Loading...
IP #889. the full report or. City Council agenda packets and/or m 0 0 P n n i n I a k9A C c) m m I c) n , ?.,genda packets, PROJECT NO. 889 Res. 11 -100 7/25/11 Resolution approving a joint powers agreement with city of Crystal for resurfacing of 58th Avenue North, Rhode Island Avenue North, Pennsylvania Avenue North and Maryland Avenue North (Crystal 2011, Phase 11 Broadway Park street reconstruction project and New Hope improvement project no. 889) COUNCIL Request for Action Originating Department Approved for Agenda Agenda Section Public Works July 25, 2011 Consent Item No. By: Guy Johnson By: Kirk McDonald, City Manager 6.6 Resolution approving a joint powers agreement between the city of New Hope and the city of Crystal for resurfacing of 58th Avenue North, Rhode Island Avenue North, Pennsylvania Avenue North and Maryland Avenue North (Crystal 2011, Phase 11 Broadway Park street reconstruction project and New Hope improvement project No. 889) Requested Action Staff requests approval of a resolution approving a joint powers agreement between the city of New Hope and the city of Crystal for resurfacing of 58th Avenue, Rhode Island Avenue, Pennsylvania Avenue and Maryland Avenue, and associated utility improvements. Policy /Past Practice Because of economics and efficiencies, the city of New Hope has participated with neighboring cities on street infrastructure projects, with regards to boundary streets, for many years. Background The attached agreement sets forth the obligations of the city of Crystal and the city of New Hope in undertaking the project. The proposed improvements are in the area of 58th Avenue, Sumter Avenue, Rhode Island Avenue, Pennsylvania Avenue and Maryland Avenue, north of Bass Lake Road. The agreement establishes that the city of Crystal is the lead agency and is responsible for bidding the project and managing the construction. Besides resurfacing the streets, the project will also include spot curb and gutter replacement and storm water infrastructure improvements wherever necessary. The Sumter Avenue improvements only involve signage and paint striping. The cities of Crystal and New Hope resurfaced Sumter Avenue through a joint powers agreement in 2009. The project will also allow 58th Avenue and Sumter Avenue to be designated Minnesota State Aid streets. , Motion by ( 1 Second by l:\RFA\PUBW0RKS\2011\889 Crystal Agreement. doc Request for Action July 25, 2011 Page 2 Funding The city of New Hope engineers and the city of Crystal engineers estimate the total cost to be $106,527.99 for the city of New Hope's portion. The breakdown of estimated revenue sources for New Hope's portion of the Crystal project is: • State Aid fund • Street infrastructure fund $53,053.33 $51,091.08 • Storm water fund $1,448.35 • Water Fund $935.23 Total estimated revenue for contract $106,527.99 Final cost will be apportioned in accordance with the engineer's cost estimate. The city of New Hope will reimburse the city of Crystal for its portion of the improvements along these streets. Attachments Copies of the resolution, a map of the improvement area, and the agreement with Appendix "A" are attached. I: \ RFA\ PUBWORKS\ 2011 \ 889 Crystal Agreement.doc City of New Hope Resolution No. 11— 100 Resolution approving a joint powers agreement between the city of New Hope and the city of Crystal for resurfacing of 58th Avenue North, Rhode Island Avenue North, Pennsylvania Avenue North and Maryland Avenue North (Crystal 2011, Phase 11 Broadway Park street reconstruction project and New Hope improvement project no. 889) WHEREAS, the city of New Hope and the city of Crystal have been negotiating to bring about improvements on 58th Avenue North between Sumter Avenue North and West Broadway; Rhode Island Avenue North, Pennsylvania Avenue North and Maryland Avenue North, north of Bass Lake Road; and, WHEREAS, said improvements include reclamation of the existing bituminous roadway, spot concrete curb and gutter replacement, and storm water infrastructure improvements wherever necessary; and, WHEREAS, the city of Crystal, through its consultant SEH Inc., has prepared plans and specifications for the improvements to be completed; and, WHEREAS, a joint powers agreement has been prepared between the city of New Hope and the city of Crystal setting forth the scope of work, terms, and conditions for sharing project costs. NOW, THEREFORE, BE IT RESOLVED by the City Council of the city of New Hope, Minnesota: 1. That the above recitals are incorporated herein by reference. 2. That the joint powers agreement between the city of New Hope and the city of Crystal for Crystal 2011, Phase 11 Broadway Park street reconstruction project is approved. 3. The mayor and city manager (the "Officers ") are authorized and directed to sign the same on behalf of the city when the following condition is met: Substantial conformance of the joint powers agreement to the form of agreement presented to the Council as of this date, with such additions and /or modifications as the Officers may deem necessary or desirable as evidenced by their execution thereof. Adopted by the City Council of the city of New Hope, Hennepin County, Minnesota this 25th day of July, 2011. Attest: C City Clerk u Mayor X ai CL CO fn cu N 0 0 Cn -1 CL cc (Y) 9 � w < 00 CY) Q) E O CU 5(o T732 7724 7716 77D8 T700 7624 7616 5957, sg6s 5973 5981 i 7532 5949 7416 7408 7516; 7508 R40 7414 I I 41 7400 5941 - 59TH PI ArF N 1432 '3 5933 5940 5932 7725 771 71 7709 17701 7625 17617 j 7609 r 7601 1 — -z 5932 `7509 5925 5925 24 5 ----------- 7425 7417 $ 5917 591 1 1 1 6 5917 7724 7716 7708 7700 7624 7616 f 7608 '�5909 5908 7732 5911 . . ........ 5909 5908 5909 , /7600 f i ! 17400 Broadway . ........ .. 7524 �7516 7 1 7408 5901 5900 5901 50 8 5901 5900 Park 17625 I AV 21 -11 7709 7701 VE N 5856 5895 1 7617 59TH AVE N 5 ........... 1,-, 7609 849 5848 5887 k 5156 51357 7601 5857 5856 5857 M5 . . ........ 5 5872 5864 5856 . ......... 5841 5840 5879 5848 5849 I f 5848 5849 5848 5849 5848 5849 ... ........... ............ 5833 5841 5832 5871 5840 5841 5840 5841 5840 5841 0 low, .. ........ 5839 5847 .. ............. 5-8. 5863 5855 5840 5832 5832 5833 -5831 5833 2 5832 5833 5832 1 5833 0 ............. 5817 7832 T­ 5824 5825 5 5824 5825 5824 5825 78% 1 1 1 5 5824 R OB 7732 7724 7716 780D 5824 5825 7700 5809 "15 5817 Z 5816 5817 5816 5817 5816 5817 Z 5816 01 ... ........... . .................... 7206 58TH PL N 5808 5809 5808 7216 5 09 5808 5809 5808 5809 1 7226 �7825 58 I -K -- — Ao --- ------ 1171 T725 T7 301 7801 7733 09 - 5�0 5801 5800 5801 5800 5801 5800 T701 0 iii - - - - - - 7215 58TH AVE N 5764 5765 5753 5748 5749 5748 5757 5756 5752 5757 5756 ...... . ... 5755 5756 .......... .......... 5757 5743 5749 5748 5749 5748 - - - , 5748 ¢ 5737 5741 5740 0 5741 5740 5749 5740 574 5731 5741 5733 5732 5733 5732 5732 ............ 5725 5733 ..... .. ... . . .......... ....... ... j 57 5725 5724 5725 $724 5724 b119 5718 5725 37 .......... . ......... 5713 5712 5717 5717 < 5716 5716 5717 5716 1 1 i ..... . .... . ..... . ...... ... 5707 z 5706 5709 5708 16 jj� 5708 1 5709 5708 5701 < 5700 5709 5700 5701 z 5700 1r X09 5701 > 5700 5701 z . . . . . ........... 5661 5660 Z t. ---- 5676 5673 5657 5655 5657 5656 5656 5654 . ......... z 1111 1701 1665 5649 5648 5141 0 5648 5649 5648 5660 V 56th 5643 5642 5 64 1 5640 5641 5640 5652 5637 5636 --- 5649 .......... . ........ 5633 5632 i5633 5632 5631 5630 ......... .......... . 5644 : 541 ............... 5625 5624 5624 5625 5624 5625 5641 13 5819 , 5617 5616 5625 7000 561 5606 1 5609 5608 333 ... . ..... . .,�� -. r,'�s -.: ,< � t, , ��. _ xim'�.:.,.r cGn, �� _ r., -.k' :�� _ � �� ,.�_� _ ...7i �. _ � 5600 ff__ 5601 f 5600 Ri 5629 zl >f 6830 FILE NO. PHASE 11 A CRYST112734 RYS7AL LOCATION MAP 0 200 400 FIGURE I -= Feet August 1, 2011 Ms. Anne Norris City Manager City of Crystal 4141 Douglas Drive N. Crystal, MN 55422 Subject: Joint Powers Agreement — 2011 Broadway Park street reconstruction project At its meeting of July 25, 2011, the New Hope City Council approved the fore- mentioned agreement. Enclosed is an agreement executed by New Hope officials. After Crystal officials sign the document, please return a fully executed copy to my attention. It is understood that New Hope's estimated cost is $106,527.99. Please continue to coordinate the project with Public Works Director Guy Johnson. Thank you. Sincerely, s Valerie Leone, CMC City Clerk Enc. cc: Guy Johnson, director of public works Kirk McDonald, city manager CITY OF NEw HOPE 4401 Xylon Avenue North * New Hope, Minnesota 55428 -4898 ® www. ci.new- hope.mn.us City Hall: 763- 531 -5100 o Police (non - emergency): 763 - 531 -5170 # Public Works: 763- 592 -6777 * TDD: 763- 531 -5109 City Hall .Fax: 763 - 531 -5136 # Police Fax: 763-531-5174 Public Works Fax: 763 -592 -6776 2011 BROADWAY PARK STREET RECONSTRUCTION CRYSTAL — NEW HOPE JOINT POWERS AGREEMENT THIS AGREEMENT ("Agreement") is made and entered into effective as of the day of J( L - 2011, by and between the City of Crystal, a municipal a corporation under the laws of the State of Minnesota (hereinafter "Crystal"), and the City of New Hope, a municipal corporation under the laws of the State of Minnesota (hereinafter "New Hope"), collectively referred to as the "Cities" and individually as a "City ". WITNESSETH: WHEREAS, the Cities have been negotiating to bring about the improvement of portions of 58th, Maryland, Pennsylvania, and Rhode Island Avenues North; and WHEREAS, the above mentions streets have common borders between New Hope and Crystal and hereinafter shall be referred to as the "Border Streets"; and WHEREAS, the scope of work that has been negotiated between the Cities is as shown on the plans for Crystal's street improvement project entitled "Crystal 2011 Phase 11 Broadway Park Street Reconstruction - #2010 -11" (hereinafter "the Project") which improvement project contemplates and includes street improvements and related work; and WHEREAS, the Border Streets part of the Project lie within the corporate limits of the Cities of Crystal and New Hope; and WHEREAS, Crystal has prepared plans and specifications for the construction of said project; and WHEREAS, Crystal has prepared a post bid cost estimate for the Project which estimate shows the total project cost to New Hope as detailed in Exhibit A, attached hereto and made a part hereof. The New Hope project cost estimate share includes Eighty -eight Thousand, Seven Hundred and Seventy -three Dollars and Thirty -three Cents ($88,773.33) in bid costs for the parts of the Border Streets which are in /adjacent to New Hope; and WHEREAS, New Hope has indicated its willingness to approve Crystal's plans and specifications for the Project and has further indicated its willingness to participate in the total project costs; and WHEREAS, it is contemplated that said the aforementioned project will be carried out by the Cities under the provisions of Minn. Stat § 471.59. NOW, THEREFORE, IT IS HEREBY AGREED: Q Crystal has advertised for bids for the Project, has received and opened bids pursuant to said advertisement and has entered into or will enter into one or more contracts with the successful bidder(s) at the unit prices specified in the bid(s) of such bidder(s), all according to the procedures set forth in Minn. Stat Chapter 429. The contract(s) will include the plans and specifications prepared by Crystal and /or its agents for the Project, which plans and specifications, as the same may be amended from time to time, are by this reference made a part of this Agreement. II. Crystal will administer all aspects of the Project and will inspect all completed work. The City Engineer of New Hope shall cooperate with the Crystal Engineer and the Crystal Engineer's staff upon request, to the extent necessary, to aid in 2 administration of the Project but will have no responsibility for the supervision of any of the work contemplated by this Agreement. M. The Cities agree that Crystal may, within the general scope of the original plans for the Project, make changes in the plan specifications or in the character of the intended improvements. Said changes may include changes which alter the proportionate cost sharing originally envisioned by Crystal and New Hope, provided that such changes are reasonably necessary to cause work for the Project to be in all things performed and contemplated in a satisfactory manner. It is further agreed by the Cities that Crystal may carry out the changes authorized by this paragraph by entering into change orders or supplemental agreements with Crystal's contractor(s) for the performance of any additional project work, including but not limited to contracts for new construction or for construction occasioned by any necessary, advantageous or desirable changes in the original project plans. nal New Hope agrees to grant temporary construction easements to Crystal over those lands owned by New Hope that are a part of the required right -of -way for the construction contemplated by this Agreement. Said easements shall be granted at no cost to Crystal. N New Hope shall reimburse Crystal for New Hope's share of the total project costs for work related to the portions of the Border Streets located within New Hope, and the total final project costs for said parts of the Project shall be under the terms and 3 provisions defined in the Crystal Engineer's initial project cost estimate and as further set forth in Exhibit A of this Agreement. V1. Project costs to be apportioned between the Cities pursuant to this Agreement shall include a fee of 20% of New Hope's costs for construction, said fee to compensate Crystal for a portion of its legal, engineering, and administrative costs relating to the Project. This brings the total estimated cost to New Hope to One Hundred Six Thousand, Five Hundred and Twenty Eight Dollars ($106,528,00). It is further agreed that the Crystal Engineer's estimate set forth as Exhibit A of this Agreement is an estimate of only the construction costs for the work contemplated by this Agreement and that the unit prices set forth in the contract with the successful bidder(s) and the final quantities as measured by the Crystal Engineer shall govern in computing the total final contract construction cost and the related apportionment contemplated by this Agreement. V11. Within sixty (60) days after the latter of an award by Crystal to the successful bidder(s) or approval of this Agreement, New Hope shall deposit with the Crystal Director of Finance ninety percent (90%) of New Hope's estimated share of the construction costs for the construction contemplated by this Agreement. Said estimated share shall be based on actual contract unit prices for estimated quantities shown on Crystal's plans for the Project. The remaining ten percent (10%) is to be paid to Crystal upon the completion of the project and submittal to New Hope of a copy of the Crystal Engineer's final cost 4 report for the project, which report shall show each City's final shares of construction, engineering and other project costs. Upon payment by Crystal of the final amount due to the successful bidder(s), any amount remaining as a balance between the amount deposited and the final share of project costs for New Hope will be returned to New Hope. Likewise any amount due Crystal by New Hope after payment by Crystal of the final amount due to the successful bidder(s) shall then be paid by New Hope as its final payment for the construction cost of the project. VIII. In the event, after consultation with and approval by the New Hope Engineering staff, the Crystal Engineer and /or the Crystal Engineer's staff determine the need to amend any project contract with a supplemental agreement or with a change order which results in an increase in that contract amount, New Hope hereby agrees to remit, within thirty (30) days of notification by Crystal of any such change, an amount equal to ninety percent (90 %) of the estimated New Hope share as documented in the supplemental agreement or change order. The remaining ten percent (10 %) of New Hope's share is to be paid to Crystal upon the completion of the Project and submittal to New Hope of a copy of the Crystal Engineer's final report for the project showing each City's final shares of construction, engineering and other project costs. IX. Record drawings shall be provided by Crystal to New Hope within 90 days of Crystal's final payment to the contractor(s) retained to complete work for the Project. All records kept by a City with respect to this Agreement shall, except to the extent 5 protected by attorney client privilege, be subject to examination by the representatives of the other City. X. It is agreed that each City shall, its own expense, remove and replace all of its respectively owned signs that are within the construction limits of the Project. Removal and replacement operations shall be coordinated with the project construction activities through the Crystal Project Engineer. XI. If detouring of traffic is necessary during the construction contemplated by this Agreement, the detour routes shall be mutually agreed upon by the Cities. All guide signs, regulatory signs and pavement markings shall be furnished, installed and maintained by Crystal's contractor(s) as part of the construction contract(s) managed by Crystal. Crystal will not be responsible for any damage caused by increased traffic generated on any municipal streets as a result of the construction contemplated by this Agreement. XII. The intent of this section is to limit a party's obligation to indemnify the other party. Except as provided in Paragraph XIII, Crystal shall assume liability for all claims arising out of the Project. Crystal shall indemnify, defend and hold harmless New Hope from any loss, liability, cost, damage and claim arising from any act or omission on the part of its officers, employees, agents, contractor or representatives in connection with the Project, including any attorney fees and expenses incurred in defending any such claim, to the extent of Crystal's statutory liability described in Minn. Stat. § 466.04, as 6 amended. The liability limitations established in Minn. Stat. § 466.04 shall apply to undertakings pursuant to this Agreement, and no individual or entity may seek to increase recovery beyond the statutory amounts applicable to a single party set forth in Minn. Stat. § 466.04 by attempting to aggregate the statutory amounts to increase the maximum amount of liability for any party. No party to this Agreement shall be required to pay on behalf of itself and to the other party any amount as indemnification to the party, arising pursuant to this Agreement, expressly, by operation of law or otherwise, in excess of the limits of liability applicable to the party required to pay as established in Minnesota Statutes Chapter 466, or in the event that Minnesota Statutes Chapter 466 does not apply, the maximum amount of insurance coverage available to the party required to pay. In those instances in which a party is directly liable for damages as well as for indemnification to the other party, the combined liability of the party will not exceed the limits of liability under Minnesota Statutes Chapter 466 applicable to the liable party or in the event that Minnesota Statutes Chapter 466 does not apply, the maximum amount of insurance coverage available to the liable party. New Hope shall indemnify, defend and hold harmless Crystal from any loss, liability, cost, damage and claim arising from any act or omission on the part of its officers, employees, agents, contractor or representatives arising solely from a specific action it takes under this Agreement which results in a liability claim(s), including any attorney fees and expenses incurred in defending any such claim, to the extent of New Hope's statutory liability described in Minn. Stat. § 466.04, as amended. Nothing herein shall change or otherwise affect the liability limits established under Minn. Statute § 466.04, as amended. No party to this Agreement shall be required to pay on behalf of itself and to the other party any amount as indemnification to the party, arising pursuant to this Agreement, expressly, by operation of law or otherwise, in excess of the limits of liability applicable to the party required to pay as established in Minnesota Statutes Chapter 466, or in the event that Minnesota Statutes Chapter 466 does not apply, the maximum amount of insurance coverage available to the party required to pay. In those instances in which a party is directly liable for damages as well as for indemnification to the other party, the combined liability of the party will not exceed the limits of liability under Minnesota Statutes Chapter 466 applicable to the liable party or in the event that Minnesota Statutes Chapter 466 does not apply, the maximum amount of insurance coverage available to the liable party. XIII. It is further agreed that any and all employees of each City and all other persons engaged by that City in the performance of any work or services required or provided as contemplated by this Agreement shall not be considered employees of the other City, and that any and all claims that may or might arise under the Worker's Compensation Act or the Unemployment Compensation Act of the State of Minnesota on behalf of said employees while so engaged and any and all claims made by any third parties as a consequence of any act or omission on the part of said employees while so engaged on any of the work or services provided as contemplated by this Agreement shall in no way be the obligation or responsibility of the other City. 0"It The provisions of Minn. Stat § 181.59 and of any applicable local ordinance relating to civil rights and discrimination shall be considered a part of this Agreement as though fully set forth herein. 8 IN TESTIMONY WHEREOF, the parties hereto have caused this Agreement to be executed by their respective duly authorized officers as of the day and year first above written, CITY OF CRYSTAL CITY OF NEW HOPE By: By: 4a �6 bAman Kat i Hernken Its: Mayor 1 Its ayor By: By: And6 Norris Kirk McDonald it%' Manager Its: Manager I:Pubworks/projects/Phase 1 1/NewHopeJPAdraftl (sas revisions).doo P:\Attorney\SAS\l Client Files\2 City of New Hope\99-10030 (Public Works general)\NewHopeJPAdraft1 (sas revisions).doc 9 _A SEH CRYSTAL, MINNESOTA 2011 - BROADWAY PARK STREET RECONSTRUCTION CITY PROJECT NO. 2010 -11 SEH NO. CRYST114482 Opinion of Probable Cost based on Palda and Son's Low Bid Costs Date: May 10, 2011 Revised: July 6, 2011 ; July 8, 2011 P: WE% ClCry s9tt44$2L5FinaADt/y�*Opinion Cost New Hope vriT MDandP -C.s PHASE tt Low Bia.dv]Opmion Cost LINE NO. ITEM NO. ITEM DESCRIPTION UNIT TOTAL ESTIMATED NEW HOPE QUANTITIES UNIT COST TOTAL ESTIMATED NEW HOPE COST MSA LOCAL NEW HOPE NEW HOPE _ AVEN 58TH AVEN U E S "..'1AUMTE P _ SAP. 182-115-00 STREET STREET STORM STREET EST7 COST EST COST EST COST EST COST 1 2021.501 MOBILIZATION LS 0.03 $382,300.00 $11 469.00 0.01 $3,823.00 0.01 $3 0.01 $3 2 2101.502 CLEARING TREE $150.00 3 2101.502 CLEARING - SPECIAL TREE 1.00 $150.00 $150.00 1 $150.00 4 2101.507 GRUBBING TREE $150.00 5 2101.507 GRUBBING - SPECIAL TREE 1.00 $150.00 $150.00 1 $150.00 6 2104.501 REMOVE CONCRETE CURB AND GUTTER LIN FT 660.00 $3.06 $2,01 9.60 330 $1,009.80 330 $1,009,80 7 2104.501 REMOVE AND REPLACE CONCRETE CURB AND LIN FT $18.84 8 2104.501 REMOVE PIPE STORM SEWER LIN FT 64.00 $5.12 $327.66 64 $327.68 9 2104.501 REMOVE AND REPLACE WATER SERVICE PIPE LIN FT $50.00 10 2104.503 REMOVE RETAINING WALL SO FT $5.00 11 2104.503 REMOVE CONCRETE WALK SO FT $1.00 12 2104.503 REMOVE AND REPLACE CONCRETE WALK SO FT $426 13 2104,505 REMOVE CONCRETE APRON SO YD 15.00 $4.01 $60.15 15 $60.15 14 2104.505 REMOVE CONCRETE DRIVEWAY PAVEMENT SO YD 200.00 $4.01 $802.00 200 $802.00 15 2104.505 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SO YD 230.00 $2.51 $577.30 230 $577.30 16 2104.505 REMOVE AND REPLACE CONCRETE APRON SO YD $45.76 17 2104.509 REMOVE DRAINAGE STRUCTURE EACH 1.00 $225.00 $225.00 1 $225.00 18 2104.511 SAWING CONCRETE PAVEMENT LIN FT 60.00 $3.50 $210.00 1 60 $210.00 19 2104.513 SAWING BITUMINOUS PAVEMENT LIN FT 85.00 $2.20 $187.00 85 $187.00 20 2104.521 SALVAGE SPLIT RAIL FENCE LIN FT $3.50 21 2104.521 SALVAGE CHAIN LINK FENCE LIN FT $3.50 22 2104.521 SALVAGE WOOD FENCE LIN FT $5.00 23 2104.523 'SALVAGE CASTING EACH 1.00 $25.00 $25.00 1 $25.00 24 2104.523 SALVAGE SIGNS -TYPE SPECIAL EACH $20.00 25 2104.523 (SALVAGE SIGN, l'YPE "C" EACH $18.00 26 2104.601 JAGGREGATE BASE HANDLING CLASS 7 LUMP SUM 0.02 $1.00 $0.02 0.02 $0.02 27 2104.618 'SALVAGE BRICK PAVERS SO FT $5.00 28 2105.501 COMMON EXCAVATION EV P CU YD 606.00 $4.36 $2.642.16 236 $1.028,96 370 $1,613.20 29 2105.501 COMMON EXCAVATION - RAIN GARDENS AND DRAINAGE SWALES EV CU YD $19.77 30 2105.501 PRIVATE DRIVEWAY WIDENING EXCAVATION (EV) CU YD $25.00 31 2105.507 SUBGRADE EXCAVATION E CU YD 167.00 $5.43 $906.81 67 $363.81 100 $543.00 32 2105.522 SELECT GRANULAR BORROW C CU YD 167.00 $0.01 $1.67 67 $0.67 100 $1.00 33 2105.523 COMMON BORROW (CV )(P) CU YD 6.00 $1.00 $6.00 4 $4.00 2 $2.00 34 2105.525 TOPSOIL BORROW LV CU YD 131_00 $0.01 $1.31 89 $0.89 42 $0.42 35 2105.543 STABILIZING AGGREGATE TON $30.00 36 2105.607 PRIVATE DRIVEWAY SUBGRADE CORRECTION CU YD $25.00 37 2106.605 TILL BOULEVARD SUBGRADE SO YD $0.15 38 2111.501 TEST ROLLING RD STA $1.00 _ 39 2112.501 SUBGRADE PREPARATION RD STA $1.00 40 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 5.00 $135.00 $675.00 5 $675.00 41 2130.501 WATE FOR DUST CONTROL AGGREGATE M GALS 20.00 $25.00 $500.00 20 $500.00 42 2211.501 BASE CLASS 5 TON 467.00 $6.93 $3 236.31 270 $1 871.10 197 $1 365.21 43 2211.607 AGGREGATE BASE PLACED, CLASS 7 C CU YD 105.00 $9.91 $1 040.55 105 $1 Page t of 4 LINE NO. ITEM NO. ITEM DESCRIPTION UNIT TOTAL ESTIMATED NEW HOPE QUANTITIES UNIT COST TOTAL ESTIMATED NEW HOPE COST MSA LOCAL NEW HOPE NEW HOPE $8TH AVENUE SUMTERAVENUE S.A.P. 182- 116 -001 SAP. 182 -115 -00 STREET STREET STORM STREET EST COST EST COST EST COST EST COST 44 1 2232.501 IMILL BITUMINOUS SURFACE 1.5" SO YD 133.00 1 $2.50 $332.50 23 $57.50 110 $275.00 45 1 2331.603 1 SAW AND SEAL TRANSVERSE CRACK CONTROL JOINTS LIN FT 400.00 $1.99 5796.00 100 $199.00 300 $597.00 46 2331.604 AGGREGATE BASE, CLASS 7, FULL DEPTH RECYCLED PRODUCTION SO YD 1,154.00 $0.82 $946.28 538 $441.16 616 $505.12 47 2331.604 BITUMINOUS PAVEMENT BREAKUP REPAIR SO YD 30.00 $54.35 $1 30 $1,630.50 48 2331.604 2.5 IN. WEARING COURSE MIXTURE FOR SO YD 100.00 $17.00 $1,700.00 100 $1.700.00 49 2331.604 PRIVATE DRIVEWAY BITUMINOUS PAVING SO YD $24.08 50 2350,502 TYPE LVWE35030C WEARING COURSE MIXTURE TON 68.00 $38.10 $2,590.80 68 $2,590.80 51 2350.502 TYPE LVNW360308 NON WEARING COURSE MIXTURE TON 90.00 $30.80 $2,772.00 90 $2 52 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALS 44.00 $4.70 $206.80 34 $159.80 10 $47.00 53 2360.501 TYPE SPWEB240C WEARING COURSE MIXTURE TON 123.00 $41.00 $5.043.00. 123 $5,043,00 54 2411.603 INSTALL OR REPLACE CONCRETE STEPS LIN FT 7.00 $49.00 $343.00 7 $343.00 55 2411.618 MODULAR BLOCK RETAINING WALL SO FT $21.00 56 2411.618 ADJUST RETAINING WALL SO FT 5.00 $20.00 $100.00 5 $100.00 57 2451.607 REPLACEMENT BACKFILL MnlDOT 3149.20 C CU YD $0.01 58 2451.609 CRUSHED ROCK PIPE FOUNDATION TON $30.00 59 1 2502.521 4 -INCH PVC SDR 35 CROSSING LIN FT $10.00 60 2502.541 44NCH PE CORRUGATED PERFORATED PIPE DRAIN WITH SOCK LIN FT 125.00 $5.85 $731.25 125 1 $731.25 61 2502.602 PE SUMP BOX EACH $175.00 62 2502.602 CONNECT 4 -INCH PVC OR PERF PE TO STORM SEWER EACH 2.00 $100.00 1 $200.00 2 $200.00 _ 63 2503.511 12 -INCH CORRUGATED PE PIPE SEWER LIN FT $28.47 64 2503.511 15 -INCH CORRUGATED PE PIPE SEWER LIN FT $33.85 65 2503.511 24 -INCH PVC SDR 35 PIPE SEWER LIN FT $100.00 66 1 2503.541 12 -INCH RC PIPE SEWER, DESIGN 3006 CLASS V LIN FT $46.17 67 2503.541 15 -INCH RC PIPE SEWER DESIGN 3006 CLASS V LIN FT $47.02 68 2503.541 18 -INCH RC PIPE SEWER DESIGN 3006 CLASS V LIN FT $50.17 69 2503.541 21 -INCH RC PIPE SEWER DESIGN 3006 CLASS III LIN FT $80.72 70 2503.541 244NGH RC PIPE SEWER, DESIGN 3006 CLASS III LIN FT 64.00 $56.51 $3,616,64 64 _ 16.64 $3.616.64 71 2503.541 30 -INCH RC PIPE SEWER DESIGN 3006 CLASS III LIN FT $68.74 72 2503.541 36 -INCH RC PIPE SEWER DESIGN 3006 CLASS 111 LIN FT $73.22 73 2503.602 ;BULKHEAD PIPE/STRUCTURE EACH $200.00 74 2501602 CONNECT TO EXISTING STORM SEWER EACH 8.00 $0.01 $0.08 8 $0.08 75 2503.602 EXPOSE & REPAIR 4" SANITARY SEWER SERVICE CONNECTION EACH $1,611.00 76 2503.602 EXPOSE & REPAIR 6" SANITARY SEWER SERVICE CONNECTION EACH $1,677.00 77 2503.602 EXPOSE & REPAIR SANITARY SEWER SERVICE WITH EXISTING PVC SLEEVE EACH $1.795= 78 2503.602 EXPOSE & REPAIR SANITARY SEWER SERVICE WYE EACH $415.00 79 2503.602 ADJUST SANITARY SEWER SERVICECLEANOUT EACH $250.00 80 2503.603 1REMOVE 'SERVICE & REPLACE 4INCH SANITARY SEWER PIPE LIN FT $33.39 81 2503.603 ,REMOVE & REPLACE 6 INCH SANITARY SEWER SERVICE PIPE LIN FT $34.85 82 2503.604 2 -INCH RIGID INSULATION SQ YD $25.00 83 2504.602 ADJUST GATE VALVE BOX EACH 2.00 $310.00 $620.00 2 $620.00 84 2504.602 REPAIR GATE VALVE BOX EACH 1.00 $709.00 $709.00 1 $709.00 B5 2504.602 REPLACE CURB STOP BOX EACH $500.00 86 2504.602 ADJUST CURB STOP BOX EACH $100.00 87 2504.602 REPAIR CURB STOP BOX EACH $300.00 88 2504.602 OFFSET EXISTING WATER MAIN EACH $3,00 .00 Page 2 of 4 LINE NO. I ITEM NO. ITEM DESCRIPTION UNIT TOTAL ESTIMATED NEW HOPE QUANTITIES UNIT COST TOTAL ESTIMATED NEW HOPE COST MSA LOCAL NEW HOPE NEW HOPE 58TH AVENUE SUMTER AVENUE SAP. 182- 116 -001 SAP, 182 -115 -00 STREET STREET STORM STREET EST COST EST COST EST COST EST COST 89 1 2504.602 IRELOCATE HYDRANT EACH $5214.00 90 2504.602 INSTALL HYDRANT, GATE VALVE AND 6 -INCH DIP CL 52 ASSEMBLY EACH $6092.00 91 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN B LIN FT 11.80 $406.00 $4,790.80 11.8 $4 92 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN C LIN FT $469.00 93 2506.501 CONSTRUCT DRAINAGE STRUCTURE, DESIGN D LIN FT $556.00 94 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN E LIN FT $659.00 95 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN F LIN FT 5.50 $866.00 $4,763.00 5.5 $4.763.00 96 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN X LIN FT $414.00 97 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN Y LIN FT 5,00 $479.00 $2,395.00 5.0 $2,395.0 98 2506.516 CASTING ASSEMBLY R -1733 EACH 2.00 $1,000.00 $2,000.00 2 $2 99 2506.516 CASTING ASSEMBLY R- 1733 -1 SELF SEAL LID EACH $1,000.00 100 2506.516 CASTING ASSEMBLY R- 3067 -V EACH 2.00 $1,000.00 $2,000.00 2 $2,000.00 101 2506.516 CASTING ASSEMBLY R -3290A EACH $1 102 2506.522 ADJUST FRAME AND RING CASTING EACH 2.00 5462.00 $924.00 2 $924.00 103 2506.602 RECONSTRUCT MANHOLE EACH 1.00 $1,098.00 $1 1 $1,09&00 104 2511.515 GEOTEXTILE FILTER TYPE 1 SO YD $5.00 105 2511.515 GEOTEXTILE FILTER TYPE V OVEN SO YD 220.00 $0.56 $123.20 220 $123.20 106 2521.501 4 -INCH CONCRETE WALK SO FT $2.70 107 2531.501 CONCRETE CURB AND GUTTER DESIGN B618 LIN FT 705.00 $7.55 $5 330 $2 375 $2 108 2531.501 CONCRETE CURB AND GUTTER, DESIGN B618 - LIN FT $13.80 109 2531. 507 6-INCH CONCRETE DRIVEWAY PAVEMENT SQ YD 320.00 $34.71 $11,107.20 320 $11 110 2531.603 SURFACE TREATMENT- EXISTING CONCRETE CURB AND GUTTER LIN FT 170.00 $0.45 $76.50 170 $76.50 Ill 2531.604 7 -INCH CONCRETE VALLEY GUTTER SO YD $50.00 112 1 2531.604 PRIVATE DRIVEWAY CONCRETE PAVING SO YD $40.22 113 1 2531.618 PEDESTRIAN CURB RAMP SOFT 120.00 $9.05 $1.086.00 120 $1.086.00 114 2540.618 INSTALL SALVAGED BRICK PAVERS SO FT $5.00 115 2557.603 INSTALL SALVAGED CHAIN LINK FENCE LIN FT $15.00 ........... 116 2557.603 INSTALL SALVAGED WOOD FENCE LIN FT $39.00 117 2563.601 TRAFFIC CONTROL LS 0.03 $20,000.00 $600.00 0.01 $200.00 0.01 $200.00 0.01 $200.00 118 2564.531 FURNISH AND INSTALL SIGN PANELS TYPE "C" SO FT 16.75 $27.50 $460.63 10.00 $275.00 6.75 $185.63 119 2564.602 FURNISH AND INSTALL SIGN PANELS, TYPE SPECIAL EACH $268.00 120 1 2564.602 INSTALL SALVAGED SIGNS TYPE "C" EACH $63.00 121 2565.602 NMC LOOP DETECTOR 6'x iS' EACH $700.00 122 2565.602 NMC LOOP DETECTOR 6'x 6' EACH $600.00 123 2565.602 ADJUST HANDHOLE COVER EACH $450.00 124 2571.502 AMERICAN YELLOWWOOD 2 -INCH B AND B TREE $278.00 125 2571.502 AUTUMN GOLD GINKGO 2 -INCH B AND B TREE $308.00 _ 126 2571.502 AUTUMN SPLENDOR BUCKEYE 2 -INCH B AND B TREE 2.00 $248.00 $496.00 2 $496.00 127 2571.502 BITTERNUT HICKORY 2 -INCH B AND B TREE 1.00 $321.00 $321.00 1 $321.00 128 2571.502 BUR OAK 24NCH B AND B TREE 1.00 $241.00 $241.00 1 $241.00 129 2571.502 COMMON HACKBERRY 2 -INCH B AND B TREE $182.00 130 2571.502 IVORY SILK TREE LILAC 2 -INCH B AND B TREE $241.00 131 2571.502 KENTUCKY COFFEETREE 2 -INCH B AND B TREE $241.00 132 2571.502 SILVER LINDEN 2 -INCH B AND B TREE $224.00 i33 2571.502 TRIUMPH ELM 2 -INCH B AND B TREE $207.00 134 2571.502 TURKISH FILBERT 2 -INCH B AND B TREE $311.00 135 2571.505 SHRUB RESIDENTIAL RAIN GARDEN SHRUB $25.00 136 2571.507 PERENNIALS DAY LILY 1 YEAR CONTAINER PLANT $9.00 137 2571.507 PERENNIALS RESIDENTIAL RAIN GARDEN PLANT $8.25 138 2571.507 PERENNIALS RESIDENTIAL RAIN GARDEN - PLANT $8.00 139 2573.502 SILT FENCE LIN FT $1.75 140 2573.530 INLET PROTECTION - TYPE A EACH $100.00 _...... 141 2573.530 INLET PROTECTION -TYPE 8 EACH $100.00 142 2575.505 SODDING. TYPE LAWN SO YD 1,175.00 $2.24 $2,632.00 525 $1 650 $1 456.00 143 2575.513 MULCH MATERIAL TYPE 6 CU YD $40.00 _ 144 2575.532 COMMERCIAL FERTILIZER ANALYSIS 12 -0-12 LB 1 42.00 $0.30 $12.60 32 $9.60 11 10 1 $3.00 Page 3 of 4 LINE NO. ITEM NO. ITEM DESCRIPTION UNIT TOTAL ESTIMATED NEW HOPE QUANTITIES UNIT COST TOTAL ESTIMATED NEW HOPE COST MSA LOCAL NEW HOPE NEW HOPE 58 TH AVENUE SUMTER AVENUE ._._ S.A.P. 182-116-001 SAP.182 -115 -00 STREET STREET STORM STREET EST COST EST COST EST COST EST COST 145 2575.535 1 POST WARRANTY SOD WATERING M GALS 1 $12.00 146 2575.604 1PRIVATE DRIVEWAY RESTORATION SO YD $2.49 147 2575.605 HYDROSEEDING ACRE $1500.00 148 2575.607 PLANTING SOIL CV CU YD $40.00 149 2582.502 4" SOLID LINE DOUBLE YELLOW PAINT LIN FT 37.00 $0.15 $5.55 37 $5.55 150 2582.502 4" SOLID LINE DOUBLE YELLOW, EPDXY LIN FT 37.00 $0.45 $16.65 37 $16.65 151 2582.502 4" BROKEN LINE YELLOW PAINT LIN FT 120.00 $0.08 $9.60 120 $9.60 152 2582.502 4" BROKEN LINE YELLOW EPDXY LIN FT 120.00 $0.24 $28.80 120 $28.80 153 2582.502 4" SOLID LINE WHITE PAINT LIN FT 727.00 $0.08 $58.16 155 $12.40 572 $45.76 154 2582.502 4" SOLID LINE WHITE, EPDXY LIN FT 727.00 $0.24 $174.48 155 $37.20 572 $137.28 155 2582.503 ZEBRA CROSSWALK WHITE EPDXY SO FT 160.00 $3.00 S480.00 108 $324.00 52 $156.00 OPINION OF PROBABLE COST TOTAL ESTIMATED COST LESS PRIVATE COSTS TOTAL ESTIMATED CONSTRUCTION COST 20% LEGAL, ADMINISTRATIVE, ENGINEERING TOTAL PROJECT COST TOTAL PROJECT COST - EXCLUDING PRIVATE, SANITARY SEWER AND WATER MAIN IMPROVEMENTS FOR FINANCING PURPOSES $88,773.33 $19,459.64 $24,166.20 $585.27 $44,562.22 $88,773.33 $19,459.64 $24,166.20 $585.27 $44,562.22 $17,754.67 $3,891.93 $4,83324 $117.05 $8,912.44 $106,527.99 $23,351.57 $28,999.44 $702.32 $53,474.66 $106,527.99 Page 4 of 4 $23,351.57 $28,999.44 $702.32 $53,474.66