel L. . .
DLJ/scb
Attachments
10
$C7.2,
LUTt'~ERAN · .
56"rt.~ i~ N'
AJA ASSOC., INC.
'COMPANY
SC-P4.10
AVF ,~
.J
4gTIt AVF' 'N.. ',.
06/30/1994 06:~4
AJA ASSOC., INC.
/
/
AVEN
"i SO-A421 0
38/I 994
86:34 5~48531
,,.r -'~i;.
/
AJA ASSOC. ~. INC.
922
O6.,
x,
AJA ASSOC., INC.
F-~!~DED D~CNTtON a~]a~i '"~.
DRY POND - / '
ANDERSON-JOHNSON ASSOCIATES, INC.
Landscal3e Architecture · Site Planning · Civil Engineering
DESIGN REPORT
DATE:
PROJECT:
June 30, 1994
COOPER HIGH SCHOOL
AJA Comm. No. 94061
BY: David A. Rey, AJA, inc.
AREA OF PARKING LOT ~ DRAINAGE AREA -SOUTH END
220 feet wide x 420 feet long = 92400 sq. ff.
+ 240 feet wide x 400 feet long = 96000 sq. ft.
ACREAGE
188400 sq. ft. / 43560 sq. ft. / acre
= 188400 sq. ft.
= 4.3 acre
TOTAL VOLUME REQUIRED
400 sq. ff. / acre of drainage
,V. OLUME OF EACH TANK
1720 cu. f. / 2 TANKS
x 4.3 acre
= 1720 cu. ff.
= 860 cu. ft. / TANK
.TANK CAPACITIE;
CREST 6000
CREST 7500
CREST 10500
= 837 cu. ft. STORAGE / TANK
= 1023 cu. ft. STORAGE / TANK
=1200 cu. ff. STORAGE / TANK
(not applicable)
DECISION
use two Crest 10500 tanks at the south end of the site.
Inlet D~t~ili
oo'~',,, I ~:;~:~-L,,~:,el, OO1/Z, Ock 004/004-~
oo~., /~1,~
%,1 ~J ~ s,,
Joint
~ ' Invert
~ Joint line
2n MH ck Pipe
_line_
4,000 Min, ps:}. ~t 28 drays.Concrete Strenght
224- _ ,~.__._______
PROPOSED GRIT CHAMBER DETAILI
SIZE
CODE
Internal
07-08-2994 ~2:33 6&2 636 2322 BONESTRO0 & ASSC.
Bonestmo
Rosene
Anderlik &
Associates
Engineers & Architects
July 8, 1994
P, 04
Mr. Kirk McDonald
City of New Hope
4401 Xylon Ave. N.
New Hope, MN 55428
Re: Cooper High School Football Field
Our File No. ~4 Gen
Dear Kirk:
Independent School District 281 has re-submitted plans and memos responding to
iMues/concems raised by staff and discussed at the June 7, 1994 Planning Commission
Meeting. Response to engineering concerns based on the submitted information is as
follows:
Tramc/PsrMn_
The school district has provided a written "Traffic Management Plan" stating
they will comply with the requirements of the City to direct and maintain
traffic, Details based on prev/ous discussions are included.
Improvements to the New Hope Elementary School parking lot are not
included. It's stated parking lot improvements will come by September 1997.
Improvements being considered include a seal coat and poss]~ole curbing. It's
also stated a small section of curbing will be constructed in 47th Avenue at this
time. Details are not provided where the curb improvements are to be located.
The Shingle Creek Watershed reviewed the plan as submitted at its July 7,
1994 meeting. Details for the inlet/outlet structure in the detention basin, the
impact/expectations of the detention basin, the three grit chambers, drainage
at New Hope Elementary School, regional ponding for water quality, and
conditions for the variance from water quality standards were discussed. The
condition of the detention basin was discussed at length. It was stated its
condition during wet periods may not meet the expectations of the school
district and nearby residents. It was stated a wet pond in accordance with New
Hope's Draft Comprehensive Storm Sewer Plan or a cash contribution to a
regional water quality pond would be more desirable. The on-going
maintenance associated with the
2335 V/est Highway -36 * St. P~ul, MN 55113 · 612-6;6-4~X) '
07-08-i994 i2:34 6i2 638 i3ii BONESTRO0 & ASSC. P.05 '
Mr. Kirk McDonald
City of ~Vew Hop~
Page -2-
grit chambers and the detention basin/outlet structure were also discussed. It
was pointed out the on-going maintenance for these facilities will be much
greater than a wet pond. The Commission tabled action until its August
meeting because the information needed to prepare a variance request was not
submitted to allow time to prepare the request. The variance is required
because requirements associated with water quality are not being met.
Drainage improvem, ents for New Hope Elementary School are not included.
,It's stated these dratnagu improvemems will come by September 1997. Specific
xmprovements are not discussed.
slt~
Site improvements discussed in our June 2, 1994 letter have been addressed,
with the exception of Items e and f. Item · recommended all existing
bituminous areas b.e resurfaced (bituminous overlay, not seal coat), while Item
f suggested the drive aisle in front of the concession area be 28' ~vide, not 24'
wide.
Conclusion
The drainage plan shall comply with requirements of the Shingle Creek
Watershed, including all conditions included with the variance. The impact of
a dry detention basin versus a wet water quality pond or a cash dedication
towards a regional water quality pond should be reviewed further by the school
district.
Parking !or and drm_'~age improvements for New Hop,? Elementary School shall
be specifically identified in writing at this time ~f the improvements are
allowed to be delayed until 1997.
If you have any questions, please contact this office.
Yours very truly,
Mark A. Hanaon
MAH:pr
Planning Case:
94-14
CITY OF NEW HOPE
PLANNING CASE REPORT
Request:
Request for Conditional Use Permit Amendment and Site/Building Plan
Review/Approval to Allow Expansion of School Uses in an R-1 Zoning
District
Location:
8230 47th Avenue North
PID No:
07-118-21 41 0001
Zoning:
R-1
Petitioner:
Report Date:
Meeting Date:
Independent School District No. 281 (Cooper High School)
May 31, 1994
june 7, 1994
BACKGROUND
The petitioner is requesting a conditional use permit amendment and site/building plan
review/approval to allow expansion of school uses in an R-1 Zoning District, pursuant to
Section 4.054 of the New Hope Zoning Code.
Robbinsdale School District No. 281 is submitting an application for approval of upgrading
the Cooper High School football, soccer, and track complex. This complex is currently
utilized for physical education classes, as well as for numerous athletic activities. The
upgrading includes the installation of a new football/soccer field with an eight lane track
surrounding the playing area; along with new long-jump, high-jump, pole-vault, shot-put and
discus facilities. Also included in the proposal are new bleachers with a press box, field
lights, storage, and concession/ticket booth/restroom facilities.
School facilities are allowed as a conditional use in the R-1 ZOning District and a conditional
use permit was granted in 1963 for the construction of the school. An amendment to the
existing conditional use permit and site/building plan review/approval is required to upgrade
the athletic facility.
The School District states in their application that the facility upgrade brings Cooper High
School up to standards with other Classic Lake Conference schools and ultimately gives all
students an opportunity to coach at a facility that will increase participation, school spirit,
and develop a sense of individual and school pride.
The School District states that attention has been given to many details to help accomplish
an awareness of concern for everyone involved in this project. Some of these details include
the following:
A. Completion of a professional traffic study/analysis of the area.
B. Placement of the home bleachers on the east side of the field with the smaller visitors
bleachers on the west side.
Planning Case Report 94-14
M~iy 31, 1994
Page 2
Do
Fo
A sound speaker system mounted on the west side of the field facing Cooper High
School and directed away from Zealand Avenue North.
A proposed lighting system to meet the code of one foot candle over flow onto
adjacent residential properties.
Bleachers that will be self-enclosed not allowing trash to drop to the ground With
placement of receptacles near the bleachers and concession stands.
Landscaping and earth berms designed to soften the area and conceal any structure
from Zealand Avenue North.
The upgraded complex will be used for physical education classes and athletic events. The
new field will improve the areas currently used for physical education and will replace
Mielke Field which was used for athletic events. The proposed site at Robbinsdale Cooper
is the area west of the school near Zealand Avenue. This area is currently used for athletic
practices and physical education. The district has allocated $2 million for upgrading fields
at both high schools -- $1.65 million from the sale of Mielke Field and the remainder from
the district's capital outlay budget. The district hopes to have the complexes ready for the
beginning for the 1995-96 school year. Arrangements have been made for both schools'
football, soccer and track teams to use facilities in other Classic Lake school districts for the
1994-95 school year.
The plans for the complex include the following:
mo
B.
C.
D.
E.
F.
G.
Ho
Eight-lane running track.
Football/soccer field inside the track.
Home bleachers seating 2,000 people and visitor bleachers seating 500.
Sound system directed to the east.
Lighting system using four light poles.
Self-enclosed bleachers.
Landscaping and earth berms to make the area more attractive and conceal the
complexes from adjoining property.
A service building which will include a concession stand, restrooms and ticket sales.
Storage facilities under home bleachers for field and physical education equipment.
High-jump, long-jump, pole-vault, discus and shot-put areas located around the
outside perimeter of the track.
Scoreboard located outside of the track at one end of the complex.
Eight-foot chain-link fence around the perimeter of the complex.
Planning Case Report 94-14
)May 31, 1994
Page 3
o
The property is zoned R-1 Single Family ReSidential and the 36 acre Cooper High School
site is surrounded by R-1 single family homes on all sides.
City staff have met with the School District on several occasions to give input on the plans
and the Design & Review Committee met with the petitioners on May 19th. Revised plans
and a revised traffic study were submitted as a result of the meeting. The School District
has also conducted neighborhood meetings with residents who reside near Cooper High
School.
10.
Property owners within 350' of the request have been notified.
ANALYSIS
Public, Educational, and Religious Buildings. (Public or semi-public recreational
buildings and neighborhood or community centers; public and private educational
institutions limited to elementary, junior high and senior high schools; and religious
institutions such as churches, chapels, temples, and synagogues) are allowed by
conditional use in the R-1 Zoning District provided that:
Ao
Side Yards. Side yards shall be double that required for the district, but no greater
than 30 feet.
Parking. Adequate off-street parking and access is provided on the site or on lots
directly abutting directly across a public street or alley to the principal use and that
such parking is adequately screened and landscaped from surrounding and abutting
residential uses.
Co
Off-Street Loading. Adequate off-street loading and service entrances are provided
and regulated where applicable by City Code.
The purpose of a Conditional Use Permit is to provide the City with a reasonable and legally
permissible degree of discretion in determining suitability of certain designated uses upon
the general welfare, public health, and safety. In making this determination, whether or
not the conditional use is to be allowed, the City may consider the nature of adjoining
land or buildings, whether or not a similar use is already in existence and located on
the same premises or on other lands close by, the effect upon traffic into and from the
premises, or on any adjoining roads, and all such other or further factors as the City shall
deem a requisite for consideration in determining the effect of such use on the general
welfare, public health, and safety.
Planning Case Report 94-14
May 31, 1994
Page 4
o
Other general criteria to be considered when determining whether to approve of deny a
conditional use permit include:
mo
Comprehensive Plan. The proposed action has been considered in relation to the
specific policies and provisions of and has been found to be consistent with the
official Comprehensive Municipal Plan of the City.
Do
Compatibility. The proposed use is compatible with its adjacent land uses.
Performance Standards. The proposed use conforms with all applicable
performance standards contained in the Code.
No Depreciation in Value. The proposed use will not tend to or actually depreciate
the area in which it is proposed.
Zoning District Criteria. In addition to the above general criteria, the proposed
CUP meets the criteria speCified for the various zoning districts:
1. In Residential Districts, R-1,2,3,4,5, R-O:
a. Traffic. Non-residential traffic is channeled into thoroughfares or onto
a street abutting business or industrial uses leading directly to
thoroughfares, and not onto minor residential streets.
b. Screening. The proposed use will be sufficiently separated by distance
or screening from adjacent residentially zoned land so the existing
homes will not be materially depreciated in value and there will be no
deterrence to development of vacant land.
c. Compatible Appearance. The structure and site shall have an
appearance that will not have an adverse effect upon adjacent
residential properties.
The Planning Consultant has prepared a report on this CUP amendment request
(attached) so please refer to it for detailed explanations, as City staff concurs with the
comments and recommendations in that report.
o
Revised plans were submitted subsequent to the Design & Review meeting which included
the following changes:
A. The traffic report was revised.
Bo
The parking lot and drive aisle layouts have been revised to comply with City
standards.
C. A lighting diagram was submitted which exceeds City standard.
Planning Case Report 94-14
./May 31, 1994
Page 5
Do
Tree types were revised per the request of the City Forester. Also, tree sizes were
uniformly increased in response to buffering concerns voiced by the City staff.
Eo
An additional service door was provided at the northeast end of the proposed under-
bleacher storage building.
Fo
To improve the quality of stormwater runoff, underground grit chambers were
proposed as suggested by the Shingle Creek Watershed District. The grit chambers
will be located immediately downstream of the existing parking lot located south of
the football/track facility. Design of the chambers will be in accordance with "best
management practices" as published by the Minnesota Pollution Control Agency.
Also, an extended detention basin (dry pond) will be provided at the northeast comer
of the complex.
G. Erosion control, in the form of silt fencing,' was shown on the Drawings.
Ho
A site line (cross-section) was added to the plans, running in a southeasterly direction
towards the northwest comer of the track. Also, the house types (i.e. rambler, split
level, etc.) were added to the plan in response to the concern regarding the view of
the complex from an upper level of a two-story home.
The District stated that they recognized the stormwater drainage concern south of the
Elementary School and will deal with the issue appropriately.
6. The City Engineer has reviewed the revised plans and has made the following comments:
Traffic Recommendations
The Traffic Management Plan as submitted shall be enforced with one addition.
Item No. 4 shah also include monitoring the four major intersections 47th and
49th Avenue at Winnetka and Boone Avenue). Special attention shall be given to
47th Avenue west of Winnetka Avenue where a permanent right turn lane may be
required for east bound traffic going south onto Winnetka Avenue. In the event
permanent improvements are required at any of these intersections, it is
recommended the School District assist in the cost of these improvements.
A detailed intersection layout has not been provided for the entrance~ from New
Hope Elementary School Parking Lot and Cooper High School Parking Lot onto
47th Avenue. It is recommended the layout be provided.
Co
Cooper High School, on a daily basis, is served by residential streets constructed to
residential standards (street width, right-of-width, street section). The daily traffic
counts on 47th Avenue east of the school and 49th Avenue at Winnetka Avenue and
Planning Case Report 94-14
May 31, 1994
Page 6
Boone Avenue are clearly higher than residential streets constructed to residential
standards can accommodate. The City of New Hope, the residents in the
neighborhood, and School District No. 281 hopefully can work together to accomplish
as much as possible when street improvements are considered in this area. The
impact from traffic for football games with a capacity crowd is substantial for a short
time, however, the daily impact Cooper High School has on the immediate streets in
this area is a major concern. It is recommended the School District work with the
City and assist in the cost of street improvements considered in this area.
Drainage Recommendation
Ao
Shingle Creek Watershed has not reviewed the plan for conformance. It is
recommended the plan be submitted to Shingle Creek Watershed and comply
with their requirements.
Hydraulic calculations shall be submitted for the detention basin to determine
its efficiency. Modifications to the existing storm sewer system may be required
based on the results of the calculations, r
Co
The parking lot improvements at New Hope Elementary School shall include
storm sewer extensions from 461/2 Avenue and Xylon Avenue including storm
water retention/detention. In addition, water quality improvements shall be included
in accordance with Shingle Creek Watershed.
Do
The storm sewer/grading improvements required immediately north of Cooper located
east of the expanded parking lot are not shown. It is recommended the
improvements in this area be identified (curbs, grades, storm sewers, etc.).
Eo
The southwesterly corner of the New Hope Elementary School site does not have
adequate drainage. It is recommended drainage improvements for this area be
considered as part of the improvements for the New Hope Elementary School
parking lot.
Site Improvements
Site improvements in the existing parking area are shown and complY with City requirements
(parking stall widths/lengths and driving aisle widths). Concrete curbs and curb medians are
shown defining parking lanes and driving aisles. The grading plan provides for constructing
a berm to hide the visitor bleacher. Substantial grading is also proposed north of the football
field to accommodate the discus area.
Planning Case Report 94-14
May 31, 1994
Page 7
Site Improvement Recommendations
Ao·
All slopes intended to be maintained and planted with landscape shall be no
steeper than 4:1.
B°
The area beneath the home and visitor bleachers shall be reviewed to determine
if paving is required. It is not clear whether the area beneath thc home bleachers
will be fenced to prevent foot traffic beyond thc storage building.
Co
Sanitary sewer and water services are not shown to either concession or storage
building. Utility services shall be constructed in accordance with City standards
including proper water meters, backflow preventor for irrigation, etc.
The hydrant located north of the discus area due to grading must be raised. The
need for a hydrant and water main in this area shall be reviewed.
It is not clear whether the new curb construction in parking area will accommodate
a bituminous overlay or seal coat. Due to the new curb construction, much of the
existing bituminous pavement will have to be removed to provide proper grades. It
is recommended a bituminous overlay be constructed in all parking areas
including stripping.
Fo
The drive aisle width in front of the concession area is identified as 24 feet wide.
Due to the congestion in this area, it is suggested this driving aisle be 28 feet wide
to allow temporary parallel parking (school bus, delivery, etc.) and still allow two-
way through traffic. The wider drive aisle will also align better with the drive aisle
in front of the main school.
o
Staff finds that the School District has made a number of revisions to the physical plans of
the site, per the staff's request, however, staff feels that there are still a number of issues that
need to be addressed, including:
A. Comments/recommendations from Northwest Consultants report.
B. Comments/recommendations from City Engineer.
Police concerns persist about vehicle and pedestrian safety and other nuisance-related
calls requiring staff time.
D°
Building Official recommendation that parking lot island design be revised to allow
for turning of busses as shown on "attachment B."
Planning Case Report 9.4-14
May 31, 1994
Page 8
Conditional Use Permit standards: Ordinance 4.21 directly relates a CUP to the
nature of adjoining land and buildings, traffic effects, and other matters that can alter
the "general welfare, public health and safety." Clearly, the proposal adds a new high
intensity public nighttime and weekend use within a stable, fully developed low-
density residential area. Staff rely heavily on the public's comments in a case, such
as this, for the perceptions and beliefs about all of the resulting impacts.
Comprehensive Plan conflicts: "Land Use Goals" and "Land Use Policies" (pages 10
and 11), "Residential Goals" and "Residential Policies" (pages 12, 13, and 14),
"Transportation Goals" and "Transportation Policies" (pages 19, 20, 21, 22 and 23),
"Community Facilities" (pages 24, 25, and 26). A new stadium would be directed
onto "collector-level" streets, as defined in the official transportation plan. Only one
adjacent roadway, 49th Avenue, is so classified. All other adjacent streets are "local,"
in contradiction to the stated goals and policies. A principle thrust of the
Comprehensive Plan is "PROTECT RESIDENTIAL NEIGHBORHOODS FROM
PENETRATION BY THROUGH TRAFFIC." With 30 percent of the proposed 830
vehicles for a peak event approaching the neighborhood from Boone Avenue, there
will be bypass or "through traffic" shortcuts resulting on 46th, Del Drive and Aquilla
Avenue.
Assorted Nuisances resulting from the intensified use. It is very hard to predict the
frequency and variety of these. Each may be similar to daytime mischief that now
occurs near Cooper. Team rivalries can result in disputes and loud activities during
evening hours. Trespass, graffiti and vandalism are possible at night with 2,000
people getting excited. Trash, littering incidents are guaranteed with a stadium. The
ability and willingness of the school district to provide adequate staff and volunteer
supervision and clean-up is a major unknown. Tall pole-mounted light glare and
noise complaints will result.
Staff would condense all of the issues and controversies into one question: "Is it possible
to introduce an expanded, intensified evening use with 2,500 people, lights, bands, traffic,
noise and littering, loitering and all, into a 30 year old single family neighborhood with no
direct access to a collector level street while "protecting residential neighborhoods from
through traffic penetration," "preserving the general welfare, public health and safety" and
assuring investors in the area that the use will NOT "tend to or actually depreciate the area."
Public input is extremely valuable in considering this request, recognizing the positive values
that the stadium will certainly provide.
Planning Case Report 94-14
,'May 31, 1994
Page 9
RECOMMENDATION
With the sale of Mielke Field, the School District has limited site choices for the establishment of
an athletic complex that will serve the Cooper High School students. In evaluating the School
District's request for a CUP, the City must consider the benefits of having a quality athletic facility
for the students as well as the New Hope residents. The educational and recreational opportunities
must, however, be weighed against the land use issues that are presented by the site.
Based on the review' of City Code requirements, the proposed stadium complex has outstanding
issues associated with it which are unique to the City and sensitive to existing surrounding area
property owners. At the forefront are compatibility, noise, and visual concerns in addition to traffic
and parking considerations. It is for these reasons that staff leaves it as a policy decision to be
decided by the Planning Commission and City Council.
Based on the review of City Code requirements and identification of several issues as discussed
herein, decision on this request to construct a new high school stadium is a sensitive one. There
are positive and negative factors that will exist both with or without the stadium location on the
Cooper High School site. In one regard, the schools long time standing in the community and
existing site uses very similar in nature to the proposed use may justify granting the request in
addition to the limited site usage on a yearly basis and lack of neighbors/activity during off-times.
However, there are negative factors which also have to be evaluated in further detail such as
compatibility, noise and traffic concerns. It must be proven, either through additional studies,
revised design, or other means that the positive factors outweigh the negative ones. While there are
typically negative factors associated with any development, the underlying decision must always be
that which affords the greatest benefit to the community as a whole.
Attachments:
Planning Consultant's Report
Zoning/Topo Maps
City Engineer Comments
Site Plan and Notes
Grading/Drainage Plan
Landscape Plan
Landscape Schedule
Field Lighting Plan
Building Elevations
Sections
Lighting Plans
5/27/94 Petitioner Letter re: Revised Plans
5/26/94 Revised Traffic Analysis
5/12/94 Original Traffic Analysis
7/20/93 Facility Improvement Study
11/19/93 Staff Correspondence
5/18/94 Parent Advisory Board Letter
Neighborhood Meeting Information
Attachment B
Attachment CP
Northwest Associated
U R B A N P L A N N I NG · DES I G N
Consultants, inc.
M A R K E T R E S E A R ~"~
PLANNING REPORT
TO:
FROM:
DATE:
RE:
FILE:
Kirk McDonald
Elizabeth Stockman / Alan Brixius
3 June 1994
New Hope Cooper High School Athletic Complex
131.01 - 94.13
Background
School District 281 has submitted plans for construction of an
athletic complex on the Cooper High School property, located at the
intersections of Zealand and 49th Avenues North in the City.' The
property is zoned R-I, Single'Family Residential which requires
that a Conditional Use Permit be obtained because of its
association with the school as a public/educational structure.
The two existing high schools, Cooper and Armstrong, currently
share' an athletic facility which is located off-site. The recent
sale of Mielke Field mandates the relocation of the athletic
complexes. The School District is requesting approval of this
project as well as a similar one in the City of Plymouth, so that
equal facilities, recreation opportunities and time are available
to both schools.
Attached for reference:
Exhibit A - Site Location
Exhibit B - Site Plan
Exhibit C - Grading and Drainage
Exhibit D - Landscaping Plan
Exhibit E - Floor Plans/Elevations
Exhibit F - Lighting Plan
Exhibit G - Section Drawings
5775 Wayzata Blvd.-Suite 555 .St. Louis Park, MN 55416. (612) 595-9636.Fax. 595-9837
Recommendation
With the sale of Mielke Field the school district has limited site
choices for the establishment of an athletic complex that will
serve the Cooper High School students. In evaluating the school
districts request for a CUP, the City must consider the benefits of
having a quality athletic facility for the students as well as the
New Hope residents. The educational and recreational opportunities
must, however, be weighed against the land use issues that are
presented by the site.
Based on the review of City Code requirements as discussed herein,
the prOposed stadium complex has several outstanding issues
asSociated with it which are unique to the City and sensitive to
existing surrounding area property owners. At the forefront are
compatibility, noise, and visual concerns in addition to traffic
and parking considerations. It is for these reasons that we do not
make recommendation on this matter, but rather leave it as a policy
decision to be decided by the Planning Commission and City Council.
Should the City decide to approve the request, it is recommended
that the following conditions be included as part of the
Conditional Use Permit.
1)
The project is found to comply with all Conditional Use Permit
criteria as outlined herein.
2)
A minimum of 625 parking spaces are provided on site in
conformance with City standards, exclusive of dead-end
parking, narrow drive lanes, and those spaces impacted by
light poles.
3)
Snow storage areas and parking lot grades are indicated on
revised plans.
4)
Additional screening is provided in the large median area at
the west end of the parking lot and along the south/east side
adjacent to Dell Drive and the residential area.
5)
If, after the first year of operation, bus parking space
proves to. be inadequate, additional spaces are provided to
accommodate them. In the event this becomes necessary, the
submitted plans should be revised to show where the additional
bus parking could be constructed. Buses shall be prohibited
from using car parking spaces during varsity football games
and other events which are at or near capacity.
6)
Additional study is given to the effect traffic will have on
the surrounding area local streets to the satisfaction of the
City Council.
2
7)
City decision on the potential extension of 47th Avenue is
determined prior to approval of the school district CUP, so as
not to create a parking shortage or place unnecessary burdens
upon the school district to relocate parking in future years.
8)
9)
Ail slopes in excess of 1:1~ are planted with materials other
than turf and such slope protection measures are indicated on
revised site plans.
The grading and drainage plan is reviewed by and subject to
the approval of the City Engineer.
zo)
Any lighting used on site is arranged so as not to reflect
onto adjacent property.
11) ~A Noise Impact Statement is submitted if required by the City
to further address related concerns.
12)
The location of trash receptacles on site and the ability of
refuse trucks to collect rubbish must be indicated on revised
plans. Additionally, the school district will be considered
responsible for the collection of trash in surrounding areas
off-site after events, thus the means by which this will occur
should be indicated.
Z3)
Ail signage which may be desired or necessary on site is
reviewed and subject to the approval of the City.
Traffic control measures are utilized by the school district
to minimize impacts on neighboring properties pursuant to that
deemed necessary by the City.
is)
The exact number of games and types of activities which will
take place on site are defined by the school district and
incorporated as a condition herein. Any activity above and
beyond that which is initially approved by the City will
require further consultation and formal approval by the City
Council.
16)
The Cooper High School athletic facility is not shared with
Armstrong or any other school on a regular basis. Special
events may be approved by the City.
Issues Analysis
Zoning. The school property is currently zoned R-i, Single Family
Residential. A Conditional Use Permit is required to locate a
public/educational building within the district. The proposed use
must meet the following criteria as outlined under Section 4.054 of
the City Zoning Ordinance in order to be approved as a conditional
use.
3
1)
Side Yards. Side yards shall be double that required for the
district, but no greater than 30 feet.
The propose~ side yard setback from the rear of the visitor
bleachers to the property line is 50 feet, thus exceeding the
minimum 30 feet required.
2)
Parkinq. Adequate off-street parking and access is provided
on the site or on lots directly abutting directly across a
public street or alley to the principal use in compliance with
Section 4.036 and that such parking is adequately screened and
landscaped from surrounding and abutting residential uses in
compliance with Section 4.033(4).
Based on the ratio of one parking space for every 4 seats, 625
spaces will be necessary to accommodate the expected crowds
and includes 25 spaces for handicapped usage. As indicated in
subsequent sections of this report, however, there are only
596 acceptable parking spaces on site, as the 33 dead-end
stalls and the 10 others encroached upon by light poles will
not be counted. It is likely that revisions to submitted
plans would be able to make provisions for an additional 43
stalls which are in compliance with City standards.
3)
Off-Street Loadinq. Adequate off-street loading and service
entrances are provided and regulated where applicable by
Section 4.037.
The proposed locations of service gates and access points are
considered to be satisfactory, but will also be subject to
review and comment by the City Engineer and Building Official.
Ail existing loading areas have been maintained appropriately.
Conditlonal Use Permit Review Criteria. The Planning Commission
and City Council will consider the possible adverse effects of the
proposed conditional use and in determining whether to approve or
deny a Conditional Use Permit, they must find that:
1)
Comprehensive Plan. The proposed action has been considered
in relation to the specific policies and provisions of and has
been found to be consistent with the official Comprehensive
Municipal Plan of the City.
The New Hope Comprehensive Land Use Plan identifies the school
district site for public and semi-public land uses. While the
athletic facility falls into this land use category as an
accessory use, the Comprehensive Plan does not specifically
address this type of land use activity for the high school
si re.
4
The Cooper High School is located in Planning District 13 as
defined in the New Hope Comprehensive Plan. This district is
characterized by totally developed single family residential
sub-neighborhoods inter-connected by a large concentration of
school and church uses. Traffic generation experienced in
this district has been greater than that traditionally found
in single family neighborhoods. The following development
policies are applicable to the proposed stadium:
a)
b)
c)
d)
e)
f)
Preserve and protect property values.
Relate land use development to transportation needs,
desired development as identified in the Community
Development Plan and community priorities.
Ensure that intensification of land use activity and
development is accompanied by sufficient corresponding
increases in related supportive and service facilities.
Protect low density residential neighborhoods from
encroachment or intrusion of incompatible higher use
types and by adequate buffering and separation from other
use categories.
Plan transportation facilities to function in a manner
compatible with adjacent land use.
Ensure that the expansion of existing development
includes adequate off-street parking.
The introduction of the high school athletic facility must be
evaluated in relation to the residential character of the area and
the aforementioned planning policies.
2) Compatibility.
land uses.
The proposed use is compatible with adjacent
The high school si te i s surrounded by single family
neighborhoods. The site is accessible via local streets. The
introduction of an athletic facility raises compatibility
issues with regard to site appearance, traffic, noise,
lighting, and evening events.
The school district has attempted to minimize the impacts of
the complex through site design features, extensive screening,
and parking lot improvements. Additionally, the school
district has indicated that the new activities being added to
the site are limited to varsity football, and girls and boys
varsity soccer. To limit the impact of the facility on
adjacent neighborhoods, the school district expressed a
willingness to limit the number of events. A more detailed
evaluation of the site design and land use concerns is
provided in subsequent sections of this report.
5
3)
4)
5)
6)
Performance Standards. The proposed use conforms with all
applicable performance standards contained in this code.
In subsequent sections of this report, detailed review of site
plans has been provided and outlines compliance with
applicable zoning regulations.
No Depreciation in Value. The proposed use will not tend to
or actually depreciate the area in which it is proposed.
While the introduction of the athletic complex to the high
school site will influence the character of the adjacent
residential properties, it will not be the sole determining
factor in decreased property values (assuming this is
possible). The individual likes and dislikes of a residence,
neighborhood, and City are typically the determining factors
for persons buying homes. T_Se County Assessor supports this
statement and has stated that they do not place values on
homes based on the existence of this type of use, but rather
the buying and selling patterns of similar homes. The
positive factors of living across from this type of use
include the lack of homes/neighbors, proximity to recreational
opportunities, and open/quiet space during off-times.
Zoninq District Criteria. In addition to the above referenced
criteria, the proposed CUP meets the'criteria specified in the
R-1 zoning district.
Ail criteria outlined under the R-1 District for conditional
uses have been met as discussed above under "Zoning".
In residential districts:
a)
Non-residential traffic is channeled into thoroughfares
or onto a street abutting business or industrial uses
leading directly to thoroughfares, and not onto minor
residential streets.
Traffic from the existing high school parking lot is
channeled onto Zealand and 47th Avenues which are both
local streets. While parking for the proposed stadium
will be utilizing the same ingress and egress points as
those which currently exist, the stadium will likely
create a greater concentration of vehicles at one time
and at a time period spanning the evening rather than
daytime hours.
b)
The proposed use will be sufficiently separated by
distance or screening from adjacent residentially zoned
land so that existing homes will not be materially
depreciated in value and there will be no deterrence to
development of vacant land.
The School District has proposed an extensive screen
utilizing berms and vegetative material along Zealand
Avenue which will be subject to review by the City in
terms of acceptability and the stadium structure meets
all required setbacks.
c)
The structure and site shall have an appearance that will
not have an adverse effect upon adjacent residential
properties.
The proposed stadium represents a high quality design and
is consistent with the style/materials of the existing
high school building.
Setbacks. The following setbacks are applicable to the proposed
development.
Front Yard (47th Avenue)
Side Yard (Zealand Avenue)
Rear Yard (49th Avenue)
30 feet
30 feet
35 feet
The proposed stadium is setback greater distances on all three
sides than the minimum required. The setback from Zealand Avenue
is 50 feet, from 47th Avenue is 220+ feet, and from 49th Avenue is
330+ feet.
Vehicle Parking. The existing number of parking stalls on site at
the current time totals 552. The breakdown for this is as follows:
381 spaces on the high school site
+167 spaces on the elementary school site
+ 6 reserved spaces
10 spaces impacted by light poles
12 spaces lost due to the new design
552 total spaces which exist
The City previously indicated to the School District that the
existing stalls do not meet code requirements. Thus, the plans
reflect a revised parking lot layout with an increase in the total
number of stalls, parking spaces and drive aisle widths at the
appropriate sizes, and improved intersections. The following
breakdown reflects the proposed parking quantities as shown on
attached plans:
342 on high school site after changes
+153 on elementary school site after changes
+144 in new lot to north of building !0 spaces impacted by light poles
33 dead-end spaces on the north/east side of building
59'6 acceptable spaces as shown on submitted plans
7
The current City parking standard indicates that a minimum of one
space per 8 seats should be provided, however, this number is
considered to be outdated and it will be necessary for the
applicant and City to come to an agreement on the minimum number of
spaces that should be provided. The traffic analysis which was
prepared by Westwood Professional Services, Inc. dated 26 May 1994,
utilizes a 1:4 ratio, thus necessitating a total of 625 parking
stalls. As a reference, other sources were checked to compare this
proposed standard. Specifically, research by Westwood indicated
that the cities of Brooklyn Park, Mankato, Plymouth, and Prior Lake
also use this ratio and the American Planning Association (1991,
PAS Report 432) supports a ratio of one space per 3 to 5 seats, as
varies between cities surveyed.
Based on this data, it is expected that one parking space for every
4 seats will be able to accommodate the expected crowds. This
necessitates a total of 625 parking spaces, including 25 for
handicapped usage. As indicated previously, however, there are
only 596 acceptable parking spaces on. site, as the 33 dead-end
stalls and the 10 others encroached upon by light poles will not be
counted. It is likely that revisions to submitted plans would be
able to make provisions for an additional 43 stalls which are in
compliance with City standards. There are 26 handicapped parking
stalls on site which exceeds the 25 required.
Other factors related to parking on-site which must be clarified
prior to approval of submitted plans.include designation of the
areas where snow is to be stored, indication of the grade of the
parking area (which must not exceed 5 percent), indication that all
parking areas will be surrounded by a perimeter curb, paved, and
striped. Additionally, the City Code requires that parking areas
be screened and landscaped from view of surrounding area
properties. Thus, it is recommended that supplementary plantings
be required in the large median area on the west end of the parking
lot and along the south/east side where residents access their
homes via Dell Drive.
A final issue related to parking is the design of the new parking
area to the north of the existing building. While the dead-end
parking arrangement for 33 spaces has already been highlighted as
an undesirable arrangement for traffic movement and congestion
reasons, the drive aisle width in this location is also
insufficient at a width of 20 feet rather than the 24 feet which is
required. Additionally, the drive aisle width between the two
northern-most rows of parking measures only 20 feet, while the
drive lane north of this point is not necessary. It is possible to
redesign these areas to be in compliance with City standards.
Bus Parking. Two designated bus parking spaces have been indicated
on submitted plans which measure 13 x 40 as is required. While the
applicants feel that two bus parking spaces is adequate, it is
recommended as ~ precautionary measure to include a proof of
parking clause which would require the provision~ of additional
spaces if it is deemed necessary during varsity football games
after evaluation of the first year of operation. It is mandatory
that buses do not utilize vehicle parking areas.
Traffic Generation. The proposed stadium has a total seating
capacity of 2500 persons and an estimated maximum vehicle count of
625 per varsity football game (the activity with the most
attendance). As indicated previously, these vehicles must utilize
47th and Zealand Avenues to access'the major thoroughfares of 49th
Avenue and Winnetka Avenue. While this is in opposition to the
intent of the CUP criteria, the existing high school parking
facility currently accommodates similar levels of traffic which use
the same streets to exit the site but the number of vehicles
leaving after games would most likely be within a shorter, more
intense time period. The traffic study indicated that the
intersections of Winnetka at 47th. and 49th as well as the
intersections of Boone at 47th and 49th are able to accommodate the
levels of traffic anticipated on game nights. Ample consideration
was not, however, given to the effect that traffic will have on
surrounding area local streets. It was indicated that an
additional 95 vehicles would utilize Virginia Avenue north of 47th
Avenue and an additional 50 vehicles would traverse Zealand Avenue,
but others were not specifically addressed. The school district
indicated a willingness to utilize additional signage, persons, or
any other traffic control measures to ensure that the effect upon
neighboring properties is kept to a minimum.
47th Avenue Extension. The City Code requires that all buildings
be placed so that they will not obstruct future streets which may
be constructed by the City according to the system and standards
employed by the City. While the proposed stadium will not hinder
the potential future connection of 47th Avenue, the parking area
would be significantly impacted. If the extension were to occur,
curvature of the road would be necessary to by-pass the elementary
school building. It is suspected that limited area exists on the
high school or adjacent sites for establishment of off-street
parking areas, thus the extension of 47th Avenue would create a
distinct shortage of parking with little, if any, on-site space
available for it's replacement.
Grading and Drainage. A grading and drainage plan has been
submitted, as required under Section 4.032 (4). The berm which has
been proposed along the west side of the stadium measures 8 to 10
feet in height and has a maximum slope of 33 percent. The Zoning
Ordinance prohibits turf slopes in excess of 1:1~. As is
recommended in subsequent sections of this report, shrubs and/or
ground covers may be better suited for the steepest sloped areas
9
and may also add to the visual quality on site. Whatever the
approved means, slope protection measures should be indicated and
if this area is to be seeded, it is recommended that erosion
control blankets or other methods be incorporated and specified on
submitted plans. The plans will be subject to review and comment
by the City Engineer, and the final plan will be subject to his
written approval.
Fencing. An eight foot high black coated chain link fence has been
proposed around the periphery of the stadium. It is in compliance
with City standards in that it is more than five percent open for
passage of air and light, does not exceed eight feet in height and
does not encroach into the required front yard building setback
area.
Landscaping. As required in the City's Zoning Ordinance, the lot
area remaining after providing for off-street parking, off-street
loading, sidewalks, driveways, or other building site requirements,
shall be landscaped using ornamental grass shrubs, trees, or other
treatment generally used in landscaping. The proposed vegetative
plantings shown on submitted plans are acceptable with regard to
species selection, size, and spacing. All proposed plantings
exceed the minimum size required at the time of installation. The
Austrian Pines and Spruce trees are both excellent screening trees
and are able to withstand more dry conditions than some other
evergreens. It is estimated that at the time of planting screening
will be provided to a height between 10 and 18 feet. Judging from
the existing topography as shown on submitted section drawings,
this is adequate to buffer the views from adjacent split level and
rambler homes. It will take approximately 20 years for the trees to
reach a height of 35 to 50 feet (45 to 60 feet as measured from the
base of the berm).
It is recommended that some small shrubs and ground cover species
be integrated into the design on berms or at the front of the
stadium to add to the visual character on site. Additionally, as
has been suggested in previous sections of this report, increased
screening would also be desirable to better buffer the parking lots
adjacent to residential areas.
Lighting. Any lighting used to illuminate stadium, parking, signs
or other site uses must be arranged to deflect light away from
adjoining residential uses and from public streets. Any lights or
combinations of lights must not cast light on a public street in
excess of one foot candle as measured from the center line of the
street. Lights reflecting onto residential property must not
exceed four foot candles as measured at or on the adjoining
property. While the proposed light poles are to extend a distance
of 80 feet into the air as measured from the field surface, the
submitted plans indicate a maximum measurement of .85 foot candles
at the curb line of Zealand Avenue which is in compliance with the
above specified requirements.
10
Noise. Chapter 9 of the New Hope City Code stipulates the
following maximum noise levels permitted by receiving land use
districts.
Receivinq District
Day Night
(7am-10pm) (10pm-7am)
L10 L5Q L10 L50
R-1 65 60 55 50
The City may require a noise impact statement to be completed if
the proposed project is considered to be a potential noise
source.
Refuse/Storage. Ail materials, equipment, and refuse must be
stored within a building or be fully screened so as not to be
visible from adjoining properties. The locations of trash
receptacles and the ability of refuse trucks to collect such must
be indicated on submitted plans.
Signage. The submitted plans do not indicate whether property
identification, directional, or temporary/portable signage will be
changed from that which exists or additional signage will be
necessary given the increased site usage. A signage plan must be
submitted for review by the City and should be in conformance with
Section 3.40 (Signage) of the City Code.
Events. The exact number of games and types of activities which
will take place on site must be defined by the school district and
incorporated as a condition herein. Any activity above and beyond
that which is initially approved by the City will require further
consultation and formal approval by the City Council.
Conclusion
Based on the review of City Code requirements and identification of
several issues as discussed herein, decision on this request to
construct a new high school stadium is a sensitive one. There are
positive and negative factors that will exist both with or without
the stadium location on the Cooper High School site. In one
regard, the schools long time standing in the community and
existing site uses very similar in nature to the proposed use may
justify granting the request in addition to the limited site usage
on a yearly basis and lack of neighbors/activity during off-times.
However, there are negative factors which also have to be evaluated
in further detail such as compatibility, noise and traffic
concerns. It must be proven, either through additional studies,
revised design, or other means that the positive factors Outweigh
the negative ones. ~nile there are typically negative factors
11
associated with any development, the underlying decision must
always be that which affords the greatest benefit to the community
as a whole.
pc:
Dan Donahue
Doug Sandstad
Steve Sondrall
12
CITY OF NEW HOPE
MEMORANDUM
DATE:
TO:
FROM:
SUBJECT:
July 1, 1994
Planning Commission Members
Kirk McDonald, Management Assistant/Community Development Coordinator
Miscellaneous Issues
1. June 13th City Council Meeting - At the June 13th Council meeting the City Council
took the following action on planning cases and other related issues:
Planning Case 94-02 - Final Plat of J.R. Jones Addition, 3216 Winnetka Avenue
North: Approved an extension on the filing of the Final Plat until October 31st, per
the petitioner's request, due to the fact that it would create an economic burden to
the property owner to pay the second half of the 1994 property taxes five months
in advance.
Awarded Contract for House Rehabilitation at 7109 62nd Avenue North - The
City acquired this vacant HUD home with a MHFA grant and will rehabilitate this
summer and sell to a low/moderate income family.
Planning Case 94-05 - Collins Electrical Systems, Inc., CUP for Outdoor Storage
at 4990 Highway 169: Accepted a ponding easement, which was a condition of
approval for the CUP.
Planning Case 93-25 - Final Plat of Carol James Addition, 7109 62nd Avenue
North: Approved, subject to a minor legal description modification to the plat.
Planning Case 94-15 - Preliminary Plat and Variance from Right-of-way Width
Requirement for Kimball Addition, 8901 36th Avenue North: Approved, subject
to conditions as recommended by the Planning Commission.
Fo
Planning Case 94-17 - Rezoning from I-1, Limited Industrial, Zoning District to
R-I, Single Family Residential, Zoning District, 3043 Louisiana Avenue North
(Kranz): Approved, but the ordinance rezoning the property will not be published
until a building permit is issued and construction started.
Go
Planning Case 94-10/Ordinance No. 94-09 - Rezoning from R-l, Single Family
Residential, to R-2, Single and Two-Family Residential, 5009 Winnetlm Avenue
North: Approved and the ordinance rezoning the property will not be published
until construction is started.
Purchase of 6073 Louisiana Avenue North - The Council approved the purchase
of the vacant (rear portion) of the Carol James property at 62nd and Louisiana
Avenue. ,The property will be replatted/combined with the rear portion of the
adjacem City-owned property at 7109 62nd Avenue North to create a new
residential lot (see attachments). The plat will be presented to the Commission later
this summer.
June 27th City Council Meeting - At the June 27th Council meeting, the City Council
took the following action on Planning cases and other related issues:
Resolution Awarding Contract for Removal of Debris and Garage at 5009
Winnetka to Prepare Site for Future Construction - The house was burned on
June 19th by the Fire Department and the Council awarded this site preparation
contract to Thomas Contracting in the amount of $4,050.
Bo
Resolution Ordering Construction of Retaining Wall Improvements - The public
hearing for retaining wall improvements was conducted and the Council authorized
the preparation of plans and specifications for 28 walls in the City (see attachments).
Co
Planning Case 94-15 - Final Plat of Kimball Addition, 8901 36th Avenue North:
Approved, as all requirements of the City Engineer and Watershed District have
been met.
Do
Resolution Authorizing Preparation and Approval of Plans and Specifications
and Ordering Advertisement for Bids for Phase II of City Hall Remodelin~ -
This deals with the remodeling of interior office space and is expected to start this
fall (see attached plans).
Eo
Listing Agreement with Thorpe Bros., Inc. to Market Ci~-Owned Property at
7300 42nd Avenue North - Approved, now that the gasoline contaminated soil is
cleaned up the City wants to solicit quality developmem proposals for the property
at the northwest intersection of 42nd and Nevada Avenues. We will be
surveying/platting the property later this summer.
Public Works Site Improvements and Salt Storaee Buildine - This project is now under
construction and I would encourage you to drive past the site when you have time.
Repainting of 42nd Avenue Railroad Bridge - This project is curently underway - see
attached project bulletin.
42nd Avenue Landscaping/Maintenance Project
underway - see attached project bulletin.
This project is also currently
SuperAmerica Development Agreement - This agreemem has been executed by
SuperAmerica and returned to the City with the appropriate financial guarantee, therefore,
construction can proceed.
Gethsemane Cemetel3,~ Article - You might enjoy reading this article from the Catholic
Bulletin on the Gethsemane Cemetery project.
Outdoor Storage and Front Yard Parkin_~ - Due to the number of planning cases,
housing and engineering projects this month, staff has not had time to schedule another
meeting with the Codes & Standards Committee on the outdoor storage and front yard
parking issues, however, the Planning Consultant and Building Official are consolidating
their ideas and a committee meeting will be scheduled later this summer or early fall
(neither issue needs immediate attention).
Planning Commission Applications - Applicants to serve on the Planning Commission
are still being sought.. If you know of anyone that is interested, please have them contact
Sayne Ferry, City Manager's Secretary, at 531-1111. We have received five applications
to date and it is anticipated that the City Council will interview and make an appointment
in August or September.
Attachments:
J.R. Jones Plat
7109 62nd Avenue Rehab
Collins Electrical Systems
Purchase of Carol James Property
Thomas Contracting Bid
Retaining Wall Improvements
City Hall Remodeling - Phase II
Thorpe Bros., Inc. Listing Agreement
42nd Avenue RR Bridge Project Bulletin
42nd Avenue Landscape Project Bulletin
SuperAmerica Development Agreement
Gethsemane Cemetery Article
COUNCIL
RE~LrF~T FOR ACTION
Approved for Agenda Agenda Section
Consent
) 6-13-94 Item No.
Originating Department
City Manager
Kirk McDonald
Management Assistant
RESOLUTION EXTENDING RECORDING PERIOD FOR J.R. JONES FINAL PLAT
J.R. Jones has request~ an extension on the filing of their Final Plat due to the fact that it
would be a hardship for them to have to pay the full year's property taxes so far in advance.
The enclosed resolution extends the recording period for the Final Plat of J.R. Jones Addition
until October 31, 1994.
Staff'recommends approval of the resolution.
MOTION BY '
SECONDBY
RFA-O01
JUN-02-94 THU 15:23 ?,02/03
CORRICK/~ ~ONDRALL, P.A.
ATTOR3~'E¥$ AT LAW
Edinburgh Executive Office Plaza
8525 Ed/nbrook Crossing
$u/te #203
lSL'uoklyii Pm'k, Mh~ac~ota 55443
FAX (61a)
June 2, 1994
Mr. Kirk McOonatd
Management Assistant
City of New Hope
4401Xylon Avenue North
New Hope, MN 55428
RE;
Reoordtn9 Final Plat of J.R. Jones Subdivision
Our Ftle NO, 99.15038
Dear Kirk:
PursUant to our dune 1, 1994 telephone conversation p]ease 11nd
enolosod & propoled Resolution extending the recording Oeriod for
the ftnal plat of the J.R. Jones Subdivision.
Contact me if you have any qLJestions.
Very truly yours,
St even A. Sondra11
sit
Enclosure
OantlT ,J'. Oonahue-
JUN-02-94 THU 15:24
P, 03/03
RESOLIJTTON NO. 94-
~ESOLUT[ON EXTENDINQ RECORDING
FOR J.R. JONES FINAL PLAT
BE IT RESOLVED by the City Council of the City of New Hope as
followe:
1. That the City Council hereby finds it would be a hardship
to require literal compliance with New Hoo9 ~ods g13.032(3).
2. Thersfore~ ~he C~ty Council hereby extends the filing
period for the J.R. ,Jones f~nal plat to October 31, 1994 and
further determines that the final plat shalllbe considered void per
New HoDs Code §13.032 If not recorded with the HenneDtn, County
Recorder on or before October 31, 199&.
Dated the day of , lgg4.
_)
AtteSt:
Valerie Leone, City Clerk
Edw. d. Ertckson~ Mayor
May27, 1994
M E:$SE:RLI
& KRAMrR P.A.
AT'roIIIINley$ AT LAW
I~00 FIFTH STIRG'WT
ISO SOUTH FIFTH
MINNEAPOLIS, MI N N E:$OTA
(6~2)
FACSIMILE: (612)
672-3698
Mr. IOrk McDonald
City of New Hope
4401 Xylon Avenue North
New Hope, MN 55428-4898
Plnnnlng Case NO. 94-02
J.R, Jones Addition
Dear Mr. McDonald:
I have been advised that pursuant to Minn. Stat. §505.04, in order to record the mylar with the
Hennepin County Recorder's office for the J.P~ Jones Addition, the Company will be required to
pay 'all 1994 taxes. This would require J.l~ Jones Fixture Company to pay its second half
taxes five months in advance.
In order to avoid this economic burden, I would like to request that the City Council approve
extending the 100-day requirement to allow the recording of the mylar in October when J.R.
Jones' second half taxes become due.
Your assistance in this matter would be greatly appreciated. Please contact me to discuss
whether a formal request needs to be submitted to the City Council and in what form.
Very truly yours,
cc: Robert Jones
JWL~,~:79049_I
COUN(
REQUEST FOR ACTION
Originating Department Approved for Agenda Agenda Section
City Manager 6-13-94 Consent
Sarah Bellefuil /iI) ItemNo.
By:. By:~// 6.10
/
· RESOLUTION AWARDING CONTRACT FOR HOUSE REHABILITATION AT 7109
62ND AVENUE NORTH, IMPROVEMENT PROJECT NO. 511
On May 23rd the City Council approved Plans and Specifications for
Rehabilitation of Property at 7109 62nd Avenue North. Bids were opened on
June 3rd and staff is requesting that the Council consider the award for the bid:
at the June 13th Council meeting.
This project is one of the City's scattered site housing projects and is being
funded with MHFA and CDBG funds. This vacant HUD home was purchased
last fall with MHFA grant funds and the rehabilitation Will be financed with
.' CDBG funds. The rehabilitation work will include new exterior siding, roof
replacement, replacement of windows, installation of a driveway, interior
painting, well sealing and upgrades to the electrical and heating systems. It is
the staffs goal to have the rehabilitation work completed this summer and sell
the home through the first time home buyer program before the end of the
year.
The City reCeived one bid for this project from Flag Builders, Inc., for $23,635.
Soffit and facia replacement were inadvertently omitted from the specs;
therefore, these items will be added by a change order. The total price will still
be s'ubstantiall¥ lower that staff's original estimate of $30,500.
Staff re~mmend$ approval of the enclosed resolution awarding the contract
to Flag Builders,. Inc.
MOTION BY SECOND BY
TO:
Revl~: Admin~tration: Finance:
CITY OF NEW HOPE
SPECIFICATIONS FOR HOUSE RESTORATION AT
7109 62ND AVENI~ NORTH
NEW HOPE, MINNESOTA
The City of N,~v Holm is s~king quot~ on th~ following repairs needed on a city-owned home at 7109
62nd Avenue North. Pleas~ contact $~an Coon~, General b~spector, at 531-$124 for access to the home
and for specific information resardin8 tl~ repairs.
GENERAL
3.
4.
5.
6.
7.
It is th~ intmt to ~ th~ subject property to a usable condition.
~ it is ~ m remov~ and replace aa it~n, the replacement item should bo equal in quality,
size and function to th~ r~plar~ it~n when new. '
Ail comra~rs ~ l~v~ a Stat~ Resick'ntial Contractor's License.
C~ and sulxx~ractors will submit evidenc~ of msum~ covera~ and workers
Contractor shall obma a buildi~ permit and necessary sub-conua~ or minor contra,m from the
City of New Hop~; Th~ City of New Hope will iequire normal iml~:tiom durins co~miction.
Colot~, ~ and ~ to bo decided upon by tbo City.
Th~ Cit~ ~ th~ risi~ to d~l~ any portion of th~ work from th~ foilowi~ without ~g
tl~ quo~d ~s of th~ r~maim~ work before or durins th~ constru~ion du~ to budsetary
1. R~:~ugggisfi~ ~ ~ m ~ color us~ ~ or ~ ~
Sl~*~i~ W',m,,~ Sutmps~ in whit~ or near whim.
Do
2. fiSslM[~~~, dimensions 30"widex30'deep.
3. Instslln~ Knnnmu w,,.sber and dryer, to fit tisht spa~e.
Bathroom i~xtur~ ~d ~umblee
1. R~mov~ and r~pl~:~ ~ sink, cabinet vanity.
2. l~-p~ f~ures shall bo Kohler, American Standard or equal. Widen sink
3. Fauc~"ts shall bo Mom.
4. Reconnect all plumbing.
Livlnm r~mn tad Bedroom
1. Provid~ and install catpeti~ in tbe livin~ room, haflway, and both bedrooms.
2. Ca~"tin~ ~ be Exquisit~ as ~ by World.
3. Cazpe6.'n~_ .shall have 1/2 inch, 8 pound pad.
4, Color to be ~:id~d upon by the City.
1. Get aflidivit firom state-licensed water well contractor.
1. Remove sido rails and pan, lin8 fi'om bedrooms.
2. Remove p~ from livin8 room and hallway.
3. Rernove walllMl~' from all rooms.
4. Prhne walls for painttnf.
6. Interior pain~ shaft be Sherwin Williams Superpaint.
Color .shall be espheil white.
1. Repaint ~ in ~ ~.
Crawl Soace Ventilation
1..Rnneveallexln~ ~ from 8arase and house.
2. "Ril~lmdnlmim'atmi bom'da and nail down loose boards prior to remvin~ _
3. Price to nma, sidin[ aoplieatimt, install Tyvek or equal weather bamor
malmiai as requited by local code requirements.
4. Install flashin& oyez heads and below sills of openinss and elsewbete as
required to provide a watertight wall.
5. Sidin8 and trim ~ shall be economy grade Alside, Alcoa, or equal
and be with a ~'s warranty. Thc warranty shall be given to
owner up~ purchase of th~ property.
6. Color to be ~ or near whim. t
Lo
Oo
Windows
1. Remov~'all windows.
2. New wind~ to be Anderson "Narrowline" double hung to match existing
rough openings (clad). One window in each bedroom must meet egress
requirements-pea' the building code. The new windows shaU include a
storm/screen window.
3. Installation shall be complete with hardware, lockset and flashing.
4. Insmlln6on will comply with manufacturer's specifications.
Iloo-
1. Remov~ and repla~ front and rear exterior doors (2'$" x 6'8'3 and
metal storm doors. Doors shall be Nord, Peachtree or equal.
House Roof
1. Rmmv~ roofcoverin8 and felt and inspect. Replace roofsheathins,
ifneed~ with 1/2 inch 4' x 8' Oxbeard (thickness to match).
2. Install fmu' (4) new 8" plastic fixed attic vents.
3. Repla~ roofcov~ with 15 pound felt, Ice & Water Shield per cod~,
and 215 pound shinsles. Shin~les should be GAF asphalt/fiberglass
and b~ medium to dark gray in color.
1. L~y3'asphMt~y. Driveway must be 10' wide.
1. Install upt~a~ ~n~=t~red teumaco in the deepened central p~rt of tl~ 'crawl
spao~ and inst~ warm and cold air ducts throughout.
,fi/O"
1. Brin8 electric system up to cod~ and eliminate electric heat to all rooms.
2. Remove wiring and baseboard heaters.
3. Install hard-wired smol~ detector to hall c¢ilm$.
Signature of iadi~
PLEASE RETURN QUOTES BY FRIDAY, JUNE 3, 1994, TO:
Sarah Beilefuil
4401 Xylon Avenue North
New Hope, MN 55425
Th~ quot~ will b~ coasid~ by the m~w Hop~ City Council at the Monday, June 13, 1994 Council
rn~-ti~. All work ~ to be compl~ by ~'uly 31, 1994.
The loweat ~ible bidder will be expected to enter into a comra~ with the City to ensure r~
completiza of the work in a timely manner. Payment will be made by the City upon acceptance of thc
quality and completim of all the work.
COUNC~
REQUF~T FOR ACTION
Originating Department Approved for Agenda Agenda Section
City Manager 6-13-94 Consent
Item No.
By:Dan Oonahue By': 6.9
RESOLUTION ACCEPTING PONDING EASEMENT AT 4990 HIGHWAY 169
Planning Case 94-05 was approved on March 14, 1994. One condition of the CUP for
Collins Electrical Systems was that the City receive a ponding easement from the
property owners to preserve a wetlands area.
The property owner has signed the easement document (exhibit A) The resolution
accepts the easement by the City. Staff recommends approval.
MOTION BY SECOND BY
TO:
Review: A~Imini.stration: Finance:
RFA-O01 ~
YAA~rlN P. M~
WILLIAM C. S'TPlAIT
CORRICK ~ SONDRALL, P.A.
Arro~mys AT Law
Edinburgh Executive Office Plaza
8525 Edtnbrook Crossing
Suite #203
Brooklyn Park, Minnesota 55443
FAX (612) 425-58~?
~A¥ONNE ~ KESKE ~.
SHARON D. OERBY
May 31, 1994
Daniel J. Oonahue
City Manager
City of New Hope
4401Xylon Avenue North
New Hope, MN 55428
RE:
Ponding Easement
Our File No. 99.29405
Dear Dan:
In March the Council approved a conditional use permit for Collins
ASsociates - Minneapolis involving the old Standard Iron Works
property. The CUP was contingent upon the City receiving a ponding
easement from the property owners to preserve a wetlands area
located on the property. The City hired a surveyor to supply a
legal description for the ponding easement, and that description
has been incorporated in the easement documents. The easement has
been signed by the property owner and the enclosed resolution
accepts the easement by the City.
Please contact me if you have any questions.
Sincerely,
Martin P. M~?eGha~
s3t ';~
Enclosure ·
cc:
Kirk McDonald (w/enc)
Valerie Leone'(w/enc)
Steven A. Sondra11, Esq.
RESOLUTION NO. 94-
RESOLUTION ACCEPTING PONDING EASEMENT
AT 4990 HIGHWAY 169
WHEREAS, on March 14, 1994, the New Hope City Council approved
a request for a conditional use permit for outdoor storage by
Co]]ins E]ectrica] Systems, Inc., submitted as Planning Case No.
94-05, involving property known as 4990 Highway 169 in the City of
New Hope, and
WHEREAS, a conditional use permit was granted conditioned upon
the property owner, Collins Associates - Minneapolis, a genera]
partnership, providing the City of New Hope with a ponding and
utility easement over a portion of the property, and
WHEREAS, said easement has been Provided by Co]]ins Associates
- Minneapolis, and now requires acceptance by this Council.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City
of New Hope as
l. That a certain easement for construction and maintenance
of public improvements from Co]]ins Associates - Minneapolis, a
genera] partnership, to the City of New Hope, a Minnesota municipal
corporation, for a ponding and utility easement, which easement is
attached hereto as Exhibit A and incorporated by referenced, has
been provided to the City. That said easement involves certain
covenants and agreements on the part of the City. That acceptance
of said easement is necessary for the successful maintenance and
preservation, of a-pond~ng area.
2. It. is hereby found and determined th'at this Counci 1
accel~t$-the attache~.Eaaement for Construction and Maintenance of
Public Iml~rovementr 1'rom"Co, Sins Associates - Minneapolis, a genera]
part nershi~l~. ....
Da1
day of , 1994.
Edw. J. Erickson, Mayor
Attest:
Valerie Leone, City Clerk
EASEMENT FOR CONSTRUCTION AND MAINTENANCE
OF PUBLIC IMPROVEMENT
'THIS INDENTURE, executed on the day of
1994, between COLLINS ASSOCIATES - MINNEAPOLIS, a General
Partnership (herein "First Party") and the CITY OF NEW HOPE a
Minnesota municipal corporation (herein "City"). '
WHEREAS, First Party is the fee owner of rea] property located
in Hennepin County, Minnesota, legally described as (herein
"ProPerty"):
That part of Outlot B, O~son Industrial Park, embraced
within the West 907.50 feet of the Southwest ~ of the
Northwest [ of Section 7, Township 118, Range 21, except
the North 60 feet thereof, lying east of Hi]lsboro
Avenue, Files of Registrar of Titles, County of Henna,in,
State of Minnesota,
and
That part of Outlot 8, Olson Industrial Park, 3ying
easterly of the Westerly 907.50 feet of the Northwest ~
of Section 7', Township 118, Range 21, except the North 60
feet thereof, according to the recorded p3at thereof, and
situate in' Hennepin County, Minnesota,
and
WHEREAS, the City wishes to obtain a ponding and utility
_~asement over, under and across a portion of said Property,
WZTNESSETH; That'ths First Party in consideration of the sum
of One Oo]]ar ($t.OO) and other good and valuable consideration to
it tn hand~ p&~d by the City, tl3e receipt of which is hereby
acknow3edgs~ doss hereby grant, bargain and convey unto the said
Ctty~ its'~ccsssors~ and assigns, forever, a permanent easement
over, u d~end;, across the easement tract described below,
including ~'an~:.free right and authority to enter upon and make
such use o~ th'~'s&td easement tract as ~s reasonably necessary and
advtsab]e tn the construction, maintenance and operation of a water
pond and public utilities.
The permanent easement herein granted for water pondtng and
public utility purposes is situated over, under and across a tract
of land (the easement tract) located in Hennepin County, Minnesota,
legally described:
EXHIBIT A
An ~a. sement for ponding and utility purposes over that
part of Outlot 8, OLSON INDUSTRIAL PARK, according to the
recorded plat thereof and situate in Hennepin County
Minnesota described as follows- '
Beginnihg at the southeast corner of said Outlot B;
thence North 05 degrees 28 minutes 51 seconds East,
assumed bearing along the east line of said Outlot 8 a
distance of 211.83 feet; to the south line of the north
60.00 feet of said Outlot B lying East of Hi]lsboro
Avenue; thence North 88 degrees 50 minutes 37 seconds
West along said south line and its westerly extension a
distance of 406.79 feet; thence South 80 degrees 43
minutes 17 seconds East a distance of 65.00 feet; thence
South 64 degrees 37 minutes 21 seconds East a distance of
54.00 feet; thence South 73 degrees 47 minutes 40 seconds
East a distance of 57.00 feet; thence South 81 degrees 28
minutes 19 seconds East a distance of 110.00 feet; thence
South 61 degrees 46 minutes 55 seconds East a distance of
100.00 feet; thence South 26 degrees 10 minutes 13
seconds West a distance of 60.00 feet; thence South 32
degrees 19 minutes 30 seconds West a distance of 48.00
feet; thence North 78 degrees 01 minutes 16 seconds West
a distance of 35.00 feet; thence South 41 degrees 55
minutes 50 seconds West a distance of 22.00 feet to the
south line of said Out]ot B; thence South 88 degrees 51
minutes 55 seconds East along said south line of Outlot
B a distance of 123.00 feet to the point of beginning.
COLLINS ASSOCIATES
MINNEAPOLIS, a Genera]
Partnership
Its Genera] Partner
GeneFa 1 Part~
STATE OF MINNESOTA )
COUNTY OF HENNEPIN )
The forego~n.g was acknowledge~ before me this
" /~Z. , 1994 by ~;/c~ ~J 73~ day of
E,
and GRe?9' ~ ~ ~ ~~ , the
General Partner, General Partner and Gene~al Partner, respectively,
of Collins Associates - Minneapolis, a General Partnersh~D, on
behalf of said partnership.
Not~ry Public
Th~s Document was Drafted by:
CORR[CK & $ONDRALL, P.A.
8525 Edinbrook Crossing, #203
Brooklyn Park, MN 55443
(612) 425-5671
Z, the undersigned, being the duly qualified and acting Clerk
of the C~ty of New Hope, Minnesota, hereby certify that the Council
of said City has duly acce~ted the foregoing easement.
Dated:
City Clerk
EDA
REQUF T FOR ACTION
Originating Department
City Manager
Dan Donahue
Approved for Agenda Agenda Section
6-13-94 EDA
Item No.
RESOLUTION APPROVING PURCHASE OF 6073 LOUISIANA AVENUE NORTH (IMPROVEMENT PROJECT
NO. 519)
At its meeting of April 25, 1994, the EDA adopted a resolution authorizing the
acquisition the property at 6073 Louisiana and directed staff to proceed with the
purchase.
The purchase agreement contains a purchase price of $17,402 which will .be
financed with CDBG scattered site funds. The City will assume responsibility for
extending utilities to the site {approximately $16,598) and construction of
affordable housing.
Staff recommends adoption of the resolution approving the purchase.
MOTION BY
TO:
SECOND BY
Administration:
Finance:.
RFA-O01
STEVEN A. SONDRAI.L
MICHAEL R. L*FLEUR
MARTIN p MALI=CHA
WILLIAM C ~TRAIT
CORRICK ~ SONDRALL, P.A.
ATTORNEYS AT LAW
Edinburgh Executive Office Plaza
8525 Edinbrook Crossin/~
Suite #203
Brooklyn Park, Minnesota 55443
TELEPHONE I6121 425-5671
FAX (612) 425-5867
LAVONNE E. KESKE ~
June 6, 1994
Kirk McDonald
Management Asst.
City of New Hope
4401Xylon Avenue North
New Hope, MN 55428
RE: Acquisition of 6073 Louisiana Avenue North
Our File No. 99.11121
Dear Kirk:
In connection with the completion of the purchase of 6073 Louisiana
Avenue North, enclosed please find a Resolution Approving Purchase
of 6073 Louisiana Avenue North. The Resolution also specifica]]y
authorizes the President, Executive Director and staff to complete
the purchase.
Please place this on the agenda for the EDA meeting on June 13,
1994.
Please contact me tf you have any questions.
Sincerely,
ORIGINAL SIGNED
~:,,~,~ RTtN P. MALECHA
Mart~n P. M&l~ch&
s3m
Enclosures ~
cc: Dante1 J. Donahue (w/
Valerie Leone (w/enc)
Steven A. Sondra11, Esq.
EDA RESOLUTION NO. 94-
RESOLUTION APPROVING PURCHASE OF
6073 LOUISIANA AVENUE NORTH
BE IT RESOLVED by the Economic Development Authority in and
for the City of New Hope as follows:
That the purchase agreement for vacant land known as 6073
Louisiana Avenue North, attached hereto as Exhibit A, is
approved.
That the President, Executive Director and/or staff are
hereby authorized and directed to sign such documents and
make such payments as are necessary to complete the
purchase of the subject property in accordance with the
terms set forth in the attached purchase agreement.
Adopted by the Economic Development Authority in and for the
City of New Hope this day of , 1994.
Edw. J. Erickson, Chairman
. Attest:
-" Daniel J. Donahue, Executive Director
-COUNCIL
REQUEST FOR ACTION
Approved for Agenda Agenda Section
Consent
f f~ 6-27-94 Item No.
~. 6.8
Originating Depa~thlent
City Manager
Sarah Bellefuil
AdminisWative Analyst
RESOLUTION AWARDING CONTt~,CT FOR REMOVAL OF THE DEBRIS AND
GARAGE AT 5009 WINNETKA AVENUE TO PREPARE SITE FOR FWrURE
CONSTRUCTION (IMPROVEMENT PROJECT NO. 505)
On Sune 19, 1994, the City-owned house at 5009 Winnetka Avenue was burned by the New
Hope F/re Department, leaving an open foundation and a free-standing, single-car ~a-a~e. In
order to prepar~ the site for future consmlction of a handicap accessible twin home, the debris
and garage must be removed from the site and the hole filled with buildable fill. The City
sought/received the following bids/quotes for this project, based on the attached specifications:
Contractor Bid
Kevitt Excavating, Ino.
$4,250
Thomas Contracth~
$4,050
Staff recommelMs approval of the enclosed resolution awarding the conUact to Thomas
Contmotin~ the low bidder;
MOTION BY
TO:
SECOND BY
Finance:
RFA-O01
CITY OF NEW HOPE
SPECIFICATIONS FOR
5009 WINNETKA AVENUE
NEW HOPE, MINNESOTA
The City of N~w Hopo ~s see, ki~ quo~ on the following items needed at a Cit~-owned property az 5009
Winnotl~ Avenuo.
GENERAL
It is tho iatm~ to ~ tl~ subj~ proporty' to a usable condition.
All ~ Ill I1~ a Stll~ Rtlid~ial Contractor's Lic~so.
Coatraol~, md siibooillra~:~ will submit evidence of insurance coverago and wotic~
~a?. ~ T~ C~y of Now ltopo Mil requiro normal insm~on~ ~ ~m~ .
quo~o m~ romamm~ worn oetom or aurin~ me constmotioa due to budaomy
i.. R,~mval oftl~ romsiz~ ~ dob~ ba.s~menr, and foundation of tho houso.
2. lmp~t ~ fill md ~ fmmdm~ m'm in 12 inch li_~ suitable for lisht
comuucliou, (Fill b'~M~N~ ~bUc Wo~ F~W,
"buildab~ cotdMm. Sotust trust bo siped ~ a ~~ M~
* '7oo.
15'0,
~'OO.
Conmc~ P~
PLP.~il ~ QUO'I"~ BfY THURSDAY, JIJN~ 23, 1994, TO:
4401
will bm ~ blt tl~ Neon Holmm City Council at tl~ Moada, y, ,Iun~ 27, 1994 Co,.mcil
Ail wod~ i~ to be oampkmM by Suly 22, 1994.
TI~ lmsu~ ~ bidd~ will bm e~eeted to ~r ~to a c~m ~ t~ City m mm~ the
4~01 Xylon Avenue North
New Hope. Minnesota 55428.4898
Telef~hone: 612.531.5 I00
TDD L/ne: 612-531.5109
City Hall Fax: =6 t 2-53'.5'
Police Fax: =6 ~ 2- ~$ ,-5 '
Public Works Fax: =6 t 2.533-TE
,June 14, 1994
To Whom it May Concern:
.The City of New Hope is seeldng bids for a number of activities at a
City owned house located at 5009 Winnetka Avenue. The house is currently vacant and
will be burned down by the City Fire Department on either/une 19 or/une 26, depending
on weather condifior~. After the property is burned, the debris from the site must be
removed and the site area restored to a buildable condition. It 'is anfidpated that the
remainin~ debri~ will coasi~ mainly of the foundation and basemem. Clean fill is available,
at the New Hope Public Work~ building, 5500 International Parkway.
There is aho a ~arage on the site that must be removed. It is not known at this time if the
garage will be burned. Therefore, space has been made ava/lable on the bid askin8 for a
quote for removal of the whole garafe and garage debris if the building is burned.
Thank you for your. cooperation. My phone number is 531-5137 if you latve, any
comments or questions r~g the project.
Sincere, t
Family Styled City !~, ', ,~,,~* For Family Living
COUNCIL
REQD'F~T FOR ACTION
Approved for Agenda Agenda Section
Public Hearing
~/ 6-27-94 Item No.
7.1
Originating Depa~i~uent
City Manager
Kirk McDonald
Management Assistant
PUBLIC I-I~ARINO - RESOLUTION CONSTRUCTION OF IMPROVEMENT
NO. 469, 1994 RETAINING WALL IMPROVEMENTS
This is the public hearin$ for Improvement Project No. 469, City-Wide Retaining Wall
Improvements. At the April 2$th City Council meeting, the Council approved a motion
accepting the Preliminary Report and ordered preparation of a Feasibility Report. On Sune
13th, the Council accepted the Feasibility Report and set the date for this public heating.
The City Engineer and Public Works identified 69 retaining walls in the City and are
recommending that 28 walls be reconstructed or removed. The specific retaining wall
improvements, estimat~t costs for the improvements and assessments to the benefitted
properties are outlined in the attached report, which is based on the following four policy
recommendations:
Assess 25 percent of the retaining wall cost, not including sidewalk, restoration, tree
removal, and ~ costs (administrative, engineering, etc.).
If a retalni~ wall is to be removed, the cost for removal, grading, and restoration
would no~ be ~.
If a retaining wall- is identified by staff for restoration and the property owner does not
agrea with i~~on or the assessment, staff recommends that the retaining wall
be ~ fo~ comideration at this time and continue to encourage the property owner
to ~i~~on in the future. Because the reufining wall construction is
MOTION BY
TO:
SECOND BY
Finance:
Request for Action
Improvement Project No. 469
Page 2
partially on private property, the City does need the property owner's permission to do
the work. However, it is recommended that condemnation for an easement to
reconstruct retaining walls not be considered initially.
The City would consider reconstructing retaining walls that are only on or adjacent to
public right-of-way. Retaining walls along driveways or extending onto private
property would not be considered. However, the property owners could work with the
City's contractor to do work on their property if they so desire.
The City Attorney has prepared the enclosed Resolution Ordering Construction of Improvement
No. 469 and Preparation of Final Plans and Specifications (1994 Retaining Wall
Improvements). Pending input at the hearing, staff recommends closing the hearing and
adoption of the resolution.
4401 Xylon Avenue North
New Hope, Minnesota 55428.4898
Telephone:
TDD Line:
612-531-5100
612-531-5109
City Hall Fax: ~6 !2-531.5 ~ $
Police Fax: ~ 12-53; -5 ~ -
Public Works Fax: #612-533-755
e17,1994
Subject: RETAINING WALL IMPROVEMENT NO. 469
Dear New Hope Property Owner:
A public hearing has been scheduled by the New Hope City Council for June 27, 1994, at 7:00 p.m.
to consider retaining wall improvements to your property in accordance with the attached Notice of
Public Hearing. The general nature of the improvement is the construction, repair or removal of
retaining walls as more fully described in the Notice.
The total cost of the improvement is $201,510.00 (includes costs for retaining wall, sidewalk, tree
removal, modular block wail, and sodding). Pursuant to the City's assessment policy, it is estimated
that $21,511.00 of said costs will be assessed to benefitted properties. Property owners rec~ivinq
this Notice are included in the assessment orQieCt. Said assessments are determined on a square foot
basis and are more fully set out in the preliminary assessment roll also attached.
In order to accomplish retaining wall reconstruction, the property owner must grant temporary
easements and the necessary rights-of-entry at no cost to the City. In the event the property owner
is not agreeable to grant the easement, the City will not construct a new retaining wall at this time.
The City will only consider the retaining wall reconstruction in a future project of similar size as this
project and when the City feels it is able to finance the City portion.
An assessment hearing determining final project costs and assessment amounts will be held after the
completion of the project. You will also receive a mailed notice of the assessment hearing. The final
assessment can be completely paid off at that time or it can be included on your tax statement and
financed over a I~riod of year~, The length of years and the interest rate will be established by the
City Council at the final aa~ea~nent hearing.
OPTION TO ASSESSMENT=
The City of New Hol~e and Henneldn County would prefer not to have any retaining walls located along
public right-of-way. Therefore, if the tOl~graphy of the property is such that the retaining wail may
be removed and i~tmisskm ia granted from the property owner, the costs associated with its removal,
grading, and re~ratien would be · City cost. No cost would be assessed to the property owner, if
you feel this rn~el~ly in. your ~ituetion, please contact Mark Hanson to discuss the details.
Questions rega~lln~thi~ project may be directed to Mark Hanson at 8oneetroo, Rossne, Anderlik &
Associates
Sincerely,
Valerie Leone
City Clerk
Enclosures
Family Styled City
Family Living
APPENDIX B
PRELIMINARY ASSESSMY.,NT ROLL
1994 RrFA]N1NG WALL IMPROVEMENTS
PROJECT NO. 469
Estlmnted Total Assess-
Wall Retnlnin! Wall Wall Cost meut (25%
No, Addruo Owner (sq. ft,~ ~S!S~00/s~ fL]~ Wall
I 6140 UtahAve~ Skot~ak 485 $ 7,275 $1,818
2. 6132 Utah Ave. Nail 140 2,100 525
3 7900 - 61st Ave. l-h2bbard 420 6,300. 1,575
4 7900 - 60½th Ave~ White 350 5,250 1,313
5 7901 - 60V~h Ava. Hudson 400 6,000 1,500
6 6001 W'maslkn Ava. Mills 330 4,950 !,2311
7 7900 - $9¥ghAv~. Myers 220 3,300 825
g 7900.591h Av~. Brandt 240 3,600 900
9 7615 Bass Lab Rd. (I) Alano Group 90 1,350 3311
10 7¢0~ BassLalm Rd. (I} Hilg~rs 60 900 225
11 7609 Bass Lalm Rd. O) ~ 90 1,350 33g
12 7643 Bass Lab Rd. (1} Dolm 90 1,350 3311
13 5546 ~ama~'. Av~. (1) Peta~ 190 2,1150 712
14 5212 W'mn~ Ava. (1) Vorass~ 70 1,050 263
15 4840 Dee, ammAva. Forint g0 1,200 300
16 4627 W'~ Av~ (1) Pianlt 1 50 2,250 562
17 462S W'nmsllmA~, (I) ~ 310 4,650 2,175
Ii 7900- 4g~ Av~ Ob /ohsnssn 2gO 3,900 975
19 4322W'mnsl~A~, O} ~ 270 4,050 1,013
20 4320 ~Aw, Ob Am~ 70 1,050 263
21 44241qB~SAvt~- l~flesen 180~ 2,700 675
22 ~~~, Ouststmn 170 2.5S0 638
23 881~Av~ (1~~ b 260 3.900 975
24 9009 o 42ndA~v. (D Nabedrick I~0 2,400 600
25 9109 - 42ndAve. (1) Newton 120 1;800 450
SoL.aDept 3?0 ,$50
] ] ] ssT s s $21,Sll
(1) Pmmins wails on Comty ~
(2) Assessment assumes 25% for sweet (220 sq. it) and 100% along north side driveway (90 sq, it).
REQUF T FOR ACTION
Approved for ~enda A~eada Section
June 27, 1994 Planning and
Development
Item No.
8.5
Originating Department
Finance/Administration
Larry Watts
RESOLUTION APPROVING DRAWINGS CITY HALL PHASE II REMODELING - AUTHORIZATION
FOR .THE PREPARATION AND APPROVAL OF PLANS AND SPECIFICATIONS AND ORDERING
ADVERTISEMENT FOR 81DS IIMPROVEMENT PROJECT NO. 502!
City Staff has been working with Milt Powell from Bonestroo, Rosene, Anderlik and Associates, inc.
to develop a remodeling plan for City Hall that will provide the following:
1. Better reception area in the Police De partment.
e
Police locker rooms that will provide adequate number of lockers, and space for Police
Officers.
3. Bring jail cells Ul~ to State requirements.
4. Realign work area~ in administration on a departmental basis.
To utilize the al)aCe vacated by the Department of Parka and Recreation, and provide
additional space for the Inspections Department.
Milt Powall will review the drawing~ that reflect the required remodeling changee'to provide the above
goals, along with estimated co~
The resolution i~ requesting the following:
Al~mval of the drawings. '
"Authmtzi~ Bonestroo, Rosene, Anderlik and Associates, Inc. to prepare plans and
sgeciflcetione.
MOTION BY
TO:
SECOND BY
AdmfnJ.qtration:
Finance:
RFA-O01
Request For Action
Page 2
Authorizing Staff to approve the plans and specifications prepared by Bonestroo,
Rosens, Anderlik and Associates, inc.
4. .Ordering the City Clerk to advertise for bids.
Staff recommends approval of this resolution.
!
""" """ ,~3n. LS r3NINNV'Id
I1'
.{
· ~.,am, v AOrllS ~)NINNY'ld
...... ' ..... :...'.... .. ...... ,._,o oo,,.~,oe r r 'F'IYH AJ.IO gdOH/IA'iN
i
~U/-~
REQUF_~T FOR ACTION
originating Department Approved for Agenda Agenda Section
City Manager EDA'
Kirk McDonald ~ 6-27-94 Item No.
By: Management Assistant By:~// 6
MOTION APPROVING LISTING AGREEMENT WITH THORPE BROS., INC. TO MARKET
CITY-OWNED PROPERTY AT 7300 42ND AVENUE NORTH
Staff is requesting that the EDA consider entering into an agreement with Thorpe Bros., Inc. to
list and market the City-owned property at 7300 42nd Avenue North (42nd and Nevada
Avenues). The gasoline contamination on the site has been cleaned up and the City has received
its reimbursement from the Petro Fund. The ground water contamination problem is under'
.control and the "responsible party", Electronic Industries, has filed an acceptable clean-up plan
with the MPCA.
Under the agreement, Thorpe would market the property for the City through various listings,
answer all calls on the property, and erect a sign on the property advertising it for sale. The
agreement would be in effect for one year and the only payment made to Thorpe would be an
8% commission upon the sale of the property. Thorpe would research comparable listings and
advise the City what they feel the property value is and reach an agreement with the City on a
sale price. Although the 65,000 square foot site is zoned B-4, Community Business District, and
could accommodate a number of'uses, the City could give Thorpe specific direction as to the type
_.. of business we would like to see on the site.
Also, if the EDA approves this agreement, staff would request to seek quotes to have the property
surveyed and platted so that the exact size can be verified.
MOTION BY SECOND BY
TO:
Review: Administration: Finance:
RFA-O01 ~
MARKETING PROPOSAL
City of New Hope
Presented by:
ULY Thompson, CIPS
June 24, 1994
Thorpe Bros., Inc.
Real Estate Since 1885
Sune 24, 1994
Mr. Kirk McDonald
City of New Hope
Development Coordinator
4401 Xylon Avenue North
New Hope, MN 5:5428
Thorpe Bros., Inc.
8085 Wayzata Blvd.
Minneal3olis, MN 55426
Tel: (612) 545-1111
Fax: (612) 545-8986
Dear Mr. McDonald:
I am pleased to present this proposal and Exclusive Listing Agreement, regarding the city-
owned property on the northwest comer of Rockford Road and Nevada Avenue.
This site offers some unique challenges, but it also offers an excellent location for certain
business uses.
Thorpe Bros., Inc., looks forward to the opportunity to market this property, with the
cooperation and assistance of the city. Your City Manager, Dan Donahue, seemed very
pleasant to deal with, and I am anxious to work with you both.
If you have any questions regarding this proposal, please feel free to call me. My direct
number is 797-1413.
Sincerely,
Uly Thompson, CIPS
UT:cid/UT- I
Your Partner in Real Estate Sen'ices Worldwide
Opinion of Value and Comparable Transactions
Pricing ·
In researching comparable sales and listings in New Hope, I found none. The search was
expanded to the neighboring communities of Plymouth, Brooklyn Park and Golden Vall.ey.
Listings were found in the price range of $2.75 per square foot (PSF) to $4.25 PSF. Sales were
identified from $2.39 PSF to $4.17 PSF.
It is my opinion that subject property should be placed on the market at $3.90 PSF. This
results in a listing priceof $254,826. This is based on an area of 65,340 square feet (furnished
by the city).
Recommendation
The city should order a Phase I environmental report, covering both contamination issues.
This will be required by any buyer, and closing would be expedited, if this information is
available.
A certified property survey is also needed, in order to determine the exact size and legal
description of subject property.
Thorpe Bros., Inc.
Marketing Plan
The following sales tools would be put in place wi thin 30 days after the acceptance by the
city of the exclusive listing agreement:
Signage:
Direct Mail:
A 4 x 8 sign will be prepared and installed on the property. This sign
will identify Thorpe Bros., Inc. as the listing office, prominently
displaying our phone number and some clear indicationregarding the
fact that the property is owned by the City of New Hope.
A colored flyer will be prepared and target-mailed to other brokers
and potential buyers.
Commercial Multiple Listing:
~The listing will be placed in the Commercial/Industrial Exchange
Book, which is issued monthly by the Regional Multiple Listing
Service, Inc. This book is distributed to most of the commercial real
estate professionals in the Twin Cities area.
Following the above listed items being accomplished, direct calls will be made to potential
buyers, as we zero in on the uses preferred by the City.
-Based on my understanding of Our conversation on Tuesday, June 21st, the City would
prefer that the property not be used for either fast-food or auto-related businesses. We
discussed a sit-down restaurant, medical offices, or selected retail businesses. It is
important thatwe have a clear understanding on this, at least with some guidelines from
the city..
Thorpe Bros., Inc.
COMMERCIAL-INDUSTRIAL
EXCLUSIVE LISTING
AGREEMENT SALE
This form approved by the Minneapolis Area Association of REALTORS®.'
Minneapolis Area Association of REALTORS® disclaims any liability arising out of use or misuse of this form.
Date:~
IN CONSIDERATION OF the Agreement of Thorpe Bros.. Inc. (hereinafter referred to as "BROKER") to
undertake to sell the premises hereinafter described, The Ci_ty of New Hone
(hereinafter refesxod to as "SELLER") grants to BROKER the exclusive fi~ht to sell or contract to sell the property
known as the northwest comer of Rockford Road and Nevada Avcr~
and legally described as Cexaet legal will be furnished bv the Seller. based on a certified survey,)
(hereinafter referred to as the "Prol~erty") for the period fi'om the date hereof through and including
/une 30. 1995.
for the sum of Two Hundred Fifty Four Thousand. Eight Hundred Twenty-Six and no/00 Dollar,~
($ $254.826.00 ) upon the following terms Cash or at any other price, terms or exchange to which
SELLER may consent.
NOTICE: THE COMMISSION RATE FOR THE SALE, LEASE, RENTAL OR MANAGEMENT OF REAL
PROPERTY SHALL BE DETERMINED BETWEEN EACH INDIVIDUAL BROKER AND ITS CLIENT.
SELLER'S OBLIGATIONS
It is agreed that SELLER shall promptly furnish BROKER with complete information concerning any person who
during the period of this Agreement makes inquiry to SELLER regarding the sale, exchange or lease of the
Property.
SELLER hereby agrees to furnish to Buyer an Abstract of Title, or a Registered Property Abstract, certified to
date, to include proper searches covering bankruptcies and state and federal judgments and liens, and to execute or
cause to be executed a deed of general warranty conveying a marketable title to the Property to the Buyer and any
further documents as may be required to consummate .the sale to Buyer in aocordanee with the terms above
designated or with the term~ to which SELLER may hereafter consent.
SELLER hereby agrees to furnish to any Buyer, before signing an agreement to sell, a written disclosure of all
knownnWells on the Property and further to provide Buyer at closing with a Well Disclosure Certificate or
certification of no known wells.
SELLER further agrees to promptly notify BR~)KER of any notices pertaining to the Property which are hereafter
received during the term ofthi~ Agreement
It is further agreed that-SIRI.ER shall permit BROKER to erect a "For Sale" sign on the Property and to remove
all other "For Sale" sign~ fix~m the ~ ,P~,~r during the period of this Agreement It is further agreed that SELLER
shall permit BROKF.~ to erect a Sold' sign on the Property for a period of 30 days following the sale or
exchange of the Property by BROKER.
Page I
LLER shall pay BROKER a brokerage fee of ~ percent of the price for whic~
the Property is sold or exchanged, upon occurrence of any of ~e following conditions:
,.. The sale, contract for sale, exchange, or conveyance of the Property during the period of this Agreement b
BROKER or any other person, including but not limited to SELLER, or any other agent or broker not a
party to this Agreement, in accordance with the price, terms or exchange as set forth herein or as otherwi
consented to by SELLER.
2. If a Buyer is procured, whether by BROKER, SELLER or anyone else, who is ready, willing, and able t¢
3. purchase the Property at the price and terms set forth above and SELLER refuses to sell.
If SELLER agrees to sell the Property before this contract expires, and SELLER refuses to close the sale.
4. SELLER removes Property from the market before expiration of this Listing Agreement.
5. If SELLER grants an option to purchase the Property, SELLER shall pay BROKER a sales commission in
the percentage provided herein based on the price paid for the option and for any extensions thereof. This
comn?'ssion shall be paid upon receipt by SELLER of any such payments. In the event such option is
exercised, whether during the term of this Agreement, or within 90 days thereafter, SELLER shall also
pay BROKER a sales commission on the gross sales price of the Property in accordance with the provisions
herein.. Notwithstanding the foregoing, to the extent that all or pan of the price paid for the option or any
extension thereof is applied to the sales price of the Property, then any commission previously paid b
owner to BROKER on account of such o,,fion ,',a,,ments shal~ t.........~,..,~.~ ___. ........ Y
............ :r r J · ,~ ,,,~,,,~u a~ums~ me comnusslon payable to
m, tUlX.l::K on account of the exercise of the option.
6. During the term of this Listing Agreement or within 30 days after the expiration of this Listing
Agreement: (i) the Pr.operty is .acquired by a public authority; (ii) an agreement to acquire the Property is
reached with a pubhc authority; or (iii)a public authority institutes eminent domain/condemnation
proceedings to acquire the Property.
7. ,SEI:,.LER contrib, utes or. conveys the Property or any interest therein to a partnership, joint venture'~r other
ousmess entity during the term of this Agreement in lieu of a sale of the Property during the term of thi.,
Agreement.
8. SELLER is a partnership or other business entity and an in terest in the partnership or other business entity i.,
transferred, whether by merger, outright purchase or otherwise in lieu of sale of the Property during the term
of this Agreement.
9. If within 90 days after the end of this Agreement, SELLER sous or agrees to sell the Property to anyone
who has made an affh'mative showing of interest in the Property by responding to an advertisement or by
contacting the BROKER or salesperson involved or has been physically shown the Property by the
BROKER or salesperson. It is understood that BROKER shall not seek to enforoe collection of a
commission under this Paragraph 9 unless the name of the prospect is on a written list given to SELLER
within 72 hours after expiration of this Listing Agreement.
S. ELLER further .a .g~'ee.s that in the event a lease of the Property is entered into (a) during the term of this Listing
..... ._. ...... . . ~, ._ . s ~. u~.gulglll,.L~Ot gross rate wmcn snail be due and payable u on
cncuuuon ox me lease or as om~ a e~ in writin As s ' , · - - P
· . gte g. ecun for BROKERs co '
here . ty mnussaon, SELLER
I. by grin. ts to .B. ROKI~ a security ~nterest m the proceeds from th Sale or lea~,.,. ,,i~ ,~,. ,~- ........
herein aha an title ¢ ut oth - .e ............... rrupeny uescnoea
[ .... Y . . ~y .. _ er closer who conducts the closm on the sal
described h ' , . . g. e or lease of the Pr.
time ofcl0s~g,m ~s ~ to msburse the BROKER s comnuss~on prowded hereunder to the BROKER
NOTICE REGARDING CLOSING
]After a purchase agreement for your property is signed by both Seller and Buyer, arrangements must be made te
l~ol~S;ot~u.e u'ansaction. Seller may arrange for a qualified person, including Seller's attorney, to conduct the closing
Page
Thorpe Bros., Inc. will arrange to provide closing services for its clients, generally through
for a charge of $ 350.00 , payable at the time of closing. All documents related to the closing will b~
available for review by your attorney, accountant or financial advisor at the closing or prior to the closing upon
your request.
As Seller, indicate below whether you will arrange for others to conduct the closing or whether you wish to have
Thorpe Bros., Inc. arrange for the closing of your transaction for the charge listed abOve. This will be decided
upon an offer to purchase the property.
Please Initial
, Seller wishes to have Thorpe Bros., Inc. arrange to provide closing services.
Seller will arrange for a qualified closing agent or his.attorney to perform the closing of this
transaction. ~
SELLER'S REPRESENTATIONS
SELLER has. full legal right to sell the Property.
SELLER certifies that as of the date of execution of this Agreement, SELLER has not received any notice of
building, health or fu'e cOde violations, nor notice of hazardous waste on Property.
FORFEITURE OF EAR_NEST MONEY
If a Buyer of the Property defaults and as a result forfeits the earnest money, SELLER will receive
percent and BROKER will receive 50 percent of the earnest money.
5O
SUB-AGENT'S AND BUYER'S BROKERS
I hereby permit you to share part of your commission with other real estate brokers, including brokers only
representing the Buyer,
MISCELLANEOUS
10. This Agreement is binding upon the heirs, successors, and assigns of the parties.
11. All of the representations and covenants of this Agreement shall survive and be enforceable after termination
of the Agreement.
12. This Agreement constitutes the complete agreement between the parties and supercedes any prior oral or
written agreements between the parties relative to the provisions herein. No amendment, modification or
extension of this Agreement shall be valid or binding unless made in writing and signed by both SELLER
and BROKEIL
13. This contract shall be governed by the laws of the State of Minnesota.
(~i_tv of New Ho_ne ' '
SELLER.
By:
Thor~e Bros.. Inc.
BRO-KE~
By:
OT:cldiUT-I
Pnge 3
42 NO AVE. N.
OFFICE
SCHOOL
BUS
BETHEL
CEMETERY
41 ST
AVE
LIONS
PARK
38TH ~VE. N
Overview
PROJECT NO. 507
BULLETIN NO. 2
PROJECT BULLETIN
42ND AVENUE RAILROAD BRIDGE REPAINTING
At the April 11th City Council meeting the City Council awarded the contract for the 42nd Avenue
Railroad Bridge Repainting Improvement Project. This project is being coordinated in conjunction with
the 42nd Avenue Landscape/Maintenance Project and the purpose of both projects is to improve the
overall appearance of 42nd Avenue through landscaping, painting and maintenance.
Currently the bridge has some water leakage at each pier, which has caused rust staining at the piers,
and the girders of the bridge are showing some surface rust. An analysis of a paint sample from the
bridge showed some lead content in the paint, which is not unusual, therefore special removal,
containment and disposal procedures will be followed. The entire bridge will be sandblasted and
painted a two-tone beige color. The project is being financed with 42nd Avenue tax increment funds.
The entire bridge will be covered with containment hoods so that no sandblasted material will escape
into the atmosphere. The removed paint and abrasives Will be disposed of at Elk River and will be
tested before it is removed from the site. Signs will be posted to identify that lead based paint is
being removed.
Proiect Schedule
Rainbow, Inc. from New Hope was awarded the contract for this project by the City. The contractor
will start moving equipment to the site on June 24th and painting will begin on June 29th. The work
is expected to take approximately 25 days to complete and should be finished by the end of July,
weather permitting. The contractor is planning on starting work at 9:00 a.m. daily and will work 10
hours per day. This should help to minimize the restrictions on the morning peak traffic hour.
Rainbow may work some weekends.
The project will be completed in three stages. The first stage will include the repainting of the
southerly portion of the bridge and south abutment and will involve closing down the southerly most
one lane of eastbound traffic. Stage two will include the painting of the center of the bridge and will
inv_o!ve closing down the two center lanes of traffic (one eastbound/one westbound). The third stage
wilt include the repainting of-the northerly portion of the bridge and north bridge abutment and will
involve closing down the northerly most one lane of westbound traffic.
Traffic Control
Traffic control will be performed by warning lights. Peak traffic on 42nd Avenue is between 7:00
a.m. to 8:00 a.rn~.and 4:00 P.m-. to 5:00 p.m. The CP Rail will supply a flagperson when the
contractor is working on the bridge deck. Train traffic is generally limited to two trains per day.
Contact Persons
The City will continue-to communicate with all property owners during construction. If you have any
questions or concerns during the project, please direct them to Mark Hanson, City Engineer (636-
2168, ext. 338) or Paul Coone, New Hope Public Works Street Lead Worker (533-4823).
Thank you for your cooperation during this project.
City of New Hope
4401 Xylon Avenue North
New Hope, Minnesota 55428
Phone: 531-5119
6/17/94
I_ _1
2-~-3 Bac~ to Back
2-Arrows
4-RWA
~0-Ref. cones
2-Sid~l ~ close~
use other side
RAII~BOW, II~C.
W
T,~TTT.~TANWA
tl..t ~ ~ll ii I I I t I i I1 ~ I'1 mill !'III i.i,
IIII III II I I I I I I I I I~1 I I 11111ill Ill
I
SWC use other
side
~EVADA
B/B
I
I RWA
Illiltlilll~i
I
I RWA
ITEM %4 PROGRESS
SCHEDULE
STAGE #1 - MOBILIZE AND SET UP CONTAIN
Abrasive Blast & Prime
Clean and Paint Hand Rail
STAGE #2 - SET UP CONTAIN
Abrasive Blast & Prime
STA~E #3 - SET UP CONTAIN
Abrasive Blast & Prime
Clean and Paint Hand Rail
STAGE 93 - APPLY FINISH COAT
STAGE #2 - APPLY FINISH COAT
STAGE #1 - APPLY FINISH COAT
8 days
10 days
8 days
2 days
2 days
2 days
PROJECT NO. 507
BULLETIN NO. 1
PROJECT BULLETIN
AVENUE LANDSCAPING/MAINTENANCE PROJECT
Overview
At the May 9th City Council meeting the City Council awarded the contract for the 42nd
Avenue North Landscaping/Maintenance Improvement Project. This project is being
coordinated in conjunction with the repainting of the 42nd Avenue Railroad Bridge and
the purpose of both projects is to improve the overall appearance of 42nd Avenue
through landsCaping, painting and maintenance. The improvements will take place on
42nd Avenue from Xylon Avenue east to Louisiana Avenue and on Winnetka Avenue
north to 45th Avenue.
The overall project involves repair of bituminous pavement and sidewalks; installation of
some decorative concrete and curb and gutter; the refinishing of benches, planters and
trash receptacles; installation of a number of canopy, ornamental and evergreen trees
and shrubs; and installation of sodding, steel edging and weed control fabric. The
project will be financed with 42nd Avenue tax increment funds. There will be absolutel~
no assessments to abutting property owners. To complete the project the City needs
and is requesting the cooperation of the property owners abutting these streets, as some
of the improvements are proposed to be installed on private property near the sidewalk.
Over the past month the City Forester and the City Engineer have met with almost all
property owners at their sites to review the plans and seek your input, and the plans
have been revised to incorporate the recommendations of all property owners.
Project Schedule
C.S. McCrossan Construction, Inc. was awarded the contract for this project by the City.
The project will start just after Memorial Day and, weather permitting, the majority of
work should be completed by mid-July. In the areas where no curb, gutter or sidewalk
Wbrk is proposed, landscaping and plantings will start immediately. In the areas where
curb, gutter or sidewalk is proposed to be removed/replaced, removal will occur first,
followed by the installation of new curb and sidewalk, and landscaping will be installed
last. The contractor has assured the City that they will strive to complete all the work
associated with each individual property in a timely manner.
Contact Persont
The City will continue to communicate with all property owners during construction. If
you have any questions or concerns during the project, please direct them to Tom
Schuster, Park Superintendent/Forester (533-0879) or Mark Hanson, City Engineer (636-
2168, ext. 338).
Thank you for your cooperation during this project.
City of New Hope
4401 Xylon Avenue North
New Hope, Minnesota 55428
Phone: 531-5119
5/25/94
CITY OF NEW HOPE
VARIANCE
CONDITIONAL USE PERMIT
SITE IMPROVEMENT AGREEMENT
a Division of Ashland Oil, Inc.
THIS AGREEMENT is entered into by Super America Group,/~
a Kentucky corporation (,,hereinfter "D. eveloper") and the City of New ~ ,
Hope (hereinafter "City ), this ~r~r day of ~_/I~ , 1994. .~/
WHEREAS, on May 23, 1994, by Resolution No. 94-.~7~, the City
Council approved Developer's request for a Conditional Use Permit
(hereinafter "CUP") for certain real property located in the City
of New Hope, County Of Hennepin, State of Minnesota known as 6144
West Broadway, legally described as:
Tract A, Registered Land Survey No. 602, Hennepin County,
Minnesota,
(hereinafter "Property") to be used as .a convenience store with
gasoline sales, and
WHEREAS, the City Council also approved Developer's site
development plans for the Property as set forth in Planning Case
94-11 (hereinafter "Plans"}, and
WHEREAS,
conditions:
said CUP was granted subject
to the following
The property shall be developed in accordance with the
plans submitted by Petitioner. Petitioner shall execute
a development agreement and post a performance bond to
guarantee sai. d development.
Hours of operation shall be limited to 6:00 a.m. to 12:00
midnight unless otherwise approved by the City'Council.
Noise governors with filters and directional volume
controls shall be installed on all outside intercom
systemst .and shall otherwise comply with the City noise
No outdoor storage or sales of merchandise shall be
allowed, unless a conditional use permit for same is
applied for and granted at a later date.
Petitioner shall submit a revised lighting plan as
recommended by the New Hope Building Official.
All signage must comply with the New Hope Sign Code and
the canopy facade shall not exceed three feet in width.
j
10.
11.
Petitioner agrees to reconsider landscaping plan for
utilization of mature trees and berming to screen the
subject property from the adjacent ]and uses.
Petitioner agrees to reconsider alternative locations for
underground gas storage tanks.
All roof-top mechanical units
screened per staff approval.
be adequately
Petitioner agrees to reconsider best internal traffic
movement to minimize potential traffic congestion on West
Broadway and 62nd Avenue North.
Petitioner's conditional use permit sha]] be subject to
annual review by staff for compliance with the New Hope
Code, ComPrehensive Plan and the required development
contract.
NOW, THEREFORE, IT ZS HEREBY AGREED' as follows:
1. ~NCORPORATION OF RECITALS.
incorporated herein by reference,
conditions of the CUP.
The recitals above are
specifically including the
2. THE WORK. The Work shall consist of the site
improvements described in the Plans, including any amendments to
the Plans which are approved by the City Council. The Work shall
be performed by the Developer to the City's satisfaction in
compliance with all applicable codes, ordinances, standards, and
policies of the City. The Work includes all on-site exterior
amenities shown on the Plans that are listed below.
-:-'Quant i t ¥ I t em
400 lin. ft. Perimeter Concrete curb
. $10/1in. ft.
2100 sci. Y~'~:LBitu~tfnous Surface a $10/sq.
Estimated Cost
$. 4,000.00
21,000.00
Lump Sum
Landscape a $6,000/]ump sum
6,000.00
Subtotal
+ 50~ Security Increase
$31,000.00
15,500.00
TOTAL:
$46,500.00
2
The Developer unconditionally guarantees to the City all of the
Work for a perioU of one year subsequent to the Completion Date of
the Work. This guarantee shall include failure of the Work due to
poor material, faulty workmanship, or any other failure of the
Work. This guarantee shall continue whether or not all of the
financial guarantee shall have been released by the C~ty.
3. COMPLETION. The Developer agrees that the Work shall be
completed in its entirety on or before the 1st day of June, 1995,
except as this period of time is extended by resolution of the
Council, or by the City taking no action to require completion
hereunder on a timely basis. It is understood and agreed that
failure of the City to promptly take action to draw upon the bond
or other security to enforce th~s Agreement after the expiration of
the time in which the Work is to be completed hereunder will not
waive, estop or release any rights of the City and the City can
take action at any time thereafter to require completion of the
Work, and payment for same. Furthermore, the term of this
Agreement shall be deemed to be automatically extended until such
time as the City Council declares the Developer in default
thereunder, and the statute of l~mitations shall not be deemed to
commence running until the City Council has been notified in
writing by the Developer that the Developer has either complied
with this Agreement, or that it refuses to for any reason. These
provisions shall be applicable to any person who shall give a
financial guarantee to the City as required below.
4. COST OF WORK. The Developer shall pay for all costs of
persons doin9 work or furnishing skill, tools, machinery or
materials, or insurance premiums or equipment or supplies and all
just claims for the same, and the City shall be under no obligation
to pay the Developer or any subcontractor any sum whatsoever on
account thereof, whether or not the City shall have approved the
.:subcontract or--.subcontract, or~, .and the Developer and its surety
shall hold the City harmless against any such claims, and provide
the City with all necessary lien waivers.
5. ~.. In the event of default by the Developer as to
any of th~.Wor~t~-be-performed hereunder, the City may, at its
option, per~d~the Work and the Developer shall promptly reimburse
the City fo~'an~expense incurred therein by the City, provided the
Developer ir'first given written notice by United States Mail of
the Work in default and required to be done by the Developer, not
less than 7 days being given thereby to the Developer to remove the
default status, said notice being addressed to the Developer at the
address set forth below. Notice g~ven ~n this manner being
sufficient as described, by agreement of the parties hereto.
Notice to the Developer shall also constitute, without further
action, notice to any contractor or subcontractor, whether they are
approved and accepted by the City or not. In the event of
emergency, as determined by the City Engineer, the 7 day notice
requirement to the Developer shall be and hereby is waived in its
entirety by the Developer, and the Developer shall reimburse the
City for any expense so incurred by the City in the same manner as
if mai led notice as described above had been given. [t is
understood by the parties, however, that the responsibility of the
Developer is limited by strikes and force majeure.
6. REVOCATION OF CUP. The City Council approved a CUP for
the Property subject to certain conditions including completion of
the Work. As an additional remedy separate and independent from
any other remedy available to it, upon breach of this Agreement by
Developer, the City may revoke the CUP for the Property. Developer
acknowledges and agrees that the City may also revoke the CUP for
failure of the Developer to satisfy any of the other conditions of
the CUP.
7. HOLD HARMLESS. The Developer agrees to indemnify and
hold harmless the City and its agents and employees against any and
all claims, demands, losses, damages and expenses (~ncluding
attorney fees) arising out of or resulting from the Developer's
negligent or intentional acts, or any violation of any safety law,
regulation or code in the performance of this Agreement, without
regard to any inspection or review made or not made by the City,
its agents or employees or failure by the City, its agents or
employees to take any other prudent precaution. In the event any
City employee, agent or representative shall come under the direct
or indirect control of the Developer, or the City, upon the failure
of the Developer to comply with any conditions of this Agreement or
the CUP, performs said conditions pursuant to the financial
guarantee, the Developer shall indemnify and hold harmless the
_~.~C._ity, its employees, agents and representatives for its or their
own negligent or intentional acts in the performance of the
Developer's required work under this Agreement or the CUP.
8. COST OF: ADMINISTRATION. The Developer agrees to
reimburse [h~C. tty:for the actual costs to the City associated with
this plannt~Lcas~.: the CUP and this Agreement, including but not
limited-to'~ne®r~ng and attorney's fees. Developer agrees that
the financfe~guarantee shall not be released until all such costs
have been p&i~ to the City.
9. COST OF ENFORCEMENT. The Developer agrees to reimburse
the City for all costs incurred by the City in the enforcement of
this Agreement, or any portion thereof, including court costs and
reasonable engineering and attorney's fees.
10. F.INANCIAL GUARANTEF. The Developer shall furnish the
City with a financial guarantee acceptable to the City in one of
the following forms: a) cash escrow; b) a performance bond issued
by an approved corporate surety licensed to do business in the
State of Minnesota, and executed by the Developer as the principal;
c) an irrevocable letter of credit; d) an automatically renewing
certificate of deposit in Developer's name but assigned to the
City; e) other financial instruments which provide equivalent
assurance to the City. Said financial guarantee shall be furnished
to the City as security to assure completion of the items of Work
as set forth above, and payment of the costs of administration as
set forth above. The financial guarantee shall be in an amount of
150% of the cost of the Work as estimated by the City Engineer.
The financial guarantee provided shall continue in full force and
effect until the City CoUncil approves and accepts all of the Work
undertaken and releases the surety and/or the Developer from any
further liability, and until all administrative costs are paid in
full. The City Council may reduce the amount of the financial
guarantee upon partial completion of ithe Work and payment of all
outstanding administrative costs.
11. No_.o~. The address of Developer, for purposes of this
Agreement is as follows, and any notice mailed by the City to this
address shall be deemed sufficient notice under this Agreement,
until notice of a change of address is given to the City in
writing:
Super America Group, a Division of Ashland Oi] [nc.
1240 West 98th Street
Bloomington MN 55431
Attn: Hanager 'of Design & Construction
12. SEVERAB]L[TY. If any portion, section, subsection,
paragraph, sentence., clause or phrase of this Agreement is for any
--::r_eason held' to be invalid, such decisions shal] not affect the
~Validity of the'r~remaining portion of this Agreement.
13. .~.~GJ~_~_~I~, This Agreement shall be binding upon the
parties, thej~.:he~r~:,~ successors or assigns as the case may be.
IN W]T[ilEaSi~WHEREOF, we have hereunto set our hands and sea]s.
CITY
SUPER AMERICA GROUP, a Divisi0n of' ~hland
0ii [nc.
Its
s'- Vi(:e President
STATE OF MINNESOTA )
) SS.
COUNTY OF HENNEPIN )
'The ~f~regoing instrument _~/as acknowledged before me
day of L~././j~ , 199~:_, by EDW. J. ERICKSON and DANIEL J.
DONAHUE, ~T~e Mayor and Manager, respect.ively, of the City of New
Hope, a municipal corporation of the State of Minnesota, on behalf
of said municipal corporation.
Notary Public ~ -
STATE OF MINNESOTA )
) SS.
COUNTY OF HENNEPIN )
The~j~regoing- instr~ument w.a/s acknow~ledged bi, fore mJ~ thts. 0~2/
199~f , ~.y.~_ . -_ /, _ -"'-- and
day of ~'~ the~ and
.... ~ respectively, of Super America Group, a I)ivfsion of
-Kentucky corporation, on behalf of said corporation. Ashland 0il [nc.
CORR[CK & SONDRALL, A PARTNERSHIP
OF PROFESSIONAL CORPORATIONS
8525 Edinbrook Crossing, #203
Brooklyn Park, MN 55443
6
· dmlniltrltor who's never
beeo in a pmtah with a cem~
For co~es c~t m2.~'4~33.
Catholic cemeteries are getting a face-lift
Building underway, -
plans drown to update
berelVement f~ollltles
By Bob Zyskowski
Paul are ~tdn~ ~ as ~he
archdioc~n C~bolic C. amem~
office ~ to meet the communi-
ty's needs for )ears ~o com.-
Catholics who visit Calm~
west area and St. Mary Cemetery
changes, said John Cberek, cem-
eteries director.
At Sc Mary, a 57~ ~
the t'u~t of two in the cemetery's
development pla~
"The Irish density in a small
area makes the mausoleums the
best use of the remainins space'
Cberek said.
Plans include a crematorium
and a seatins area with l~aisious
features for people lookins for a
place to pray at the cemetery.
more burial sites, and Calvary in
The space wa~ made available in
both pzevi~ crowded cemeter-
ies with a plan that calls for dos-
lng some roads and re-designing
roadways through the cemeteries.
'%Veil be putting signs up to
warn people about the coming
after we're done, there still should
no Ions waiks~'
leum construction yet. But crypt
sales are under way, and the cem-
etery eventually will have 1,500
Catholic Cememteries' biggest
42ud OZKI W~ in New Hop~
Only 2~ acres of the 80-acre
much of the site is not maintain-
ed, Cherek said.
But area de~opment since the
1960s shows a projected need for
olic Cemeteries had a master plan
designed to de~elop the cemetery
The plato indude a lra~/med-
itation garden, new office space
with a design reminiscent of nafi~
peoples that would be open to
would be unique to ethnic groups
such as native Americans and
"Father James Notebaart, din~-
tor of the azchdiocesm Indian
Ministry, designed that portion of'~
the land-use plan;' Cherek said.
"When that part of the plan might
become a reality we can't really
say, but we're aware of the need for
a place where people of other
cultures can observe their own
customs:'
The design ~tains a section of
existing woods and wetlands, and
it includes roads, a new entrance
way, mausolea and even an out-
door amphitheater.
'%VCd like to see the cemetery
become a meeting place for the
parishes of the northwest quadrant
for cemetaT-~p~ evems --
p~ services, memorial services,
outdoor liturgies:' Cherek said.
BuriaLs are often 'occasions
when families and communities
are reunited, and the cemetery
wants to be able to offer them a
place to gather, he said.
"The vision is for the parishes
W see the cemetery as an extension
of their parish space' Cherek said.
to develop it with a Catholic iden-
Catholics of the archdiocese can
be proud of and see as a part of
A mausoleum being consUucted
is w be ready this la;ar. It will in-
dude a chapel with seating for 100
people.
And, to keep others aware of
cemetery plans and programs, the
cemeteries office will begin pub-
lishing a newsletter for its clients.
"We still find ourselves in the
position that a lot of Catholic
folks do not know who we are as
an asency of the archdiocesan
church," Cherek ,said.
"Wdm tr~ in our public rela-
tions efforU% U) position ourselves
as a leader in burial in the Twin
CfQes offering produas and serv-
ices comparable to other cemeter-
ies.
"Plus, we want to offer an in-
vironm~mt and be seen as a leader
in education in issues related to
dea~ grief and bereawment in
the Catholic conu~.
"Tt~'s wh~e we feel w~re dif-
fer · fl~m any other non-sectar-
ian or publicly owned c~m~'~.'
Catholic Bulletin
May 26, 1994