Loading...
012516 EDA Meeting PacketCITY OF NEW HOPE EDA MEETING City Hall, 4401 Xylon Avenue North January 25, 2016 EDA Meeting will commence upon adjournment of the City Council Meeting President Kathi Hemken Commissioner John Elder Commissioner Andy Hoffe Commissioner Eric Lammle Commissioner Jonathan London Call to order EDA Meeting of January 25, 2016 2. Roll call 3. Approval of Minutes: • January 11, 2016 4. Resolution approving survey contract for 6065 Louisiana Avenue North (improvement project no. 973) 5. Adjournment CITY OF NEW HOPE 4401 XYLON AVENUE NORTH NEW HOPE, MINNESOTA 55428 EDA Minutes January 11, 2016 Regular Meeting City Hall CALL TO ORDER President Hemken called the meeting of the Economic Development Authority to order at 7:56 p.m. ROLL CALL Present: Kathi Hemken, President John Elder, Commissioner Andy Hoffe, Commissioner Eric Lammle, Commissioner Jonathan London, Commissioner Staff Present: Kirk McDonald, City Manager Aaron Chirpich, Community Development Specialist Tim Fournier, Police Chief Valerie Leone, City Clerk Jeff Sargent, Director of Community Development Stacy Woods, Assistant City Attorney APPROVAL OF Motion was made by Commissioner Elder, seconded by Commissioner MINUTES London, to approve the minutes of December 14, 2015. All present voted in Item 3 favor. Motion carried. IMP. PROJECT 897 President Hemken introduced for discussion EDA Item 4, Resolution Item 4 approving non -enforcement agreement with Minnesota Housing Finance Agency regarding indemnification provisions in purchase and redevelopment agreement for "Compass Pointe" development — 6113 West Broadway (New Hope Planning Case 14-03/Project 897). Mr. Jeff Sargent, director of community development, stated this item is similar action as Council Item 8.4 except it is the "indemnification provisions" in the purchase and redevelopment agreement. RESOLUTION 2016-01 Commissioner Hoffe introduced the following resolution and moved its Item 4 adoption "RESOLUTION APPROVING NON -ENFORCEMENT AGREEMENT WITH MINNESOTA HOUSING FINANCE AGENCY REGARDING INDEMNIFICATION PROVISIONS IN PURCHASE AND REDEVELOPMENT AGREEMENT FOR "COMPASS POINTE" DEVELOPMENT — 6113 WEST BROADWAY (NEW HOPE PLANNING CASE 14-03/PROJECT 897)." The motion for the adoption of the foregoing resolution was seconded by Commissioner Elder, and upon vote being taken thereon, the following voted in favor thereof: Hemken, Elder, Hoffe, Lammle, London; and the following voted against the same: None; Abstained: None; Absent: None; whereupon the resolution was declared duly passed and adopted, signed by the president which was attested to by the executive director. EDA Meeting Page 1 January 11, 2016 IMP. PROJECT 973 President Hemken introduced for discussion EDA Item 5, Resolution Item 5 approving contract with Scott's Tree Service for tree removal and stump grinding at 6065 Louisiana Avenue North (project no. 973). Mr. Aaron Chirpich, community development specialist, requested Council enter into a contract s with Scott's Tree Service for $6,000 for removal of trees and stump grinding at 6065 Louisiana Avenue North to prepare the site for redevelopment. He stated the city has utilized services of Scott's Tree Service in the past with good results. He EDA funds would be used for the expenses but would be reimbursed with CDBG funds. Commissioner Elder inquired of the quantity of trees to be removed. Mr. Chirpich stated the contract includes two large cottonwood trees and a variety of 15 smaller trees. RESOLUTION 2016-02 Commissioner Elder introduced the following resolution and moved its Item 5 adoption "RESOLUTION APPROVING CONTRACT WITH SCOTT'S TREE SERVICE FOR TREE REMOVAL AND STUMP GRINDING AT 6065 LOUISIANA AVENUE NORTH (PROJECT NO. 973)." The motion for the adoption of the foregoing resolution was seconded by Commissioner London, and upon vote being taken thereon, the following voted in favor thereof: Hemken, Elder, Hoffe, Lammle, London; and the following voted against the same: None; Abstained: None; Absent: None; whereupon the resolution was declared duly passed and adopted, signed by the president which was attested to by the executive director. IMP. PROJECT 973 President Hemken introduced for discussion EDA Item 6, Resolution Item 6 approving contract with Robinson Environmental Inc., for hazardous material abatement at 6065 Louisiana Avenue North (project no. 973). Mr. Aaron Chirpich, community development specialist, explained a demolition survey was recently completed by Angstrom Analytical Inc. for the property at 6065 Louisiana Avenue North to identify any hazardous materials. He stated the survey was utilized to solicit quotes from contractors to remove the identified hazardous materials. He indicated three bids were received, and the low bid for hazardous material abatement was received by Robinson Environmental for $6,300. Mr. Chirpich stated the work is necessary to prepare the site for redevelopment. He stated the city has not worked with Robinson Environmental in the past, but Angstrom Analytical Inc. provided a good reference. He stated EDA funds would be used for the expenses but would be reimbursed with CDBG funds. RESOLUTION 2016-03 Commissioner London introduced the following resolution and moved its Item 6 adoption "RESOLUTION APPROVING CONTRACT WITH ROBINSON ENVIRONMENTAL INC., FOR HAZARDOUS MATERIAL ABATEMENT AT 6065 LOUISIANA AVENUE NORTH (PROJECT NO. 973)." The motion for the adoption of the foregoing resolution was seconded by Commissioner Lammle, and upon vote being taken thereon, the following voted in favor thereof: Hemken, Elder, Hoffe, Lammle, London; and the following voted against the same: None; Abstained: None; Absent: None; whereupon the EDA Meeting Page 2 January 11, 2016 resolution was declared duly passed and adopted, signed by the president which was attested to by the executive director. ADJOURNMENT Motion was made by Commissioner London, seconded by Commissioner Elder, to adjourn the meeting. All present voted in favor. Motion carried. The New Hope EDA adjourned at 8:05 p.m. Respectfully submitted, Valerie Leone, City Clerk EDA Meeting Page 3 January 11, 2016 Request for Action January 25, 2016 Approved by: Kirk McDonald, City Manager Originating Department: Community Development By: Aaron Chirpich, CD Specialist Agenda Section EDA Agenda Title Resolution approving survey contract for 6065 Louisiana Ave. N. (improvement project no 973) Item :Number 4 Requested Action Staff requests approval of a resolution awarding a contract for survey work at 6065 Louisiana Avenue North, to the low and responsible bidder, The Gregory Group, Inc. d/b/a Lot Surveys Company, in the amount of $3,500. Policy/Past Practice When public bidding is required as part of the Scattered Site Housing Program, it is practice of staff to present contracts to the EDA for consideration. Background The City has recently acquired the single family home located at 6065 Louisiana Ave N, as part of the Scattered Site Housing Program. The EDA has directed staff to take the necessary steps in preparing the property to be subdivided in order to facilitate the creation of two buildable lots. The property is currently un -platted. Before the new lots can be resold, the property will have to be platted in conjunction with the subdivision. The contracted surveyor will provide all necessary documents required to complete the lot split and record the new plat with Hennepin County. Staff received two bids for the project. The results are as follows: Kurth Surveying, LLC $4,913 The Gregory Group, Inc. d/b/a Lot Surveys Company $3,500 Funding EDA funds will be used to pay for this project on the front end. Following the sale of the vacant lots, the EDA will be reimbursed by Hennepin County with Community Development Block Grant funds for all eligible costs. Attachments • Resolution • Bids Received I:\RFA\COMM DEV\Development\6065 Louisiana Approve Survey Contract Project 973.docx EDA RESOLUTION NO. 16 - RESOLUTION APPROVING SURVEY CONTRACT FOR 6065 LOUISIANA AVE. N. (IMPROVEMENT PROJECT NO. 973) BE IT RESOLVED by the Economic Development Authority in and for the City of New Hope as follows: WHEREAS, the Economic Development Authority ("EDA") in and for the City of New Hope, purchased the residential property located at 6065 Louisiana Avenue North, New Hope (the "Property"); and WHEREAS, as part of the demolition process, competitive bids have been secured for a survey of the Property. A contract has been prepared with the lowest responsible bidder for the survey work as the listed contractor (the "Contract"), specifically as follows: The Gregory Group, Inc. d/b/a Lot Surveys Company, with a bid amount of $3,500.00. WHEREAS, City staff has reviewed the Contract and is agreeable with the terms, believing the Contract to be in the best interest of redeveloping this Property for the benefit of the EDA and the City; and WHEREAS, this Contract is a strategic piece of the scattered site housing program and policy. NOW, THEREFORE, BE IT RESOLVED by the Economic Development Authority in and for the City of New Hope as follows: Attest: 1. The EDA in and for the City of New Hope hereby approves the Contract attached hereto as Exhibit A, it being in the best interest of the City to engage the contractor to perform the survey work. 2. The President, Executive Director and New Hope City staff are authorized and directed to sign the Contract, and to take whatever additional actions are necessary or desirable, in accordance with the Contract attached hereto as Exhibit A. Dated the day of January, 2016. Kirk McDonald, Executive Director Kath.i Hemken, President The Gregory Group, Inc. dba Lot Surveys Company, Inc. REGISTERED UNDER THE LAWS OF THE STATE OFWNWESOTA Gregory R Prasch 7601 73' Aven ue North ,YIN Reg. No. 24992 Minneapolis, MN 55428 Phone: 763-560-3093/Fax: 763-560-3522 December 21, 2015 Established in1962 Mr. Aaron Chirpich c/o City of New Hope 4401 Xylon Ave No New Hope, MN 55428 RE: 6065 Louisiana Ave No. New Hope MN PID# 05118-21-21-0017 Part of the NEIA of the NW1/4 Section 5 Twp 118, Range 21 Dear Mr, Chirpich, As you requested I have researched the cost of providing the following services: 1. Verify Hennepin County section corner locations for section 5. 2. Boundary survey (verify existing corner locations and/or set missing corners). 3. Topography with 2 foot contours. 4. Locate visible improvements. 5. Prepare a two lot preliminary plat for City review. 6. Prepare a two lot final plat for City and County review. 7. Provide all plat corrections necessary to meet Hennepin County final plat approval. 8. Provide Mylar of final plat for recording purposes, 9. Set new lot corners. The cost of the above items is $3,500.00. We are available to commence with these services immediately following your authorization. All fees associated with the approval and recording process are the responsibility of the City of New Hope. Thank you for considering us for these services, we look forward to working together with you to make this a successful project. Best Regards, 9 '4.-W.7!1 � O Gregory R. Prasch President Authorization to proceed this day of Signed it, s 2015. ESTIMATING WORKSHEET KURTH SURVEYING, INC. FILE NAME: New Hope Plat CLIENT: City of New Hope DATE: 12-17-15 DESCRIPTION: Split lot at 6065 Louisiana Ave - plat for recording PROCEDURE CREW HRLY RATE HOURS EST. COST PRELIMINARY RESEARCH 1 95 1 95 SKETCH & DESIGN LAYOUT (1) 1 95 0 0 CITY & COUNTY FILES 1 95 2 190 BOUNDARY COMPS 1 95 3 285 BOUNDARY SURVEY 2 165 5 825 BOUNDARY DRAWING 1 75 2 150 TOPO [FIELD] 2 165 1 165 TOPO [DRAWING] 1 75 2 150 WETLAND LOCATIONS 2 165 0 0 WETLAND DRAWINGS 1 75 0 0 TREE LOCATIONS 1 165 0 0 TREE DRAWINGS ? 75 0 0 BORING HOLE LOCATIONS 2 165 0 0 BORING & SEPTIC DRAWINGS 75 0 0 PRELIMINARY PLAT DRAWINGS 75 6 450 GRADING PLAN DESIGN (5) 95 0 0 GRADING PLAN DRAWING (5) 75 0 0 UTILITY PLAN DESIGN (5) 1 95 0 0 UTILITY PLAN DRAWING (5) 1 75 0 0 GRADE STAKING [SITE] 2 165 0 0 GRADE STAKING [ROAD] (4) 2 165 0 0 PUBLIC UTILITY STAKING 2 165 0 0 SANITARY SEWER STAKING 2 165 0 0 STORM SEWER STAKING 2 165 0 0 WATERMAIN STAKING 2 165 0 0 CURB STAKING 2 165 0 0 COUNTY PLAT CHECKING FEE (2) 1 415 1.2 498 FINAL PLAT COMPUTATIONS 1 95 2 190 FINAL PLAT DRAWING & REVISIONS 1 75 10 750 PLAT STAKING (3) 2 165 3 495 AS BUILT LOCATIONS 2 165 0 0 AS BUILT DRAWINGS 1 75 0 0 REPRODUCTION COSTS (2) 1 400 1.2 480 INDV. LOT CERTIFICATES EACH 95 2 190 INDV. BLDG. STAKINGS EACH 800 0 0 ESTIMATED TOTAL COST 4913 (1) BASED ON PER DRAWING (2) 20% HANDLING FEE ADDED IF PAID BY KSI -CLIENT HAS OPTION OF PAYING DIRECT (3) BASED ON STAKING OF CORNERS ONCE (4) BASED ON STAKING OF ROAD TWICE (1.SUBGRADE PREPERATION 2. GRAVEL GRADE) (5) THESE COSTS ARE FOR PRELIMINARY DESIGN & DRAFTING PURPOSES ONLY. KURTH SURVEYING IS A LAND SURVEYING FIRM AND HAS NO CIVIL ENGINEER ON STAFF TO PREPARE FINAL ENGINEERING PLANS, SPECIFICATIONS OR CONTRACTS. THESE PLANS WILL BE PREPARED BY EITHER THE MUNICIPALITIES CONSULTING CIVIL ENGINEERS OR THE PRIVATE CIVIL ENGINEER HIRED BY THE OWNER/DEVELOPER