Loading...
101104 EDA CITY OF NEW HOPE 4401 XYLON AVENUE NORTH NEW HOPE, MINNESOTA 55428 EDA Minutes October 11, 2004 Regular Meeting City Hall CALL TO ORDER President Collier called the meeting of the Economic Development Authority to order at 9:11 p.m. ROLL CALL Present: Don Collier, President Doug Andersen, Commissioner Sharon Cassen, Commissioner Mary Gwin-Lenth, Commissioner Steve Sommer, Commissioner APPROVE MINUTES Motion was made by Commissioner Cassen, seconded by Commissioner Sommer, to approve the Regular Meeting Minutes of September 27, 2004. All present voted in favor. Motion carried. IMP. PROJECT 603 President Collier introduced for discussion Item 4, Discussion and update Item 4 regarding development proposal for the city-owned property located at 7819 Angeline Drive (improvement project no. 603). Mr. Shawn Siders, community development specialist, stated at its meeting of September 27, 2004, city staff provided the EDA with an overview of a proposed development by Kingsman, LLC for a single family home at 7819 Angeline Drive. At that time, staff indicated that Kingsman, LLC made an offer to purchase the lot from the EDA for $35,000. Staff was directed to negotiate the price as the 2002 appraised value was $46,000. Mr. Siders reported on his meetings with Mr. Peter Long, President of Kingman, LLC regarding the property. He stated the site may require up to $11,000 in site preparation costs including $5,000 to strip the topsoil, grade and compact the new soil brought to the property in order to elevate the site, $2,000 to conduct two soil boring tests, $2,000 additional cost to waterproof the basement, if the water table is too high (water table will be determined by the soil boring tests), and $2,000 for extending the driveway and adding the brick façade (as requested by staff). The developer was provided direction by the city’s planning consultant, city engineer and building official to ensure the proposed single-family house conforms to all applicable city building codes. In response to the City Engineer’s request, the developer has agreed to provide the city with an additional ten-foot wide by forty-seven foot long (470 sq. ft.) drainage and utility easement to the rear (south end) of the property. This would allow for the future extension of the existing culvert EDA Meeting October 11, 2004 Page 1 which currently terminates on the east side of the property. This easement would be conveyed to the city during the closing, if approved by the EDA. Mr. Long has indicated that the potential purchaser is in a position to cover the additional expense related to the site preparation work as directed by the City Engineer and Building Official. Mr. Long also indicated that because of the additional site preparation costs, which were not anticipated in the original proposal, his client is not in a position to increase the purchase price offer. Therefore, Mr. Long has submitted a revised offer to cover all expenses related to the site preparation work, and pay the EDA $35,000 for the land acquisition. This is the same purchase price that was discussed by the EDA at its meeting of September 27, 2004. Mr. Siders requested direction from the EDA with respect to the proposed purchase price. The EDA determined that $35,000 was a fair purchase price based on the site correction costs. MOTION Motion was made by Commissioner Sommer, seconded by Commissioner Item 4 Gwin-Lenth, authorizing the sale of the property for $35,000. All present voted in favor. Motion carried ADJOURNMENT Motion was made by Commissioner Sommer, seconded by Commissioner Andersen, to adjourn the meeting. All present voted in favor. Motion carried. The New Hope EDA adjourned at 9:25 p.m. Respectfully submitted, Valerie Leone City Clerk EDA Meeting October 11, 2004 Page 2