Discussion regarding JWC emergency backup water supply project
Requested Action
The City Council requested this topic be added to this work session agenda in follow up to the three -city joint council
meeting that was recently held regarding the emergency backup supply project. Staff requests to discuss the
upcoming council resolutions for the project and, per several council members' informal discussion at the joint
meeting, possibly adding an additional charge to water bills to fund the new backup system.
Policy/Past Practice
The construction of an emergency backup water supply system has been discussed over the past several years and is
a goal of the JWC.
Background
The Joint Water Commission (JWC) is a joint powers entity consisting of the cities of Crystal, Golden Valley, and New
Hope, initiated in 1963. Based on this agreement, the three cities built their water distribution systems to be
interconnected without reference to city boundaries. The JWC has an ongoing long-term water purchase agreement
with the City of Minneapolis water utility and intends to continue that relationship, however the JWC continues to
have concerns regarding the reliability of the Mississippi River as the sole water supply source for the city of
Minneapolis and its customers.
In 2009 the JWC and each of the three member cities adopted a Water Supply, Emergency and Conservation Plan to
comply with Minnesota Statute which requires the JWC and the three member cities to identify and develop an
emergency source of water supply. The JWC identified groundwater from the Prairie du Chien/Jordan aquifer to be a
viable alternative water supply on an emergency basis and legislation was passed during the 2004 legislative session
authorizing the JWC to drill wells to meet the needs of the three member cities.
At the direction of the three city councils at the May 7, 2012 tri -Council meeting each city adopted by resolution the
Emergency Water Supply Preliminary Design and Feasibility Study was prepared. At the direction of the three City
Councils at the May 23, 2013 tri -Council meeting and adopted by resolution by each city, staff was directed to
develop a capital improvement program to implement the emergency water supply plan; and to retain professional
and contractor services to implement the emergency water supply. At the tri -Council meeting on January 9, 2014, a
detailed report, cost estimate and financing plan were presented to elected officials and staff.
Motion by Second by
To:
1:/RFA/CityManager/2014/Q-Discuss JWCEmergency Backup 012114
Request for Action, Page 2
January 21, 2014
Staff is recommending the attached resolution ordering the construction of the emergency water supply system which
is outlined above, be placed on the January 27th council agenda. Golden Valley and Crystal will be voting on the
resolution before the end of this month.
My understanding is the financing resolution is anticipated to be prepared by Golden Valley's bond counsel and
forwarded to New Hope and Crystal in March. The resolution will obligate the two cities who are not financing the
project to pay their appropriate costs for the bond through the JWC capital improvement program. The estimated
bond is roughly $4.6 million, and the annual 20 -year payments are approximately $330,000 per the attached bond
schedule. The payments have been incorporated into the JWC CIP program.
The City Council informally discussed adding a charge to the monthly utility bill for water rates to help fund the
emergency backup system. The estimated cost for the annual principal and interest payments is 17t per 1,000 gallons.
The additional charge could be added to utility bills and labeled "emergency backup supply". We have attached an
example of a current utility bill to denote where the charge could be added. On the sample bill, 2,000 gallons of water
was used, so the charge would be 17t x 2, or 34t. The average New Hope household uses roughly 5,000 gallons of
water per month, so the average charge would be 17t x 5, or 85�. The council should discuss this information and
provide appropriate direction to staff regarding the amount to be charged, and implementation date, if staff is to
proceed with this idea.
Attachments
January resolution ordering project
Preliminary Bond schedule
CIP excerpts
January 9, 2014 presentation excerpts
Sample utility bill
Resolution 14- January 2014
Council Member introduced the following resolution and moved its
adoption:
RESOLUTION ORDERING CONSTRUCTION OF EMERGENCY WATER SUPPLY
WHEREAS, the Joint Water Commission (JWC) is a joint powers entity
authorized by Minnesota Statute 471.59 consisting of the cities of Crystal, Golden
Valley, and New Hope, initiated in 1963; and,
WHEREAS, based on this agreement, the three cities built their water distribution
systems to be interconnected without reference to city boundaries; and,
WHEREAS, the JWC has an ongoing long-term water purchase agreement with
the City of Minneapolis water utility and intends to continue that relationship; and,
WHEREAS, the JWC continues to have concerns regarding the reliability of the
Mississippi River as the sole water supply source for the City of Minneapolis and its
customers; and,
WHEREAS, in 2009 the JWC and separately each of the three member cities,
adopted a Water Supply, Emergency and Conservation Plan to comply with Minnesota
Statute 473.859, and said statute requires the JWC and the three member cities to
identify and develop an emergency source of water supply; and,
WHEREAS, the JWC has identified groundwater from the Prairie du
Chien/Jordan aquifer to be a viable alternative water supply on an emergency basis;
and,
WHEREAS, legislation was passed during the 2004 legislative session
authorizing the JWC to drill wells to meet the needs of the three member cities on a
case-by-case basis; and
WHEREAS, at the direction of the three City Councils at the May 7, 2012
tri -Council meeting and adopted by resolution in session separately, the Emergency
Water Supply Preliminary Design and Feasibility Study was prepared; and,
WHEREAS, at the direction of the three City Councils at the May 23, 2013
tri -Council meeting and adopted by resolution in session separately, staff was directed
to develop a capital improvement program to implement the emergency water supply
plan; and to retain professional and contractor services to implement the emergency
water supply; and,
WHEREAS, at a tri -Council meeting on January 9, 2014, a detailed report, cost
estimate and financing plan were presented to elected officials and staff.
GAMMesolutions\Ordering Construction of Wells.doc
NEW HOPE RESOLUTION FORMAT
City of New Hope
Resolution 2014 -
Resolution ordering construction
of emergency water supply
WHEREAS, the Joint Water Commission (JWC) is a joint powers entity authorized by Minnesota Statute 471.59
consisting of the cities of Crystal, Golden Valley, and New Hope, initiated in 1963; and,
WHEREAS, based on this agreement, the three cities built their water distribution systems to be interconnected
without reference to city boundaries; and,
WHEREAS, the JWC has an ongoing long-term water purchase agreement with the City of Minneapolis water
utility and intends to continue that relationship; and,
WHEREAS, the JWC continues to have concerns regarding the reliability of the Mississippi River as the sole
water supply source for the City of Minneapolis and its customers; and,
WHEREAS, in 2009 the JWC and separately each of the three member cities, adopted a Water Supply,
Emergency and Conservation Plan to comply with Minnesota Statute 473.$59, and said statute
requires the JWC and the three member cities to identify and develop an emergency source of
water supply; and,
WHEREAS, the JWC has identified groundwater from the Prairie du Chien/Jordan aquifer to be a viable
alternative water supply on an emergency basis; and,
WHEREAS, legislation was passed during the 2004 legislative session authorizing the JWC to drill wells to
meet the needs of the three member cities on a case by case basis; and
WHEREAS, at the direction of the three City Councils at the May 7, 2012 tri -Council meeting and adopted by
resolution in session separately, the Emergency Water Supply Preliminary Design and Feasibility
Study was prepared; and,
WHEREAS, at the direction of the three City Councils at the May 23, 2013 tri -Council meeting and adopted by
resolution in session separately, staff was directed to develop a capital improvement program to
implement the emergency water supply plan; and to retain professional and contractor services to
implement the emergency water supply; and,
WHEREAS, at a tri -Council meeting on January 9, 2014, a detailed report, cost estimate and financing plan
were presented to elected officials and staff.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the city of New Hope, Minnesota:
that the construction of an emergency backup water supply to include three new wells,
reestablishment of the existing New Hope well, all motors, pumps, meters, meter vaults, valves,
associated pipe work, control and support equipment is hereby ordered.
Adopted by the City Council of the city of New Hope, Hennepin County, Minnesota, this 27th day of January,
2014.
Attest:
City Clerk
t
10"Doi,aid Kirk
From: Virnig, Sue [SVirnig@goidenvalleymn.gov]
Sent: Thursday, January 09, 2014 8:50 AM
To: Burt, Tom; 'Anne Norris (Anne. Norris@crystalmn.gov)'; McDonald Kirk; 'Charles Hansen
(Charles. Hansen@ci.crystal.mn.us)'
Subject: RE: Structure of Bond for JWC
Originally rovements in for $450,000 per year or around .21/1000 gallons. It is now at $350,000 per year at
arou .17/1000.
Sue Virnig J Finance Director J City of Golden Valley
7800 Golden Valley Road I Golden Valley, MN 55427 1763-593-8010 1763-593-3969 (Fax) 763-593- city �+'�
od, iP'111
�- vase
3968 (TTY) I svirnirt@eoldenvalleymn.aov orol ]�Pf
Note new email address
From: Vimig, Sue
Sent: Thursday, January 09, 2014 7:57 AM
To: Burt, Tom; 'Anne Norris (Anne.Norris@c-rystalmn.gov);
Hansen (Charles.Hansen@ci.erystal.mn.usa'
Subject: Structure of Bond for JWC
'Kirk McDonald (kmcdonald ci.new-ho e.mn.us); 'Charles
The structure would be GO Water Revenue Bonds, secured by revenues of the City of GV's water utility. The JWC would
construct well facilities across all participants including the City of GV. The JWC would.receive participant debt service
payments and transmit them to the City of GV's water utility, from which the City would then make bond payments. As
the bonds are secured by GV's water utility and ultimately GO pledge, any payment delinquencies would first be borne
by the City which would then seek remedies under the JWC contract.
Sue Virnig J Finance Director I City of Golden Valley
7800 Golden Valley Road I Golden Valley, MN 55427 763-593-8010 1763-593-3969 (Fax) 1 763-593-
3968 (TTY) I svirniR0eoldenga1levmn.Aovva den, 011,
al. ey
Note new email address
$4,605,000
City of Golden Valley, Minnesota
General Obligation Bonds
Series 2014 - Joint Water Commission
DEBT SERVICE SCHEDULE
Date
Principal
Coupon
Interest
Total P+I
105% Levy
02/0112015
205,000.00
0.800%
123,235.42
328,235.42
344,647.19
02/0112016
185,000.00
0.850%
146,242.50
331,242.50
347,804.63
02101/2017
185,000.00
1.150%
144,670.00
329,670.00
346,153.50
02!0112018
185,000.00
1.450%
142,542.50
327,542.50
343,919.63
02/01/2019
190,000.00
1.850%
139,860.00
329,860.00
346,353.00
02/0112020
195,000.00
2.200%
136,345.00
331,345.00
347,912.25
0210112021
200,000.00
2.500%
132,055.00
332,055.00
348,657.75
02!0112022
205,000.00
2.800%
127,055.00
332,055.00
348,657.75
02101/2023
210,000.00
3.000%
121,315.00
331,315.00
347,880.75
02101/2024
21,5,000.00
3.250%
115,015.00
330,015.00
346,515.75
02/01/2025
220,000.00
3.450%
108,027.50
328,027.50
344,428.88
02101@026
230,000.00
3.650%
100,437.50
330,437.50
346,959.38
02/01/2027
235,000.00
3.800%
92,042.50
327,042.50
343,394.63
02/01/2028
245,000.00
3.950%
83,112.50
328,112.50
344,518.13
02!0112029
255,000.00
4.050%
73,435.00
328,435.00
344,856.75
02101/2030
265,000.00
4.150%
63,107.50
328,107.50
344,512.88
02101/2031
275,000.00
4.300%
52,110.00
327,110.00
343,465.50
02/01/2032
290,000.00
4.400%
40,285.00
330,285.00
346,799.25
02/01/2033
300,000.00
4.450%
27,525.00
327,525.00
343,901.25
02101/2034
315,000.00
4.500%
14,175.00
329,175.00
345,633.75
Total
$4,605,000.00
-
$1,982,592.92
$6,587,592.92
$6,916,972.57
SIGNIFICANT DATES
Dated...............................................................................................................................................................................
4/01/2014
DeliveryDate...................................................................................................................................................................
4101/2014
FirstCoupon Date...........................................................................................................................................................
210112015
Yield Statistics
BondYear Dollars............................................................................................................................................................
$51,927.50
AverageLife....................................................................................................................................................................
11.276 Years
AverageCoupon..............................................................................................................................................................
3.8180019%
NetInterest Cost (NIC)....................................................................................................................................................
3.9244195%
TrueInterest Cost (TIC)..................................................................................................................................................
3.8884567%
Bond Yield for Arbitrage Purposes..................................................................................................................................
3.7517252%
AllInclusive Cost (AIC)....................................................................................................................................................
4.0016028%
IRS Form 8038
NetInterest Cost..............................................................................................................................................................
3.8180019%
WeightedAverage Maturity.............................................................................................................................................
11.276 Years
Interest rates are estimates. Changes In rates may
cause significant alterations to this schedule.
The actual underwriter's discount bid may also vary.
&rks2019 -Jam WA&P / SIN=X ft Vff / 1212/2015 / 9.99AM
Springsted
VI I T yr MCY1f "%JrC
UTILITY BILL
AUTOMATIC PAYMENT -DO NOT PAY
Pro -authorized payment of 38.24 vAll be drawn from your bank on 01/1812014
I I I I I 1111111 I II I I I It I I II I 1111 I I I 11111 f I I I I I I I I I I I I II
NEW HOPE MN 65427-1538
REMIT TO: CITY OF NEW HOPE
8500 INTERNATIONAL PKWY
NEW HOPE, MN SS428-3606
This Portion For Your Records
SERVICE ADDRESS:
Motor # Read Date Prev. Read Pres. Read Usage
19960877 1 013 2775 2795 20
Total Wader Consumption, 20
Total Sewer Consumption: 20
Consumption Measured in HUNDREDS OF GALLONS
WATER: (Fixed Change) Based on usage - per 1,000 Gallons
Sane Fee (Residential & Can newial): $6.43
Black I: 1 - 10,000 Gallons: $4.73
Block 2:10,001 - 20,000 Gallons: $5.15
Mock3:Greater than 20,001Gall= &Lrigadow $5.79
Commercial: 54.85
EWER: (Fixed Charge) Based on Winter Average Consumption far Residential or Ac
Water used for Commercial or Institutional - per 1,000 Gallons
Minimum Fee includes 1st 1,000 Gallops: $6.01
Foch additional 1,000 Gallons: $3.99
Treatment SumherV11,000 Gallons: 50.46
STREET LIGHTS, (Pro -rated) Used to pay ft Strr;et Eights throughout city
Non -Decorative (Overhead Power): $I.05
DeeoniUve (Underground Power): $1.50
RECYCLING: (Pro4ved) Not based on how often or how much used: $3,55
STORM DRAINAGE* (Fro -rated) Pays for cleaning, mamf enanee and improvements
throughout the City
Residential: $6.30
Non Residential: $9.45
STATE TESTING FEE: (Fixed Charge) Annual fee of $6.36 collected bythe City and
paid to the MN Depc oflicalth: x0.53
REMIT TO: CITY OF NEW HOPE
BILLING
33.66
PAYMENT - THANK YOU
33.66CR
BALANCE FORWARD:
b.00CR
STATE TESTING FEE
0.53
WATER BASE FEE
6.43
I-CWATER CONSUMPTION - BLOCK 1
9.46
EWER MONTHLY CHARGES
10.00
SEWER TREATMENT SURCHARGE
0,92
STORM DRAINAGE - RES
6,30
RECYCLING CHARGES
3,55
STREET LIGHTS
1,05
TOTAL. CURRENT CHARGES:
38.44
TOTAL AMOUNT DUE:
38.Z4
A 5% PEMALrY K7LL BE cIYARGED IF R4YMEdr is Nor w ouR
OFRCE BY 4 Pill ON THE DUE DA TE PRINTED ADOVF—
Pre-authorized payment of 38.24 will be drawn from your bank on
01/16/2014
5500 INTERNATIONAL PKWY
NEW HOPE, MN 55428.3606
Please Include your CUSTOMER NUMBER located at the top of your bill when authorizing electronic payments or submitting your CLOSING BILL to
ensure pap*nts are applied correctly.
For Further information or Assistance. Contact: 763-592-6760
Min" I Water
�Commii�ian
,2014-2018
Capital improvement Pr-
Ic, r
CVstal, GoidenV-ll1cy;&xew,,l1o17, IN
December 4, 2014
To Commissioners, Council of the Crystal, Golden Valley, and New Hope and the
residents of the three cities,
The Adopted Capital Improvement Program (CIP) for 2014-2018 is presented in this
transmittal. The Capital Improvement Program is a five-year fiscal planning instrument
that is used to identify needed capital projects and to delineate the financing and timing
of the associated projects. Generally these projects exceed $10,000 in cost and require
financing by the three cities of the Joint Water Commission_ An annual capital
improvement budget, encompassing the projects outlined for the first year of the CIP, is
presented to the Commissioners with the City budget. Each project is brought forth in
the upcoming year for final approval by the Commissioners.
The adoption of a CiP is a requirement for each city in the metropolitan area. As part of
the Metropolitan Land Planning Act passed by the State legislature in 1976, each city is
required to adopt a Comprehensive Plan. Each city included the water supply plan in
their comprehensive plan.
Background of the Joint Water Commission
The Cities of Crystal, Golden Valley, and New Hope addressed the issue collaboratively
in 1963, when they formed the Joint Water Commission (JWC) to purchase water from
the City of Minneapolis and develop the infrastructure to deliver that water to their
communities. Since then, the JWC has efficiently managed the three Cities' unique
water supply and storage system in a fair and equitable manner. Each City maintains its
own distribution system and utility billing, meter reading, and water sampling functions.
As required by the US Environmental Protection Agency (EPA), the JWC frequently
performs many stringent water quality tests on water samples taken from locations
throughout each of the three communities to ensure consumers receive safe, quality
water.
For 50 years, the City of Minneapolis has been a reliable source of reasonably priced,
good quality water. In return, the JWC has been a good customer, purchasing about 15
percent of the water treated by Minneapolis.
The JWC remains committed to providing its customers with the highest quality water at
the least cost. As the cost of water continues to increase, the JWC must evaluate its
altematives to ensure it will continue to honor that pledge.
The JWC currently purchases water from the City of Minneapolis. The Minneapolis
Water Works (NWN) draws its water supply from the Mississippi River in Fridley. After
treatment and purification, the water is pumped to customers in Minneapolis, Columbia
Heights, Hilltop, Bloomington, Edina, and the JWC communities of Crystal, Golden
Valley, and New Hope.
The system that brings water to your house involves miles of piping. Treated water is
pumped from the MWW plant through large pipes (the largest of which is 48 inches in
diameter) to two JWC water reservoirs in Crystal and Golden Valley. The storage
capacity of the two reservoirs is 27 million gallons. The water is pumped from the
reservoirs into the water distribution systems separately owned and maintained by each
of the three JWC cities. Each city is responsible for installing and operating its own
water mains, pumping stations, water towers, and utility billing.
The three JWC Cities use about seven million gallons each day. Water demands of
JWC customers have been relatively constant over the past 10 years. During the day,
the amount of water used by residences and businesses fluctuate hour by hour. The
JWC water storage reservoirs are big enough to meet each day's needs, keeping the
water flowing through the pipelines at an adequate pressure to meet customer needs.
Water demands in the summer increase dramatically (often up to 17 million gallons
each day) when residences and businesses sprinkle their lawns. The most customers
have used in a single day was 20 million gallons.
Future Plans
The JWC needs an emergency supply backup. Currently their water supply system
would have to rely on the Minneapolis for their needs and currently they do not have a
plan to meet the needs of all their customers. As the three cities prepare for the future,
the emergency supply backup is a top priority.
This document will help plan the upcoming needs for all three cities. As rates continue
to increase, the planning of the financial future is most important.
JOINT WATER COMMISSION
2014-2018 CIP
CAPITAL IMPROVEMENT FUND
EXHIBIT I
Total Available 6,269,565 2,238,574 3,580,614 1,231,683 1,375,783
Expenditures:
Capital Improvement Plan
Expenditures 5,735,000 1 700,000 3 038 000 685,000 825,000
Total Expenditures 5,735,000 1,78D,000 3,038.000 685,000 825,000
Estimated Net Assets Q 12131 $W,05 $538,574 $542,614 $548,683 $550783
Page II
2014
2015
2018
2017
2018
Cash Selance @ 111
$229,092
$534,565
$538,574
$542,614
$60,683
Rei+enue:
City of Golden Valley
589,765
731,000
1,308,340
294,550
354,750
City of Crystal
358,225
459,000
820,260
184,950
222,750
City of New Hope
377,015
510,000
911,400
205,500
247,500
Hennepin County
233,750
Bond Prxxmeds
4,500,000
Other
Interest Earnings
1,718
4,009
4,039
4,070
4,100
Total Available 6,269,565 2,238,574 3,580,614 1,231,683 1,375,783
Expenditures:
Capital Improvement Plan
Expenditures 5,735,000 1 700,000 3 038 000 685,000 825,000
Total Expenditures 5,735,000 1,78D,000 3,038.000 685,000 825,000
Estimated Net Assets Q 12131 $W,05 $538,574 $542,614 $548,683 $550783
Page II
s
9
Capital Improvement Plan
2014 ffim 2018
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Department Project# Priority 2014 2015 2016 2017 2018 Total
Joint Water Commission
Ccu* Road 9 ProJact
12-023
rrla
5WAID
5(10,000
11,983„000
Joint watdr ComN&SIo>f Total 5,7Am
1,000000
Secwity Fence at Reservoir -Golden Valley
13-030
A
35.000
35,000
Securtgr Fence at ReWv&ZWfal
13-031
n1a
70,000
70,000
figb f Valve at 8" Taww-New Hope
134W
Fila
20,000
20,ODO
Service Payments
14-001
ala
350,000
35D,DOD
350,000 360,000
1,400,000
Emergency Watrn Supply
14-011
nfa
4.000,ODD
4,001),000
Two Pumila Valvas -Golden Valley
144127
n!a
70,000
70,000
SCADA LIpdatu
14-029
ala
55,000
55.000
110,000
Replace water Tower AlMde Val"DI len valley
14-035
Na
50,ODD
5000
Elevated wakwTawera -New, Hope
14-036
nla
45,01)1)
45,000
Secu* forA0 Towea and Pump Stallms
14-037
We
60,000
60,000
Replace York Pit Veale and Vault Crystal
14-038
Na
200,000
200,000
Intal Gener tZrystal
14-039
rile
500,01)0
500,000
WaWMain Leek DeledimSurvey
14-040
We
130,1100
13D,ODD
Replace Trunk Vahm - Golden Valley
15-001
Na
70,000
70,000
14001
Elevated Tower Impaction - Golden Valley
15-002
A
10,000
10,000
North Tower steel and Repald-New Hope
15-W3
Wa
6DQ,OD0
600,0(3}
Replace Geta Vehra-New Hope
15.004
We
7000
70,001)
Instal Additional Reeerv& Acmaa-Crystal
15-005
Na
100,000
1000(10
Install4W Gala Valve -Golden Valley
154M
Wa
IDDAD0
100,00(I
Replsowrr* at Pump swan -Golden Valley
16 -ODI
we
26001)1)
280,000
560,000
Ladders at ReservoirGolden Valley
1802
We
14,001)
14,000
RbdVatvae(2)-GoldenVallay
16-01)3
Wa
24,001)
24,000
South Tourer blest and RepainMew Hope
16-0D4
A
750,000
750.000
Gale Vahre Rsplaaernenbs-Cryslal
16 005
nla
70,000
70,000
140,001)
Inspect and Clean Reservoir -Crystal
16-006
WA
30,000
30,000
Replace 16' and 18' Wafer Alain -Golden Valley
16-0D7
we
ODD,000
80OAM
50 Avenue Weller Main -Naw Hope
18-008
720,000
720,000
Replace Trunk Vahre-New Hope
17 -ODI
n/a
70,01)(1
70,001)
Raroof Pump Slaeon-ryotai
17-002
A
90,000
90,000
Rapla onm* at Pump Stadon-Cryslel
17.003
ala
175,000
175,000
Joint Water Commission Total
$73.UN
1,MD W
3,1)31,1)00
6Mi W . 825,000
11,083,090
Joint WeAer cmWn tRsion 5,735.000
1,700AW
3,036,000
666,000
825,000
11,983„000
Joint watdr ComN&SIo>f Total 5,7Am
1,71)1),0111) .,.
8,686,001)
.6K,00D
868,000
i1,980,ODD
Page I
RL
000
.. :; i4 d ■
M � t
JWC EMERGENCY WELL SUPPLY UPDATE
Joint City Council Work Session
January 9,, 2014
Presented by Bolton & Menk, Inc.
3 Critical Success Factors
for the
JWC Emergency Water Supply
1. Reliable
Ensure ability for quick MDH approval and start-up
2. Maintainable
Minimal vulnerability and need for maintenance
3. Operator Friendly
Simple to operate to achieve maximum flow
Potential Water Quality Issues
• Switchin
from Softened/Filtered Water To
Unsoftened/Unfiltered Water:
Aesthetics Related Impacts:
— 1 Colored Water / 1 Difficulty getting laundry white
— 1 Spotted Dishes / t Difficulty getting soap to lather
— T Oily sheen on coffee
• Longer Residence Time (SRT):
Aesthetics Related Impacts:
— j T&O
Health Related Impacts:
— j C12
— t Orthophosphate/Polyphosphate — 1 Microbial Activity (and 1D0)
I Sequestering Effectiveness
pH, IPb & Cu
Chlorine Feed
Block construction and 4 cylinders per well may
be warranted (6-9 day supply) as opposed to 2
cylinders (3-4 day supply).
• Cylinder delivery occurs when Y2supply is used.
PRELIMINARY OPINIONS OF COSH
JWC EMERGENCY WELL SUPPLY
I TEM
O.
DESCRIPTION Casts
1
CIVIL ENGINEERING
$167,000
2
NEW ELLS AND APPURTENANCES
$1 A721000-
ELE TRIC, L AND �O1 TROLE COSTS
$626¢000
�I-IL 1 I IE CLOSETS!BRICK N TR TION
$96,000
he
-E IL EES E%T -bc
437tOOO
6
NEW HOPE WELLI` OUSE PUMP/PIPING
$1171000
LOTHER IMPROVEMENTS
�J5g00V.� �(
�L
CONTINGENCIES
$611.000
TOTAL E TIMTED CCNSTRUCTION COSTS1
$3,979,000
Milestone Schedule
• 80% Cost Estimate
• Tri -City Council Meeting
• Council Resolutions Approved
• Begin Advertise for Bids
• Complete Construction
January 2014
January 2014
March 2014
April 2014
December 31, 2015
Springsted, Inc.
* Authorize Construction of Three Emergency Wells
within the JWC Communities
* If yes then;
* Adopt Resolution to order construction of the
Emergency Water supply
* Adopt resolution agreeing to financing of the project
Request for Action
Originating Department
Approved for Agenda
Agenda Section
Ordinances &
City Manager
January 27, 2014
Resolutions
Item No.
By: Kirk McDonald, City Manager
1 By: Kirk McDonald
10.2
Resolution ordering construction of emergency water supply "1
Requested Action
Staff requests the City Council approve the attached resolution ordering construction of emergency water supply.
The City Council discussed this matter at the January 21 work session and directed staff to place the resolution on this
agenda.
Policy/Past Practice
The construction of an emergency backup water supply system has been discussed over the past several years and is
a goal of the JWC,
Background
The Joint Water Commission (JWC) is a joint powers entity consisting of the cities of Crystal, Golden Valley, and New
Hope, initiated in 1963. Based on this agreement, the three cities built their water distribution systems to be
interconnected without reference to city boundaries. The JWC has an ongoing long-term water purchase agreement
with the City of Minneapolis water utility and intends to continue that relationship, however the JWC continues to
have concerns regarding the reliability of the Mississippi River as the sole water supply source for the city of
Minneapolis and its customers.
In 2009 the JWC and each of the three member cities adopted a Water Supply, Emergency and Conservation Plan to
comply with Minnesota Statute which requires the JWC and the three member cities to identify and develop an
emergency source of water supply. The JWC identified groundwater from the Prairie du Chien/Jordan aquifer to be a
viable alternative water supply on an emergency basis and legislation was passed during the 2004 legislative session
authorizing the JWC to drill wells to meet the needs of the three member cities.
At the direction of the three city councils at the May 7, 2012 tri-Council meeting each city adopted by resolution the
Emergency Water Supply Preliminary Design and Feasibility Study was prepared. At the direction of the three City
Councils at the May 23, 2013 tri-Council meeting and adopted by resolution by each city, staff was directed to
develop a capital improvement program to implement the emergency water supply plan; and to retain professional
and contractor services to implement the emergency water supply. At the tri-Council meeting on January 9, 2014, a
detailed report, cost estimate and financing Elan were presented to elected officials and staff.
Motion by Second by
To:
i
I:/RFA/CityManager/2014/Q-ConstructEmergWater 012714
G
Request for Action, Page 2
January 27, 2014
The three city councils were supportive of moving forward with the project and agreed each individual city would
approve this resolution. The JWC and member cities will finalize financing costs and options in the near future.
Staff recommends approval of the resolution.
Attachments
Resolution ordering project
CIP excerpts
January 9, 2014 presentation excerpts
City of New Hope
Resolution 2014-23
Resolution ordering construction
of emergency water supply
WHEREAS, the Joint Water Commission (TWC) is a joint powers entity authorized by Minnesota Statute 471.59
consisting of the cities of Crystal, Golden Valley, and New Hope, initiated in 1963; and,
WHEREAS, based on this agreement, the three cities built their water distribution systems to be interconnected
without reference to city boundaries; and,
WHEREAS, the JWC has an ongoing long-term water purchase agreement with the City of Minneapolis water
utility and intends to continue that relationship; and,
WHEREAS, the JWC continues to have concerns regarding the reliability of the Mississippi River as the sole
water supply source for the City of Minneapolis and its customers; and,
WHEREAS, in 2009 the JWC and separately each of the three member cities, adopted a Water Supply,
Emergency and Conservation Plan to comply with Minnesota Statute 473.859, and said statute
requires the JWC and the three member cities to identify and develop an emergency source of
water supply; and,
WHEREAS, the JWC has identified groundwater from the Prairie du Chien/Jordan aquifer to be a viable
alternative water supply on an emergency basis; and,
WHEREAS, legislation was passed during the 2004 legislative session authorizing the JWC to drill wells to
meet the needs of the three member cities on a case by case basis; and
WHEREAS, at the direction of the three City Councils at the May 7, 2012 tri -Council meeting and adopted by
resolution in session separately, the Emergency Water Supply Preliminary Design and Feasibility
Study was prepared; and,
WHEREAS, at the direction of the three City Councils at the May 23, 2013 tri -Council meeting and adopted by
resolution in session separately, staff was directed to develop a capital improvement program to
implement the emergency water supply plan; and to retain professional and contractor services to
implement the emergency water supply; and,
WHEREAS, at a tri -Council meeting on January 9, 2014, a detailed report, cost estimate and financing plan
were presented to elected officials and staff.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the city of New Hope, Minnesota:
that the construction of an emergency backup water supply to include three new wells,
reestablishment of the existing New Hope well, all motors, pumps, meters, meter vaults, valves,
associated pipe work, control and support equipment is hereby ordered.
Adopted by the City Council of the city of New Hope, Hennepin County, Mi esota, this 27th day of January,
2014.
Mayor J�
Attest:
City Clerk
December 4, 2014
To Commissioners, Council of the Crystal, Golden Valley, and New Hope and the
residents of the three cities,
The Adopted Capital Improvement Program (CiP) for 2014-2018 is presented in this
transmittal. The Capital improvement Program is a five-year fiscal planning instrument
that is used to identify needed capital projects and to delineate the financing and timing
of the associated projects. Generally these projects exceed $10,000 in cost and require
financing by the three cities of the Joint Water Commission_ An annual capital
improvement budget, encompassing the projects outlined for the first year of the CIP, is
presented to the Commissioners with the City budget. Each project is brought forth in
the upcoming year for final approval by the Commissioners.
The adoption of a CIP is a requirement for each city in the metropolitan area. As part of
the Metropolitan Land Planning Act passed by the State legislature in 1976, each city is
required to adopt a Comprehensive Plan. Each city included the water supply plan in
their comprehensive plan.
Background of the Joint Water Commission
The Cities of Crystal, Golden Valley, and New Hope addressed the issue collaboratively
in 1963, when they formed the Joint Water Commission (JWC) to purchase water from
the City of Minneapolis and develop the infrastructure to deliver that water to their
communities. Since then, the JWC has efficiently managed the three Cities' unique
water supply and storage system in a fair and equitable manner. Each City maintains its
own distribution system and utility billing, meter reading, and water sampling functions.
As required by the US Environmental Protection Agency (EPA), the JWC frequently
performs many stringent water quality tests on water samples taken from locations
throughout each of the three communities to ensure consumers receive safe, quality
water.
For 50 years, the City of Minneapolis has been a reliable source of reasonably priced,
good quality water. In return, the JWC has been a good customer, purchasing about 15
percent of the water treated by Minneapolis.
The JWC remains committed to providing its customers with the highest quality water at
the least cost. As the cost of water continues to increase, the JWC must evaluate its
alternatives to ensure it will continue to honor that pledge.
The JWC currently purchases water from the City of Minneapolis. The Minneapolis
Water Works (MWW) draws its water supply from the Mississippi River in Fridley. After
treatment and purification, the water is pumped to customers in Minneapolis, Columbia
Heights, Hilltop, Bloomington, Edina, and the JWC communities of Crystal, Golden
Valley, and New Hope.
The system that brings water to your house involves miles of piping. Treated water is
pumped from the MWW plant through large pipes (the largest of which is 48 inches in
diameter) to two JWC water reservoirs in Crystal and Golden Valley. The storage
capacity of the two reservoirs is 2? million gallons. The water is pumped from the
reservoirs into the water distribution systems separately owned and maintained by each
of the three JWC cities. Each city is responsible for installing and oper'eting its own
water mains, pumping stations, water towers, and utility billing.
The three JWC Cities use about seven million gallons each day. Water demands of
JWC customers have been relatively constant over the past 10 years. During the day,
the amount of water used by residences and businesses fluctuate hour by hour. The
JWC water storage reservoirs are big enough to meet each day's needs, keeping the
water flowing through the pipelines at an adequate pressure to meet customer needs.
Water demands in the summer increase dramatically (often up to 17 million gallons
each day) when residences and businesses sprinkle their lawns. The most customers
have used in a single day was 20 million gallons.
Future Pians
The JWC needs an emergency supply backup. Currently their water supply system
would have to rely on the Minneapolis for their needs and currently they do not have
plan to most the needs of all their customers. As the these cities prepare for the future,
the emergency supply backup is a top priority.
This document will help plan the upcoming needs for all three cities. As rates continue
to increase, the planning of the financial future is most important.
AL
My of
CRTSTAL f
�f
JWC EMERGENCY WELL SUPPLY UPDATE
Joint City Council Work Session
January 9,, 2014
Presented by Bolton dank, inc..
3 Critical Success Factors
for the
JWC Emergency Water Supply
1. Reliable
Ensure ability for quick MDH approval and start-up
2. Maintainable
Minimal vulnerability and need for maintenance
3. Operator Friendly
Simple to operate to achieve maximum flow
Potential Water Quality Issues
• Switchin
from Softened/Filtered Water To
Unsoftened/Unfiltered Water:
Aesthetics Related Impacts:
® 1 Colored Water /t Difficulty getting laundry white
t Spotted Dishes% t Difficulty getting soap to lather
-� t Oily sheen on coffee
• Longer Residence Time ORT),--
Aesthetics
Related Impacts:
-- t T&O
Health Related Impacts:
- 1 C12
— t Orthophosphate/Polyphosphate — 1 Microbial Activity (and !DO)
j Sequestering Effectiveness
pH, IPb & Cu
Chlorine Feed
* a If% le +
r-,
%, I ut,L U" d"u 14 cylinaers per wail may
be warranted (6-9 day supply) as opposed to 2
cylinders (3-4 day supply).
Cylinder delivery occurs when Y2supply is used.
PRELIMINARY OPINIONS OF COST
JWC EMERGENCY WELL SUPPLY
ITEtr'T
NO. _ _ DESCRIPTION
1 CIVIL ENGINEERINGNEW i'ELL AND APPURTENANCES
ELECTRICAL AND CONTROLS COSTS
4 CHLORINE CLOSES BRICK CONSTRUCTION
CHEMICAL PEED E UIPMEN l-
6 NEW HOPE WELLHOU E PUMP'
PIPIN
77HER 11PR 'E TENT
CON77INGEN IE 115%)
TOTAL ESTIMATED N TR.UCTION COSTS
Costs
$187,000
$1,472,000
$626.000
$98,000
$437,000
$117000
$525.000
$51 .000
$31979,000
Milestone Schedule
• 80% Cost Estimate
• Tri -City Council Meeting
Council Resolutions Approved
• Begin Advertise for Bids
• Complete Construction
January 2014
January 2014
March 2014
April 2014
December 31, 2015
Authorize Construction of Three Emergency Wells
within the JWC Communities
If yes then:
* Adopt Resolution to order construction of the
Emergency Water supply
* Adopt resolution agreeing to financing of the project
_ Request for Action
Originating Department
Approved for Agenda
Agenda Section
City Manager
March 17, 2014
Work Session
Item No.
By: Kirk McDonald, City Mana er
1 By: Kirk McDonald
11.10
Discussion regarding internal financing for emergency water supply system (improvement project 929)
Requested Action
Staff requests to discuss the option of internal financing for New Hope's share of the JWC emergency water supply
system. AEM will be in attendance for the discussion. If council is supportive of the recommendation, a resolution
establishing an interfund loan will be presented at a regular council meeting in the near future.
Policy/Past Practice
The council has approved interfund loans in the past when the funds are available to save on interest costs and
accomplish city projects. A recent example includes paying off the golf course clubhouse outside debt via an
interfund loan from the temporary financing fund and EDA.
Background
At the tri -city JWC council meeting held on January 9, 2014 the three councils unanimously agreed to move forward
with the construction of an emergency water supply system. Each city would be responsible for financing their share
of the project, and the estimated cost to New Hope is $1.1 million. The council further discussed this matter at the
January 21 work session and supported approving a resolution to construct the project along with the other cities.
The council also discussed adding a 20� charge per 1,000 gallons of water to pay for New Hope's share of the project
and discussed internal financing. At the January 27 council meeting the council approved a resolution ordering
construction of an emergency water supply, and at the February 10 council meeting an ordinance was approved
establishing a fee for the emergency water supply system. The 20c per 1,000 gallon fee will be effective on the April
2014 utility bills.
AEM has prepared the attached memo regarding the option of internal financing. As of December 31, 2013 the
temporary financing fund had a balance of $3,128,321, and AEM recommends that there are adequate funds to
internally finance New Hope's share of the emergency water supply system. Based on the number of gallons of water
sold in 2013, it is estimated the new 20a charge will generate approximately $122,681 in revenue per year that would
be utilized to pay off the internal loan. With the addition of a small 1.51% interest rate for an internal loan, the loan
would be repaid in a ten year period (please see attached amortization schedule).
Motion by Second by
To:'7
I:/RFA/CityManager/2014/Q-Discuss n'#929 031714
Request for Action, Page 2
March 17, 2014
If the council is supportive of financing the project internally from the temporary financing fund, a resolution
establishing the interfund loan would be presented in the future.
Attachments
AEM memo
2013 water consumption
2013 41h quarter report
- ZL1JO
�'EICK &
NMU1 S TLP
AEM Financial Solutions'
MEMORANDUM
Date: March 12, 2014
To: Kirk McDonald
From: Jean McGann
Subject: Emergency Water Supply System Financing
On February 10, 2014 the City Council approved an ordinance establishing a fee to fund construction and maintenance of the
emergency water supply system. Each City in the Joint Water Commission UWC) will participate in the funding of the system. The
City of New Hope's share of the project is $1.1M. AEM has been asked to review funding alternatives in order to finance this project
internally.
In reviewing information provided by City staff, it is anticipated to generate $122,680 per year from the $.20 per 1.000 gallons fee. If
this is financed internally, the Temporary Financing Fund has adequate reserves to manage this internal loan. The City currently has a
weighted average interest rate of 1.51%. If the Temporary Financing Fund loans the Water Fund $1.1M at 1.5I %, the loan could be
repaid in 10 years at $119,341 per year with final maturity is 2024.
Amortization schedule is as follows:
Date Total Payment Interest
06/30/2014
06/30/2015
06/30/2016
06/30/2017
06/30/2018
06/30/2019
06/30/2020
06/30/2021
06/30/2022
06/30/2023
06/30/2024
119,340.80
119,340.80
119,340.80
119,340.80
119,340.80
119,340.80
119,340.80
119,340.80
119,340.80
119,340.84
$ 1,193,408.04
5201 Eden Avenue,, Suite 250
Edina, MN 55436
962.715,3070 1 Fax 952,835.3261
$ 16,610.10
15,058.76
13,484.11
11,885.67
10,263.10
8,616.02
6,944.08
5,246.89
3,524.07
1,775.24
$ 93,408-04
Principal
$ 102,730.70
104,282.04
105,856.69
107,455.13
109,077.70
110,724.78
112, 396.72
114,093.91
115,816.73
117,565.60
$ 1,100,000.00
Outstanding Principal
$ 11100,000.00
$ 997,269.30
892,987.26
787,130.57
679,675.44
570,597.74
459,872.96
347,476.24
233,382.33
117,565.60
0.00
CBH
City of New Hope
Land Use
Report Water Consumption
2013
Per 100 gallons
MONTH
RESIDENTIAL
COMMERCIAL INSTITUTIONAL
Hundreds of Gallons
Hundreds of
JWC
Eme en Fee we bill in
January
347,102.00
71,356.00 7,048.00 1
Gallons
425,506.00
Total In Gallons
42,550,600
r$0.20
$8,510.12
$0.19
$0.18
$0.17
$0.16
$0.15
February
359,435.00
83,078.00 8,094.00
450,607.00
45,060,700
$9,012.14
$8,084.61
$8,567.53
$7,659.10
$7,233.60
$6,808.09
$6,382.59
March
317,610.00
76,808.00 6,648.00
401,066.00
40,106,600
$8,021.32
$7,620.25
$8,110.92
$7,660.31
$7,209..71
$6,,,759..10
April
,.
,.4,841.00
423,816.00
42,381,600
$8,4763
$8,052.50
$7,219.18
$7,6286
$6,818.12
$7,204.87
$6,417.05
$6,015.99
347,060.00
416,517.00
79,210.00 7,374.00
433,64.00
43,364,400
$8,672.88
$8,239.23
$7,805.59
$7,371.94
$6,781.05
$938.34
$6,357.24'Ma
$6,504.66June
363,726.00
99,857.00 12,996.00
529,370.00
52,937,000
$10,587.40
$10,058.03
$9,528.66Jul
$8,999.29
$8,469.92
$7,940.55
535,931.00
,.,.
131,701.00
71,514.00
47,151,400
$9,430.28
$8,958.76
$8,487.25
$8,015.73
$7,528.22
$7,072.71August
September610,877.00
24,075.00
134,577.00
691,707.00
69,170700
$13,834.14
$13,142.43
$12,450.72
$11,759.01
$11,x67.31
$10,375.60
October
447,074.00
,8.00
775,602.00
77,560,200
$15,512.04
$14,736.43
$13,960.83
$13,185.23
$12,409.63
$11,634.03
November
385,951.00
,.29,312.00
100,715.00 14,054.00
611,581.00
61,158,100
$12,231.62
$11,620.03
$11,008.45
$10,396.87
$9,785.
$9,173.71
December
339,213.00
74,328.00 5,379.00
,.
418,920.00
,72,000
$10,014.40$8,512.24
$7,510.80
41,892,000
$8,378.40
$7,959.48
$7,121.64
711-52
$6,02.72
283.80
TOTAL
4,812,246
1,159,905.00 161,902.00
6,134,053.00613,405,300.00
$122,681.06
16,546.96
$$0.56
110,412.90
$104,278.85
$98,12885
$9201078
CBH
(1) See statement of revenue and expenditures general fund for further explanation of this increase
(2) 4/29/13 Council authorization to close fund to Golf Course
(3) Decrease due to acquistitions and payments on current projects
(4) Decrease due to scheduled bond payments
(5) Increase of $100,000 Council authorized transfer
(6) Increase due to receipt of municipal state aid
(7) Increase due to property tax receipts being accumulated and minimal project payments
(7) Increase due to payments on current projects
(8) Increase due to receipt of payment for Golf Course interfund loan and reduction in improvement costs
(9) Decrease due to payments on current projects and/or scheduled debt payments
(10) Decrease due to payments on current projects and/or scheduled debt payments and offset by a SIM transfer from Storm Water fund.
(11) Increase due to energy improvement grant revenue
(12) Variance due to Council authorized transfer of $1,000,000 from storm water fund to Water utility fund
(13) Decrease due to payments on current projects and/or scheduled debt payments
-5-
° r• 1 •
I I
r r �
Y'Y06 A
,l.F <.
341
..--1�. �'RS„- ,. ':?<rL._ .:, .Y >' s r. _3�#,_t:
:rzt 14�*.a
:,. i�'•°�S y .,., r�i rv_ y i?' ,°.l t� {'.
'� + "i-
=5,
#�±�Ti
V�.19'T
r. ,�., ,:� SW /"�
+R��.i � ,.7F:.- . M.�1:"'r "'III""" �,�„ z_P� •ma !' �''-
�""�,S,.A` ,15+.3„A �
, ? G'� w�'.i7'� .��
yyDID1 P— 1 I
Ell
ry,Ny {I
1 j�
1 '
,I
l
1'-!�!ri`;•
�.?.1��1�-."���11��'�S2 e�el7�`y�.�tirrs
• 1
tV
1�
S�ru4�.-.1.41..
11
-K"
I
11 1
_1
1 i.... �.r.+..., �•.Y..'Ywh��.°�,?,v
�"'1
a�
i •'111
° �i,..t 9 1 ,_fit
�.
y� 5{ _qi �R' :: y,Yt �
t
{
•� p' 1n
6 I•.1�`'�y.
8.. 1 ,1.,_ T�
�,.�i�
�5�`
;•H�2n F•.Y-e,�1 u1�W�S�,� �iJ�i ��d"I�"�;;.
y. A���. �'.� '�+ �� ��
�•'S
� +�l ,
���t�
r' M' 1 1 1 9 1 1
•
'
ice, 11 11 1•
1.
y�y�•
"f
; x� 'yy�'
S
��/'
r,,
it{t.�' ,�I Alf fall � �s y� V�"
r�T_ -�J 'd'"""�F:�SkN�
}yam->irr �F �:
:yY.�. ��� '�,.-I!... .ik�H.���
I[I+�,.
�.'IW-•S'�������
k � �!'[�
�'[;. �����L;!k�S`VL�l�i'.
MAAds,�
ewer
•,"� 3lYR�,
291,571
`' ,,/ �E y �
.5
{{i�1}y1y�� .fir}
r
�
§;_
:'.'�,�Fi �!F: L�"_'Xi:RJ�'i5 )°"'?
1F'iw" S�"�,..�`.: .m ,T-+�' ,,
°��%�"
i� ��+�n .. 1
1
Ptx 1
i 1 ./
31d
1 ,
- r -.': b_.
f
�$e'_:+i
37,257
,
Yf;'':li,". h�v.
_.-:..
=!'.xufF�+p:-+hA, . u R - 1
7
f. -.j:' }"'
1'
Storm
014,675
,
9402
Central garage
_
5,329,235
�C!t
.4,746,975
1,
1if
„d`I�' :'le;-.p',r-' 3
.__+i-��s LI ' _
k° rr+ "iJ:+6
I!,'U-';°P�;�'?i
8
�,�,i D
Vacation leave
fllre �T:�e�Ai���.r'E 911 i 1I @ 7�3'�'
620,433
:�.=' y .'p' ins '�Irr �P ��'111d�
�^# ���ys
E" -�- �
Agency - pass thru
46,081
16,374
(29,707)
Total9503
2365=01,200
Item Jr
anadon. ofohaniMs-: : 1 1 1
f i Y
(1) See statement of revenue and expenditures general fund for further explanation of this increase
(2) 4/29/13 Council authorization to close fund to Golf Course
(3) Decrease due to acquistitions and payments on current projects
(4) Decrease due to scheduled bond payments
(5) Increase of $100,000 Council authorized transfer
(6) Increase due to receipt of municipal state aid
(7) Increase due to property tax receipts being accumulated and minimal project payments
(7) Increase due to payments on current projects
(8) Increase due to receipt of payment for Golf Course interfund loan and reduction in improvement costs
(9) Decrease due to payments on current projects and/or scheduled debt payments
(10) Decrease due to payments on current projects and/or scheduled debt payments and offset by a SIM transfer from Storm Water fund.
(11) Increase due to energy improvement grant revenue
(12) Variance due to Council authorized transfer of $1,000,000 from storm water fund to Water utility fund
(13) Decrease due to payments on current projects and/or scheduled debt payments
-5-
Request for Action
Originating Department
Approved for Agenda
Agenda Section
Ordinances &
City Manager
April 14, 2014
Resolutions
Item No.
By: Kirk McDonald, City Manager
1 BY: -Kirk McDonald
10.2
Resolution approving interfund loan and transfer from temporary financing fund to water fund for emergency water
supply system (improvement project #929)
Requested Action
Staff recommends the City Council approve the attached resolution approving interfund loan and transfer from
temporary financing fund to water fund for emergency water supply system. At the March 17, 2014, work session the
Council discussed funding New Hope's share of this project internally, and was supportive of the option presented
by the city's financial consultant (AEM) and staff.
Policy/Past Practice
The council has approved interfund loans in the past when the funds are available to save on interest costs and
accomplish city projects. A recent example includes paying off the golf course clubhouse outside debt via an
interfund loan from the temporary financing fund and EDA.
Background
At the tri -city JWC council meeting held on January 9, 2014 the three councils unanimously agreed to move forward
with the construction of an emergency water supply system. Each city would be responsible for financing their share
of the project, and the estimated cost to New Hope is $1.1 million. The council further discussed this matter at the
January 21 work session and supported approving a resolution to construct the project along with the other cities.
The council also discussed adding a 20t charge per 1,000 gallons of water to pay for New Hope's share of the project
and discussed internal financing. At the January 27 council meeting the council approved a resolution ordering
construction of an emergency water supply, and at the February 10 council meeting an ordinance was approved
establishing a fee for the emergency water supply system. The 20is per 1,000 gallon fee will be effective on the April
2014 utility bills.
AEM prepared the attached memo regarding the option of internal financing which was reviewed at the March 17
council work session. As of December 31, 2013 the temporary financing fund had a balance of $3,128,321, and AEM
recommends that there are adequate funds to internally finance New Hope's share of the emergency water supply
system. Based on the number of gallons of water sold in 2013, it is estimated the new 2N charge will generate
approximately $122,681 in revenue per year that would be utilized to pay off the internal loan. With the addition of a
small 1.51% interest rate for an internal loan, the loan would be repaid in a ten year period (please see attached
amortization schedule).
Motion by Second by J/�Zto, L6V
To: j
I:/RFA/CityManager/2014/Q&R-Approve Interfund-YU929 041414
Request for Action, Page 2
April 14, 2014
The attached resolution authorizes an interfund loan and transfer from temporary financing fund to water fund in the
amount of $1.1 million as project expenses are incurred for New Hope's share of the JWC emergency water supply
system. Staff recommends approval of the resolution.
Attachments
Resolution
March 17, 2014 work session minutes
March 17, 2014 RFA including amortization schedule
City of New Hope
Resolution 2014- 57
Resolution approving interfund loan and
transfer from temporary financing fund
to water fund for emergency water supply
system (improvement project #929)
WHEREAS, the three city councils of the Joint Water Commission (New Hope, Golden Valley, and Crystal)
have unanimously agreed to construct an emergency water supply system; and
WHEREAS, at the January 27, 2014, council meeting the council approved a resolution ordering construction of
an emergency water supply, similar to the other two cities; and
WHEREAS, each city is responsible for financing their share of the project and the estimated cost for New Hope
is $1.1 million; and
WHEREAS, at the February 10, 2014, council meeting the city council approved an ordinance establishing a fee
for the emergency water supply system in the amount of 20c per 1,000 gallons of water; and
WHEREAS, the city's financial consultant (AEM) has recommended the city council finance the emergency
water supply project internally with an interfund loan from the temporary financing fund to the
water fund to pay for project expenses as they are incurred; and
WHEREAS, the interfund loan would be paid back with the 2N per 1,000 gallon fee over a ten year period with
a small 1.51% interest rate for an internal loan per the attached amortization schedule; and
WHEREAS, the city council supports the internal financing option for the emergency water supply project and
the recommendation from AEM.
NOW, THEREFORE, BE IT RESOLVED, by the city council of the city of New Hope, Minnesota that an
interfund loan and transfer from the temporary financing fund to the water fund in the amount of
$1.1 million as project expenses are incurred for the emergency water supply system is hereby
approved.
Adopted by the City Council of the city of New Hope, Hennepin County, Minnesota, this 14th day of April, 2014.
Mayor
Attest:
�e u_
City Clerk T
Purchase skates for rental, set up rental area
Golf course grills
Fairway unit
e Rotary rough mower
Golf carts lease program
Directors Paschke and Rader also reviewed proposed CIP projects for years 2016-
2018.
Ms. Jean McGann of AEM reported on the financial aspects related to CIP for parks,
street, and central garage. She stated the street infrastructure maintains a positive
cash balance and appears to have sufficient resources for the projects planned in the
next five years. She stated the park infrastructure fund cash balance is projected to
be negative at the end of 2015 due to the large number of projects scheduled for
year 2015. She pointed out if major expenditures are not delayed, the city should
consider increasing funding to the park infrastructure by approximately $150,000
per year over the next four years. Ms. McGann stated the central garage cash flow
assumes replacement is funded at 25% and operations funded at 100%. She stated
funding replacement at 25% will continue to have a negative effect on the overall
cash position of the central garage. She noted Council may want to consider
increasing the replacement funding level in 2015 to 50%. She also pointed out the
2018 CIP assume a public works addition for $2,650,000 paid out of current funds.
Ms. McGann stated by increasing both the park tax levy and the street tax levy by
3% would result in approximately $45,000 for each fund which equates to a tax
increase of $7 for a home valued at $200,000.
Council thanked the directors and AEM representatives for the update.
IMP. PROJECT 929Mayor Hemken introduced ntroduced for discussion item 11.10, Discussion regarding internal
Item 11.10 financing for emergency water supply system (improvement project no. 929).
Mr. Kirk McDonald, city manager, reported the recent $.20 charge per 1,000 gallons
of water will generate approximately $122,681 of revenue per year. He stated the
city's share of the emergency water supply system is $1.1 million. He recommended
financing the cost internally with repayment over ten years.
Ms. Jean McGann, AEM, stated the city's temporary financing fund has adequate
reserves to manage the internal loan. She recommended using a 1.51% interest rate
which is the average interest earned on investments. She indicated the $1.1 million
loan could be repaid in 10 years at $119,341 per year with final maturity in 2024.
Council expressed support for an internal loan.
Tracking Project Costs Mayor Hemken introduced for discussion item 11.11, Discussion regarding tracking
Item 11.11 project costs.
Mr. Kirk McDonald, city manager, explained how projects are tracked by Council
action and expenses are coded to the corresponding project number by the Finance
Department. He stated a report can be generated for expenses/revenues related to
an improvement project number.
City Council Work Session March 17, 2014
Page 10
ABDO
EICK &
• _ VMRSLLP
AEM Financial Solutions'"
MEMORANDUM
Date: March 12, 2014
To: Kirk McDonald
From; Jean McGann
Subject: Emergency Water Supply System Financing
On February 10, 2014 the City Council approved an ordinance establishing a fee to fund construction and maintenance of the
emergency water supply system. Each City in the Joint Water Commission (JWQ will participate in the funding of the system. The
City of New Hope's share ofthe project is $1 JAL AEM has been asked to review fimding alternatives in order to finance this Projectinternally.
In reviewing information provided by City staff it is anticipated to generate $122,680 per year from the $.20 per 1.000
this is financed internally, the Temporary Financing Fund has ad P gallons fee. If
weighted average interest rate of 1.51 %. If the Temporary Fiaencing Fuytd loans the Water Fund $1, IinterrM at 1.3 %, the loan coauld as a
repaid in 10 years at $119,341 per year with final maturity is 2024.
Amortization schedule is as fellows:
Date Total Payment Interest
06/30/2014
Prin! F al Outstanding Principal
06/30/2015
119,340.80 $
16,610.10
$
$ 102,730.70 $
111001000.00
06/30/2016
119,340.80
15,058.76
104,282.04
997,269.30
06/30/2017
119,340.80
13,484.11
105,856.69
892,987.26
06/30/2018
119,340.80
11,885.67
107,455.13
787,130.57
06/30/2019
119,340.80
10,263.10
109,077:70
679, 675.44
06/30/2020
119,340.80
8,616.02
110,724.78
570,597.74
06/30/2021
119,340.80
6,944.08
112,396.72
459,872.96
06/30/2022
119,340.80
5,246.89
114,093.91
347,476.24
06/30/2023
119,340.80
3,524.07
115,816.73
233,382.33
06/30/2024
119,340.84
1,775.24
117,565.60.
117,565.60
0.00
$ 1,193,408.04 $
93,408.04
$ 11100,000.00
stat Eden Avenue, Sub 230
Edha, MN 65498
852116. M I FaK982.836.3M,
City of New Hope
CBH
Hundreds of Gallons
Emergency Fee (we bill In
$0.20
$8,510.92
Land Use Report Water Consumption 2013
$0.18
$0.17
Per 100 gallons
$0.15
$9,012.14
MOMM
RESIDII IL COMMERCIAL INSTITUTIONAL
$7,233.60
$6,808.09
$6,38z.5(
58,021.32
$7,620.25
$8,110.92
$7,219.18
Hundreds of
.1W7c
Janua
347,102.00
71,656.00
7,048.o0
Gallons
425.508.00
Total in Gallom
Februa
359,435.00
83,078.00
8,094.00
4,607.00
42,550,600
March
317,610.00
76,808.00
6,6411 o0
401,066.00
45,080,700
TIS
�Ma
34f,750.00
77,225.00
4,841.00
423,81 —
40,106,600
42,381.600
June
347,060.00
79,210.00
7,374.00
433,644.00
43.364.400
�l1
418.517,00
99,857.00
12,996.00
529370-00
52.937,000
AU USt
363,728.00
951855.00
11,933.00
471,514.00
47,151,400
Se tember
535,931.00
131,701.00
24,075.00691,707.00
$8,512.24
$7,121.64
69.170,700
8men.00
October
134,577,00
30148.00
0.200
November
47,
4074.00
135,1 95.00
29,91200
611,561.00
61.15 $,100
December
385 951.00
100,715.00
14,054.00
500,720.00
50.072,000
399,213,00 1
74,328.00
5,379.00
418,920,00
41,892,000
TOTAL
4,812,246.00
1.159,905.00
161,9oz.00
6,134.053.00
s1 -'A enn %M nn
CBH
Hundreds of Gallons
Emergency Fee (we bill In
$0.20
$8,510.92
$0.19
$0.18
$0.17
$0.16
$0.15
$9,012.14
$8,084.61
$8,561.53
$7,659.10
$7,233.60
$6,808.09
$6,38z.5(
58,021.32
$7,620.25
$8,110.92
$7,219.18
57,680.31
$7,209.71
$6,759.1(
58,478.32
$8,052.50
$7,828.68
$8,818.12
$6,417.05
$6,015.9f
$8.672.88
$8,239.23
$7,805.59
$7,204.87
87,371.94
$6,781.05
$6,357.2(
$10,587.40
$10,058.03
$9,528.66
$8,999.29
$6.938.34
$6.504.6(
$9,430.28
$8,958.76
$8,487.25
$8,015.73
$8,469.92
$7,528,22
$7,940.5.
$13,834.14
$13,142.43
$12,450.72
$11,759.01
$11,067.31
$7,072.7'
110,375.6
$15,512.04
$12,231.62
$14,736.43
$f 1,620.03
$13,)80.83
$13,185.23
$12,409.63
$11,834.0
$10,014.40
$9,513.68
$11,008.45
$9,x12.96
$10,396,87
$9,785.29
$9,173.7•
$8,378.40
$7,959.48
$7 540.56
$8,512.24
$7,121.64
$8,011.52
56,702.72
$6.283.8(
$122,681.06 116,546.86 ;110,412.80 $104,278.85 ;98,728.85
$92.010.7
)tvI
fr.:neral
9€I10
Fire capita ppm
901!
&wix>irrr►i'<div,4oprrt•:otawh,jrhy
4016
Solid %ask ma t
9€11 ".
Ift aw,a �10,i mmxut
9021
polii:t Jbr*-K
')117
F.D.% sinki. P 1 i1, (1 l,A'
9118 • ED.X sinking W 11, C-1-1
4114 * EDA si.,1mg it 2, N-2
9140
Fin; pmion bund 1196
51145
20109 QQ Fquipr: ejj
92-02
Cies Halt ClP
9203
-two:[ 'rn6z' trJGhirr,
9;13
1: DA consu tiott.45. V-1
9214
EDA v-n:;trurv, ,n t7. X -i-1
.x.3,15.
)"M;xt:ratrtrction 0 3, 85-2
4:}f:
EDA r.mmFuetion 1.19, 0-;,v1
9217 * EDA a irt5 'ta Gt t)Y) 4 t0.03-01
9318 •
k, DA ion al 1, 04-1
9213
EDA cm -a mina u.12: 0.1-3
0220
ED.% owi- tmciiim ;11= 11,1
92°13
Pak Wr iamzium
93(,2
Golfcwjr.!%:
4jf13
lwe arena
c,3(4
Stt).nn %;avr
433
5`rm iilt`:Z'.�t nul
9402
Centra. ware
a: a(r7
i:7S1:f.it3S2
94Q3
Vaca:_o i, L -a—,
941•)
Irfu rr-aliun weno!(Agt
95: )3
IA;,:m,) - F, w thro
Total
t~1'i Y O!' Nl;A% 1.1111'F IMP; ` E NOT_k AT"?" ACHN.BN T B
lNittilIfl)CASH 13:11.zV..('F,SBN ftND
Y)ECEN113E1i :t 1, 21112 :V ,D I)ECE�ISER ? 1, 2`113
B36"Re slaacx Chauge from
1213162([12 12431/2013 I MI12012
4.043,41 T
348.301
2.74-7.114
140.808
131v11
l(1lsn
234,464
(2A.1021i
(517.51 t 1
3$.902
100.74-
573
I05,4t;
t 114.5$ot
14,a,T1f t:
l 1 8,}143
(1fr,Ss•1i
I YS.47fl
2.1.�i.r975
5,319.n3
`(:7,917
620,433
46 091
S ft,13L771
3,73. t 1
152.694
13,(x:3
117,459
136.468
(17,144)
(i«0:1551
201.f'r7
(1.4281
1,34ta,? a3
;ti9 '1u8
t 1f.1:f'
19 429)
01,70',
5.1.,35,
.[53.'58
576.777
'_49.1 xt}
4." 4€,11''5
415,$[40
OU59
153.1;9
1637t
S 25,308,4.02 23 �ta1.?tI€I
1—rrt xpl.-:atimo nl+a�te�rs r.elxPtl.pn. ]trtrs},',(1
t 1) Sed s 1St 11:61[ of r,% CriLsE sn:l exna'. rtti3 8,�;.::ral ti ".•�1 ti3P i� ri` _r cti�1-.atio.- r;ft:ti ini r� ass
(") 4 2913 Coum:il at hwi7,Jon w clo.: fund to Golf1wour.::u
(3) 1 _ s.w Jue to 9a4ui;-taair.s and (,a)rrwnts on currem prvje,w�
(4) dth- to--cbMu4ed band payme:,ts
(5s I numaz": of SIO0,000 Council act( orized tr ci.:rr
(.61 Inmm du:: to rowipt of rrrwicipal .tM ,tint
f'1 ]rtcaet j w w rrors' tax rezzir:3 h.-ingaceumululwd m -.J minimal pro ,:Ll pa) rm„- u
(7) 1nmax d x to p)metta on i;arnent je-4s
t8) ln�xe" du;. to mcei, t of xsg went for Giff C'mcr ,: irtertund lo -Ir- and tett: tett in it VLm ,;[[twat Oog3
(.348,301) t2)
13)
11.$86
ft$R)
15.581
f1#:'moit (4)
10.958
(3:.tt 4
(35 902)
(13-kU59) }4)
100.85ii (5)
i.423.Ggla €8)
(i,Ell l)
13-,' MR 1571
(2 698)
t 1.• 4�5
I I'D 188 (7)
[ 17.175)
(1.85[4)
t?. Vv1
98 893
165,02.1 id)
S1�-�35► €lb,
37,'157
3JS,;95 (11'
t 1,517.1(9$; 112'
4'541'_.26(4) (13,
(92.3571
111,775)
1.656
S (1,847,212)
(9) D=4a,:: due to ra}tmertts oat cimot projects in -i or whe,14ed &bt papnent-1
x 1 vi Dai re. a dw to pad=w; on ct nr tt :gin jests and or .� f,_ luted a bt p.1Y~1tnts and afiie't b3° a S t M tr n:;fcr fro[, Storm W!ter ftmd.
1117 1r1�r:.a.�: dei: tv �o::rb} irsap:titvean�nt 1tr„mt re�;•rrcu
(12) ttar:anw Jut to O-u:tcil a"., --r: trw7!, .ar cif sl; } i3(:r7 firm :'._ rm x%-tLr t`;an,l t) Wgr ati(ity fund(131 �::; r,'�>S EI!::,'. t,t j.`M,;.T.�rii� (3n e"lar�+eatt 11ts jwY.i'� a.:t.: ti,r �.i;+:nt::.,A( !:Litt t'.c•) trit:r6t? Y
-5-
September 11, 2015
Municipal Builders, Inc.
17125 Roanoke Street NW
Andover, MN 55304
Subject: Joint Water Commission Emergency Supply Wells
City Project #14-07 Change Order
Dear Mr. Wegner:
Enclosed please find a fully executed Emergency Supply Pumps/Piping Electrical/Chemical
Change Order Agreement between Municipal Builders, Inc. and the City of Golden Valley.
We look forward to a successful recycling agreement with you. If you have any questions,
please contact me at 763-593-8008.
W
L—
Jeff Oliver, PE
City Engineer
Enclosures
CC: Bolton & Menk, Inc.
City of Golden Valley, Finance Department
City of Crystal, City Manager
City of New Hope, City Manager
Joint Water Commission
763-593-8000 763-593-8109 763-593-3968
1
Municipal Builders, Ing
September 8, 2015
Mr. Steve Nelson
Bolton & Menk, Inc
7533 5unwood Drive NW, Suite 206
Ramsey, MN 55303
Re: Joint Water Commission Emergency Supply Wells
City Project #14-07
Change Order
Dear Sir,
We would have preferred that additional days be added to the project duration on the attached change
order #1 due to the additional work that was requested.
The attached change order #1 is being signed with the understanding that no liquidated damages will be
assessed on this project per the recent e-mails exchanged between the JWC, the project engineer and
Municipal Builders, Inc.
1.`• 725 Roanoke Street NW 0 Andover' MN 55304 0 Phone: (763) 421-8740 FAX: (763) 421-1077£3
SECTION 00491— CHANGE ORDER
No. 1
PROJECT: Emergency supply Pumpsipiping/Eleci icavaemical
DATE OF ISSUANCE: August 3, 201 S EFFECTIVE DATE: 813/15
OWNER: Joint Water Commission
ENGINEER'S Project No.: R22.107452
CONTRACTOR Municipal Builders ENGINEER: Steve Nelson, P.E.
You am dhccW to snake the following changes in the Contract Documents.
Descripdow-
All the scope changes and costs change dewn"bcd, referenced and tabulaW in Memoranda of Understanding MOUI and
MOU2.
Reason for Change Order:
Reasons for gilts approved are outlined in MOU l and MOU2,
Attachments: (Ust documents supporting rhaage)
Sm MOU 1 and MOU2.
C NAME IN CONTRA[ 17 PRICE:
CHANGE IN CO'No"TRACT TIES:
ft1vv
Original C=hWt Tunes
0,514.400.OQ
Subsurd'aq CaqActikm 15
Rmdy W NW payment 711!11,
Net CbWges tram Fe"Ous Cama mdea
30.0
�
d mvm d rkbwn Psion to sh Chane Order
ContcwtT&ms oar to this
� � CtwwgeChrkx
s]3i4�t1.DI1
�� �
Ready Cor G1A
ltiiet Dac�e+�'this C6a4ge +Order
No Changs idrtliis �e+Deder
Caaplseci Price wig alt apgrrovad t mange tinders
Contrast Times
51.188.1133.05
Subda"Cwn�
ReadyffhWMrW 711/12
RECIOMNI vMr-0• APPROV
tea:
qtr ^_ By
BY -
r. rghtrtAu/*.tu"bWSWmtw)
tnriaedS dva) t
EJCDC No. 1910CS-B (1990 motion)
ftVmwd by the awhieen Joint Comm iincoments C=F xmttoe end endorsed by The Associated Geral Cmenctors
N22.107452 — New Hope, Golden Valley, and Crystal, MN CHANGE ORDER
Emergency SuPply Pumps/Piping/Electrical/Cheluical PAGE 00991-1