IP #854For the full report on r ' F� - M% 0 kalty Council agenda packets and/or Plannin Cc)mml�ozolilon agenda packets, PROJECT NO. 854 2009 Retaining Walls Item 8.4 6/8/09 Motion authorizing preparation of plans and specifications for the proposed 2009 New Hope retaining wall rebuilding project Res. 09 -100 7/27/09 Resolution approving plans and specifications for the proposed 2009 New Hope retaining wall improvement project and ordering advertisement for bids (improvement project 854) Res. 09 -124 9/14/09 Resolution awarding a contract to TMS Construction Inc. for the 2009 New Hope retaining wall improvement project (improvement project no. 854) for $84,164.90 Res. 11 -175 12/12/11 Resolution accepting easements required for installation of retaining walls at 20 sites throughout the city (improvement project No. 854) COUNCIL V1q9 Request for Action Originating Department Approved for Agenda Agenda Section Public Works September 14, 2009 Develo ment & Plannin Item No. By: Guy Johnson By: Kirk McDonald, City Manager 8.4 Resolution awarding a contract to TMS Construction Inc. for the 2009 New Hope retaining wall improvement project (improvement project 854) Requested Action Staff is recommending that Council approve a resolution awarding a contract in the amount of $84,164.90 to TMS Construction Inc. for removal and /or reconstruction of approximately 20 retaining walls in the city. Policy /Past Practice The City Council routinely considers public infrastructure improvement projects to improve the city's appearance, increase public safety, and replace the city's infrastructure when maintaining the existing infrastructure becomes infeasible. Background Staff estimates the city of New Hope currently maintains approximately 50 retaining walls, composed of various materials and of various ages, throughout the city. In 1994, the retaining walls were inspected and reviewed by the city engineers. Of the 69 total retaining walls existing in 1994, 28 were either permanently removed or rebuilt. Today, approximately 20 original retaining walls exist in the city. Based upon the age of the homes adjacent to the retaining walls, staff estimates these walls were originally built between the late 50's and mid -60's. Over many years, city staff has made temporary repairs to many of the walls in order to maintain the integrity of the structures. Many of the walls are now in disrepair and have deteriorated beyond the point of repair. Staff feels the walls have become unsafe, irreparable, and are now in need of replacement or removal. Motion by ('l fY'A Second by r To: c -� I: \ RFA \ PUBWORKS \ 2009 \ 854 2009 Retaining Wall Award Contract.doc Request for Action September 14, 2009 Page 2 At the Council's June 8, 2009, meeting, the Council authorized preparation of plans and specifications for the work. Plans and specifications for the project were approved by Council on July 27, 2009, and direction was given to solicit bids for the project. Bids were opened on September 3, 2009. Of the seven bids received by the city, the bid submitted by TMS Construction Inc. was identified as the lowest and responsible bid. Staff recommends that the proposed project start in the fall of 2009 with restoration to be completed in the spring of 2010. Funding The proposed 2009 retaining wall improvement project's preliminary cost estimated was $120,000, and TMS Construction's low bid is approximately $35,000 under this estimate. The proposed project would be funded through state aid funding and the city's street infrastructure fund. As the Council is aware, there is a need to utilize a portion of the city's state aid funding dollars so as to not jeopardize future city allotments. Attachments The engineer's memorandum, a copy of the resolution, a copy of the bid tab, and a map of the proposed area of work are attached. I: \RFA \PUBWORKS \2009 \854 2009 Retaining Wall Award Contract.doc City of New Hope Resolution No. 09 -124 Resolution awarding a contract to TMS Construction Inc. for the 2009 New Hope retaining wall improvement project (improvement project 854) WHEREAS, the city requires the assistance of a contractor for the removal and reconstruction of approximately 20 retaining walls in the city; and, WHEREAS, the city engineer has prepared plans, specifications, and contract terms for the work; and, WHEREAS, the city has accepted bids for work described in the plans and specifications and has identified the lowest responsible bidder. NOW, THEREFORE, BE IT RESOLVED by the City Council of the city of New Hope, Minnesota: 1. That the contract for removal and reconstruction of retaining walls in the city is awarded to TMS Construction Inc. in the amount of $84,164.90. 2. That a contract between the city of New Hope and TMS Construction Inc. is approved, and the mayor and city manager are authorized and directed to sign the same. Adopted by the City Council of the city of New Hope, Hennepin County, Minnesota, this 14th day of September, 2009. 4V4 Mayor J Attest: t City Clerk 2335 Highway 36 VV St. Paul, MN 55113 Tel 651 -636 -4600 Fax 651- 636 -1311 www.bonestroo.com September 4, 2009 Honorable Mayor and City Council City of New Hope 4401 Xylon Avenue N. New Hope, MN 55428 -4898 Re: 2009 Retaining Wall Improvements City Project No. 854 Project No. 000034 - 09216 -0 Bid Results Dear Honorable Mayor and City Council: 0=1 Bids were opened for the Project stated above on Thursday, September 3, 2009. Transmitted herewith is a copy of the Bid Tabulation for your information and file. Copies will also be distributed to each Bidder once the Project has been awarded. There were a total of seven Bids. The following summarizes the results of the Bids received: The low Bidder on the Project was TMS Construction, Inc. with a Total Base Bid Amount of $84,164.90. This compares to the Engineer's Estimate of $120,000. These Bids have been reviewed and found to be in order. If the City Council wishes to award the Project to the low Bidder, then TMS Construction, Inc. should be awarded the Project on the Total Base Bid Amount of $84,164.90. Should you have any questions, please feel free to contact me at (651) 604 -4938. Sincerely, BONESTROO �;:: � C2 e- -�� - Jason P. Quisberg, P.E. Enclosure Co »tractor Tots! Base Bid Low TMS Construction, Inc. $84,164.90 #2 A & L Construction, Inc. $91,964.68 #3 Wruck Excavating, Inc. $103,831.88 #4 Ti -Zack Concrete, Inc. $110,580.00 #5 Urban Companies $110,737.50 #6 Sunram Construction, Inc. $118,245.25 #7 Environmental Associates, Inc. $130,185.00 The low Bidder on the Project was TMS Construction, Inc. with a Total Base Bid Amount of $84,164.90. This compares to the Engineer's Estimate of $120,000. These Bids have been reviewed and found to be in order. If the City Council wishes to award the Project to the low Bidder, then TMS Construction, Inc. should be awarded the Project on the Total Base Bid Amount of $84,164.90. Should you have any questions, please feel free to contact me at (651) 604 -4938. Sincerely, BONESTROO �;:: � C2 e- -�� - Jason P. Quisberg, P.E. Enclosure g C g O • y y x Z ti IY N E H z E E A 21 z O 888888$$S g K 46 gggggggg K 4* *0� O- z Ln 9 N r� 32 2 .9 8$888888$ $ 88888$ 4* 4& K 46 'A "r cz Ln K KK M Ly v I Ln w , a, �! Oi 06 ri g Z w - i ' t m dgg%gggl 4. 0) AA. nz m E 1 c, a, LU T y a, 2�� 22 a j DPW LD COCO Zrw Lu u E E A 21 z O O c lu T . z 0 I -w *0� g g � 14 ui fl 40� ss 9 9 Vo. -1 M 3 'Z,q fj Z cp vw 2 4g N 4o� 1 6+ Ao� v� Ab N =) 2V N v o V1 N N Rag 1z"Ra 3 0 yy Z4 w z E U (0 >g2 s _� M U, M ol US EE �i VE 'i EXISTING RET.AiNING 46 INALL CONSIDERED FOR IkIPF'O"EMENTS 0 1250 2500 Scale In feet (CO RD Nik') - 0) 2 7 TH AYE N iMEUCNE [AXE RD) 2' rH AVE: N PROJECT LOCATIONS NEW HOPE, MINNESOTA FIGURE 1 Bones Too 2009 RETAINING WALL IMPROVEMENTS 3409216FOl R.dwg DATE: JULY 2009 COMM: 000034-09216-0 49TH 4vE P4 x. 5F p ROAD 47,14 Avt N EXISTING RET.AiNING 46 INALL CONSIDERED FOR IkIPF'O"EMENTS 0 1250 2500 Scale In feet (CO RD Nik') - 0) 2 7 TH AYE N iMEUCNE [AXE RD) 2' rH AVE: N PROJECT LOCATIONS NEW HOPE, MINNESOTA FIGURE 1 Bones Too 2009 RETAINING WALL IMPROVEMENTS 3409216FOl R.dwg DATE: JULY 2009 COMM: 000034-09216-0 October 12, 2009 Mr. Todd Schmidt TMS Construction Inc. 5990 Meadowlark Lane Prior Lake, MN 55372 SUBJECT: Retaining Wall Project (Improvement Project No. 854) Enclosed is a fully executed contract document for New Hope Project No. 854 This contract was awarded by the New Hope City Council on September 14, 2009, for $84,164.90. Enclosed is return of your bid bond. Also enclosed is a "Withholding Affidavit for Contractors" (IC -134 form). We cannot make final payment to contractors until this is approved by the Minnesota Department of Revenue and submitted to our office (Minnesota Statute 290.97). The form contains instructions for completion. Sincerely, �-� r r e- �� — Valerie Leone City Clerk, CMC enc. cc: Jason Quisberg, City Engineer (Project No. 000034 - 09216 -0) Steve Sondrall, City Attorney (File No. 99- 10030) Guy Johnson, Director of Public Works • • 4401 Xylon Avenue North + New Hope, Minnesota 55428 -4898 + www. ci.new- hope.mn.us City Hall: 763- 531 -5100 + Police (non - emergency): 763- 531 -5170 + Public Works: 763- 592 -6777 + TDD: 763- 531 -5109 City Hall Fax: 763- 531 -5136 + Police Fax: 763 -531 -5174 + Public Works Fax: 763- 592 -6776 2335 Highway 36 W St. Paul, MN 55113 Tel 651- 636 -4600 Fax 651- 636 -1311 www.bonestroo.com September 16, 2009 Mr. Todd Schmidt TMS Construction, Inc. 5990 Meadowlark Lane Prior Lake, MN 55373 Re: City of New Hope, Minnesota 2009 Retaining Wall Improvements City Project No. 854 Project No. 000034 - 09216 -0 Contract Documents Dear Mr. Schmidt: 0� Enclosed are four Contract Documents between you and the City of New Hope covering the above - referenced Project. Please complete Specification Document 00520 Agreement Form, Document 00610 Performance Bond, and Document 00615 Payment Bond. The insurance and indemnity requirements shall be provided. After the bonding company has completed the Contract Documents, forward them to the attorney listed below who will review them for the City of New Hope: Steven Sondrall Jensen & Sondrall PA 8525 Edinbrook Xing #201 Brooklyn Park, MN 55443 -1968 After the necessary officials have signed the Contracts, they will be distributed as follows: 2 copies TMS Construction, Inc. (1 - your file, 1 - your bond company) 1 copy City of New Hope, Attention: Valerie Leone 1 copy Bonestroo, Attention: Jason Quisberg Upon receipt of a signed Contract and a filed Certificate of Insurance, approved by the City of New Hope's attorney, a pre - construction conference will be scheduled with you and the City of New Hope to review the Project. Sincerely, Jason P. Quisberg Enclosures: Four Contract Documents cc: Valerie Leone, City of New Hope Steven Sondrall, City Attorney 1,SS *ON 1- kLD i3Ns Tilu S.LN3K3AOIIdWI - nVM DNINIVAd 60OZ F V VI052NNIW 'RdOH M3N -- - - - - - - I I C5 O 9 C-4 CD 9 0 T z -4 z 00 U ui al F r- < 9) - F , ✓ < < W LU vi u v, vi U, g -Z 0 00 99 6 C US , Ell a. 6 1 g g 5 5- o s i. 41. 9 6 b P4 < R HT [ a ww� w W o w 1 - 1 � w Lu m I z a : m x < < LA �2 to G W z z :5 z z 6 N 14 F- 0 =) D D u om C) 0� u 8 8 8 'o 6 0 B. N z u -. ui m D m 6 CT W M E 6 MA LU C) a: > 4 1 C) ui t U, z o o z o E: o z LLJ LL Q0 w U V , m 9 EN 6 ,� UJ 2: UJ 0 gal �pl 0 U-15 89 Z - Li !t;6 r si RAV VNvisinoi ET LJH 11`7­ fl I = Z.O : -t �i. 3 L 11 r AV 3NM8 4 1 J--j 69T,kVMHDIH)INnu 69T AaMHDIM YN r"L �O �xuaeas KS •Md 1:)3Mdd Alb rna� -- S1N3W3A021dWI'nVM JNINM.I3N 6002 o m V.LOS3NNIW'3dOH M3N c N O x o o f °8� o �GgBgg� ao g O gg �sg=sasff�aeee������e�3 — o Si8g _ I A W (n C L9 i 5�[+ A X I ' � V 89 F a s w ZZ � + "' - • ®® • ■ ® . $ + Yet a o � � � W fos�� scat e 0 s �d z ° .-:.0 -IM �pZOR�9i26pK .idq�0YJ�09IZfi0YE5iE11 KB 'ON 1- AM '�'ul'Nvnb jouawgiv.Ls S.LN3W3AO'ddWI - nVM DNINIViMi 60OZ V-LOS3NNIW '3dOH M3N O C, C. co O O 9 i0 O w O ti g C i — n: Yl M 0 C , n 0 .98.M. a a lu INV E NO < URN A 6w Ri Tfdgtm aw dm Noumi S1N3W3AO'ddWl'nVM_9NINIVi3d 60OZ V1-OS3NNIW '3dOH M3N PUZ9 r r ;e t-D �T D F� -i l o r T �z o - -w" I � �z h s sys > i -'7--- L tu- - - z - E77 ' q Tr H-WON 'N '3AV LPZZ gal ul Z - pli �Co) TF, ITE 1412dON 3l1P73AV puzi, r-- r7. 7q 11 PE gal TF, ITE r-- r7. 7q 11 PE CIVMI 3NVI aNi:)Iagw OL ' Pii - OD M R X m 8 9 IN qq pg. �5 jE 12 T 0 Ms� Inn . .— mhxA anNgAV 3N008 GNV 3nN3AV PUZ9 SIN3W3A0 IIVM E)NINIVEN 60OZ VJ-OS3NNIW '3dOH M3N I III II I �h z 0 3a —X- 77747- 77----'m - ------------------ I II { ' II m � J ' E � ffi �����"�'� T ------------ Lu r.4 Pj UPS Rd ------------------ i� 3nN3AV 0NV1V3Z rl P , �. �w L L k Z0'13� 133H5 33 3nN3AV PUZE uj cLL g !2 I LU f 3 Hip 3 g HR v 91021I0 3N009 SS W I I 0 0 1 95. ,T it M- T LIJ - ------------------ I II { ' II m � J ' E � ffi �����"�'� T ------------ Lu r.4 Pj UPS Rd ------------------ i� 3nN3AV 0NV1V3Z rl P , �. �w L L k �S P, 7 F1 IL O oea 33 . Im. WzA Z0'13� 133H5 33 3nN3AV PUZE uj g !2 I LU f 3 Hip 3 g HR v 91021I0 3N009 SS W I I 0 0 1 95. ,T it M- T uj D z W z 0 q 24- I �S P, 7 F1 IL O oea 33 . Im. WzA --------------- 3nN3AV PUZE uj ----------- C) !2 I LU VF 3 Hip 3 g HR v A SS W I I 0 0 1 95. ,T it M- T �S P, 7 F1 IL O oea 33 . Im. WzA --------------- 3nN3AV Hvin ----------- C) !2 I LU VF Z Hip 3 g HR v A SS 1 95. ,T it �S P, 7 F1 IL O oea 33 . Im. WzA K9 *ON I:Groad ,uD 3fiNMV3NO08 N SLN3W3AO'ddWI "nVM ONINIV13'd 60OZ o V.LOS3NNIW '3dOH M3N e � oi3e 33 � ee 7 I� c O 0 w I; i Gj y� O 52 Z co + yy G 90 co ui t;9 0 _ � anii aa..a =pw ernes o-w o,u-- 'anu o.,D_. w ', Z , 1 - m . ^� _ i a �I zg 43, a 3 N ,y L � U � D L I _M 3(1N3Ad 4�9ti :. w if l$ 8lg I --------- - r IIr 0 , § II F 3 t, I i ICI J =. 1 ` ` k i IC ----- ____._____ ui - G� GC� - - G � I "° — �d � r ` 3f1N3A1/3N008 I stn 3iIR 3 � s w J' +;., � I 6 o w - Z 0 C) IY m �I - -- - -- -- N � I W q N I - — $ -- - -- _ Ik a I Uj 3a - ++ - h_, L P m ' r J 1BA08V 33 F l0'90 133NS 33S W EY:QO[ 6%V*Zle & P209J9Tt601E16M 'IIDYAU9TZ60KkW;l KS '-N DNO kM 14y's' :)) 3nN3AV V)UgNMM SiN3W9AO'ddWI 'nVM 9NINIVI3M 6002 VLOS3NNIW '3dOH M3N — — — — — — — - — — — - II 1 � - - - - - - - - - - - - - "61 ------------ �f It 1 9 LIM JlOF k L3 LU 7 aa — — — — — — — — — — — — gQ LU > r bl z R, H iE A - 2 I�b -------------- — — — — — — — - — — — - II 1 � - - - - - - - - - - - - - "61 ------------ It r. 1 °� 3 .6 I' fli JlOF k - ---------- ---------- 0 — — — 7 aa — — — — — — — — — — — — gQ r j z R, H iE A - 2 I�b z, 17 � .I ��oJy Ip I '\ rI Iii uj 6 ----------------- It r. 1 °� 3 .6 7 1 T 0� 1%6 u Il �i��l" Iii c� �° - ---------- ---------- 0 — — — 7 aa — — — — — — — — — — — — gQ r j z R, H iE — — — — — — — — — — — — — — — — — 7 1 T 0� 1%6 u Il 0 z 41-4 "i -f." I �i��l" Iii c� �° - ---------- ---------- r j z R, H iE PEA z, 17 0 z 41-4 "i -f." I t 3roaa uo g `s L aH'vs�) avow am sStl0 0Nv 3nNaAv PWZ9 S1N3W3AO'ddWI - nVM E)NINIVL:rd 60OZ Q m V-LOS3NNIW ° 3dOH M3N g ° v —:z— N o N Go � 3 a i d I co I S ° w ti i ,,v F r,. I I O .y LO'9� 133H5 33S u � r ' 0 ---- _ — __— — — c 5 0 � o a I� I o 3hN3AV VI{ IEMIA t - m cn II � i I 1W � o Wt R:fE-0i WULNIfe dw P' 109AS2fiDM.i�'d10.7�p9iZbON�fEI:i . � / \ KO «n__ S-LN3W3n _�M m»13'd _! V mRmw' off MgN ° , \�§ !� § | «| | |) |G \ / § \ §\ & / / _ & v2 \ O N .: 02 . � 3 . / DOCUMENT 00005 PROFESSIONAL CERTIFICATIONS I hereby certify that this report, drawing, or specification was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota. Jason P Quisberg, P.E. Date: July 27, 2009 Reg. No. 44315 END OF DOCUMENT 000034 - 09216-0 C 2009 Bonestroo PROFESSIONALCERTIRCATIONS This Page Left Blank Intentionally DOCUMENT 00010 TABLE OF CONTENTS 2009 RETAINING WALL IMPROVEMENTS CITY PROJECT NO. 854 PROJECT NO. 000034 - 09216 -0 NEW HOPE, MINNESOTA NX11 Introductory Information 00005 Professional Certifications 00010 Table of Contents Bidding Requirements 00100 Advertisement for Bids 00200 Instructions to Bidders 00300 Information Available to Bidders 00410 Bid Form Contracting Requirements 00520 Agreement Form 00610 Performance Bond 00615 Payment Bond 00700 EJCDC C -700 Standard General Conditions of the Construction Contract 00800 Supplementary Conditions Specifications Division I — General Requirements 01100 Summary 01200 Price and Payment Procedures 01310 Project Management and Coordination 01330 Submittal Procedures 01400 Quality Requirements 01500 Temporary Facilities and Controls 01700 Execution Requirements Division 2 — Site Construction 02225 Removals 02230 Site Clearing 02280 Adjust Miscellaneous Structures 02315 Excavation and Fill 02830 Segmental Retaining Wall Systems 02920 Lawns and Grasses END OF DOCUMENT 000034 - 09216 -0 G 2009 Bonestroo TABLE OF CONTENTS This Page Left Blank Intentionally DOCUMENT 00100 ADVERTISEMENT FOR BIDS Sealed Bids will be received by the City of New Hope, Minnesota, in the City Hall at 4401 Xylon Avenue North, until 11:30 A.M., C.D.S.T., Thursday, September 3, 2009, at which time they will be publicly opened and read aloud for the furnishing of all labor, materials, and all else necessary for the following: 2009 Retaining Wall Improvements, City Project No 854 In general, Work consists of the following approximate quantities: 4,500 SF Remove Retaining Wall 450 CY Common Excavation 3,000 SF Modular Block Retaining Wall 2,000 SY Sodding 2 EA Clearing and Grubbing The estimated construction cost for this Project is $120,000. Bidding Documents may be purchased by credit card at www.bonestroo.com (follow the Plan Room link) for a fee of $40 (for a paper copy), or a fee of $20 (for a download digital copy). Bidders may purchase a paper copy of the Bidding Documents from the Issuing Office of Bonestroo, 2335 Highway 36 West, St. Paul, MN 55113, (651) 636 -4600 with a check for a fee of $40. Bidding Documents may be viewed at the office of the City of New Hope and at the Issuing Office. Direct inquiries to Engineer's Project Manager Jason Quisberg at (651) 604 -4938. Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. Kirk McDonald, City Manager City of New Hope, Minnesota 000034 - 09216 -0 © 2009 Bonestroo ADVERTISEMENT FOR BIDS This Page Left Blank Intentionally DOCUMENT 00200 INSTRUCTIONS TO BIDDERS ARTICLE 1 - DEFINED TERMS 1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below: A. Issuing Office: The office from which the Bidding Documents are to be issued and where the Bidding procedures are to be administered. ARTICLE 2 - COPIES OF BIDDING DOCUMENTS 2.01 Complete sets of the Bidding Documents in the number and for the non - refundable sum stated in the Advertisement for Bids may be obtained from the Issuing Office. 2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.03 Owner and Engineer in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use. 2.04 Neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from Bidder's use of electronic downloadable Bidding Documents (Electronic Bidding Documents). In addition to the above items, Bidders using Electronic Bidding Documents are solely responsible for use of such documents, including, but not limited to: A. It is the responsibility of the Bidder to go to the Bonestroo Plan Room, check for the presence of Bidding Documents (including Addenda), and download documents as they become available. B. It is the responsibility of the Bidder to verify the intended document size (sheet dimensions) and to verify proper colors (color, or black and white) of the Electronic Bidding Documents prior to reproduction. Bidder shall ensure that the Electronic Bidding Documents are reproduced to the correct and exact scale, and correct colors. C. It is the responsibility of the Recipient of Electronic Bidding Documents from this site to check the electronic data for computer viruses or other harmful coding. D. Bidders are subject to the Terms of Use and Limitations on Use detailed in the Bonestroo Plan Room. 000034 - 09216 -0 © 2009 Bonestroo 00200 -1 INSTRUCTIONS TO BIDDERS ARTICLE 3 - QUALIFICATIONS OF BIDDERS 3.01 To demonstrate Bidder's qualifications to perform the Work within 5 days of Owner's request, Bidder shall submit written evidence, such as financial data, previous experience, present commitments, and such other data, as may be called for below: A. Evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of Contract. B. Evidence of genuineness of Bid and lack of collusion in conjunction therewith. ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE 4.01 Subsurface and Physical Conditions A. The Supplementary Conditions Identify: 1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Engineer has used in preparing the Bidding Documents. 2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that Engineer has used in preparing the Bidding Documents. B. Copies of reports and drawings referenced in Paragraph 4.01.A will be made available by Owner to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02 of the General Conditions has been identified and established in Paragraph 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any "technical data" or any other data, interpretations, opinions, or information contained in such reports, or shown or indicated in such drawings. 4.02 Underground Facilities A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner or others. 000034 - 09216 -0 © 2009 Bonestroo 00200_2 INSTRUCTIONS TO BIDDERS 4.03 Hazardous Environmental Condition A. The Supplementary Conditions identify those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that Engineer has used in preparing the Bidding Documents. B. Copies of reports and drawings referenced in Paragraph 4.03.A will be made available by Owner to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.06 of the General Conditions has been identified and established in Paragraph 4.06 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any "technical data" or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings. 4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in Paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications, or identified in the Contract Documents to be within the scope of the Work appear in Paragraph 4.06 of the General Conditions. 4.05 On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes, and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates. 4.06 Reference is made to Article 7 of the Supplementary Conditions for the identification of the general nature of other work that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) that relates to the Work contemplated by these Bidding Documents. On request, Owner will provide to each Bidder for examination access to or copies of contract documents (other than portions thereof related to price) for such other work. 4.07 It is the responsibility of each Bidder before submitting a Bid to: A. examine and carefully study the Bidding Documents, the other related data identified in the Bidding Documents, and any Addenda; 000034 - 09216 -0 © 2009 Bonestroo 00200 -3 INSTRUCTIONS TO BIDDERS B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work; C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work; D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in Paragraph 4.02 of the General Conditions, and (2) reports and drawings of Hazardous Environmental Conditions at the Site which have been identified in the Supplementary Conditions as provided in Paragraph 4.06 of the General Conditions; E. obtain and carefully study (or accept consequences of not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, safety precautions, and programs incident thereto; F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the Price(s) Bid and within the times and in accordance with the other terms and conditions of the Bidding Documents; G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents; H. correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents; I. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder; and J. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work. 000034 - 09216 -0 © 2009 Bonestroo 00200 -4 INSTRUCTIONS TO BIDDERS 4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents, and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. ARTICLE 5 - PRE -BID CONFERENCE 5.01 There will be no pre -Bid conference. ARTICLE 6 - SITE AND OTHER AREAS 6.01 The Site is identified in the Bidding Documents. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner, unless otherwise provided in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. ARTICLE 7 - INTERPRETATIONS AND ADDENDA 7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than 10 days prior to the date for Opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer. 8.01 A Bid must be accompanied by Bid Security made payable to Owner in an amount of 5 percent of Bidder's maximum Bid Price and in the form of a certified check or bank money order, or a Bid Bond issued by a surety meeting the requirements of Paragraphs 5.01 and 5.02 of the General Conditions. 000034 - 09216 -0 © 2009 Bonestroo 00200 -5 INSTRUCTIONS TO BIDDERS 8.02 The Bid Security of the successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required Contract Security, and met the other conditions of the Notice of Award, whereupon the Bid Security will be returned. If the successful Bidder fails to execute and deliver the Contract Documents and furnish the required Contract Security within 15 days after the Notice of Award, Owner may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of other Bidders whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Agreement or 61 days after the Bid Opening, whereupon Bid Security furnished by such Bidders will be returned. 8.03 Bid Security of other Bidders whom Owner believes do not have a reasonable chance of receiving the award will be returned within 7 days after the Bid Opening. ARTICLE 9 - CONTRACT TIMES 9.01 The number of days within which or the dates by which Milestones are to be achieved and the Work is to be Substantially Completed and ready for Final Payment are set forth in the Agreement. ARTICLE 10 - LIQUIDATED DAMAGES 10.01 Provisions for liquidated damages, if any, are set forth in the Agreement. ARTICLE 11 - SUBSTITUTE AND "OR- EQUAL" ITEMS 11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration of possible substitute or "or- equal" items. Whenever it is specified or described in the Bidding Documents that a substitute or "or- equal" item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the Effective Date of the Agreement. ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS 12.01 If the Supplementary Conditions require the identity of certain subcontractors, suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the Effective Date of the Agreement, the apparent successful Bidder and any other Bidder so requested shall within 5 days after Bid Opening, submit to Owner a list of all such subcontractors, suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such subcontractor, supplier, individual, or entity if requested by Owner. If Owner or Engineer after due investigation has reasonable objection to any proposed subcontractor, supplier, individual, or entity, Owner may before the Notice of Award is given request apparent successful Bidder to submit a substitute in which case 000034 - 09216 -0 © 2009 Bonestroo 00200 -6 INSTRUCTIONS TO BIDDERS apparent successful Bidder shall submit an acceptable substitute, Bidder's Bid Price will be increased (or decreased) by the difference in cost occasioned by such substitution and Owner may consider such price adjustment in evaluating Bids and making the Contract award. 12.02 If apparent successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable subcontractors, suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid Security of any Bidder. Any subcontractor, supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award, will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Paragraph 6.06 of the General Conditions. 12.03 Contractor shall not be required to employ any subcontractor, supplier, individual, or entity against whom Contractor has reasonable objection. ARTICLE 13 - PREPARATION OF BID 13.01 The Bid Form is included with the Bidding Documents. 13.02 All blanks on the Bid Form shall be completed by printing in ink or by typewriter and the Bid signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid Unit Price shall be indicated for each Bid Item listed therein. 13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice - president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature. 13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown below the signature. 13.06 A Bid by an individual shall show the Bidder's name and official address. 13.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown below the signature. 13.08 All names shall be typed or printed in ink below the signatures. 000034 - 09216 -0 © 2009 Bonestroo 00200 -7 INSTRUCTIONS TO BIDDERS 13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. 13.10 The address and telephone number for communications regarding the Bid shall be shown. 13.11 The Bid shall contain evidence of Bidder's authority and qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the Contract. Bidder's State Contractor License Number, if any, shall also be shown on the Bid Form. 13.12 Bidders shall identify the name of the company or subcontractor that will perform the listed portion of the Work if the Bidder is awarded the Contract. ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS 14.01 Bid Unit Price A. Bidders shall submit a Bid on a Bid Unit Price Basis for each Bid Item of Work listed in the Bid Form. B. The total of all estimated prices will be the sum of the products of the estimated quantity of each Bid Item and the corresponding Bid Unit Price. The final quantities and Contract Price will be determined in accordance with Paragraph 11.03 of the General Conditions. C. Discrepancies between the multiplication of units of Work and Bid Unit Prices will be resolved in favor of the Bid Unit Prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. D. Bids will be compared on the basis of the "Total Base Bid" and this amount will be the basis for determining the lowest Bidder. 14.02 The Bid Price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in Paragraph 11.02 of the General Conditions. ARTICLE 15 - SUBMITTAL OF BID 15.01 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the Advertisement for Bids and shall be enclosed in an opaque sealed envelope plainly marked with the Project Title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid Security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate 000034 - 09216 -0 © 2009 Bonestroo 00200 -1 INSTRUCTIONS TO BIDDERS envelope plainly marked on the outside with the notation "BID ENCLOSED." A mailed Bid shall be addressed to Owner's office. ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID 16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the Opening of Bids. 16.02 Bids may be withdrawn after Bid Opening only in accordance with the law. ARTICLE 17 - OPENING OF BIDS 17.01 Bids will be opened at the time and place indicated in the Advertisement for Bids and, unless obviously non - responsive, read aloud publicly. A Bid Tabulation of the amounts of the Base Bids and major Alternates, if any, will be made available to Bidders after the Project is awarded. ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE 18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid Security prior to the end of this period. ARTICLE 19 - EVALUATION OF BIDS AND AWARD OF CONTRACT 19.01 If the Contract is awarded, award will be made on the basis of the lowest responsive, responsible, qualified Bidder determined by the Total Base Bid. 19.02 Owner reserves the right to reject any or all Bids, including without limitation nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds after reasonable inquiry and evaluation to not be responsible. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate Contract terms with the successful Bidder. 19.03 More than 1 Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than 1 Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest. 19.04 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements and such Alternates, Bid Unit Prices, and other data as may be requested in the Bid Form or prior to the Notice of Award. 000034 - 09216 -0 © 2009 Bonestroo 00200 -2 INSTRUCTIONS TO BIDDERS 19.05 In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of subcontractors, suppliers, other individuals, or entities proposed for those portions of the Work for which the identity of subcontractors, suppliers, other individuals, or entities must be submitted as provided in the Supplementary Conditions. 19.06 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed subcontractors, suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents. As a condition of its Bid, Bidder is required to waive any and all claims of whatever nature against Owner, Engineer, and their employees and agents which arise out of or relate to such investigations and statements made as a result thereof, except for statements that can be shown by clear and convincing evidence to be intentionally false and made with actual malice. This waiver is not intended to restrict Bidder's rights to challenge a Contract award pursuant to law. 19.07 If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Project. ARTICLE 20 - CONTRACT SECURITY AND INSURANCE 20.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner's requirements as to Performance and Payment Bonds and Insurance. When the successful Bidder delivers the executed Agreement to Owner, it shall be accompanied by such bonds. ARTICLE 21 - SIGNING OF AGREEMENT 21.01 When Owner gives a Notice of Award to the successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within 15 days thereafter, successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner. Within 10 days thereafter, Owner shall deliver 2 fully signed counterparts to successful Bidder with a complete set of the Drawings with appropriate identification. END OF DOCUMENT 000034 - 09216 -0 © 2009 Bonestroo 00200 -3 INSTRUCTIONS TO BIDDERS DOCUMENT 00300 Portions of reports and drawings used by the Engineer in the preparation of the Bidding Documents are attached to this document. The Technical Data is identified in the Supplementary Conditions. Bidders are responsible for their own interpretation, verification, and use of the Technical Data contained in these reports and drawings consistent with the General Conditions and Supplementary Conditions. Reports, drawings, and other historical information regarding the Project may be available for Bidder's review at the Engineer's office. Schedule a viewing time with the Project Manager. END OF DOCUMENT 000034 - 09216 -0 © 2009 Bonestroo INFORMATION AVAILABLE TO BIDDERS This Page Left Blank Intentionally BIDDER: Bonestroo DOCUMENT 00410 BID FORM 2009 RETAINING WALL IMPROVEMENTS CITY PROJECT NO. 854 PROJECT NO. 000034 - 09216 -0 NEW HOPE, MINNESOTA 2009 71IS BID IS SUBMITTED TO: :ity of New Hope :ity Hall 401 Xylon Avenue North ew Hope, MN 55428 -4898 01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in e Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated this Bid and in accordance with the other terms and conditions of the Bidding Documents. DI Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the ;position of Bid Security. The Bid will remain subject to acceptance for 60 days after the Bid Opening, or for such longer period of time 3t Bidder may agree to in writing upon request of Owner. In submitting this Bid, Bidder represents that: A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all which is hereby acknowledged: Addendum No. Addendum Date A7 I/ 4r 1! zelvY B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Bidder is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work. D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at, or contiguous to, the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at, or contiguous to, the Site (except Underground Facilities) which have been identified in SC -4.02, and (2) reports and drawings of Hazardous Environmental Conditions that have been identified in SC -4.06. 1216-0 nestroo 00410-1 BID FORM Unit Prices have been computed in accordance with Paragraph 11.03.B of the General Conditions No. 1 2 3 4 5 6 7 E 9 10 11 12 13 14 15 16 1 34 -09216-0 09 Bonestroo Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities provided, determined as provided in the Contract Documents. Item BASE BID: MOBILIZATION LUMP SUM CLEARING TREE GRUBBING TREE REMOVE RETAINING WALL SQ FT REMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD SAWING BITUMINOUS PAVEMENT LIN FT SALVAGE AND REINSTALL CHAIN LINK FENCE LIN FT RELOCATE SATELLITE DISH EACH MODIFY EXISTING WOOD RETAINING WALL SQ FT MODIFY EXISTING MODULAR BLOCK SQ FT RETAINING WALL $ � oz. U l COMMON EXCAVATION CU YD MODULAR BLOCK RETAINING WALL SQ FT ADJUST CURB BOX EACH TRAFFIC CONTROL LUMP SUM SODDING TYPE LAWN SQ YD SELECT TOPSOIL BORROW SPECIAL (LV) CU YD TOTAL BASE BID r 00410 -3 Qty Unit Price Total Price BID FORM 4$ 7� f ��-- $ . 4525 $ ' . _.--- 20$ , .°..�- $ � oz. U l 100 $ $ ` 1 $ x7 $ 00 0 '•��' 15$ �t t $ 30 $ �< $ �c 450 $ r $ 2950$ l �1 $ — FtQ 22 7 J . q --q ' $ 1 $ $ 2050 $ 3 1 $ �f 300 $ IOU Pik-, 8 $ f r �. (,� (Q ffi' 0 ) 6 BID FORM A PartnershlD A Corporation Partnership Name: (SEAL) By: Name (typed or printed): (Signature of general partner) Business Street Address (No P.O. Box #'s): Phone No.: Fax No.: Corporation Name: �i/15 /rG�IU�y1 (SEAL) State of Incorporation: G'(.° Type (General Business, Professional, Service, Limited Liability): _ By �- (Signature) Name (typed or printed): Title: ;r-5 Attest (CORPORATE SEAL) (Signature of Corporate Secretary) Business Street Address (No P.O. Box #'s): �� „� �� � 4� p i irtaj? L4 ' my-j 5 Phone No.: 0 -; 7 - - L Z1 Fax No.: / 1 LORI AlA 1NTEIR 'OTARY PUBLIC 4c MI.-JNkSOTA My 4ommr von Explraa Jan. 31, 201 t 34 -09216-0 B9 Bonesbw 00410 -5 BID FORM THE AMERIC AR CHITECTS AIA Document A310 Bid Bond BOND # RB9158029583 KNOW ALL MEN BY THESE PRESENTS that we TMS CONSTRUCTION INC. 5990 MEADOWLARK LANE, PRIOR LAKE, MN 55372 (Here insert full name and address or legal title of Contractor) as Principal, hereinafter called the Principal, and GRANITE RE, INC. 14001 QUAILBROOK DRIVE, OKLAHOMA CITY, OK 73134 (Here insert full name and address or legal title of Surety) a corporation duly organized under the laws of the State of OKLAHOMA as Surety, hereinafter called the Surety, are held and firmly bound unto City of New Hope (Here insert full name and address or legal title of Owner) as Obligee, hereinafter called the Obligee, in the sum of FIVE AND 00/100 PERCENT of Amount Bid------------------- - - - - -- Dollars ( $ 5 % of Amount Bid), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for PROJECT NO. 854 - 2009 RETIANING WALL IMPROVEMENTS (Here insert full name, address and description of project) NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 1st day of September, 2009. (Witness) � (Witness) TMS CON TION .IN _. rin ' (S (Title) GRANITE RE INC (Sure (Seal) ( tie) Jonathan Pate, Attorney -in -Fact Pate Bonding, Inc. 1276 South Robert Street West St. Paul, MN 55118 (651)457 -6842 AIA DOCUMENT A310 BID BOND AIA ® FEBRUARY 1970 ED THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W. WASHINGTON, D.C. 20006 State of ACKNOWLEDGMENT OF PRINCIPAL (Individual) ) County of )) On this day of in the year , before me personally come(s) , to me known and known to me to be the person(s) who (is) (are) described in and executed the foregoing instrument and acknowledge(s) to me that _ he — executed the same. Notary Public State of ACKNOWLEDGMENT OF PRINCIPAL (Partnership) ) County of ) On this day of in the year , before me personally come(s) a member of the co- partnership of to me known and known to me to be the person who is described in and executed the foregoing instrument and acknowledges to me that he executed the same as for the act and deed of the said co- partnership. Notary Public State of ACKNOWLEDGMENT OF PRINCIPAL (Corporation) -MtAmn h ) County of ) On this , day of na in the yea before me personally come(s) 1"?_' _{ i 1 r a : says that he is the to me known, who, being duly sworn, deposes and and of the 'T��1,� the corporation described in and which executed the foregoing instruments that he knows the seal of the said corporation; the seal affixed to the said instrument is such c ate seal; that it was so affixed by the order if the ofsaid corporation, and that he signed his name ther like order. TONI L. REIS e, L NOTARY P UBLIC My Commissi n Expires flan. 312012 Notary Public Mate of Minnesota ACKNOWLEDGMENT OF SURETY ) .ounty of Dakota ) G GENE Know all Men by these Presents: That GRANITE RE, INC., a corporation oreani7Pri To sign its name as surety to, and to execute, cts and things 'set forth in the resolution of the Boa nd made a part of this Power of Attorney; and the s nd whatsoever the said: DNATHAN PATE; WANDA FRANZ, TOM LAHL; LISA resents. In Witness Whereof, the said GRANITE RE, Its ignatures of its President and Secretary/Treasurer, th. FATE OF OKLAHOMA ) s F SS. Mkt OUNTY OF OKLAHOMA ) On this 14 day of January, 2008, before me f vorn, said, that they, the sai( e GRANITE RE, INC., the cor )rporation; that the seal affixi 'd ZAN ITE RE INC. AL POWER OF ATTORNEY id existing under the laws of the State of OKLAHOMA and having its principal office' k does hereby constitute and appoint: A. FRANCOUR, JENNIFER BOYLES its true and lawful Attorney -in'- Fact(s) for the ind acknowledge any and all bonds, and to respectively do and perform any and all Directors of the said GRANITE RE, INC. a certified copy of which is hereto annexed RANITE RE, INC. through us its Board of Directors, hereby ratifies and confirms all FRANCOUR JENNIFER BOYLES may lawfully do in the premises by virtue of these s caused this instrument to be sealed with its corporate seal, duly attested by the 'day of January, 2008. Kenneth D. Whittin on, President Rodman A. Frates, Secretary/Treasurer sally came Kenneth D. Whittington,' President of the GRANITE RE, INC. Company y, with both of whom 1 am personally acquainted, who being by me severally duly 1 Rodman A. Frates were respectively the President and the` Secretary/Treasurer of ich executed the foregoing Power of Attorney, that they each knew the seat of said was such corporate seal, that it was so fixed by order of the Board of Directors of i corporation, and that they signeo tneir name tnereto by like 'order as President and Secretary/Treasurer, respectively, of the Company. A N OTA � R�r My Commission Expires: May 9, 2008 NotarWubl Commission # 00005708 ' GRANITE RE, INC'' Certificate E UNDERSIGNED, being the duly elected and acting Secretary/Treasurer of Granite Re, Inc., an Oklahoma Corporation, HEREBY CERTIFIES tt the following resolution is a "true and correct excerpt from the July 15, 1987, minutes of the meeting of the Board of Directors of Granite Inc. and that said Power of Attorney has not been revoked and is now in full force and effect. "RESOLVED, that the President, any Vice President, the Secretary, and any Assistant Vice President shall each have authority to appoint individuals as attorneys -in -fact or under other appropriate' titles with authority to execute on behalf of the company fidelity and surety bonds and other documents of similar character issued by the Company in the course of its business. On any instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond or undertaking of the Company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced; provided, however, that the seal shall not be necessary to the validity, of any such instrument or undertaking." NITNESS WHEREOF, the undersigned has subscribed this Certificate and affixed the corporate seal of the Corporation this day of September, 2009 �ttE PtC � O �MPW� c e °�• z odfdmman A. Frates, Secretary/Treasurer 0 -1 ii I ii 1 AGREEMENT FORM THIS AGREEMENT is by and between the City of New Hope, Minnesota (hereinafter called Owner) and TMS Construction Inc. (hereinafter called Contractor). Owner and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1- WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Retaining Wall Improvements. ARTICLE 2 - THE PROJECT 2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: 2009 Retaining Wall Improvements for the City of New Hope, Minnesota, City Project No. 854. ARTICLE 3 - ENGINEER 3.01 The Project has been designed by Bonestroo, 2335 Highway 36 West, St. Paul, MN 55113 (Engineer), who is to act as Owner's representative, assume all duties and responsibilities, and will have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 4 - CONTRACT TIMES 4.01 Time of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. 4.02 Dates for Substantial Completion and Final Payment A. The Work will be Substantially Completed on or before November 20, 2009, and completed and ready for Final Payment in accordance with Paragraph 14.07 of the General Conditions on or before July 16, 2010. 4.03 Liquidated Damages A. Contractor and Owner recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as Liquidated Damages for delay (but not as a penalty), Contractor shall pay Owner $100 for each day that expires after the time specified in Paragraph 4.02 for Milestones and 000034 - 09216 -0 00520 -1 © 2009 Bonestroo AGREEMENT FORM Substantial Completion until the Work is Substantially Complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $100 for each day that expires after the time specified in Paragraph 4.02 for completion and readiness for Final Payment until the Work is completed and ready for Final Payment. ARTICLE 5 - CONTRACT PRICE 5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current funds as follows: For all Work at the prices stated in Contractor's Bid, attached hereto as an exhibit for an Original Contract Amount of Eighty -Four Thousand One Hundred Sixty -Four Dollars and Ninety Cents ($84,164.90) for the Total Base Bid. ARTICLE 6 - PAYMENT PROCEDURES 6.01 Submittal and Processing of Payments A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions. 6.02 Progress Payments, Retainage A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment, monthly during performance of the Work as provided in Paragraphs 6.02.A1 and 6.02.A2 below. All such payments will be measured by the Schedule of Values established in Paragraph 2.07.A of the General Conditions (and in the case of Bid Unit Price Work based on the number of units completed) or, in the event there is no Schedule of Values, as provided in the General Requirements: 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but in each case, less the aggregate of payments previously made and less such amounts as Engineer may determine or Owner may withhold, including but not limited to liquidated damages, in accordance with Paragraph 14.02 of the General Conditions: a. 95 percent of Work completed (with the balance being retainage). b. 95 percent of cost of materials and equipment not incorporated in the Work (with the balance being retainage). 2. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 100 percent of the Work completed, less such amounts as Engineer shall determine in accordance with Paragraph 14.02.B5 of the General Conditions and less 100 percent of Engineer's estimate of the value of Work to be completed or corrected as shown on the tentative list of items to be completed or corrected attached to the certificate of Substantial Completion. 6.03 Final Payment A. Upon Final Completion and acceptance of the Work, in accordance with Paragraph 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 14.07. 000034 - 09216 -0 00520 -2 © 2009 Bonestroo AGREEMENT FORM ARTICLE 7 - INTEREST 7.01 All moneys not paid when due, as provided in Article 14 of the General Conditions, shall bear interest at the maximum rate allowed by law at the place of the Project. ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS 8.01 In order to induce Owner to enter into this Agreement, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work. D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in Paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the Site which has been identified in the Supplementary Conditions as provided in Paragraph 4.06 of the General Conditions. E. Contractor has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work, or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including applying the specific means, methods, techniques, sequences, and procedures of construction, if any, expressly required by the Contract Documents to be employed by Contractor and safety precautions and programs incident thereto. F. Contractor does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has correlated the information known to Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. I. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor. 000034 - 09216 -0 00520 -3 © 2009 Bonestroo AGREEMENT FORM J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. ARTICLE 9 - CONTRACT DOCUMENTS 9.01 Contents A. The Contract Documents consist of the following: 1. This Agreement. 2. Performance Bond, Payment Bond, and other Bonds. 3. General Conditions. 4. Supplementary Conditions. 5. Specifications. 6. Drawings bearing the following general title: 2009 Retaining Wall Improvements. 7. Addendum A. 8. Exhibits to this Agreement (enumerated as follows): a. Contractor's Bid Form. b. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto: a. Notice to Proceed. b. Work Change Directives. C. Change Order(s). B. The documents listed in Paragraph 9.01.A are attached to this Agreement (except as expressly noted otherwise above). C. There are no Contract Documents other than those listed above in this Article 9. D. The Contract Documents may only be amended, modified, or supplemented as provided in Paragraph 3.04 of the General Conditions. 000034- 09216 -0 00520 -4 © 2009 Bonestroo AGREEMENT FORM ARTICLE 14 - MISCELLANEOUS 10.01 Terms A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions. 10.02 Assignment of Contract A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 10.03 Successors and Assigns A. Owner and Contractor each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 10.04 Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 000034 - 09216 -0 00520 -5 0 2009 Bonestroo AGREEMENT FORM Any singular reference to Contractor, Surety, Owner, or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): OWNER (Name and Address): CONTRACT Date: Amount: Description (Name and Location): BOND Bond Number: Date (Not earlier than Contract Date): Amount: Modifications to this Bond Form: SURETY (Name and Address of Principal Place of Business): Surety and Contractor, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Performance Bond to be duly executed on its behalf by its authorized officer, agent, or representative. CONTRACTOR AS PRINCIPAL Company: Signature: _ Name and Title: SURETY Surety's Name and Corporate Seal By: Signature and Title (Attach Power of Attorney) (Space is provided below for signatures of additional parties, if required.) Attest: Signature and Title CONTRACTOR AS PRINCIPAL Company: Signature: _ Name and Title: (Seal) (Seal) SURETY Surety's Name and Corporate Seal By: Signature and Title (Attach Power of Attorney) Attest: Signature and Title: (Seal) (Seal) EJCDC No. C -610 (2002 Edition) Originally prepared through the joint efforts of the Surety Association of America, Engineers Joint Contract Documents Committee, the Associated General Contractors of America, and the American Institute of Architects. 00610 -1 I . Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to Owner for the performance of the Contract, which is incorporated herein by reference. 1 If Contractor performs the Contract, Surety and Contractor have no obligation under this Bond, except to participate in conferences as provided in Paragraph 3.1. 3. If there is no Owner Default, Surety's obligation under this Bond shall arise after: 3.1. Owner has notified Contractor and Surety, at the addresses described in Paragraph 10 below, that Owner is considering declaring a Contractor Default and has requested and attempted to arrange a conference with Contractor and Surety to be held not later than 15 days after receipt of such notice to discuss methods of performing the Contract. If Owner, Contractor and Surety agree, Contractor shall be allowed a reasonable time to perform the Contract, but such an agreement shall not waive Owner's right, if any, subsequently to declare a Contractor Default; and 3.2. Owner has declared a Contractor Default and formally terminated Contractor's right to complete the Contract. Such Contractor Default shall not be declared earlier than 20 days after Contractor and Surety have received notice as provided in Paragraph 3.1; and 3.3. Owner has agreed to pay the Balance of the Contract Price to: 1. Surety in accordance with the terms of the Contract; 2. Another contractor selected pursuant to Paragraph 4.3 to perform the Contract. 4. When Owner has satisfied the conditions of Paragraph 3, Surety shall promptly and at Surety's expense take one of the following actions: 4.1. Arrange for Contractor, with consent of Owner, to perform and complete the Contract; or 4.2. Undertake to perform and complete the Contract itself, through its agents or through independent contractors; or 4.3. Obtain bids or negotiated proposals from qualified contractors acceptable to Owner for a contract for performance and completion of the Contract, arrange for a contract to be prepared for execution by Owner and Contractor selected with Owner's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Contract, and pay to Owner the amount of damages as described in Paragraph 6 in excess of the Balance of the Contract Price incurred by Owner resulting from Contractor Default; or 4.4. Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances: 1. After investigation, determine the amount for which it may be liable to Owner and, as soon as practicable after the amount is determined, tender payment therefor to Owner; or 2. Deny liability in whole or in part and notify Owner citing reasons therefor. 5. If Surety does not proceed as provided in Paragraph 4 with reasonable promptness, Surety shall be deemed to be in default on this Bond 15 days after receipt of an additional written notice from Owner to Surety demanding that Surety perform its obligations under this Bond, and Owner shall be entitled to enforce any remedy available to Owner. If Surety proceeds as provided in Paragraph 4.4, and Owner refuses the payment tendered or Surety has denied liability, in whole or in part, without further notice Owner shall be entitled to enforce any remedy available to Owner. 6. After Owner has terminated Contractor's right to complete the Contract, and i Surety elects to act under Paragraph 4.1, 4.2, or 4.3 above, then the responsibilities o Surety to Owner shall not be greater than those of Contractor under the Contract, an the responsibilities of Owner to Surety shall not be greater than those of Owner unde the Contract. To a limit of the amount of this Bond, but subject to commitment b; Owner of the Balance of the Contract Price to mitigation of costs and damages on th Contract, Surety is obligated without duplication for: 6.1. The responsibilities of Contractor for correction of defective Work an( completion of the Contract; 6.2. Additional legal, design professional, and delay costs resulting fron Contractor's Default, and resulting from the actions or failure to act o Surety under Paragraph 4; and 6.3. Liquidated damages, or if no liquidated damages are specified in flit Contract, actual damages caused by delayed performance or non performance of Contractor. 7. Surety shall not be liable to Owner or others for obligations of Contractor that art unrelated to the Contract, and the Balance of the Contract Price shall not be reduced o setoff on account of any such unrelated obligations. No right of action shall accrue or this Bond to any person or entity other than Owner or its heirs, executors administrators, or successors. 8. Surety hereby waives notice of any change, including changes of time, to Contrac or to related subcontracts, purchase orders, and other obligations. 9. Any proceeding, legal or equitable, under this Bond may be instituted in any cour of competent jurisdiction in the location in which the Work or part of the Work i; located and shall be instituted within two years after Contractor Default or within tw( years after Contractor ceased working or within two years after Surety refuses or fail: to perform its obligations under this Bond, whichever occurs first. If the provisions o: this paragraph are void or prohibited by law, the minimum period of limitatior available to sureties as a defense in the jurisdiction of the suit shall be applicable. 10. Notice to Surety, Owner, or Contractor shall be mailed or delivered to the address shown on the signature page. 11. When this Bond has been furnished to comply with a statutory requirement in th¢ location where the Contract was to be performed, any provision in this Bon( conflicting with said statutory requirement shall be deemed deleted herefrom anc provisions conforming to such statutory requirement shall be deemed incorporates herein. The intent is that this Bond shall be construed as a statutory bond and not as s common law bond. 12. Definitions. 12.1 Balance of the Contract Price: The total amount payable by Owner tc Contractor under the Contract after all proper adjustments have beer made, including allowance to Contractor of any amounts received or to be received by Owner in settlement of insurance or other Claims for damages to which Contractor is entitled, reduced by all valid and proper payment: made to or on behalf of Contractor under the Contract. 12.2. Contract: The agreement between Owner and Contractor identified on the signature page, including all Contract Documents and changes thereto. 12.3. Contractor Default: Failure of Contractor, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Contract. 12.4. Owner Default: Failure of Owner, which has neither been remedied nor waived, to pay Contractor as required by the Contract or to perform and complete or comply with the other terms thereof. FOR INFORMATION ONLY — Name, Address and Telephone Surety Agency or Broker Owner's Representative (engineer or other party) 00610 -2 16AMAki 10191 6*11121C Any singular reference to Contractor, Surety, Owner, or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): OWNER (Name and Address): CONTRACT Date: Amount: Description (Name and Location): BOND Bond Number: Date (Not earlier than Contract Date): Amount: Modifications to this Bond Form: SURETY (Name and Address of Principal Place of Business): Surety and Contractor, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Payment Bond to be duly executed on its behalf by its authorized officer, agent, or representative. CONTRACTOR AS PRINCIPAL Company: Signature: _ Name and Title: (Seal) SURETY Surety's Name and Corporate Seal By: Signature and Title (Attach Power of Attorney) (Space is provided below for signatures of additional parties, if required.) Attest: Signature and Title CONTRACTOR AS PRINCIPAL Company: Signature: _ Name and Title: (Seal) Surety's Name and Corporate Seal By: Signature and Title (Attach Power of Attorney) Attest: Signature and Title: (Seal) (Seal) EJCDC No. C -615 (2002 Edition) Originally prepared through the joint efforts of the Surety Association of America, Engineers Joint Contract Documents Committee, the Associated General Contractors of America, the American Institute of Architects, the American Subcontractors Association, and the Associated Specialty Contractors. 00615 -1 1. Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to Owner to pay for labor, materials, and equipment furnished by Claimants for use in the performance of the Contract, which is incorporated herein by reference. 2. With respect to Owner, this obligation shall be null and void if Contractor: 2.1. Promptly makes payment, directly or indirectly, for all sums due Claimants, and 2.2. Defends, indemnifies, and holds harmless Owner from all claims, demands, liens, or suits alleging non - payment by Contractor by any person or entity who furnished labor, materials, or equipment for use in the performance of the Contract, provided Owner has promptly notified Contractor and Surety (at the addresses described in Paragraph 12) of any claims, demands, liens, or suits and tendered defense of such claims, demands, liens, or suits to Contractor and Surety, and provided there is no Owner Default. 3. With respect to Claimants, this obligation shall be null and void if Contractor promptly makes payment, directly or indirectly, for all sums due. 4. Surety= shall have no obligation to Claimants under this Bond until: 4.1. Claimants who are employed by or have a direct contract with Contractor have given notice to Surety (at the addresses described in Paragraph 12) and sent a copy, or notice thereof, to Owner, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim. 4.2. Claimants who do not have a direct contract with Contractor: 1. Have furnished written notice to Contractor and sent a copy, or notice thereof, to Owner, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials or equipment were furnished or supplied, or for whom the labor was done or performed; and 2. Have either received a rejection in whole or in part from Contractor, or not received within 30 days of furnishing the above notice any communication from Contractor by which Contractor had indicated the claim will be paid directly or indirectly; and 3. Not having been paid within the above 30 days, have sent a written notice to Surety and sent a copy, or notice thereof, to Owner, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to Contractor. 5. If a notice by a Claimant required by Paragraph 4 is provided by Owner to Contractor or to Surety, that is sufficient compliance. 6. When a Claimant has satisfied the conditions of Paragraph 4, the Surety shall promptly and at Surety's expense take the following actions: 6.1. Send an answer to that Claimant, with a copy to Owner, within 45 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed. 6.2. Pay or arrange for payment of any undisputed amounts. 7. Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by Surety. 8. Amounts owed by Owner to Contractor under the Contract shall be used foi the performance of the Contract and to satisfy claims, if any, under an} performance bond. By Contractor furnishing and Owner accepting this Bond they agree that all funds earned by Contractor in the performance of the Contrac' are dedicated to satisfy obligations of Contractor and Surety under this Bond. subject to Owner's priority to use the funds for the completion of the Work. 9. Surety shall not be liable to Owner, Claimants, or others for obligations of Contractor that are unrelated to the Contract. Owner shall not be liable foi payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond. 10. Surety hereby waives notice of any change, including changes of time, to the Contract or to related Subcontracts, purchase orders and other obligations. 11. No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the location in which the Work or part of the Work is located or after the expiration of one year from the date (1) on which the Claimant gave the notice required by Paragraph 4.1 or Paragraph 4.2.3, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 12. Notice to Surety, Owner, or Contractor shall be mailed or delivered to the addresses shown on the signature page. Actual receipt of notice by Surety, Owner, or Contractor, however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page. 13. When this Bond has been furnished to comply with a statutory requirement in the location where the Contract was to be performed, any provision in this Bond conflicting with said statutory requirement shall be deemed deleted herefrom and provisions conforming to such statutory requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory Bond and not as a common law bond. 14. Upon request of any person or entity appearing to be a potential beneficiary of this Bond, Contractor shall promptly furnish a copy of this Bond or shall permit a copy to be made. 15. DEFINITIONS 15.1. Claimant: An individual or entity having a direct contract with Contractor, or with a first -tier subcontractor of Contractor, to furnish labor, materials, or equipment for use in the performance of the Contract. The intent of this Bond shall be to include without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service, or rental equipment used in the Contract, architectural and engineering services required for performance of the Work of Contractor and Contractor's Subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials, or equipment were furnished. 15.2. Contract: The agreement between Owner and Contractor identified on the signature page, including all Contract Documents and changes thereto. 15.3. Owner Default: Failure of Owner, which has neither been remedied nor waived, to pay Contractor as required by the Contract or to perform and complete or comply with the other terms thereof. FOR INFORMATION ONLY — Name, Address and Telephone Surety Agency or Broker: Owner's Representative (engineer or other party): 00615 -2 Nomly Prepared by ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE and Issued and Published Jointly By AMERICAN COUNCIL OF ENGINEERING COMPANIES AMERICAN SOCIETY OF CIVIL ENGINEERS This document has been approved and endorsed by ' C The Associated General Contractors of America ittsrwwkaclga lbr CKeaz6j .0 off ff and Sustalr�ng Construction Specifications Institute EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-1 Copyright ©2002 National Society of Professional Engineers 1420 King Street, Alexandria, VA 22314 American Council of Engineering Companies 1015 15th Street, N.W., Washington, DC 20005 American Society of Civil Engineers 1801 Alexander Bell Drive, Reston, VA 20191 -4400 These General Conditions have been prepared for use with the Suggested Forms of Agreement Between Owner and Contractor Nos. C -520 or C -525 (2002 Editions). Their provisions are interrelated and a change in one may necessitate a change in the other. Comments concerning their usage are contained in the EJCDC Construction Documents, General and Instructions (No. C -001) (2002 Edition). For guidance in the preparation of Supplementary Conditions, see Guide to the Preparation of Supplementary Conditions (No. C -800) (2002 Edition). EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-2 TABLE OF CONTENTS Page ARTICLE 1 - DEFINITIONS AND TERMINOLOGY ................................................................................ ..............................6 1.01 Defined Terms ............................................................................................................................ ..............................6 1.02 Terminology ............................................................................................................................... ..............................8 ARTICLE 2 - PRELIMINARY MATTERS ................................................................................................. ..............................9 2.01 Delivery of Bonds and Evidence of Insurance ........................................................................... ..............................9 2.02 Copies of Documents ................................................................................................................. ..............................9 2.03 Commencement of Contract Times; Notice to Proceed ............................................................. ..............................9 2.04 Starting the Work ....................................................................................................................... ..............................9 2.05 Before Starting Construction ..................................................................................................... ..............................9 2.06 Preconstruction Conference ...................................................................................................... ..............................9 2.07 Initial Acceptance of Schedules ................................................................................................. ..............................9 ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE ......................................... .............................10 3.01 Intent ......................................................................................................................................... .............................10 3.02 Reference Standards ................................................................................................................. .............................10 3.03 Reporting and Resolving Discrepancies ................................................................................... .............................10 3.04 Amending and Supplementing Contract Documents ............................................................... ............................... 11 3.05 Reuse of Documents ................................................................................................................ ............................... 11 3.06 Electronic Data ....................................................................................................................... ............................... l l ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS ................................................................... .............................11 4.01 Availability of Lands ............................................................................................................... ............................... 11 4.02 Subsurface and Physical Conditions ......................................................................................... .............................12 4.03 Differing Subsurface or Physical Conditions ........................................................................... .............................12 4.04 Underground Facilities ............................................................................................................. .............................13 4.05 Reference Points ....................................................................................................................... .............................13 4.06 Hazardous Environmental Condition at Site ............................................................................ .............................13 ARTICLE 5 - BONDS AND INSURANCE ................................................................................................ .............................14 5.01 Performance, Payment, and Other Bonds ................................................................................. .............................14 5.02 Licensed Sureties and Insurers ................................................................................................. .............................15 5.03 Certificates of Insurance ........................................................................................................... .............................15 5.04 Contractor's Liability Insurance .............................................................................................. .............................15 5.05 Owner's Liability Insurance ..................................................................................................... .............................16 5.06 Property Insurance ................................................................................................................... .............................16 5.07 Waiver of Rights ........................................................................................................................ .............................17 5.08 Receipt and Application of Insurance Proceeds ....................................................................... .............................17 5.09 Acceptance of Bonds and Insurance; Option to Replace .......................................................... .............................17 5.10 Partial Utilization, Acknowledgment of Property Insurer ........................................................ .............................18 ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES ............................................................................. .............................18 6.01 Supervision and Superintendence ............................................................................................. .............................18 6.02 Labor; Working Hours .............................................................................................................. .............................18 6.03 Services, Materials, and Equipment .......................................................................................... .............................18 6.04 Progress Schedule ..................................................................................................................... .............................18 6.05 Substitutes and "Or- Equals .. .................................................................................................... .............................19 6.06 Concerning Subcontractors, Suppliers, and Others .................................................................. .............................20 6.07 Patent Fees and Royalties ......................................................................................................... .............................21 6.08 Permits ...................................................................................................................................... .............................21 6.09 Laws and Regulations ............................................................................................................... .............................21 6.10 Taxes ......................................................................................................................................... .............................22 6.11 Use of Site and Other Areas ...................................................................................................... .............................22 6.12 Record Documents .................................................................................................................... .............................22 6.13 Safety and Protection ................................................................................................................ .............................22 6.14 Safety Representative ................................................................................................................ .............................23 6.15 Hazard Communication Programs ........................................................................................... .............................23 EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700- 6.16 Emergencies .............................................................................................................................. .............................23 6.17 Shop Drawings and Samples .................................................................................................... .............................23 6.18 Continuing the Work ................................................................................................................. .............................24 6.19 Contractor's General Warranty and Guarantee ....................................................................... .............................24 6.20 Indemnification ......................................................................................................................... .............................24 6.21 Delegation of Professional Design Services ............................................................................. .............................25 ARTICLE - OTHER WORK AT THE SITE ............................................................................................ .............................25 7.01 Related Work at Site .................................................................................................................. .............................25 7.02 Coordination ............................................................................................................................. .............................26 7.03 Legal Relationships ................................................................................................................... .............................26 ARTICLE - OWNER'S RESPONSIBILITIES ......................................................................................... .............................26 8.01 Communications to Contractor ................................................................................................. .............................26 8.02 Replacement of Engineer .......................................................................................................... .............................26 8.03 Furnish Data ............................................................................................................................. .............................26 8.04 Pay When Due .......................................................................................................................... .............................26 8.05 Lands and Easements; Reports and Tests ................................................................................. .............................26 8.06 Insurance .................................................................................................................................. .............................26 8.07 Change Orders .......................................................................................................................... .............................26 8.08 Inspections, Tests, and Approvals ............................................................................................. .............................26 8.09 Limitations on Owner's Responsibilities .................................................................................. .............................27 8.10 Undisclosed Hazardous Environmental Condition ................................................................... .............................27 8.11 Evidence of Financial Arrangements ........................................................................................ .............................27 ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION ........................................................ .............................27 9.01 Owner's Representative ............................................................................................................ .............................27 9.02 Visits to Site .............................................................................................................................. .............................27 9 .03 Project Representative ............................................................................................................ ............................... 27 9.04 Authorized Variations in Work ................................................................................................. .............................27 9.05 Rejecting Defective Work .......................................................................................................... .............................27 9.06 Shop Drawings, Change Orders and Payments ........................................................................ .............................28 9.07 Determinations for Unit Price Work ......................................................................................... .............................28 9.08 Decisions on Requirements of Contract Documents and Acceptability of Work ...................... .............................28 9.09 Limitations on Engineer's Authority and Responsibilities ........................................................ .............................28 ARTICLE10 - CHANGES IN THE WORK; CLAIMS .............................................................................. .............................28 10.01 Authorized Changes in the Work .............................................................................................. .............................28 10.02 Unauthorized Changes in the Work .......................................................................................... .............................29 10.03 Execution of Change Orders ..................................................................................................... .............................29 10.04 Notification to Surety ................................................................................................................ .............................29 10.05 Claims ....................................................................................................................................... .............................29 ARTICLE 11 - COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK ..................................... .............................30 11.01 Cost of the Work ....................................................................................................................... .............................30 11 .02 Allowances ................................................................................................................................ .............................31 11 .03 Unit Price Work ........................................................................................................................ .............................31 ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES ........................ .............................32 12.01 Change of Contract Price ......................................................................................................... .............................32 12.02 Change of Contract Times ........................................................................................................ .............................33 12.03 Delays ....................................................................................................................................... .............................33 ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK ....... 33 13.01 Notice of Defects ....................................................................................................................... .............................33 13.02 Access to Work .......................................................................................................................... .............................33 13.03 Tests and Inspections ................................................................................................................ .............................33 13.04 Uncovering Work ...................................................................................................................... .............................34 13.05 Owner May Stop the Work ........................................................................................................ .............................34 13.06 Correction or Removal of Defective Work ................................................................................ .............................34 13.07 Correction Period ..................................................................................................................... .............................34 13.08 Acceptance of Defective Work ................................................................................................ ............................... 35 13.09 Owner May Correct Defective Work ......................................................................................... .............................35 ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION ................................................. .............................36 14.01 Schedule of Values .................................................................................................................... .............................36 14.02 Progress Payments .................................................................................................................... .............................36 14.03 Contractor's Warranty of Title ................................................................................................. .............................37 14.04 Substantial Completion ..................................... ........................................................................ .............................37 EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-4 14.05 Partial Utilization ..................................................................................................................... .............................38 14 .06 Final Inspection ........................................................................................................................ .............................38 14 .07 Final Payment ........................................................................................................................... .............................38 14.08 Final Completion Delayed ........................................................................................................ .............................39 14.09 Waiver of Claims ...................................................................................................................... .............................39 ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION ............................................................ .............................39 15.01 Owner May Suspend Work ........................................................................................................ .............................39 15.02 Owner May Terminate for Cause .............................................................................................. .............................39 15.03 Owner May Terminate For Convenience .................................................................................. .............................40 15.04 Contractor May Stop Work or Terminate ................................................................................. .............................40 ARTICLE 16 - DISPUTE RESOLUTION ................................................................................................... .............................41 16.01 Methods and Procedures .......................................................................................................... .............................41 ARTICLE17 - MISCELLANEOUS ............................................................................................................ .............................41 17.01 Giving Notice ............................................................................................................................ .............................41 17 .02 Computation of Times ............................................................................................................... .............................41 17 .03 Cumulative Remedies ................................................................................................................ .............................41 17 .04 Survival of Obligations ............................................................................................................. .............................41 17 .05 Controlling Law ........................................................................................................................ .............................41 17.06 Headings ................................................................................................................................... .............................41 EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-5 GENERAL CONDITIONS ARTICLE 1 - DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in the Bidding Requirements or Contract Documents and printed with initial capital letters, the terms listed below will have the meanings indicated which are applicable to both the singular and plural thereof. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda -- Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement- -The written instrument which is evidence of the agreement between Owner and Contractor covering the Work. 3. Application for Payment - -The form acceptable to Engineer which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos- -Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Bid - -The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 6. Bidder - -The individual or entity who submits a Bid directly to Owner. 7. Bidding Documents - -The Bidding Requirements and the proposed Contract Documents (including all Addenda). 8. Bidding Requirements- -The Advertisement or Invitation to Bid, Instructions to Bidders, bid security of acceptable form, if any, and the Bid Form with any supplements. 9. Change Order - -A document recommended by Engineer which is signed by Contractor and Owner and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Agreement. 10. Claim - -A demand or assertion by Owner or Contractor seeking an adjustment of Contract Price or Contract Times, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Claim. 11. Contract- -The entire and integrated written agreement between the Owner and Contractor concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 12. Contract Documents -- Those items so designated in the Agreement. Only printed or hard copies of the items listed in the Agreement are Contract Documents, Approved Shop Drawings, other Contractor's submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 13. Contract Price - -The moneys payable by Owner to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 14. Contract Times - -The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any, (ii) achieve Substantial Completion; and (iii) com- plete the Work so that it is ready for final payment as evidenced by Engineer's written recommendation of final payment. 15. Contractor - -The individual or entity with whom Owner has entered into the Agreement. 16. Cost of the Work - -See Paragraph 11.0 LA for definition. 17. Drawings - -That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Shop Drawings and other Contractor submittals are not Drawings as so defined. 18. Effective Date of the Agreement - -The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 19. Engineer - -The individual or entity named as such in the Agreement. EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700- 20. Field Order - - A written order issued by Engineer which requires minor changes in the Work but which does not involve a change in the Contract Price or the Contract Times. 21. General Requirements -- Sections of Division 1 of the Specifications. The General Requirements pertain to all sections of the Specifications. 22. Hazardous Environmental Condition - - The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, or Radioactive Material in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto in connection with the Work. 23. Hazardous Waste - - The term Hazardous Waste shall have the meaning provided in Section 1004 of the Solid Waste Disposal Act (42 USC Section 6903) as amended from time to time. 24. Laws and Regulations; Laws or Regulations - -Any and all applicable laws, rules, regulations, ordinanc- es, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 25. Liens -- Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 26. Milestone - - A principal event specified in the Contract Documents relating to an intermediate comple- tion date or time prior to Substantial Completion of all the Work. 27. Notice of Award- -The written notice by Owner to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, Owner will sign and deliver the Agreement. 28. Notice to Proceed - - A written notice given by Owner to Contractor fixing the date on which the Con- tract Times will commence to run and on which Contractor shall start to perform the Work under the Contract Documents. 29. Owner- -The individual or entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 30. PCBs -- Polychlorinated biphenyls. 31. Petroleum -- Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non - Hazardous Waste and crude oils. 32. Progress Schedule - - A schedule, prepared and maintained by Contractor, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Times. 33. Project- -The total construction of which the Work to be performed under the Contract Documents may be the whole, or a part. 34. Project Manual - - The bound documentary information prepared for bidding and constructing the Work. A listing of the contents of the Project Manual, which may be bound in one or more volumes, is contained in the table(s) of contents. 35. Radioactive Material -- Source, special nucle- ar, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 36. Related Entity -- An officer, director, partner, employee, agent, consultant, or subcontractor. 37. Resident Project Representative - - The autho- rized representative of Engineer who may be assigned to the Site or any part thereof. 38. Samples -- Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 39. Schedule of Submittals - - A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 40. Schedule of Values - - A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 41. Shop Drawings - - All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 42. Site - - Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the Work is to be performed, including rights -of -way and easements for access thereto, and such other lands furnished by Owner which are designated for the use of Contractor. 43. Specifications- -That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and ce rtain EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-7 administrative requirements and procedural matters applicable thereto. 44. Subcontractor - -An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. 45. Substantial Completion - -The time at which the Work (or a specified part thereof) has progressed to the point where, in the opinion of Engineer, the Work (or a specified part thereof) is sufficiently complete, in accordance with the Contract Documents, so that the Work (or a specified part thereof) can be utilized for the purposes for which it is intended. The terms "substantially complete" and "substantially completed" as applied to all or part of the Work refer to Substantial Completion thereof. 46. Successful Bidder- -The Bidder submitting a responsive Bid to whom Owner makes an award. 47. Supplementary Conditions - -That part of the Contract Documents which amends or supplements these General Conditions. 48. Supplier - -A manufacturer, fabricator, suppli- er, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or any Subcontractor. 49. Underground Facilities - -All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 50. Unit Price Work - -Work to be paid for on the basis of unit prices. 51. Work- -The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 52. Work Change Directive - -A written statement to Contractor issued on or after the Effective Date of the Agreement and signed by Owner and recommended by Engineer ordering an addition, deletion, or revision in the Work, or responding to differing or unforeseen subsurface or physical conditions under which the Work is to be performed or to emergencies. A Work Change Directive will not change the Contract Price or the Contract Times but is evidence that the parties expect that the change ordered or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Times. 1.02 Terminology A. The following words or terms are not defined but, when used in the Bidding Requirements or Contract Documents, have the following meaning. B. Intent of Certain Terms or Adjectives 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered ", "as directed" or terms of like effect or import to authorize an exercise of professional judgment by Engineer. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of Engineer as to the Work. It is intended that such exercise of professional judgment, action or determination will be solely to evaluate, in general, the Work for compliance with the requirements of and information in the Contract Documents and conformance with the design concept of the completed Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). The use of any such term or adjective is not intended to and shall not be effective to assign to Engineer any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility contrary to the provisions of Paragraph 9.09 or any other provision of the Contract Documents. 1. The word "day" means a calendar day of 24 hours measured from midnight to the next midnight. D. Defective 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents, or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents, or c. has been damaged prior to Engineer's - recommendation of final payment (unless responsibility for the protection thereof has been assumed by Owner at Substantial Completion in accordance with Paragraph 14.04 or 14.05). EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-8 E. Furnish, Install, Perform, Provide 1. The word "furnish," when used in connection with services, materials, or equipment, shall mean to supply and deliver said services, materials, or equipment to the Site (or some other specified location) ready for use or installation and in usable or operable condition. 2. The word "install," when used in connection with services, materials, or equipment, shall mean to put into use or place in final position said services, materials, or equipment complete and ready for intended use. 3. The words "perform" or "provide," when used in connection with services, materials, or equipment, shall mean to furnish and install said services, materials, or equipment complete and ready for intended use. 4. When "furnish," "install," "perform," or "pro- vide" is not used in connection with services, materials, or equipment in a context clearly requiring an obligation of Contractor, "provide" is implied. F. Unless stated otherwise in the Contract Docu- ments, words or phrases which have a well -known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 - PRELIMINARY MATTERS 2.01 Delivery of Bonds and Evidence of Insurance A. When Contractor delivers the executed counterparts of the Agreement to Owner, Contractor shall also deliver to Owner such bonds as Contractor may be required to furnish. B. Evidence of Insurance: Before any Work at the Site is started, Contractor and Owner shall each deliver to the other, with copies to each additional insured identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance which either of them or any additional insured may reasonably request) which Contractor and Owner respectively are required to purchase and maintain in accordance with Article 5. 2.02 Copies of Documents or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 30 days after the Effective Date of the Agreement. In no event will the Contract Times com- mence to run later than the sixtieth day after the day of Bid opening or the thirtieth day after the Effective Date of the Agreement, whichever date is earlier. 2.04 Starting the Work A. Contractor shall start to perform the Work on the date when the Contract Times commence to run. No Work shall be done at the Site prior to the date on which the Contract Times commence to run. 2.05 Before Starting Construction A. Preliminary Schedules: Within 10 days after the Effective Date of the Agreement (unless otherwise specified in the General Requirements), Contractor shall submit to Engineer for timely review: 1. a preliminary Progress Schedule; indicating the times (numbers of days or dates) for starting and completing the various stages of the Work, including any Milestones specified in the Contract Documents; 2. a preliminary Schedule of Submittals; and 3. a preliminary Schedule of Values for all of the Work which includes quantities and prices of items which when added together equal the Contract Price and subdi- vides the Work into component parts in sufficient detail to serve as the basis for progress payments during performance of the Work. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work. 2.06 Preconstruction Conference A. Before any Work at the Site is started, a conference attended by Owner, Contractor, Engineer, and others as appropriate will be held to establish a working understanding among the parties as to the Work and to discuss the schedules referred to in Paragraph 2.05.A, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, and maintaining required records. 2.07 Initial Acceptance of Schedules A. Owner shall furnish to Contractor up to ten A. At least 10 days before submission of the first printed or hard copies of the Drawings and Project Application for Payment a conference attended by Manual. Additional copies will be furnished upon request Contractor, Engineer, and others as appropriate will be at the cost of reproduction. held to review for acceptability to Engineer as provided below the schedules submitted in accordance with 2.03 Commencement of Contract Times; Notice to Paragraph 2.05.A. Contractor shall have an additional 10 Proceed days to make corrections and adjustments and to complete and resubmit the schedules. No progress payment shall be A. The Contract Times will commence to run on made to Contractor until acceptable schedules are the thirtieth day after the Effective Date of the Agreement submitted to Engineer. EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-9 1. The Progress Schedule will be acceptable to Engineer if it provides an orderly progression of the Work to completion within the Contract Times. Such acceptance will not impose on Engineer responsibility for the Progress Schedule, for sequencing, scheduling, or progress of the Work nor interfere with or relieve Contractor from Contractor's full responsibility therefor. 2. Contractor's Schedule of Submittals will be acceptable to Engineer if it provides a workable arrangement for reviewing and processing the required submittals. 3. Contractor's Schedule of Values will be acceptable to Engineer as to form and substance if it provides a reasonable allocation of the Contract Price to component parts of the Work. ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete Project (or part thereof) to be constructed in accordance with the Contract Docu- ments. Any labor, documentation, services, materials, or equipment that may reasonably be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the intended result will be provided whether or not specifically called for at no additional cost to Owner. C. Clarifications and interpretations of the Contract Documents shall be issued by Engineer as provided in Article 9. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regula- tions in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. responsibilities of Owner, Contractor, or Engineer, or any of their subcontractors, consultants, agents, or employees from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to Owner, or Engineer, or any of, their Related Entities, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake respon- sibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies 1. Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein and all applicable field measurements. Contractor shall promptly report in writing to Engineer any conflict, error, ambiguity, or discrepancy which Contractor may discover and shall obtain a written interpretation or clarification from Engineer before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents or between the Contract Documents and any provision of any Law or Regulation applicable to the performance of the Work or of any standard, specification, manual or code, or of any instruction of any Supplier, Contractor shall promptly report it to Engineer in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph 6.16.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to Owner or Engineer for failure to report any conflict, error, ambigu- ity, or discrepancy in the Contract Documents unless Contractor knew or reasonably should have known thereof. B. Resolving Discrepancies 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and: a. the provisions of any standard, specification, manual, code, or instruction (whether or not specifically incorporated by reference in the Contract Documents); or 2. No provision of any such standard, specification, manual or code, or any instruction of a b. the provisions of any Laws or Regulations Supplier shall be effective to change the duties or applicable t o the performance of the Work EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-10 (unless such an interpretation of the provisions of the Contract Documents would result in viola- tion of such Law or Regulation). 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by either a Change Order or a Work Change Directive. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized, by one or more of the following ways: 1. A Field Order; 2. Engineer's approval of a Shop Drawing or Sample; (Subject to the provisions of Paragraph 6.17.D.3); or 3. Engineer's written interpretation or clarification. sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. Because data stored in electronic media format can deteriorate or be modified inadvertently or otherwise without authorization of the data's creator, the party receiving electronic files agrees that it will perform acceptance tests or procedures within 60 days, after which the receiving party shall be deemed to have accepted the data thus transferred. Any errors detected within the 60- day acceptance period will be corrected by the transferring party.. C. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier or other individual or entity performing or furnishing all of the Work under a direct or indirect contract with Contractor, shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer or Engineer's consultants, including electronic media editions; or 2. reuse any of such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of Owner and Engineer and specific written verification or adaption by Engineer. B. The prohibition of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data 4.01 Availability ofLands A. Owner shall furnish the Site. Owner shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. Owner will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. If Contractor and Owner are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, as a result of any delay in Owner's furnishing the Site or a part thereof, Contractor may make a Claim therefor as provided in Paragraph 10.05. B. Upon reasonable written request, Owner shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed and Owner's interest therein as necessary for giving notice of or filing a mechanic's or construction lien against such lands in accordance with applicable Laws and Regulations. A. Copies of data furnished by Owner or Engineer to Contractor or Contractor to Owner or Engineer that may be relied upon are limited to the printed copies (also known as hard copies). Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's C. Contractor shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment. EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-11 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Engineer has used in preparing the Contract Documents; and 2. those drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) that Engineer has used in preparing the Contract Documents. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the general accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Except for such reliance on such "technical data," Contractor may not rely upon or make any claim against Owner or Engineer, or any of their Related Entities with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsur- face or physical condition at or contiguous to the Site that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connec- tion therewith (except in an emergency as required by Paragraph 6.16.A), notify Owner and Engineer in writing about such condition. Contractor shall not further disturb such condition or perform any Work in connection therewith (except as aforesaid) until receipt of written order to do so. B. Engineer's Review: After receipt of written notice as required by Paragraph 4.03.A, Engineer will promptly review the pertinent condition, determine the necessity of Owner's obtaining additional exploration or tests with respect thereto, and advise Owner in writing (with a copy to Contractor) of Engineer's findings and conclusions. C. Possible Price and Times Adjustments 1. The Contract Price or the Contract Times, or both, will be equitably adjusted to the extent that the existence of such differing subsurface or physical condition causes an increase or decrease in Contractor's cost of, or time required for, performance of the Work; subject, however, to the following: a. such condition must meet any one or more of the categories described in Paragraph 4.03.A; and b. with respect to Work that is paid for on a Unit Price Basis, any adjustment in Contract Price will be subject to the provisions of Paragraphs 9.07 and 11.03. 2. Contractor shall not be entitled to any adjustment in the Contract Price or Contract Times if. a. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to Owner with respect to Contract Price and Contract Times by the submission of a Bid or becoming bound under a negotiated contract; or b. the existence of such condition could reasonably have been discovered or revealed as a result of any examination, investigation, explo- ration, test, or study of the Site and contiguous areas required by the Bidding Requirements or Contract Documents to be conducted by or for Contractor prior to Contractor's making such final commitment; or EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-12 c. Contractor failed to give the written notice as required by Paragraph 4.03.A. 3. If Owner and Contractor are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, a Claim may be made therefor as provided in Paragraph 10.05. However, Owner and Engineer, and any of their Related Entities shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. 4.04 Underground Facilities A. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to Owner or Engineer by the owners of such Underground Facilities, including Owner, or by others. Unless it is otherwise expressly provided in the Sup- plementary Conditions: 1. Owner and Engineer shall not be responsible for the accuracy or completeness of any such information or data; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data, b. locating all Underground Facilities shown or indicated in the Contract Documents, c. coordination of the Work with the owners of such Underground Facilities, including Owner, during construction, and d. the safety and protection of all such Under- ground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated 1. If an Underground Facility is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.16.A), identify the owner of such Underground Facility and give written notice to that owner and to Owner and Engineer. Engineer will promptly review the Underground Facility and determine the extent, if any, to which a change is required in the Contract Documents to reflect and document the consequences of the existence or location of the Under- ground Facility. During such time, Contractor shall be responsible for the safety and protection of such Underground Facility. 2. If Engineer concludes that a change in the Contract Documents is required, a Work Change Directive or a Change Order will be issued to reflect and document such consequences. An equitable adjustment shall be made in the Contract Price or Contract Times, or both, to the extent that they are attributable to the existence or location of any Underground Facility that was not shown or indicated or not shown or indicated with reasonable accuracy in the Contract Documents and that Contractor did not know of and could not reasonably have been expected to be aware of or to have anticipated. If Owner and Contractor are unable to agree on entitlement to or on the amount or extent, if any, of any such adjustment in Contract Price or Contract Times, Owner or Contractor may make a Claim therefor as provided in Paragraph 10.05. 4.05 Reference Points A. Owner shall provide engineering surveys to establish reference points for construction which in Engineer's judgment are necessary to enable Contractor to proceed with the Work. Contractor shall be responsible for laying out the Work, shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations without the prior written approval of Owner. Contractor shall report to Engineer whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be responsible for the accurate replacement or relocation of such reference points or property monuments by professionally qualified personnel. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: Reference is made to the Supplementary Conditions for the identification of those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that have been utilized by the Engineer in the preparation of the Contract Documents. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the general accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Except for such reliance on such "technical data," Contractor may not rely upon or make any claim against Owner or Engineer, or any of their Related Entities with respect to: EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-13 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or re- vealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.16.A); and (iii) notify Owner and Engineer (and promptly thereafter confirm such notice in writing). Owner shall promptly consult with Engineer concerning the necessity for Owner to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after Owner has obtained any required permits related thereto and delivered to Contractor written notice: (i) specifying that such condition and any affected area is or has been rendered safe for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed safely. If Owner and Contractor cannot agree as to entitlement to or on the amount or extent, if any, of any adjustment in Contract Price or Contract Times, or both, as a result of such Work stop- page or such special conditions under which Work is agreed to be resumed by Contractor, either party may make a Claim therefor as provided in Paragraph 10.05. entitlement to or on the amount or extent, if any, of an adjustment in Contract Price or Contract Times as a result of deleting such portion of the Work, then either party may make a Claim therefor as provided in Paragraph 10.05. Owner may have such deleted portion of the Work performed by Owner's own forces or others in accordance with Article 7. G. To the fullest extent permitted by Laws and Regulations, Owner shall indemnify and hold harmless Contractor, Subcontractors, and Engineer, and the officers, directors, partners, employees, agents, consultants, and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition, provided that such Hazardous Environmental Condition: (i) was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be included within the scope of the Work, and (ii) was not created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06. G shall obligate Owner to indemnify any individual or entity from and against the conse- quences of that individual's or entity's own negligence. H. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless Owner and Engineer, and the officers, directors, partners, employees, agents, consultants, and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.H shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. I. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. ARTICLE 5 - BONDS AND INSURANCE 5.01 Performance, Payment, and Other Bonds F. If after receipt of such written notice A. Contractor shall furnish performance and Contractor does not agree to resume such Work based on payment bonds, each in an amount at least equal to the a reasonable belief it is unsafe, or does not agree to Contract Price as security for the faithful performance and resume such Work under such special conditions, then payment of all of Contractor's obligations under the Owner may order the portion of the Work that is in the Contract Documents. These bonds shall remain in effect area affected by such condition to be deleted from the until one year after the date when final payment becomes Work. If Owner and Contractor cannot agree as to due or until completion of the correction period specified EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-14 in Paragraph 13.07, whichever is later, except as provided otherwise by Laws or Regulations or by the Contract Documents. Contractor shall also furnish such other bonds as are required by the Contract Documents. B. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the current list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Compa- nies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent must be accompanied by a certified copy of the agent's authority to act. C. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements of Paragraph 5.01.13, Contractor shall promptly notify Owner and Engineer and shall, within 20 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01.13 and 5.02. 5.02 Licensed Sureties and Insurers A. All bonds and insurance required by the Contract Documents to be purchased and maintained by Owner or Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the jurisdiction in which the Project is located to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.03 Certificates of Insurance A. Contractor shall deliver to Owner, with copies to each additional insured identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by Owner or any other additional insured) which Contractor is required to purchase and maintain. B. Owner shall deliver to Contractor, with copies to each additional insured identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by Contractor or any other additional insured) which Owner is required to purchase and maintain. 5.04 Contractor's Liability Insurance A. Contractor shall purchase and maintain such liability and other insurance as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees, 3. claims for damages because of bodily injury, sickness or disease, or death of any person other than Contractor's employees; 4. claims for damages insured by reasonably available personal injury liability coverage which are sus- tained: a. by any person as a result of an offense directly or indirectly related to the employment of such person by Contractor, or b. by any other person for any other reason; 5. claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including loss of use resulting therefrom; and 6. claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance or use of any motor vehicle. B. The policies of insurance required by this Paragraph 5.04 shall: 1. with respect to insurance required by Paragraphs 5.04.A.3 through 5.04.A.6 inclusive, include as additional insured (subject to any customary exclusion regarding professional liability) Owner and Engineer, and any other individuals or entities identified in the Supple- mentary Conditions, all of whom shall be listed as addi- tional insureds, and include coverage for the respective officers, directors, partners, employees, agents, consultants and subcontractors of each and any of all such additional insureds, and the insurance afforded to these additional insureds shall provide primary coverage for all claims covered thereby; 2. include at least the specific coverages and be written for not less than the limits of liability provided in the Supplementary Conditions or required by Laws or Regulations, whichever is greater; EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-15 3. include completed operations insurance; 4. include contractual liability insurance covering Contractor's indemnity obligations under Paragraphs 6.11 and 6.20; 5. contain a provision or endorsement that the coverage afforded will not be canceled, materially changed or renewal refused until at least 30 days prior written notice has been given to Owner and Contractor and to each other additional insured identified in the Supplementary Conditions to whom a certificate of insurance has been issued (and the certificates of insurance furnished by the Contractor pursuant to Paragraph 5.03 will so provide); 6, remain in effect at least until final payment and at all times thereafter when Contractor may be correcting, removing, or replacing defective Work in accordance with Paragraph 13.07; and 7. with respect to completed operations insur- ance, and any insurance coverage written on a claims - made basis, remain in effect for at least two years after final payment. a. Contractor shall furnish Owner and each other additional insured identified in the Supple- mentary Conditions, to whom a certificate of insurance has been issued, evidence satisfactory to Owner and any such additional insured of continuation of such insurance at final payment and one year thereafter. 5.05 Owner's Liability Insurance A. In addition to the insurance required to be provided by Contractor under Paragraph 5.04, Owner, at Owner's option, may purchase and maintain at Owner's expense Owner's own liability insurance as will protect Owner against claims which may arise from operations under the Contract Documents. 5.06 Property Insurance A. Unless otherwise provided in the Supple- mentary Conditions, Owner shall purchase and maintain property insurance upon the Work at the Site in the amount of the full replacement cost thereof (subject to such deductible amounts as may be provided in the Supplementary Conditions or required by Laws and Regulations). This insurance shall: 1. include the interests of Owner, Contractor, Subcontractors, and Engineer, and any other individuals or entities identified in the Supplementary Conditions, and the officers, directors, partners, employees, agents, consultants and subcontractors of each and any of them, each of whom is deemed to have an insurable interest and shall be listed as an insured or additional insured; 2. be written on a Builder's Risk "all -risk" or open peril or special causes of loss policy form that shall at least include insurance for physical loss or damage to the Work, temporary buildings, false work, and materials and equipment in transit, and shall insure against at least the following perils or causes of loss: fire, lightning, extended coverage, theft, vandalism and malicious mischief, earthquake, collapse, debris removal, demolition occasioned by enforcement of Laws and Regulations, water damage, (other than caused by flood) and such other perils or causes of loss as may be specifi- cally required by the Supplementary Conditions; 3. include expenses incurred in the repair or replacement of any insured property (including but not limited to fees and charges of engineers and architects); 4. cover materials and equipment stored at the Site or at another location that was agreed to in writing by Owner prior to being incorporated in the Work, provided that such materials and equipment have been included in an Application for Payment recommended by Engineer; Owner; 5. allow for partial utilization of the Work by 6. include testing and startup; and 7. be maintained in effect until final payment is made unless otherwise agreed to in writing by Owner, Contractor, and Engineer with 30 days written notice to each other additional insured to whom a certificate of insurance has been issued. B. Owner shall purchase and maintain such boiler and machinery insurance or additional property insurance as may be required by the Supplementary Conditions or Laws and Regulations which will include the interests of Owner, Contractor, Subcontractors, and Engineer, and any other individuals or entities identified in the Supplementary Conditions, and the officers, directors, partners, employees, agents, consultants and subcontractors of each and any of them, each of whom is deemed to have an insurable interest and shall be listed as an insured or additional insured. C. All the policies of insurance (and the certifi- cates or other evidence thereof) required to be purchased and maintained in accordance with Paragraph 5.06 will contain a provision or endorsement that the coverage afforded will not be canceled or materially changed or renewal refused until at least 30 days prior written notice has been given to Owner and Contractor and to each other additional insured to whom a certificate of insurance has been issued and will contain waiver provisions in accor- dance with Paragraph 5.07. D. Owner shall not be responsible for purchasing and maintaining any property insurance specified in this Paragraph 5.06 to protect the interests of Contractor, Subcontractors, or others in the Work to t extent of any EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-16 deductible amounts that are identified in the Supple- mentary Conditions. The risk of loss within such identified deductible amount will be borne by Contractor, Subcontractors, or others suffering any such loss, and if any of them wishes property insurance coverage within the limits of such amounts, each may purchase and maintain it at the purchaser's own expense. E. If Contractor requests in writing that other special insurance be included in the property insurance policies provided under Paragraph 5.06, Owner shall, if possible, include such insurance, and the cost thereof will be charged to Contractor by appropriate Change Order. Prior to commencement of the Work at the Site, Owner shall in writing advise Contractor whether or not such other insurance has been procured by Owner. 5.07 Waiver of Rights A. Owner and Contractor intend that all policies purchased in accordance with Paragraph 5.06 will protect Owner, Contractor, Subcontractors, and Engineer, and all other individuals or entities identified in the Supple- mentary Conditions to be listed as insureds or additional insureds (and the officers, directors, partners, employees, agents, consultants and subcontractors of each and any of them) in such policies and will provide primary coverage for all losses and damages caused by the perils or causes of loss covered thereby. All such policies shall contain provisions to the effect that in the event of payment of any loss or damage the insurers will have no rights of recovery against any of the insureds or additional insureds thereunder. Owner and Contractor waive all rights against each other and their respective officers, directors, partners, employees, agents, consultants and subcontractors of each and any of them for all losses and damages caused by, arising out of or resulting from any of the perils or causes of loss covered by such policies and any other property insurance applicable to the Work; and, in addition, waive all such rights against Subcontractors, and Engineer, and all other individuals or entities identified in the Supplementary Conditions to be listed as insured or additional insured (and the officers, directors, partners, employees, agents, consultants and subcontractors of each and any of them) under such policies for losses and damages so caused. None of the above waivers shall extend to the rights that any party making such waiver may have to the proceeds of insurance held by Owner as trustee or otherwise payable under any policy so issued. B. Owner waives all rights against Contractor, Subcontractors, and Engineer, and the officers, directors, partners, employees, agents, consultants and subcontractors of each and any of them for: 1. loss due to business interruption, loss of use, or other consequential loss extending beyond direct physical loss or damage to Owner's property or the Work caused by, arising out of, or resulting from fire or other perils whether or not insured by Owner; and 2. loss or damage to the completed Project or part thereof caused by, arising out of, or resulting from fire or other insured peril or cause of loss covered by any property insurance maintained on the completed Project or part thereof by Owner during partial utilization pursuant to Paragraph 14.05, after Substantial Completion pursuant to Paragraph 14.04, or after final payment pursuant to Paragraph 14.07. C. Any insurance policy maintained by Owner covering any loss, damage or consequential loss referred to in Paragraph 5.07.13 shall contain provisions to the effect that in the event of payment of any such loss, damage, or consequential loss, the insurers will have no rights of recovery against Contractor, Subcontractors, or Engineer, and the officers, directors, partners, employees, agents, consultants and subcontractors of each and any of them. 5.08 Receipt and Application of Insurance Proceeds A. Any insured loss under the policies of insurance required by Paragraph 5.06 will be adjusted with Owner and made payable to Owner as fiduciary for the insureds, as their interests may appear, subject to the requirements of any applicable mortgage clause and of Paragraph 5.08.13. Owner shall deposit in a separate account any money so received and shall distribute it in accordance with such agreement as the parties in interest may reach. If no other special agreement is reached, the damaged Work shall be repaired or replaced, the moneys so received applied on account thereof, and the Work and the cost thereof covered by an appropriate Change Order. B. Owner as fiduciary shall have power to adjust and settle any loss with the insurers unless one of the parties in interest shall object in writing within 15 days after the occurrence of loss to Owner's exercise of this power. If such objection be made, Owner as fiduciary shall make settlement with the insurers in accordance with such agreement as the parties in interest may reach. If no such agreement among the parties in interest is reached, Owner as fiduciary shall adjust and settle the loss with the insurers and, if required in writing by any party in interest, Owner as fiduciary shall give bond for the proper performance of such duties. 5.09 Acceptance of Bonds and Insurance, Option to Replace A. If either Owner or Contractor has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the other party in accordance with Article 5 on the basis of non - conformance with the Contract EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-17 Documents, the objecting party shall so notify the other party in writing within 10 days after receipt of the certificates (or other evidence requested) required by Paragraph 2.01.13. Owner and Contractor shall each provide to the other such additional information in respect of insurance provided as the other may reasonably request. If either parry does not purchase or maintain all of the bonds and insurance required of such party by the Contract Documents, such party shall notify the other party in writing of such failure to purchase prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. Without prejudice to any other right or remedy, the other party may elect to obtain equivalent bonds or insurance to protect such other party's interests at the expense of the party who was required to provide such coverage, and a Change Order shall be issued to adjust the Contract Price accordingly. 5.10 Partial Utilization, Acknowledgment of Property Insurer A. If Owner finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Completion of all the Work as provided in Paragraph 14.05, no such use or occupancy shall commence before the insurers providing the property insurance pursuant to Paragraph 5.06 have acknowledged notice thereof and in writing effected any changes in coverage necessitated thereby. The insurers providing the property insurance shall consent by endorsement on the policy or policies, but the property insurance shall not be canceled or permitted to lapse on account of any such partial use or occupancy. ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. Contractor shall not be responsible for the negligence of Owner or Engineer in the design or specification of a specific means, method, technique, sequence, or procedure of construction which is shown or indicated in and expressly required by the Contract Documents. B. At all times during the progress of the Work, Contractor shall assign a competent resident superin- tendent who shall not be replaced without written notice to Owner and Engineer except under extraordinary circumstances. The superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communications given to or received from the superintendent shall be binding on Contractor. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to survey and lay out the Work and perform construction as required by the Contract Docu- ments. Contractor shall at all times maintain good disci- pline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during regular working hours. Contractor will not permit the performance of Work on a Saturday, Sunday, or any legal holiday without Owner's written consent (which will not be unreasonably withheld) given after prior written notice to Engineer. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of Owner. If required by Engineer, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. C. All materials and equipment shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 6.04 Progress Schedule A. Contractor shall adhere to the Progress Schedule established in accordance with Paragraph 2.07 as it may be adjusted from time to time as provided below. EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-18 1. Contractor shall submit to Engineer for acceptance (to the extent indicated in Paragraph 2.07) proposed adjustments in the Progress Schedule that will not result in changing the Contract Times. Such adjust- ments will comply with any provisions of the General Re- quirements applicable thereto. 2. Proposed adjustments in the Progress Schedule that will change the Contract Times shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Times may only be made by a Change Order. 6.05 Substitutes and "Or- Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or- equal" item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be submitted to Engineer for review under the circumstances described below. 1. "Or- Equal" Items: If in Engineer's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by Engineer as an "or- equal" item, in which case review and approval of the proposed item may, in Engineer's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. in the exercise of reasonable judgment Engineer determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole, 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the Owner or increase in Contract Times, and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items a. If in Engineer's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or- equal" item under Paragraph 6.05.A.1, it will be considered a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow Engineer to determine that the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by Engineer from anyone other than Contractor. c. The requirements for review by Engineer will be as set forth in Paragraph 6.05.A.2.d, as supplemented in the General Requirements and as Engineer may decide is appropriate under the circumstances. d. Contractor shall make written application to Engineer for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application: 1) shall certify that the proposed substi- tute item will: a) perform adequately the functions and achieve the results called for by the general design, b) be similar in substance to that specified, and c) be suited to the same use as that specified; 2) will state: a) the extent, if any, to which the use of the proposed substitute item will preju- dice Contractor's achievement of Substantial Completion on time; b) whether or not use of the proposed substitute item in the Work will require a change in any of the Contract Docu- ments (or in the provisions of any other direct contract with Owner for other work on the Project) to adapt the design to the proposed substitute item; and EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-19 c) whether or not incorporation or use of the proposed substitute item in con- nection with the Work is subject to payment of any license fee or royalty; 3) will identify: a) all variations of the proposed substitute item from that specified, and b) available engineering, sales, maintenance, repair, and replacement services; 4) and shall contain an itemized esti- mate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and claims of other contractors affected by any resulting change, B. Substitute Construction Methods or Proce- dures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by Engineer. Contractor shall submit sufficient information to allow Engineer, in Engineer's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. The requirements for review by Engineer will be similar to those provided in Paragraph 6.05.A.2. C. Engineer's Evaluation: Engineer will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.13. Engineer may require Contractor to furnish additional data about the proposed substitute item. Engineer will be the sole judge of acceptability. No "or equal" or substitute will be ordered, installed or utilized until Engineer's review is complete, which will be evidenced by either a Change Order for a substitute or an approved Shop Drawing for an "or equal." Engineer will advise Contractor in writing of any negative determination. D. Special Guarantee: Owner may require Contractor to furnish at Contractor's expense a special performance guarantee or other surety with respect to any substitute. E. Engineer's Cost Reimbursement: Engineer will record Engineer's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.13 Whether or not Engineer approves a substitute item so proposed or submitted by Contractor, Contractor shall reimburse Owner for the charges of Engineer for evaluating each such proposed substitute. Contractor shall also reimburse Owner for the charges of Engineer for making changes in the Contract Documents (or in the provisions of any other direct contract with Owner) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or- equal" at Contractor's expense. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall not employ any Subcon- tractor, Supplier, or other individual or entity (including those acceptable to Owner as indicated in Paragraph 6.06.13), whether initially or as a replacement, against whom Owner may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection. B. If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, or other individuals or entities to be submitted to Owner in advance for acceptance by Owner by a specified date prior to the Effective Date of the Agreement, and if Contractor has submitted a list thereof in accordance with the Supplementary Conditions, Owner's acceptance (either in writing or by failing to make written objection thereto by the date indicated for acceptance or objection in the Bidding Documents or the Contract Documents) of any such Subcontractor, Supplier, or other individual or entity so identified may be revoked on the basis of reason- able objection after due investigation. Contractor shall submit an acceptable replacement for the rejected Subcontractor, Supplier, or other individual or entity, and the Contract Price will be adjusted by the difference in the cost occasioned by such replacement, and an appropriate Change Order will be issued. No acceptance by Owner of any such Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, shall consti- tute a waiver of any right of Owner or Engineer to reject defective Work. C. Contractor shall be fully responsible to Owner and Engineer for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between Owner or Engineer and any such Subcontractor, Supplier or other individual or entity, nor 2. shall anything in the Contract Documents create any obligation on the part of Owner or Engineer to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-20 or entity except as may otherwise be required by Laws and Regulations. D. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. E. Contractor shall require all Subcontractors, Suppliers, and such other individuals or entities per- forming or furnishing any of the Work to communicate with Engineer through Contractor. F. The divisions and sections of the Specifica- tions and the identifications of any Drawings shall not control Contractor in dividing the Work among Subcon- tractors or Suppliers or delineating the Work to be performed by any specific trade. G. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appro- priate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of Owner and Engineer. Whenever any such agreement is with a Subcontractor or Supplier who is listed as an additional insured on the property insurance provided in Paragraph 5.06, the agreement between the Contractor and the Subcontractor or Supplier will contain provisions whereby the Subcontractor or Supplier waives all rights against Owner, Contractor, and Engineer„ and all other individuals or entities identified in the Supplementary Conditions to be listed as insureds or additional insureds (and the officers, directors, partners, employees, agents, consultants and subcontractors of each and any of them) for all losses and damages caused by, arising out of, relating to, or resulting from any of the perils or causes of loss covered by such policies and any other property insurance applicable to the Work. If the insurers on any such policies require separate waiver forms to be signed by any Subcontractor or Supplier, Contractor will obtain the same. 6.07 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if to the actual knowledge of Owner or Engineer its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by Owner in the Contract Documents. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless Owner and Engineer, and the officers, directors, partners, employees, agents, consultants and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.08 Permits A. Unless otherwise provided in the Supple- mentary Conditions, Contractor shall obtain and pay for all construction permits and licenses. Owner shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement. Owner shall pay all charges of utility owners for connections for providing permanent service to the Work. 6.09 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applica- ble to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, neither Owner nor Engineer shall be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's primary responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.03. C. Changes in Laws or Regulations not known at the time of opening of Bids (or, on the Effective Date of the Agreement if there were no Bids) having an effect on the cost or time of performance of the Work shall be the subject of an adjustment in Contract Price or Contract Times. If Owner and Contractor are unable to agree on entitlement to or on the amount or extent, if any, of any such adjustment, a Claim may be made therefor as provided in Paragraph 10.05. EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-21 6.10 Taxes A. Contractor shall pay all sales, consumer, use, and other similar taxes required to be paid by Contractor in accordance with the Laws and Regulations of the place of the Project which are applicable during the performance of the Work. 6.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas 1. Contractor shall confine construction equip- ment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. Should any claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly settle with such other party by negotiation or otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law. 3. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless Owner and Engineer, and the officers, directors, partners, employees, agents, consultants and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against Owner, Engineer, or any other party indemnified hereunder to the extent caused by or based upon Contractor's performance of the Work. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Cleaning: Prior to Substantial Completion of the Work Contractor shall clean the Site and the Work and make it ready for utilization by Owner. At the com- pletion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition all property not designated for alteration by the Contract Documents. D. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.12 Record Documents A. Contractor shall maintain in a safe place at the Site one record copy of all Drawings, Specifications, Addenda, Change Orders, Work Change Directives, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all approved Shop Drawings will be available to Engineer for reference. Upon completion of the Work, these record documents, Samples, and Shop Drawings will be delivered to Engi- neer for Owner. 6.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precau- tions and programs in connection with the Work. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. All damage, injury, or loss to any property referred to in Paragraph 6.13.A.2 or 6.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor (e xcept damage or loss attributable to the fault of Draw- EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-22 ings or Specifications or to the acts or omissions of Owner or Engineer or , or anyone employed by any of them, or anyone for whose acts any of them may be liable, and not attributable, directly or indirectly, in whole or in part, to the fault or negligence of Contractor or any Subcontractor, Supplier, or other individual or entity directly or indirectly employed by any of them). D. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and Engineer has issued a notice to Owner and Contractor in accordance with Paragraph 14.07.13 that the Work is acceptable (except as otherwise expressly provided in connection with Substantial Completion). 6.14 Safety Representative A. Contractor shall designate a qualified and experienced safety representative at the Site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of safety precautions and programs. 6.15 Hazard Communication Programs A. Contractor shall be responsible for coordi- nating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the Site in accordance with Laws or Regulations. 6.16 Emergencies A. In emergencies affecting the safety or protec- tion of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give Engineer prompt written notice if Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If Engineer determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Work Change Directive or Change Order will be issued. 6.17 Shop Drawings and Samples A. Contractor shall submit Shop Drawings and Samples to Engineer for review and approval in accor- dance with the acceptable Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as Engineer may require. 1. Shop Drawings a. Submit number of copies specified in the General Requirements. b. Data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show Engineer the services, materials, and equipment Contractor proposes to provide and to enable Engineer to review the information for the limited purposes required by Paragraph 6.17.D. 2. Samples: Contractor shall also submit Samples to Engineer for review and approval in accor- dance with the acceptable schedule of Shop Drawings and Sample submittals. a. Submit number of Samples specified in the Specifications. b. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as Engineer may require to enable Engineer to review the submittal for the limited purposes required by Paragraph 6.17.D. B. Where a Shop Drawing or Sample is required by the Contract Documents or the Schedule of Submittals , any related Work performed prior to Engineer's review and approval of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. Submittal Procedures 1. Before submitting each Shop Drawing or Sample, Contractor shall have determined and verified: a. all field measurements, quantities, dimensions, specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information with respect thereto; b. the suitability of all materials with respect to intended use, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; c. all information relative to Contractor's responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto; and d. shall also have reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents. 2. Each submittal shall bear a stamp or specific written certification that Contractor has satisfied Contractor's obligations u nder the Contract Documents EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-23 with respect to Contractor's review and approval of that submittal. 3. With each submittal, Contractor shall give Engineer specific written notice of any variations, that the Shop Drawing or Sample may have from the requirements of the Contract Documents. This notice shall be both a written communication separate from the Shop Drawing's or Sample Submittal; and, in addition, by a specific notation made on each Shop Drawing or Sample submit- ted to Engineer for review and approval of each such variation. D. Engineer's Review 1. Engineer will provide timely review of Shop Drawings and Samples in accordance with the Schedule of Submittals acceptable to Engineer. Engineer's review and approval will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Docu- ments. 2. Engineer's review and approval will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of con- struction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. 3. Engineer's review and approval shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Paragraph 6.17.C.3 and Engineer has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample. Engineer's review and approval shall not relieve Contractor from responsibility for complying with the requirements of Paragraph 6.17.C.1. E. Resubmittal Procedures 1. Contractor shall make corrections required by Engineer and shall return the required number of cor- rected copies of Shop Drawings and submit, as required, new Samples for review and approval. Contractor shall direct specific attention in writing to revisions other than the corrections called for by Engineer on previous submittals. 6.18 Continuing the Work A. Contractor shall carry on the Work and adhere to the Progress Schedule during all disputes or disagreements with Owner. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as permitted by Paragraph 15.04 or as Owner and Contractor may otherwise agree in writing. 6.19 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to Owner that all Work will be in accordance with the Contract Documents and will not be defective. Engineer and its Related Entities shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Sub- contractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by Engineer; 2. recommendation by Engineer or payment by Owner of any progress or final payment; 3. the issuance of a certificate of Substantial Completion by Engineer or any payment related thereto by Owner; 4. use or occupancy of the Work or any part thereof by Owner; 5. any review and approval of a Shop Drawing or Sample submittal or the issuance of a notice of acceptabil- ity by Engineer; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by Owner. 6.20 Indemnification A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless Owner and Engineer, and the officers, directors, partners, employees, agents, consultants and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-24 arbitration or other dispute resolution costs) arising out of or relating to the performance of the Work, provided that any such claim, cost, loss, or damage is attributable to bodily injury, sickness, disease, or death, or to injury to or destruction of tangible property (other than the Work itself), including the loss of use resulting therefrom but only to the extent caused by any negligent act or omission of Contractor, any Subcontractor, any Supplier, or any individual or entity directly or indirectly employed by any of them to perform any of the Work or anyone for whose acts any of them may be liable. B. In any and all claims against Owner or Engineer or any of their respective consultants, agents, officers, directors, partners, or employees by any employ- ee (or the survivor or personal representative of such employee) of Contractor, any Subcontractor, any Supplier, or any individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, the indemnification obligation under Paragraph 6.20.A shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for Contractor or any such Subcontractor, Supplier, or other individual or entity under workers' compensation acts, disability benefit acts, or other employee benefit acts. C. The indemnification obligations of Contractor under Paragraph 6.20.A shall not extend to the liability of Engineer and Engineer's officers, directors, partners, employees, agents, consultants and subcontractors arising out of: 1. the preparation or approval of, or the failure to prepare or approve, maps, Drawings, opinions, reports, surveys, Change Orders, designs, or Specifications; or 2. giving directions or instructions, or failing to give them, if that is the primary cause of the injury or damage. 6.21 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. Contractor shall not be required to provide professional services in violation of applicable law. shall appear on all drawings, calculations, specifications, certifications, Shop Drawings and other submittals prepared by such professional. Shop Drawings and other submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to Engineer. C. Owner and Engineer shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided Owner and Engineer have specified to Contractor all performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.21, Engineer's review and approval of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. Engineer's review and approval of Shop Drawings and other submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.17.D.1. E. Contractor shall not be responsible for the adequacy of the performance or design criteria required by the Contract Documents. ARTICLE 7 - OTHER WORK AT THE SITE 7.01 Related Work at Site A. Owner may perform other work related to the Project at the Site with Owner's employees, or via other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Con- tract Documents, then: 1. written notice thereof will be given to Contractor prior to starting any such other work; and 2. if Owner and Contractor are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times that should be allowed as a result of such other work, a Claim may be made therefor as provided in Paragraph 10.05. B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner B. If professional design services or and Owner, if Owner is performing other work with certifications by a design professional related to systems, Owner's employees, proper and safe access to the Site, a materials or equipment are specifically required of reasonable opportunity for the introduction and storage of Contractor by the Contract Documents, Owner and materials and equipment and the execution of such other Engineer will specify all performance and design criteria work, and shall properly coordinate the Work with theirs. that such services must satisfy. Contractor shall cause Contractor shall do all cutting, fitting, and patching of the such services or certifications to be provided by a Work that may be required to properly connect or properly licensed professional, whose signature and seal otherwise make its several parts come together and EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright cU 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-25 properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only cut or alter their work with the written consent of Engineer and the others whose work will be affected. The duties and responsibilities of Contractor under this Paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of Contractor in said direct contracts between Owner and such utility owners and other contractors. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to Engineer in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects and deficiencies in such other work. 7.02 Coordination A. If Owner intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Condi- tions: 1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibili- ties will be provided. B. Unless otherwise provided in the Supplementary Conditions, Owner shall have sole authority and responsibility for such coordination. 7.03 Legal Relationships A. Paragraphs 7.01.A and 7.02 are not applicable for utilities not under the control of Owner. B. Each other direct contract of Owner under Paragraph 7.0 LA shall provide that the other contractor is liable to Owner and Contractor for the reasonable direct delay and disruption costs incurred by Contractor as a result of the other contractor's actions or inactions. C. Contractor shall be liable to Owner and any other contractor for the reasonable direct delay and disruption costs incurred by such other contractor as a result of Contractor's action or inactions. ARTICLE 8 - OWNER'S RESPONSIBILITIES 8.01 Communications to Contractor A. Except as otherwise provided in these General Conditions, Owner shall issue all communications to Contractor through Engineer. 8.02 Replacement of Engineer A. In case of termination of the employment of Engineer, Owner shall appoint an engineer to whom Contractor makes no reasonable objection, whose status under the Contract Documents shall be that of the former Engineer. 8.03 Furnish Data A. Owner shall promptly furnish the data required of Owner under the Contract Documents. 8.04 Pay When Due A. Owner shall make payments to Contractor when they are due as provided in Paragraphs 14.02.0 and 14.07.C. 8.05 Lands and Easements; Reports and Tests A. Owner's duties in respect of providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to Owner's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by Engineer in preparing the Contract Documents. 8.06 Insurance A. Owner's responsibilities, if any, in respect to purchasing and maintaining liability and property insur- ance are set forth in Article 5. 8.07 Change Orders A. Owner is obligated to execute Change Orders as indicated in Paragraph 10.03. 8.08 Inspections, Tests, and Approvals A. Owner's responsibility in respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03.13. EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-26 8.09 Limitations on Owner's Responsibilities A. The Owner shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. Owner will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. 8.10 Undisclosed Hazardous Environmental Condition A. Owner's responsibility in respect to an undis- closed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.11 Evidence of Financial Arrangements A. If and to the extent Owner has agreed to furnish Contractor reasonable evidence that financial arrangements have been made to satisfy Owner's obligations under the Contract Documents, Owner's responsibility in respect thereof will be as set forth in the Supplementary Conditions. ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION 9.01 Owner's Representative A. Engineer will be Owner's representative during the construction period. The duties and responsi- bilities and the limitations of authority of Engineer as Owner's representative during construction are set forth in the Contract Documents and will not be changed without written consent of Owner and Engineer. 9.02 Visits to Site A. Engineer will make visits to the Site at inter- vals appropriate to the various stages of construction as Engineer deems necessary in order to observe as an experienced and qualified design professional the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, Engineer, for the benefit of Owner, will determine, in general, if the Work is proceeding in accordance with the Contract Documents. Engineer will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. Engineer's efforts will be directed toward providing for Owner a greater degree of confidence that the completed Work will conform generally to the Contract Documents. On the basis of such visits and observations, Engineer will keep Owner informed of the progress of the Work and will endeavor to guard Owner against defective Work. B. Engineer's visits and observations are subject to all the limitations on Engineer's authority and responsibility set forth in Paragraph 9.09. Particularly, but without limitation, during or as a result of Engineer's visits or observations of Contractor's Work Engineer will not supervise, direct, control, or have authority over or be responsible for Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. 9.03 Project Representative A. If Owner and Engineer agree, Engineer will furnish a Resident Project Representative to assist Engineer in providing more extensive observation of the Work. The authority and responsibilities of any such Resident Project Representative and assistants will be as provided in the Supplementary Conditions, and limitations on the responsibilities thereof will be as provided in Paragraph 9.09. If Owner designates another representative or agent to represent Owner at the Site who is not Engineer's consultant, agent or employee, the responsibilities and authority and limitations thereon of such other individual or entity will be as provided in the Supplementary Conditions. 9.04 Authorized Variations in Work A. Engineer may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Times and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Docu- ments. These may be accomplished by a Field Order and will be binding on Owner and also on Contractor, who shall perform the Work involved promptly. If Owner or Contractor believes that a Field Order justifies an adjustment in the Contract Price or Contract Times, or both, and the parties are unable to agree on entitlement to or on the amount or extent, if any, of any such adjustment , a Claim may be made therefor as provided in Paragraph 10.05. 9.05 Rejecting Defective Work A. Engineer will have authority to reject Work which Engineer believes to be defective, or that Engineer believes will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. Engineer will also have authority to require special inspection or testing of the Work as provided in Paragraph 13.04, whether or not the Work is fabricated, installed, or completed. EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-27 9.06 Shop Drawings, Change Orders and Payments A. In connection with Engineer's authority, and limitations thereof, as to Shop Drawings and Samples, see Paragraph 6.17. B. In connection with Engineer's authority, and limitations thereof, as to design calculations and design drawings submitted in response to a delegation of professional design services, if any, see Paragraph 6.21. C. In connection with Engineer's authority as to Change Orders, see Articles 10, 11, and 12. D. In connection with Engineer's authority as to Applications for Payment, see Article 14. 9.07 Determinations for Unit Price Work A. Engineer will determine the actual quantities and classifications of Unit Price Work performed by Contractor. Engineer will review with Contractor the Engineer's preliminary determinations on such matters before rendering a written decision thereon (by recommendation of an Application for Payment or otherwise). Engineer's written decision thereon will be final and binding (except as modified by Engineer to reflect changed factual conditions or more accurate data) upon Owner and Contractor, subject to the provisions of Paragraph 10.05. 9.08 Decisions on Requirements of Contract Documents and Acceptability of Work A. Engineer will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. All matters in question and other matters between Owner and Contractor arising prior to the date final payment is due relating to the acceptability of the Work, and the interpretation of the requirements of the Contract Documents pertaining to the performance of the Work, will be referred initially to Engineer in writing within 30 days of the event giving rise to the question B. Engineer will, with reasonable promptness, render a written decision on the issue referred. If Owner or Contractor believe that any such decision entitles them to an adjustment in the Contract Price or Contract Times or both, a Claim may be made under Paragraph 10.05. The date of Engineer's decision shall be the date of the event giving rise to the issues referenced for the purposes of Paragraph 10.05.13. partiality to Owner or Contractor and will not be liable in connection with any interpretation or decision rendered in good faith in such capacity. 9.09 Limitations on Engineer's Authority and Responsibilities A. Neither Engineer's authority or responsibility under this Article 9 or under any other provision of the Contract Documents nor any decision made by Engineer in good faith either to exercise or not exercise such authority or responsibility or the undertaking, exercise, or performance of any authority or responsibility by Engineer shall create, impose, or give rise to any duty in contract, tort, or otherwise owed by Engineer to Contractor, any Subcontractor, any Supplier, any other individual or entity, or to any surety for or employee or agent of any of them. B. Engineer will not supervise, direct, control, or have authority over or be responsible for Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. Engineer will not be respon- sible for Contractor's failure to perform the Work in accordance with the Contract Documents. C. Engineer will not be responsible for the acts or omissions of Contractor or of any Subcontractor, any Supplier, or of any other individual or entity performing any of the Work. D. Engineer's review of the final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, bonds, certificates of inspection, tests and approvals, and other documentation required to be delivered by Paragraph 14.07.A will only be to determine generally that their content complies with the require- ments of, and in the case of certificates of inspections, tests, and approvals that the results certified indicate compliance with the Contract Documents. E. The limitations upon authority and responsi- bility set forth in this Paragraph 9.09 shall also apply to, the Resident Project Representative, if any, and assistants, if any. ARTICLE 10 - CHANGES IN THE WORK; CLAIMS 10.01 Authorized Changes in the Work C. Engineer's written decision on the issue referred will be final and binding on Owner and A. Without invalidating the Contract and without Contractor, subject to the provisions of Paragraph 10.05. notice to any surety, Owner may, at any time or from time to time, order additions, deletions, or revisions in the D. When functioning as interpreter and judge Work by a Change Order, or a Work Change Directive. under this Paragraph 9.08, Engineer will not show Upon receipt of any such document, Contractor shall EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-28 promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). B. If Owner and Contractor are unable to agree on entitlement to, or on the amount or extent, if any, of an adjustment in the Contract Price or Contract Times, or both, that should be allowed as a result of a Work Change Directive, a Claim may be made therefor as provided in Paragraph 10.05. 10.02 Unauthorized Changes in the Work A.Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Times with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.16 or in the case of uncovering Work as provided in Paragraph 13.04.13. 10.03 Execution of Change Orders A. Owner and Contractor shall execute appropri- ate Change Orders recommended by Engineer covering: 1. changes in the Work which are: (i) ordered by Owner pursuant to Paragraph 10.01.A, (ii) required because of acceptance of defective Work under Paragraph 13.08.A or Owner's correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Times which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed in accordance with a Work Change Directive; and 3. changes in the Contract Price or Contract Times which embody the substance of any written decision rendered by Engineer pursuant to Paragraph 10.05; provided that, in lieu of executing any such Change Order, an appeal may be taken from any such decision in accordance with the provisions of the Contract Documents and applicable Laws and Regulations, but during any such appeal, Contractor shall carry on the Work and adhere to the Progress Schedule as provided in Paragraph 6.18.A. 10.04 Notification to Surety A. If notice of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Times) is required by the provisions of any bond to be given to a surety, the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted to reflect the effect of any such change. 10.05 Claims A. Engineer's Decision Required. All Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the Engineer for decision. A decision by Engineer shall be required as a condition precedent to any exercise by Owner or Contractor of any rights or remedies either may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Claims. B. Notice: Written notice stating the general nature of each Claim, shall be delivered by the claimant to Engineer and the other party to the Contract promptly (but in no event later than 30 days) after the start of the event giving rise thereto. The responsibility to substantiate a Claim shall rest with the party making the Claim. Notice of the amount or extent of the Claim, with supporting data shall be delivered to the Engineer and the other party to the Contract within 60 days after the start of such event (unless Engineer allows additional time for claimant to submit additional or more accurate data in support of such Claim). A Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01.13. A Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02.13. Each Claim shall be accompanied by claimant's written statement that the adjustment claimed is the entire adjustment to which the claimant believes it is entitled as a result of said event. The opposing party shall submit any response to Engineer and the claimant within 30 days after receipt of the claimant's last submittal (unless Engineer allows additional time). C. Engineer's Action: Engineer will review each Claim and, within 30 days after receipt of the last submittal of the claimant or the last submittal of the opposing party, if any, take one of the following actions in writing: 1. deny the Claim in whole or in part, 2. approve the Claim, or 3. notify the parties that the Engineer is unable to resolve the Claim if, in the Engineer's sole discretion, it would be inappropriate for the Engineer to do so. For purposes of further resolution of the Claim, such notice shall be deemed a denial. D. In the event that Engineer does not take action on a Claim within said 30 days, the Claim shall be deemed denied. E. Engineer's written action under Paragraph 10.05.0 or denial pursuant to Paragraphs 10.05.C.3 or 10.05.1) will be final and binding upon Owner and Contractor, unless Owner or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-29 F. No Claim for an adjustment in Contract Price or Contract Times will be valid if not submitted in accordance with this Paragraph 10.05. ARTICLE 11 - COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK 11.01 Cost of the Work A. Costs Included. The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.013, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order or when a Claim for an adjustment in Contract Price is determined on the basis of Cost of the Work, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work or because of the event giving rise to the Claim. Except as otherwise may be agreed to in writing by Owner, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items, and shall not include any of the costs itemized in Paragraph 11.0I.B. 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by Owner and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time at the Site. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include, but not be limited to, salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of regular working hours, on Saturday, Sunday, or legal holidays, shall be included in the above to the extent authorized by Owner. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. All cash discounts shall accrue to Contractor unless Owner deposits funds with Contractor with which to make pay- ments, in which case the cash discounts shall accrue to Owner. All trade discounts, rebates and refunds and Contractor and shall deliver such bids to Owner, who will then determine, with the advice of Engineer, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 4. Costs of special consultants (including but not limited to Engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 5. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and mainte- nance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the perfor- mance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by Owner with the advice of Engineer, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equip- ment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. d. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable, imposed by Laws and Regulations. e. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. returns from sale of surplus materials and equipment shall f. Losses and damages (and related expenses) accrue to Owner, and Contractor shall make provisions so caused by damage to the Work, not compensated that they may be obtained. by insurance or otherwise, sustained by Contractor in connection with the performance 3. Payments made by Contractor to of the Work (except losses and damages within Subcontractors for Work performed by Subcontractors. If the deductible amounts of property insurance required by Owner, Contractor shall obtain competitive established in accordance with Paragraph bids from subcontractors acceptable to Owner and 5.06.1)), provided such losses and damages have EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-30 resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of Owner. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. g. The cost of utilities, fuel, and sanitary facilities at the Site. h. Minor expenses such as telegrams, long distance telephone calls, telephone service at the Site, expresses, and similar petty cash items in connection with the Work. i. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attor- neys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.0l.A.1 or specifically covered by Paragraph 11.01.A.4, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind and the costs of any item not specifically and expressly included in Paragraphs 11.0 LA and 11.01.B. C. Contractor's Fee: When all the Work is performed on the basis of cost -plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order or when a Claim for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.0 LA and 11.0 1.13, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to Engineer an itemized cost breakdown together with supporting data. 11.02 Allowances A. It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to Owner and Engineer. B. Cash Allowances 1. Contractor agrees that: a. the cash allowances include the cost to Contractor (less any applicable trade discounts) of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation , overhead, profit, and other expenses contemplated for the cash allowances have been included in the Contract Price and not in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance 1. Contractor agrees that a contingency allowance, if any, is for the sole use of Owner to cover unanticipated costs. D. Prior to final payment, an appropriate Change Order will be issued as recommended by Engineer to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-31 B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by Engineer subject to the provisions of Paragraph 9.07. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. D. Owner or Contractor may make a Claim for an adjustment in the Contract Price in accordance with Paragraph 10.05 if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and signifi- cantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect any other item of Work; and 3. Contractor believes that Contractor is entitled to an increase in Contract Price as a result of having incurred additional expense or Owner believes that Owner is entitled to a decrease in Contract Price and the parties are unable to agree as to the amount of any such increase or decrease. ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. Any Claim for an adjustment in the Contract Price shall be based on written notice submitted by the party making the Claim to the Engineer and the other party to the Contract in accordance with the provisions of Paragraph 10.05. B. The value of any Work covered by a Change Order or of any Claim for an adjustment in the Contract Price will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by applica- tion of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.01.C.2); or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum is not reached under Paragraph 12.01.13.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit (determined as provided in Paragraph 12.01.C). C. Contractor's Fee: The Contractor's fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.0I.A.I and 11.0l.A.2, the Contractor's fee shall be 15 percent; b. for costs incurred under Paragraph 11.0l.A.3, the Contractor's fee shall be five percent; c. where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraph 12.01.C.2.a is that the Subcontractor who actually performs the Work, at whatever tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.0I.A.I and 11.0I.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent of the amount paid to the next lower tier Subcontractor; d. no fee shall be payable on the basis of costs itemized under Paragraphs 11.0I.A.4, 11.01.A.5, and 11.01.B; e. the amount of credit to be allowed by Contractor to Owner for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent of such net decrease; and f. when both additions and credits are involved in any one change, the adjustment in Contractor's fee shall be computed on the basis of the net change in accordance with Paragraphs 12.0l.C.2.a through 12.0LC.2.e, inclusive. 12.02 Change of Contract Times A. The Contract Times may only be changed by a Change Order. Any Claim for an adjustment in the Contract Times shall be based on written notice submitted EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-32 by the party making the Claim to the Engineer and the other parry to the Contract in accordance with the provisions of Paragraph 10.05. B. Any adjustment of the Contract Times covered by a Change Order or any Claim for an adjustment in the Contract Times will be determined in accordance with the provisions of this Article 12. 12.03 Delays A. Where Contractor is prevented from completing any part of the Work within the Contract Times due to delay beyond the control of Contractor, the Contract Times will be extended in an amount equal to the time lost due to such delay if a Claim is made therefor as provided in Paragraph 12.02.A. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by Owner, acts or neglect of utility owners or other contractors performing other work as contemplat- ed by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. B. If Owner, Engineer, or other contractors or utility owners performing other work for Owner as contemplated by Article 7, or anyone for whom Owner is responsible, delays, disrupts, or interferes with the performance or progress of the Work, then Contractor shall be entitled to an equitable adjustment in the Contract Price or the Contract Times , or both. Contractor's entitlement to an adjustment of the Contract Times is conditioned on such adjustment being essential to Contractor's ability to complete the Work within the Contract Times. C If Contractor is delayed in the performance or progress of the Work by fire, flood, epidemic, abnormal w=eather conditions, acts of God, acts or failures to act of utility owners not under the control of Owner, or other causes not the fault of and beyond control of Owner and Contractor, then Contractor shall be entitled to an equitable adjustment in Contract Times, if such adjustment is essential to Contractor's ability to complete the Work within the Contract Times. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph 12.03.C. D. Owner, Engineer and the Related Entities of each of them shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of Engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects A. Prompt notice of all defective Work of which Owner or Engineer has actual knowledge will be given to Contractor. All defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work A. Owner, Engineer, their consultants and other representatives and personnel of Owner, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspecting, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's Site safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give Engineer timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. Owner shall employ and pay for the services of an independent testing laboratory to perform all inspections, tests, or approvals required by the Contract Documents except: 1. for inspections, tests, or approvals covered by Paragraphs 13.03.0 and 13.03.1) below; 2. that costs incurred in connection with tests or inspections conducted pursuant to Paragraph 13.04.13 shall be paid as provided in said Paragraph 13.04.C; and 3. as otherwise specifically provided in the Con- tract Documents. C. If Laws or Regulations of any public body having jurisdiction require any Work (or part thereof) specifically to be inspected, tested, or approved by an employee or other representative of such public body, Contractor shall assume full responsibility for arranging and obtaining such inspections, tests, or approvals, pay all costs in connection therewith, and furnish Engineer the required certificates of inspection or approval. E. Contractor shall not be entitled to an adjustment in Contract Price or Contract Times for delays D. Contractor shall be responsible for arranging within the control of Contractor. Delays attributable to and obtaining and shall pay all costs in connection with and within the control of a Subcontractor or Supplier shall any inspections, tests, or approvals required for Owner's be deemed to be delays within the control of Contractor. and Engineer's acceptance of materials or equipment to EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700 be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, or approvals shall be performed by organizations acceptable to Owner and Engineer. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of Engineer, it must, if requested by Engineer, be uncovered for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense unless Contractor has given Engineer timely notice of Contractor's intention to cover the same and Engineer has not acted with reasonable promptness in response to such notice. 13.04 Uncovering Work A. If any Work is covered contrary to the written request of Engineer, it must, if requested by Engineer, be uncovered for Engineer's observation and replaced at Contractor's expense. B. If Engineer considers it necessary or advisable that covered Work be observed by Engineer or inspected or tested by others, Contractor, at Engineer's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as Engineer may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. C. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); and Owner shall be entitled to an appropriate decrease in the Contract Price. If the parties are unable to agree as to the amount thereof, Owner may make a Claim therefor as provided in Paragraph 10.05. D. If, the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Times, or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. If the parties are unable to agree as to the amount or extent thereof, Contractor may make a Claim therefor as provided in Paragraph 10.05. 13.05 Owner May Stop the Work A. If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, Owner may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of Owner to stop the Work shall not give rise to any duty on the part of Owner to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of notice, Contractor shall correct all defective Work, whether or not fabricated, installed, or completed, or, if the Work has been rejected by Engineer, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair Owner's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within one year after the date of Substantial Completion (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents) or by any specific provision of the Contract Documents, any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by Owner or permitted by Laws and Regulations as contemplated in Paragraph 6.1 LA is found to be defective, Contractor shall promptly, without cost to Owner and in accordance with Owner's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by Owner, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-34 B. If Contractor does not promptly comply with the terms of Owner's written instructions, or in an emergency where delay would cause serious risk of loss or damage, Owner may have the defective Work corrected or repaired or may have the rejected Work re- moved and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. In special circumstances where a particular item of equipment is placed in continuous service before Substantial Completion of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Specifications . D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work will be extended for an additional period of one year after such correction or removal and replacement has been satisfactorily completed. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work A. If, instead of requiring correction or removal and replacement of defective Work, Owner (and, prior to Engineer's recommendation of final payment, Engineer) prefers to accept it, Owner may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) attributable to Owner's evaluation of and determination to accept such defective Work (such costs to be approved by Engineer as to reasonableness) and the diminished value of the Work to the extent not otherwise paid by Contractor pursuant to this sentence. If any such acceptance occurs prior to Engineer's recommendation of final payment, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and Owner shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. If the parties are unable to agree as to the amount thereof, Owner may make a Claim therefor as provided in Paragraph 10.05. If the acceptance occurs after such recommendation, an appropriate amount will be paid by Contractor to Owner. 13.09 Owner May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from Engineer to correct defective Work or to remove and replace rejected Work as required by Engineer in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, Owner may, after seven days written notice to Contractor, correct or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, Owner shall proceed expeditiously. In connection with such corrective or remedial action, Owner may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, take posses- sion of Contractor's tools, appliances, construction equipment and machinery at the Site, and incorporate in the Work all materials and equipment stored at the Site or for which Owner has paid Contractor but which are stored elsewhere. Contractor shall allow Owner, Owner's representatives, agents and employees, Owner's other contractors, and Engineer and Engineer's consultants access to the Site to enable Owner to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred or sustained by Owner in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and Owner shall be entitled to an appropriate decrease in the Contract Price. If the parties are unable to agree as to the amount of the adjustment, Owner may make a Claim therefor as provided in Paragraph 10.05. Such claims, costs, losses and damages will include but not be limited to all costs of repair, or replacement of work of others destroyed or damaged by correction, removal, or replacement of Contractor's defective Work. D. Contractor shall not be allowed an extension of the Contract Times because of any delay in the performance of the Work attributable to the exercise by Owner of Owner's rights and remedies under this Paragraph 13.09. ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values A. The Schedule of Values established as provid- ed in Paragraph 2.07.A will serve as the basis for progress EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00 700-35 payments and will be incorporated into a form of Applica- tion for Payment acceptable to Engineer. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments 1. At least 20 days before the date established in the Agreement for each progress payment (but not more often than once a month), Contractor shall submit to Engineer for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that Owner has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate property insurance or other arrangements to protect Owner's interest therein, all of which must be satisfactory to Owner. 2. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that all previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 3. The amount of retainage with respect to progress payments will be as stipulated in the Agreement. B. Review of Applications 1. Engineer will, within 10 days after receipt of each Application for Payment, either indicate in writing a recommendation of payment and present the Application to Owner or return the Application to Contractor indicating in writing Engineer's reasons for refusing to recommend payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. Engineer's recommendation of any payment requested in an Application for Payment will constitute a representation by Engineer to Owner, based on Engineer's observations on the Site of the executed Work as an experienced and qualified design professional and on Engineer's review of the Application for Payment and the accompanying data and schedules, that to the best of Engineer's knowledge, information and belief: a. the Work has progressed to the point indicat- ed; b. the quality of the Work is generally in accor- dance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract Documents, to a final determination of quantities and classifications for Unit Price Work under Paragraph 4.07, and to any other qualifications stated in the recommendation); and c. the conditions precedent to Contractor's being entitled to such payment appear to have been fulfilled in so far as it is Engineer's responsibility to observe the Work. 3. By recommending any such payment Engineer will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsi- bilities specifically assigned to Engineer in the Contract Documents; or b. that there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by Owner or entitle Owner to withhold payment to Contractor. 4. Neither Engineer's review of Contractor's Work for the purposes of recommending payments nor Engineer's recommendation of any payment, including final payment, will impose responsibility on Engineer: a. to supervise, direct, or control the Work, or b. for the means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or c. for Contractor's failure to comply with Laws and Regulations applicable to Contractor's performance of the Work, or d. to make any examination to ascertain how or for what purposes Contractor has used the moneys paid on account of the Contract Price, or e. to determine that title to any of the Work, materials, or equipment has passed to Owner free and clear of any Liens. 5. Engineer may refuse to recommend the whole or any part of any payment if, in Engineer's opinion, it would be incorrect to make the representations to Owner stated in Paragraph 14.02.13.2. Engineer may also refuse to recommend any such payment or, because of subse- quently discovered evidence or the results of subsequent EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-36 inspections or tests, revise or revoke any such payment recommendation previously made, to such extent as may be necessary in Engineer's opinion to protect Owner from loss because: a. the Work is defective, or completed Work has been damaged, requiring correction or replace- ment; b. the Contract Price has been reduced by Change Orders; c. Owner has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or d. Engineer has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Payment Becomes Due 1. Ten days after presentation of the Application for Payment to Owner with Engineer's recommendation, the amount recommended will (subject to the provisions of Paragraph 14.02.1)) become due, and when due will be paid by Owner to Contractor. D. Reduction in Payment 1. Owner may refuse to make payment of the full amount recommended by Engineer because: a. claims have been made against Owner on account of Contractor's performance or furnish- ing of the Work; b. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to Owner to secure the satisfaction and discharge of such Liens; c. there are other items entitling Owner to set -off against the amount recommended; or d. Owner has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.5.a through 14.02.B.5.c or Paragraph 15.02.A. 2. If Owner refuses to make payment of the full amount recommended by Engineer, Owner will give Contractor immediate written notice (with a copy to Engineer) stating the reasons for such action and promptly pay Contractor any amount remaining after deduction of the amount so withheld. Owner shall promptly pay Contractor the amount so withheld, or any adjustment thereto agreed to by Owner and Contractor, when Contractor corrects to Owner's satisfaction the reasons for such action. 3. If it is subsequently determined that Owner's refusal of payment was not justified, the amount wrongfully withheld shall be treated as an amount due as determined by Paragraph 14.02.C.1. 14.03 Contractor's Warranty of Title A. Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to Owner no later than the time of payment free and clear of all Liens. 14.04 Substantial Completion A. When Contractor considers the entire Work ready for its intended use Contractor shall notify Owner and Engineer in writing that the entire Work is substantially complete (except for items specifically listed by Contractor as incomplete) and request that Engineer issue a certificate of Substantial Completion. B. Promptly after Contractor's notification, , Owner, Contractor, and Engineer shall make an inspection of the Work to determine the status of completion. If Engineer does not consider the Work substantially complete, Engineer will notify Contractor in writing giving the reasons therefor. C. If Engineer considers the Work substantially complete, Engineer will deliver to Owner a tentative certificate of Substantial Completion which shall fix the date of Substantial Completion. There shall be attached to the certificate a tentative list of items to be completed or corrected before final payment. Owner shall have seven days after receipt of the tentative certificate during which to make written objection to Engineer as to any provisions of the certificate or attached list. If, after considering such objections, Engineer concludes that the Work is not substantially complete, Engineer will within 14 days after submission of the tentative certificate to Owner notify Contractor in writing, stating the reasons therefor. If, after consideration of Owner's objections, Engineer considers the Work substantially complete, Engineer will within said 14 days execute and deliver to Owner and Contractor a definitive certificate of Substantial Completion (with a revised tentative list of items to be completed or correct- ed) reflecting such changes from the tentative certificate as Engineer believes justified after consideration of any objections from Owner. D. At the time of delivery of the tentative certificate of Substantial Completion, Engineer will deliver to Owner and Contractor a written recommen- dation as to division of responsibilities pending final payment between Owner and Contractor with respect to security, operation, safety, and protection of the Work, maintenance, heat, utilities, insurance, and warranties and guarantees. Unless Owner and Contractor agree otherwise in writing and so inform Engineer in writing prior to Engineer's issuing the definitive certificate of Substantial EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-37 Completion, Engineer's aforesaid recommendation will be binding on Owner and Contractor until final payment. E. Owner shall have the right to exclude Contractor from the Site after the date of Substantial Completion subject to allowing Contractor reasonable access to complete or correct items on the tentative list. 14.05 Partial Utilization A. Prior to Substantial Completion of all the Work, Owner may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which Owner, Engineer, and Contractor agree constitutes a separately functioning and usable part of the Work that can be used by Owner for its intended purpose without significant interference with Contractor's performance of the remainder of the Work, subject to the following condi- tions. 1. Owner at any time may request Contractor in writing to permit Owner to use or occupy any such part of the Work which Owner believes to be ready for its intended use and substantially complete. If and when Contractor agrees that such part of the Work is substantially complete, Contractor will certify to Owner and Engineer that such part of the Work is substantially complete and request Engineer to issue a certificate of Substantial Completion for that part of the Work. 2. Contractor at any time may notify Owner and Engineer in writing that Contractor considers any such part of the Work ready for its intended use and substan- tially complete and request Engineer to issue a certificate of Substantial Completion for that part of the Work. 3. Within a reasonable time after either such request, Owner, Contractor, and Engineer shall make an inspection of that part of the Work to determine its status of completion. If Engineer does not consider that part of the Work to be substantially complete, Engineer will notify Owner and Contractor in writing giving the reasons therefor. If Engineer considers that part of the Work to be substantially complete, the provisions of Paragraph 14.04 will apply with respect to certification of Substantial Completion of that part of the Work and the division of responsibility in respect thereof and access thereto. 4. No use or occupancy or separate operation of part of the Work may occur prior to compliance with the requirements of Paragraph 5.10 regarding property insurance. 14.06 Final inspection A. Upon written notice from Contractor that the entire Work or an agreed portion thereof is complete, Engineer will promptly make a final inspection with Owner and Contractor and will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 14.07 Final Payment A. Application for Payment 1. After Contractor has, in the opinion of Engineer, satisfactorily completed all corrections identified during the final inspection and has delivered, in accordance with the Contract Documents, all maintenance and operating instructions, schedules, guarantees, bonds, certificates or other evidence of insurance certificates of inspection, marked -up record documents (as provided in Paragraph 6.12), and other documents, Contractor may make application for final payment following the procedure for progress payments. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.04.13.7; b. consent of the surety, if any, to final payment; c. a list of all Claims against Owner that Contractor believes are unsettled; and d. complete and legally effective releases or waivers (satisfactory to Owner) of all Lien rights arising out of or Liens filed in connection with the Work. 3. In lieu of the releases or waivers of Liens specified in Paragraph 14.07.A.2 and as approved by Owner, Contractor may furnish receipts or releases in full and an affidavit of Contractor that: (i) the releases and receipts include all labor, services, material, and equipment for which a Lien could be filed; and (ii) all payrolls, material and equipment bills, and other indebtedness connected with the Work for which Owner or Owner's property might in any way be responsible have been paid or otherwise satisfied. If any Subcontractor or Supplier fails to furnish such a release or receipt in full, Contractor may furnish a bond or other collateral satisfactory to Owner to indemnify Owner against any Lien. B. Engineer's Review of Application and Acceptance 1. If, on the basis of Engineer's observation of the Work during construction and final inspection, and Engineer's review of the final Application for Payment and accompanying documentation as required by the Contract Documents, Engineer is satisfied that the Work has been completed and Contractor's other obligations EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-38 under the Contract Documents have been fulfilled, Engineer will, within ten days after receipt of the final Application for Payment, indicate in writing Engineer's recommendation of payment and present the Application for Payment to Owner for payment. At the same time Engineer will also give written notice to Owner and Contractor that the Work is acceptable subject to the provisions of Paragraph 14.09. Otherwise, Engineer will return the Application for Payment to Contractor, indicat- ing in writing the reasons for refusing to recommend final payment, in which case Contractor shall make the necessary corrections and resubmit the Application for Payment. C. Payment Becomes Due 1. Thirty days after the presentation to Owner of the Application for Payment and accompanying docu- mentation, the amount recommended by Engineer, less any sum Owner is entitled to set off against Engineer's recommendation, including but not limited to liquidated damages, will become due and , will be paid by Owner to Contractor. 14.08 Final Completion Delayed A. If, through no fault of Contractor, final completion of the Work is significantly delayed, and if Engineer so confirms, Owner shall, upon receipt of Contractor's final Application for Payment (for Work fully completed and accepted) and recommendation of Engineer, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by Owner for Work not fully completed or corrected is less than the retainage stipulated in the Agreement, and if bonds have been furnished as required in Paragraph 5.01, the written consent of the surety to the payment of the balance due for that portion of the Work fully completed and accepted shall be submitted by Contractor to Engineer with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Claims. 14.09 Waiver of Claims A. The making and acceptance of final payment will constitute: 1. a waiver of all Claims by Owner against Contractor, except Claims arising from unsettled Liens, from defective Work appearing after final inspection pursuant to Paragraph 14.06, from failure to comply with the Contract Documents or the terms of any special guarantees specified therein, or from Contractor's continuing obligations under the Contract Documents; and 2. a waiver of all Claims by Contractor against Owner other than those previou made in accordance with the requirements herein and expressly acknowledged by Owner in writing as still unsettled. ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION 15.01 Owner May Suspend Work A. At any time and without cause, Owner may suspend the Work or any portion thereof for a period of not more than 90 consecutive days by notice in writing to Contractor and Engineer which will fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. Contractor shall be granted an adjust- ment in the Contract Price or an extension of the Contract Times, or both, directly attributable to any such suspension if Contractor makes a Claim therefor as provided in Paragraph 10.05. 15.02 Owner May Terminate for Cause A. The occurrence of any one or more of the following events will justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment or failure to adhere to the Progress Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's disregard of the authority of Engineer; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents. B. If one or more of the events identified in Paragraph 15.02.A occur, Owner may, after giving Contractor (and surety ) seven days written notice of its intent to terminate the services of Contractor: 1. exclude Contractor from the Site, and take possession of the Work and of all Contractor's tools, appliances, construction equipment, and machinery at the Site, and use the same to the full extent they could be used by Contractor (without liability to Contractor for trespass or conversion), 2. incorporate in the Work all materials and equipment stored at the Site or for which Owner has paid Contractor but which are stored elsewhere, and EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-39 3. complete the Work as Owner may deem expedient. C. If Owner proceeds as provided in Paragraph 15.02.13, Contractor shall not be entitled to receive any further payment until the Work is completed. If the unpaid balance of the Contract Price exceeds all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Owner arising out of or relating to completing the Work, such excess will be paid to Contractor. If such claims, costs, losses, and damages exceed such unpaid balance, Contractor shall pay the difference to Owner. Such claims, costs, losses, and damages incurred by Owner will be reviewed by Engineer as to their reasonableness and, when so approved by Engineer, incorporated in a Change Order. When exercising any rights or remedies under this Paragraph Owner shall not be required to obtain the lowest price for the Work performed. D. Notwithstanding Paragraphs 15.02.13 and 15.02.C, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. E. Where Contractor's services have been so terminated by Owner, the termination will not affect any rights or remedies of Owner against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by Owner will not release Contractor from liability. F. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.01.A, the termination procedures of that bond shall supersede the provisions of Paragraphs 15.02.13, and 15.02.C. 15.03 Owner May Terminate For Convenience A. Upon seven days written notice to Contractor and Engineer, Owner may, without cause and without prejudice to any other right or remedy of Owner, terminate the Contract. In such case, Contractor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; 3. all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred in settlement of terminated contracts with Subcontractors, Suppliers, and others; and 4. reasonable expenses directly attributable to termination. B. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. 15.04 Contractor May Stop Work or Terminate A. If, through no act or fault of Contractor, (i) the Work is suspended for more than 90 consecutive days by Owner or under an order of court or other public authority, or (ii) Engineer fails to act on any Application for Payment within 30 days after it is submitted, or (iii) Owner fails for 30 days to pay Contractor any sum finally determined to be due, then Contractor may, upon seven days written notice to Owner and Engineer, and provided Owner or Engineer do not remedy such suspension or failure within that time, terminate the Contract and recover from Owner payment on the same terms as provided in Paragraph 15.03. B. In lieu of terminating the Contract and without prejudice to any other right or remedy, if Engineer has failed to act on an Application for Payment within 30 days after it is submitted, or Owner has failed for 30 days to pay Contractor any sum finally determined to be due, Contractor may, seven days after written notice to Owner and Engineer, stop the Work until payment is made of all such amounts due Contractor, including interest thereon. The provisions of this Paragraph 15.04 are not intended to preclude Contractor from making a Claim under Paragraph 10.05 for an adjustment in Contract Price or Contract Times or otherwise for expenses or damage directly attributable to Contractor's stopping the Work as permitted by this Paragraph. ARTICLE 16 - DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either Owner or Contractor may request mediation of any Claim submitted to Engineer for a decision under Paragraph 10.05 before such decision becomes final and binding;. The mediation will be EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright D 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-40 governed by the Construction Industry Mediation Rules of the American Arbitration Association in effect as of the Effective Date of the Agreement. The request for mediation shall be submitted in writing to the American Arbitration Association and the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.05.E. B. Owner and Contractor shall participate in the mediation process in good faith. The process shall be concluded within 60 days of filing of the request. The date of termination of the mediation shall be determined by application of the mediation rules referenced above. C. If the Claim is not resolved by mediation, Engineer's action under Paragraph 10.05.0 or a denial pursuant to Paragraphs 10.05.C.3 or 10.05.13 shall become final and binding 30 days after termination of the mediation unless, within that time period, Owner or Contractor: 1. elects in writing to invoke any dispute resolution process provided for in the Supplementary Conditions, or 2. agrees with the other party to submit the Claim to another dispute resolution process, or 3. gives written notice to the other party of their intent to submit the Claim to a court of competent jurisdiction. ARTICLE 17 - MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. 17.02 Computation of Times A. When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day will be omitted from the computation. 17.03 Cumulative Remedies A. The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regula- tions, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. 17.04 Survival of Obligations A. All representations, indemnifications, warran- ties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Docu- ments, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Controlling Law A. This Contract is to be governed by the law of the state in which the Project is located. 17.06 Headings A. Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. EJCDC C -700 Standard General Conditions of the Construction Contract. Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00700-41 This Page Left Blank Intentionally DOCUMENT 00800 SUPPLEMENTARY CONDITIONS These Supplementary Conditions amend or supplement the Standard General Conditions of the Construction Contract (No. C -700, 2002 Edition) and other provisions of the Contract Documents as indicated below. All provisions which are not so amended or supplemented remain in full force and effect. The terms used in these Supplementary Conditions have the meanings stated in the General Conditions. Additional terms used in these Supplementary Conditions have the meanings stated below, which are applicable to both the singular and plural thereof. ARTICLE 1 - DEFINITIONS AND TERMINOLOGY SC -1.02 Add the following new paragraph immediately after Paragraph 1.02.F: G. The Specifications are written in imperative mood and streamlined form. This imperative language is directed to the Contractor, unless specifically noted otherwise. The words "shall be" are included by inference where a colon () is used within sentences or phrases. ARTICLE 2 - PRELIMINARY MATTERS SC 2.02. Delete Paragraph A in its entirety and insert the following: A. Owner shall furnish to Contractor 1 printed copy and 1 electronic (PDF) version of the Contract Documents. Additional printed copies may be obtained as directed in the Advertisement for Bids, General Conditions, and the Bonestroo Plan Room Terms of Use and Limitations on Use. ARTICLE 4 - AVAILABILITY OF LANDS: SUBSURFACE AND PHYSICAL CONDITIONS, REFERENCE POINTS SC -4.02 Delete 4.02.A and 4.02.13 in their entirety and insert the following: A. No reports of explorations or tests of subsurface conditions at or contiguous to the Site are known to the Owner or Engineer. ARTICLE 5 - BONDS AND INSURANCE SC -5.01 Add the following new paragraph immediately after Paragraph 5.0LC: D. Separate Performance and Payment Bonds should be submitted utilizing EJCDC Form C -610 and C -615 (2002 Edition) or a similar bond form if approved by Owner. 000034 - 09216 -0 00800 -1 © 2009 Bonestroo SUPPLEMENTARY CONDITIONS SC- 5.03.13 Delete Paragraph 5.03.13 in its entirety and insert the following: B. Failure of Owner to demand such certificates or other evidence of full compliance with these insurance requirements or failure of Owner to identify a deficiency from evidence provided shall not be construed as a waiver of Contractor's obligation to maintain such insurance. C. By requiring such insurance and insurance limits herein, Owner does not represent that coverage and limits will necessarily be adequate to protect Contractor and such coverage and limits shall not be deemed as a limitation on Contractor's liability under the indemnities granted to Owner in the Contract Documents. SC -5.04 Add the following new paragraph immediately after Paragraph 5.04.13: C. The limits of liability for the insurance required by Paragraph 5.04 of the General Conditions shall provide coverage for not less than the following amounts or greater where required by Laws and Regulations: 1. Worker's Compensation Insurance Coverage A - Statutory Coverage B - $500,000 Each Accident $500,000 Disease - Policy Limit $500,000 Disease - Each Employee 2. Commercial General Liability $1,000,000 General Aggregate $1,000,000 Products /Completed Operations Aggregate $1,000,000 Each Occurrence $1,000,000 Personal Injury 3. Comprehensive Automobile Liability $1,000,000 Combined Single Limit - Bodily injury and property damage. All owned, non - owned, and hired vehicles. 4. Umbrella Excess Liability $1,000,000 Each Occurrence $1,000,000 Aggregate Umbrella excess liability shall be a combined single limit which shall provide excess liability insurance over Commercial General Liability, Comprehensive Automobile Liability, and Employers Liability. 000034 - 09216 -0 00800 -2 © 2009 Bonestroo SUPPLEMENTARY CONDITIONS 5. The following persons or entities shall be included as additional insured on the Commercial Liability, Comprehensive Automobile Liability, and Umbrella Excess Liability. This coverage shall be primary and noncontributory: Owner. Engineer. SC- 5.06.A Amend the first sentence of Paragraph 5.06.A to read: A. Contractor shall purchase and maintain during the entire construction period a Builders Risk Property Insurance Policy in the amount of the full replacement cost of the entire Work at the Site. The insurance policy shall comply with the provisions of Paragraph 5.06.A1 through 5.06.A7. A minimum deductible of $1,000 each claim shall apply to this insurance and the risk of loss of the applicable deductible shall be born by Contractor, subcontractor, or others suffering such loss. In addition, the provisions of Paragraphs 5.07, 5.09, and 5.10 shall apply with the exception that Contractor shall act as fiduciary for the insureds as their interest may appear and adjust the loss with the insurance company. SC- 5.06.A Add the following new item immediately after Item 5.06.A7: 8. The Builder's Risk Insurance required herein shall apply to projects involving construction of structures and buildings only. The requirements of this Section shall be waived on projects involving only underground utilities, grading, street improvements, and similar construction work but any damage or loss to property shall be at the sole responsibility of Contractor until final acceptance of the Work. ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES SC -6.06 Add the following new paragraph immediately after Paragraph 6.06.G: H. Pursuant to Minnesota Statute, Contractor shall be fully responsible to pay subcontractors, suppliers, and other entities within 10 days of the Contractor's receipt of payment for undisputed services provided by the subcontractor, supplier, or other entity. Contractor shall pay interest of 1-1/2 percent per month or any part of a month to the subcontractor, supplier, or other entity on any amount not paid on time to the subcontractor, supplier, or other entity. The minimum monthly interest penalty payment for an unpaid balance of $100 or more is $10. For an unpaid balance of less than $100, the Contractor shall pay the actual penalty due to the subcontractor, supplier, or other entity. A subcontractor, supplier, or other entity who prevails in a civil action to collect interest penalties from a Contractor must be awarded its costs and disbursements, including attorney's fees included in bringing the action. SC- 6.08.A Amend the first sentence of Paragraph 6.08.A by replacing the words "the Supplementary Conditions" with the words "Division 1." SC- 6.19.A Delete the words "representation of in the second sentence. 000034 - 09216 -0 00800 -3 © 2009 Bonestroo SUPPLEMENTARY CONDITIONS ARTICLE 10 - CHANGES IN THE WORK; CLAIMS SC- 10.05.13 Amend the first sentence of Paragraph 10.05.13 by replacing the words "30 days" with the words "10 days." Amend the third sentence of Paragraph 10.05.13 by replacing the words "60 days" with the words "30 days." ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK SC- 13.07.A Amend the first sentence of Paragraph 13.07.A by striking out the words "one year" and inserting the words "two years." ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION SC- 14.02.135 Add the following new item immediately after Item 14.02.135d: e. Contractor's failure to make acceptable submittals in accordance with the accepted schedules. ARTICLE 16 - DISPUTE RESOLUTION SC -16.01 Delete Paragraph 16.01.0 in its entirety and insert the following in its place: C. If the claim is not resolved by mediation, Engineer's action under Paragraph 10.05.0 or a denial pursuant to Paragraphs 10.05.C3 or 10.05.1) shall become final and binding 30 days after termination of the mediation, unless within that time period Owner or Contractor: 1. elects in writing to demand arbitration of the claim, pursuant to Paragraph SC- 16.02, or 2. agrees with the other party to submit the claim to another dispute resolution process. SC -16.02 Add the following new paragraph immediately after Paragraph 16.01: SC -16.02 Arbitration B. The demand for arbitration will be filed in writing with the other party to the Contract and with the selected arbitrator or arbitration provider and a copy will be sent to Engineer for information. The demand for arbitration will be made within the 30 day period specified in Paragraph SC- 16.01.0 and in all other cases within a reasonable time after the claim or counterclaim, dispute, or other matter in question has arisen, and in no event shall any such demand be made after the date when institution of legal or equitable proceedings based on such claim or other dispute or matter in question would be barred by the applicable statue of limitations. 000034 - 09216 -0 00800 -4 © 2009 Bonestroo SUPPLEMENTARY CONDITIONS C. No arbitration arising out of or relating to the Contract Documents shall include by consolidation, joinder, or in any other manner any other individual or entity (including Engineer, Engineer's consultants and the officers, directors, partners, agents, employees, or consultants of any of them) who is not a party to this Contract, unless: 1. the inclusion of such other individual or entity is necessary if complete relief is to be afforded among those who are already parties to the arbitration; and 2. such other individual or entity is substantially involved in a question of law or fact which is common to those who are already parties to the arbitration and which will arise in such proceedings. D. The award rendered by the arbitrator(s) shall be consistent with the agreement of the parties in writing and include: (i) a concise breakdown of the award; (ii) a written explanation of the award specifically citing the Contract Document provisions deemed applicable and relied on in making the award. E. The award will be final. Judgment may be entered upon it in any court having jurisdiction thereof and it will not be subject to modification or appeal, subject to provisions of the Controlling Law relating to vacating or modifying an arbitral award. F. The fees and expenses of the arbitrators and any arbitration service shall be shared equally by Owner and Contractor. SC -16.01 Delete Paragraph 16.0l.0 in its entirety and insert the following in its place: C. If the claim is not resolved by mediation, Engineer's action under Paragraph 10.05.0 or a denial pursuant to Paragraphs 10.05.C3 or 10.05.13 shall become final and binding 30 days after termination of the mediation, unless within that time period Owner or Contractor: 1. elects in writing to demand arbitration of the claim, pursuant to Paragraph SC- 16.02, or 2. agrees with the other party to submit the claim to another dispute resolution process. END OF DOCUMENT 000034 - 09216 -0 00800 -5 © 2009 Bonestroo SUPPLEMENTARY CONDITIONS This Page Left Blank Intentionally SECTION 01100 SUMMARY PART 1 GENERAL 1.01 SECTION INCLUDES A. Basic description of the Project and Work restrictions. 1.02 SUMMARY OF WORK A. Project Name: 2009 Retaining Wall Improvements for the City of New Hope, Minnesota, City Project No. 854. B. Description of Work: Remove and replace retaining walls at various locations. 1.03 COMPLETION DATES A. Substantial Completion: Set forth in the Agreement. B. Final Completion: Set forth in the Agreement. 1.04 LIQUIDATED DAMAGES A. Provisions for liquidated damages, if any, are set forth in the Agreement. 1.05 WORK RESTRICTIONS A. Use of Site: 1. Contractor responsible for snow removal and disposal from the Owner's property if necessary to maintain access and working space during construction. 2. Keep existing driveways and entrances clear and available to the public and to the Owner. 3. If additional space is needed, obtain and pay for such space off Site. PART 2 PRODUCTS Not Used. 000034 - 09216 -0 01 100 -1 C 2009 Bonestroo SUMMARY PART 3 EXECUTION 3.01 MEASUREMENT AND PAYMENT A. All Work and costs of this Section shall be incidental to the Project and included in the TOTAL BASE BID. L _ O10 6 `MONE01 000034 - 09216 -0 01100 -2 V 2009 Bonestroo SUMMARY SECTION 01200 PART 1 GENERAL 1.01 SECTION INCLUDES A. Administrative and procedural requirements for pricing of Work and request for payment procedures. 1.02 BID UNIT PRICES A. Provide access and assist Engineer in determining actual quantities of Bid Unit Price work. B. Provide documentation to substantiate Bid Unit Price work. C. If the Contractor delivers and places more of any material that is paid for on a Bid Unit Price basis than is required to perform the Work and thereby causes the materials to be wasted, the quantity wasted will be deducted from the final measurement for that Bid Item. 1.03 PAYMENT PROCEDURES A. Engineer will provide initial Application for Payment Form at the Preconstruction Conference. B. Submit 1 preliminary copy of progress payment application for review, consistent with Article 14 of the General Conditions. Submit 4 signed copies of Application for Payment to Engineer prior to the dates identified at the Preconstruction Conference. C. Attach the following supporting documentation, in addition to the requirements of General Conditions Article 14: 1. Documentation to substantiate Bid Unit Price work. 2. . Updated construction schedule consistent with Section 01330. Not Used. 000034 - 09216 -0 01200 -1 © 2009 Bonestroo PRICE AND PAYMENT PROCEDURES PART 3 EXECUTION 3.01 MEASUREMENT AND PAYMENT A. All Work and costs of this Section shall be incidental to the Project and included in the TOTAL BASE BID. END OF SECTION 000034 - 09216 -0 01200 -2 2009 Bonestroo PRICE AND PAYMENT PROCEDURES SECTION 01310 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.01 SECTION INCLUDES A. General requirements for overall Project coordination. 1.02 UTILITIES A. Notify Gopher State One Call before starting construction in a given area requesting utility locates in the Site. B. Project Utility Sources: Coordinate Work with the following utility owners. The following utilities are known to be on the Site and are shown on the Drawings in a general way: 1. Water: Owner. 2. Sanitary Sewer: Owner. 3. Storm Sewer: Owner. 4. Electric: Xcel Energy, Greg Plumedahl; 763 - 493 -1670, fax: 763 - 493 -1501. 5. Gas: CenterPoint Energy, Alla Denisova; 612 -321 -5077, fax: 612- 321 -5480. 6. Telephone: Qwest, Steve Hotvedt; 612 -381 -5031, fax: 612- 381 -5571. 7. Cable TV: Comcast, Doug Zahn; 651- 493 -5316, fax: 651- 493 -5116. C. Owner requires 48 -hours notice for all utility interruptions. D. Private utility information obtained from utility owners /operators is shown on the Drawings in a general way. The location of utilities is not guaranteed. The location of utilities and coordination during construction is the responsibility of the Contractor. Final locations of all utilities, per Gopher State One System, will be the responsibility of the Contractor. All costs associated with private utility coordination shall be incidental to the total Work of the Project. Information provided is of Quality Level D (QLD) as defined by ASCE Standards. Utility locations shown on the Drawings are based on this QLD information and have not been verified with a field survey. 000034 - 09016 -0 PROJECT MANAGEMENT VD 2009 Bonestroo 01310 -1 AND COORDINATION 1.03 PERMITS A. Apply for, obtain, and comply with the provisions of the following permits: 1. Hennepin County Permit for work within the County right -of -way. B. Apply for, obtain, and comply with other permits, licenses, and approvals which may be required for the Project. 1.04 SURVEYING AND CONSTRUCTION OBSERVATION A. Provide Engineer a minimum of 48 -hours notice in advance of the need for establishing lines, grades, measurements, grade checks, and observation of Work. B. Engineer will furnish a Resident Project Representative consistent with Paragraph 9.03 of the Supplementary Conditions. 1.05 PROJECT MEETINGS A. Administrative Requirements: 1. Proj ect Superintendent or persons designated by the Contractor to attend and participate in the Project meetings shall have all required authority to commit the Contractor to solutions agreed upon in the Project meetings. 2. Engineer will set the time, sites, and prepare the agenda for the meetings. 3. Engineer will prepare meeting minutes and distribute 1 copy to Contractor. Notify Engineer of inaccuracies or discrepancies in the meeting minutes within 5 calendar days of receipt of the minutes. 4. The attendance and cooperation of subcontractors and suppliers may be required. B. Preconstruction Conference: 1. Provisions for the Preconstruction Conference are set forth in the General Conditions. 2. Requirements for preconstruction submittals are set forth in the General Conditions. Submittal procedures shall be consistent with Section 01330. 000034-09016-0 PROJECT MANAGEMENT C 2009 Bonestroo 01310 -2 AND COORDINATION C. Progress Meeting Procedures: Engineer will schedule construction progress meetings throughout the duration of the Project to assess the progress of the Work, identify and discuss Project related issues, and discuss near -term construction activities. 1.06 CONSTRUCTION SCHEDULING A. Sequencing and Scheduling 1. The Owner is very sensitive to the inconvenience each property owner will experience to construct this Project. The most frequent complaint received during this type of Project is the length of time for which boulevards are disturbed. Therefore, scheduling of the work, maintenance of local traffic, and timely repair of each yard are critical to the success of the Project. 2. Resident notification of work directly affecting their property is required for all situations. The Project Inspector may assist with notifying residents. However, it is the responsibility of the Contractor to ensure residents are aware of issues such as access restrictions. 3. Construction should be coordinated such that disturbed areas are minimized at any given time. PART 2 PRODUCTS Not Used. PART 3 EXECUTION 3.01 MEASUREMENT AND PAYMENT A. All Work and costs of this Section shall be incidental to the Project and included in the TOTAL BASE BID. END OF SECTION 000034 - 09016 -0 PROJECT MANAGEMENT © 2009 Bonestroo 01.310 -3 AND COORDINATION This Page Left Blank Intentionally SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. General procedures and requirements for submittals during the course of construction. 1.02 SEQUENCING AND SCHEDULING A. Schedule submittals consistent with the Contractor's schedule of shop drawings. PART 2 PRODUCTS Not Used. PART 3 EXECUTION 3.01 CONSTRUCTION SCHEDULE A. Submit preliminary schedule and progress schedule consistent with the General Conditions. B. Prepare schedules on 11 inch by 17 inch sheets showing overall sequence of construction. Organize the schedule by work activity. Identify separate stages of each work activity: 1. List work items in chronological sequence. Show beginning and completion dates of each activity. Include all activities with an estimated duration of 3.days or longer. 2. Format schedule as a horizontal bar chart. Provide separate bars for each activity or trade. 3. Provide space for revisions and notations. 4. Identify interrelations between activities. 000034- 09216 -0 01330 -1 0 2009 Bonestroo SUBMITTAL PROCEDURES C. As Work progresses, revise, update, and resubmit schedule as requested by Engineer. At a minimum, update schedule with each Application for Payment. Show all activities started or finished since previous schedule was submitted and show percentage of completion for each activity. 3.02 EMERGENCY CONTACT LIST A. Before any Work at the Site is started, submit a typed list on 8 -1/2 inch by 11 inch paper outlining 24 hour on -call contacts for the Project. This list shall include the Contractor's safety representative, key representatives from the Contractor, subcontractors, and suppliers. Include the following information for each contact: 1. Company name. 2. Contact person(s). 3. Local and mobile phone numbers. 4. Fax number. 3.03 SHOP DRAWINGS AND MANUFACTURERS' INFORMATION A. Conform to the requirements of Paragraph 6.17 of the General Conditions, except as modified herein. B. The minimum sheet size shall be 8 -1/2 inches by I 1 inches. Non - legible copies will not be reviewed. C. Submit a minimum of 3 copies of shop drawings, plus the quantity of copies the Contractor wants returned. Each copy shall contain the following information: 1. Date of submission and date of any previous submittals. 2. Project Title. 3. Names Of: Contractor, subcontractor, supplier, and manufacturer. 4. Identification of product and Specification Section number. 5. Identification of revisions from previous submittals. 6. A 4 inch by 4 inch blank space for the Engineer's stamp. D. Engineer's review will be in conformance with the requirements of Paragraph 6.17 of the General Conditions, except as modified herein. 000034 - 09216 -0 01330-2 © 2009 Bonestroo SUBMITTAL PROCEDURES E. Engineer will stamp shop drawings and indicate requirements for Contractor's review or resubmittal as follows: 1. "Approved" — Appears that items covered by the submittal will, after installation or incorporation into the Work, conform to the Contract Documents and appears to be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. "Approved as Noted" — Appears that items covered by the submittal will, after installation or incorporation into the Work, conform to the Contract Documents and appears to be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents, except as noted by Engineer. 3. "Revise and Resubmit" — Appears that items covered by the submittal will not, after installation or incorporation into the Work, conform to the Contract Documents and will not be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. Work cannot proceed until the submittal is revised and resubmitted conforming to the resubmittal procedures described in Paragraph 6.17.E of the General Conditions. 4. "Rejected" — Work covered by the submittal is not complete or it appears that items covered by the submittal will not, after installation or incorporation into the Work, conform to the Contract Documents and will not be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. Contractor shall conform to the resubmittal procedures described in Paragraph 6.17.E of the General Conditions. F. Engineer will return reviewed submittals to Contractor by U. S. Postal Service general delivery. If Contractor wants Engineer to expedite return delivery, Contractor shall notify Engineer in writing and reimburse Owner for delivery plus 15- percent mark- up. 3.04 TEST REPORTS A. Submit 3 copies of all inspections, tests, and approvals required in the Specification. 3.05 MEASUREMENT AND PAYMENT A. All Work and costs of this Section shall be incidental to the Project and included in the TOTAL BASE BID. END OF SECTION 000034 - 09216 -0 01330 -3 C "? 2009 Bonestroo SUBMITTAL PROCEDURES This Page Left Blank Intentionally SECTION 01400 QUALITY REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Information required for conformance to regulatory requirements. B. Quality assurance. C. Procedures to measure and report the quality and performance of the Work. 1.02 REFERENCE STANDARDS A. Whenever reference is made to the Minnesota Department of Transportation Specifications, such reference shall mean "Standard Specifications for Construction," 2005 Edition (MnDOT Spec.) and all subsequent revisions and supplements. The word "Engineer" is understood to refer to the Engineer for the Owner. 1.03 SUBMITTALS A. Prior to start of Work, submit testing laboratory name for various specified tests for approval by Engineer. B. Laboratory test results or analysis. C. Manufacturer's certificates of quality control or performance. 1.04 WORKMANSHIP A. Comply with industry standards of the region, except where more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship. 1.05 TESTS AND INSPECTIONS A. Conform to the requirements of Article 13 of the General Conditions, except as modified herein. B. Notify Engineer 48 hours prior to expected time for operations requiring tests and inspections. 000034 - 09216 -0 01400 -1 © 2009 Bonestroo QUALITY REQUIREMENTS C. Provide incidental labor and facilities to obtain and handle samples at Site or source, transport samples to laboratory, facilitate tests and inspections for storing and curing of test samples. A. After each inspection and test, submit 3 copies of Laboratory Report to Engineer. B. Include: Date issued, Project Title and number, name of inspector, date and time of sampling or inspection, identification of product and Specifications Section, location in the Project, type of inspection or test, date of test, results of tests, and conformance with Contract Documents. A. Test samples and perform field tests. B. Provide qualified personnel. Cooperate with Engineer and Contractor in performance of services. C. Ascertain compliance with the requirements of the Contract Documents. D. When requested by Engineer, provide interpretation of test results. 1.08 LIMITS ON TESTING LABORATORY AUTHORITY A. Laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents. B. Laboratory may not approve or accept any portion of the Work. C. Laboratory may not assume any duties of Contractor. D. Laboratory has no authority to stop Work. 1.09 MANUFACTURER'S CERTIFICATES A. If requested by Engineer, submit manufacturer's certificate with shop drawings certifying that products meet or exceed specified requirements executed by responsible officer. PART 2 PRODUCTS Not Used. 000034 - 09216 -0 01400 -2 C0 2009 Bonestroo QUALITY REQUIREMENTS PART 3 EXECUTION 3.01 MEASUREMENT AND PAYMENT A. All Work and costs of this Section shall be incidental to the Project and included in the TOTAL BASE BID. END OF SECTION 000034 - 09216 -0 01400 -3 n 2009 Bonestroo QUALITY REQUIREMENTS This Page Left Blank Intentionally SECTION 01500 TEMPORARY FACILITIES AND CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES A. Temporary utilities and miscellaneous temporary facilities required during construction. 1.02 REFERENCES A. Minnesota Department of Transportation "Standard Specifications for Construction," 2005 Edition (MnDOT Spec.). B. The Minnesota Manual on Uniform Traffic Control Devices (MMUTCD), including the Field Manual on Temporary Traffic Control Zone Layouts — Latest edition. C. Minnesota Department of Transportation Traffic Engineering Manual. 1.03 SUBMITTALS A. Construction Staging Plan consistent with 3.03 of Section 01330. Plan shall include the following information: 1. Sequence of construction and traffic control. 2. Streets closed or restricted during any stage of construction. 3. Provisions for routing any detoured traffic as permitted. 4. Specific signs, striping, and other traffic control devices to be utilized. B. Traffic Management Plan consistent with 3.03 of Section 01330. Plan shall include the following information: 1. Haul and access routes. 2. Permits or applications required by local authorities. 3. Temporary facilities required. PART 2 PRODUCTS Not Used. 000034 - 09216 -0 (0 2009 Bonestroo 01500 -1 TEMPORARY FACILITIES AND CONTROLS PART 3 EXECUTION 3.01 MOBILIZATION A. Move personnel, equipment, materials, and all other items required to complete the Work at the Site. B. Temporarily hold or relocate utilities and any miscellaneous structures, such as signs, power poles, guy wires, and mailboxes disturbed. 3.02 SIGNS, MAILBOXES, ETC REMOVAL AND REPLACEMENT A. Remove, store carefully, and replace all signs, posts, etc. that maybe within the Site as directed by Engineer (incidental). 3.03 TEMPORARY UTILITIES A. Provide and maintain all temporary facilities, utilities, and controls as long as needed for the safe and proper completion of the Work. Remove all temporary facilities, utilities, and controls as rapidly as progress will permit or as directed by Engineer. B. Temporary Water for Construction: Obtain water for construction from Owner at a hydrant. Obtain a meter and backflow preventer assembly from Owner. Return to Owner at completion. 2. Obtain water for construction from locations designated by the Owner. 3.04 CONSTRUCTION FACILITIES A. Sanitary Facilities: Comply with all governing regulations, including safety and health codes, for sanitary fixtures and facilities. 2. Provide self - contained toilet units, or water and sewer connected temporary toilet facilities consistent with governing regulations. Contractor may not use Owner's toilet facilities. 3. Provide and maintain adequate supply of toilet tissue, paper towels, paper cups, and similar disposal materials for each facility. Provide appropriate covered waste containers for used material. 000034 - 09216 -0 TEMPORARY FACILITIES 0 2009 Bonestroo O 1500 -2 AND CONTROLS 3.05 TEMPORARY CONSTRUCTION A. Pumping and Dewatering: 1. Provide draining, pumping, dewatering, and cleaning operations as necessary to complete the Work. 2. Provide all necessary pumping to remove all surface water and groundwater as required for the Work. Provide erosion control measures for discharge of water. 3. Protect Site and adjacent property to avoid damage. 3.06 TRAFFIC CONTROL A. General: 1. The Contractor shall provide and maintain all traffic control devices in accordance with the approved Construction Staging Plan. All traffic control devices and other protective measures shall conform to MMUTCD. 2. The Contractor will not be permitted to park vehicles as to obstruct a traffic control device. The parking of workers' vehicles will not be allowed within the Project limits, unless so approved by the Engineer 3. The Contractor will not be permitted to store materials or equipment within 30 feet of through traffic, unless approved by the Engineer. If materials or equipment must be stored within 30 feet of through traffic, the Contractor shall provide barricades or barriers, as directed by the Engineer, to warn and protect traffic. 4. The Contractor shall conduct his work in a manner which will allow access to all properties within and adjacent to the Project by fire, police, and emergency vehicles. B. Construction Staging Plan: 1. Within 10 days following the approval of the Contract, the Contractor shall provide the Engineer with a Construction Staging Plan and a Traffic Management Plan. The Engineer may accept, reject, or suggest alterations to the plans. These plans shall reflect the following conditions: a. The Contractor shall provide a method of protecting traffic from open excavation areas. b. Minimum through -lane lane widths of 10 feet will be maintained at all times. 000034 - 09216 -0 01$00 -3 TEMPORARY FACILITIES © 2009 Bonestroo AND CONTROLS C. 2 -way traffic (1 lane in each direction) will be maintained at all times. d. The Contractor may request changes to the Construction Staging Plan at any time. No change or deviation will be permitted without approval of the Engineer. e. Provide access for emergency vehicles and busses to all residences at all times f. The Contractor will re- establish access to all driveways at the end of each day. g. For all traffic lane switches, interim pavement markings shall be installed in accordance with Chapter 8 of the Traffic Engineering Manual. There will be no direct compensation for interim pavement markings. h. The Contractor shall furnish, install, and maintain "ROAD WORK AHEAD" and "END ROAD WORK" signs in advance of and beyond each end of the construction limits. The Contractor shall also furnish, install, and maintain "ROAD WORK AHEAD" signs in advance of the construction limits on all intersecting roads and streets. The staging shall be undertaken to provide street access and local access to adjacent properties as directed by the Engineer. The Engineer may modify the requirements for traffic control as deemed necessary due to field conditions. j. Contractor shall remove traffic control devices at the conclusion of the Work. C. Vehicle Warning Light: 1. All Contractors', subcontractors', and suppliers' mobile equipment, which are working in the lane closure or within 15 feet of the lane closure, shall be equipped with operable warning lights which meet the appropriate requirements of the SAE Specifications. This would include any vehicle which enters the traveled roadway at any time. The SAE Specification requirements are as follows: a. 360 - Degree Rotating Lights - SAE Specification J845. b. Flashing Lights - SAE Specification J595. C. Flashing Strobe Lights - SAE Specification J1318. 000034 - 09216 -0 TEMPORARY FACILITIES v 2009 Bonestroo 01500 -4 AND CONTROLS D. Temporary Lane Closures: 1. Temporary Lane Closures shall conform to the following: a. A "short- term" lane closure, or traffic restriction, shall be one that is in -place only during the Contractor's work hours. b. Temporary "short- term" lane closures by the Contractor, consistent with time restrictions, will be permitted during those hours and at those locations approved by the Engineer. Requests for "short- term" lane closures shall be made at least 24 hours prior to such closures. The Contractor shall furnish, erect, and maintain all traffic control devices required for these closures. No direct compensation will be made for temporary lane closures. C. Application of traffic control devices shall be in accordance with the Field Manual. d. Lane closures will not be permitted during inclement weather, nor any other time when, in the opinion of the Engineer, the lane closures will be a hazard to traffic. e. When a temporary lane closure is used by the Contractor, the closure shall be incidental work and no direct compensation will be made therefore. E. Traffic Control Devices: 1. Daily inspect and insure that all traffic control devices required by the construction are in accordance with the MMUTCD. Any discrepancy between the actual devices in use and the required devices shall be immediately rectified. At least 1 nighttime inspection shall be made each week. 2. The Contractor shall complete the checklist attached to the end of this Section, each day of each week that traffic control devices for any overnight lane closure or detour are being used on the Project. The completed checklist shall be submitted each working day to the Engineer or the Engineer's designated representative at some mutually agreeable time. 3. The Contractor shall furnish qualified flagpersons to adequately control traffic when needed or as directed by the Engineer. Qualified flagpersons shall comply with the requirements set forth in the Flagging Handbook Section of the Field Manual Faagpersons are required to protect construction vehicles during unloading of construction materials. 000034 - 09216 -0 TEMPORARY FACILITIES © 2009 Bonestroo 01500 -5 AND CONTROLS 4. Furnish names, addresses, and phone numbers of at least 3 individuals responsible for the placement and maintenance of traffic control devices. At least 1 of these individuals shall be "on call" 24 hours per day, 7 days per week during the time any traffic control devices furnished and installed by the Contractor are in place. 5. Respond to any request from the Engineer to improve or correct the usage of traffic control devices on or related to this Project within 1 hour of the time of notification. 6. Keep all traffic control signs and devices in a legible condition. This shall include but not be limited to removing grime and dust deposited on any device by traffic, natural causes, or when requested by Engineer. F. Failure to Complete The Work On Time: 1. The Contractor will be subject to an hourly charge for failure to maintain the traffic control devices. Non- compliance charges, for each incident, will be assessed at a rate of $250 per hour for each hour or any portion thereof with which the Engineer determines that the Contractor has not complied. 2. The Contractor will be subject to an hourly charge for failure to remove temporary lane restrictions within the permitted hours, unless authorized by the Engineer. Non - compliance charges, for each incident, will be assessed at a rate of $500 per hour for each hour or any portion thereof with which the Engineer determines that the Contractor has not complied. A. Temporary Barriers: Provide temporary covers, enclosures, markers, and barriers as necessary to protect Work. 2. Damage to the Site caused by removal of temporary fencing, including postholes, shall be promptly repaired by Contractor. During removal at no time shall the Work remain unattended if a dangerous condition exists because of incomplete removal or Site repairing. 3.08 ADDITIONAL TRAFFIC CONTROL DEVICES A. General: In addition to the traffic control devices shown on the Traffic Control Layouts, the Engineer may require more traffic control as traffic conditions may warrant. 000034 - 09216 -0 TEMPORARY FACILITIES G 2009 Bonestroo 01500 -6 AND CONTROLS 2. The Contractor shall furnish the additional traffic control devices as ordered by the Engineer. 3. The devices shall be installed and maintained in a functional and/or legible condition at all times, to the satisfaction of the Engineer. 3.09 MEASUREMENT AND PAYMENT A. A Bid Item has been provided for Mobilization. Measurement is Lump Sum. This will be considered payment in full for all work and costs of this Bid Item. The amount of the Lump Sum Bid shall not exceed 5 percent of the Total Base Bid: 1. Partial payment of the Lump Sum Bid Item "Mobilization" will be made using a percentage based on the following: Cumulative Percent of Mobilization Item Paid First Partial Payment 50 Percent of original contract amount earned — 25 70 Percent of original contract amount earned — 50 90 Percent of original contract amount earned — 100 100 B. Dewatering will be considered incidental to the Project with all costs included in the TOTAL BASE BID. C. A Bid Item has been provided for Traffic Control. Measurement is Lump Sum: 1. This shall be considered payment in full for all labor, equipment, and materials associated with the required traffic control devices for the entire Project. 2. This Bid Item shall include but not be limited to furnishing, installing, and relocating the traffic control due to various road closures, daily maintenance, and ultimate removal of all such devices used over the duration of the Contract or as directed by the Engineer. 3. Partial payment of the Lump Sum Item "Traffic Control" will be made using a percentage based on the following: Cumulative Percent of Traffic Control Item Paid First Partial Payment 50 Percent of original Contract amount earned — 25 70 Percent of original Contract amount earned — 50 90 Percent of original Contract amount earned — 100 100 000034 - 09216 -0 01500 -7 TEMPORARY FACILTUES 0 2009 Bonestroo AND CONTROLS D. All other Work and costs of this Section shall be incidental to the Project and included in the TOTAL BASE BID. END OF SECTION 000034 - 09216 -0 TEMPORARY FACILITIES © 2009 Bonestroo X1500 -8 AND CONTROLS SECTION 01700 EXECUTION REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Requirements for overall execution of the Work and closeout of the Contract for Final Payment. 1.02 SUBMITTALS A. Submit the following items consistent with the Conditions of the Contract and Division 1 Sections: 1. Record Documents. 2. Written Notification of Substantial Completion. 3. Executed Certificate of Substantial Completion. 4. Written Notification of Final Completion. 5. Schedules, warranties, Bonds, certificates, certificates of inspection, and other documents. 6. Final Application for Payment, including accompanying documentation. 7. IC -134 Form. PART 2 PRODUCTS Not Used. PART 3 EXECUTION 3.01 EXAMINATION A. Acceptance of Conditions: By commencing Work, Contractor construes acceptance of the adjacent work as satisfactory to receive subsequent Work. 000034- 09216 -0 01700-1 2009 Bonestroo EXECUTION REQUIREMENTS B. Existing Conditions: Before commencing Work, inspect Work completed by others that is adjacent to Work. If adjacent conditions prevent completion of Work, Contractor will not commence Work until the conditions are corrected. C. Inspect each product immediately prior to installation. Remove damaged products from Site. 3.02 GENERAL INSTALLATION REQUIREMENTS A. Comply with the manufacturer's instructions for installation of manufactured products to the extent that these instructions are applicable and more explicit or more stringent than requirements indicated in the Contract Documents. B. Install each element of work during weather conditions and Project status to ensure coordination of the Work. 3.03 SITE MAINTENANCE A. Maintain stockpiles, excavations, and all other work areas free from dust. Employ dust abatement techniques whenever a dust nuisance or hazard occurs, or as directed by Engineer. Comply with local ordinances. B. Protect hazardous work areas and hazardous material storage areas. C. Protect trees, unless specifically indicated on Drawings. D. Clean access roads and haul routes with mechanical street sweeper. E. If Contractor fails to maintain Site, Engineer will provide Written Notice of Contractor's defective Work. Contractor will be given 12 hours from the Notice to clean Site. After the 12 -hour period, Owner may correct the defective Work consistent with Article 13.09 of the Conditions of the Contract. 3.04 CUTTING AND PATCHING A. Complete all cutting, fitting, and patching as necessary to join the new Work to existing conditions. B. Remove or cut existing work only as necessary to join the new Work to the existing construction or as required by the Contract Documents. C. Patch defective and incomplete surfaces caused or exposed by Work of the Project. D. Repair any damage to existing conditions and patch to match. 000034 - 09216 -0 01700 -2 © 2009 Bonestroo EXECUTION REQUIREMENTS E. Existing construction designated by the Contract Documents to remain that is loosened, cracked, or otherwise damaged or defaced beyond repair as a result of Work by the Contractor will be considered unsuitable for the use intended and shall be removed and replaced by the Contractor. 3.05 CERTIFICATE OF COMPLIANCE WITH MINNESOTA STATUTES 290.92 AND 290.97 A. Upon completion of the Project and prior to Final Payment, the Contractor and all subcontractors shall complete Minnesota Department of Revenue Revised Form IC -134. This form, Affidavit for Obtaining Final Settlement of Contract with the State of Minnesota and any of its Political or Governmental Subdivisions, is to be signed by a Department of Revenue representative and forwarded to the Owner. Copies of this form can be obtained by writing to the Minnesota Department of Revenue, Forms Section, Mail Station 1173, St. Paul, MN 55146 -1173 or by calling (651) 296 -4444. 3.06 MEASUREMENT AND PAYMENT A. All Work and costs of this Section shall be incidental to the Project and included in the TOTAL BASE BID. END OF SECTION 000034 - 09216 -0 01700 -3 C, 2009 Bonestroo EXECUTION REQUIREMENTS This Page Left Blank Intentionally SECTION 02225 1.01 SECTION INCLUDES REMOVALS A. Complete or partial removal and disposal or salvage of at grade, above grade, and below grade structures and miscellaneous items. 1.02 RELATED SECTIONS A. Section 02315 — Excavation and Fill. 1.03 REFERENCES A. Minnesota Department of Transportation "Standard Specifications for Construction," 2005 Edition (MnDOT Spec.): 1. 2104 — Removing Pavement and Miscellaneous Structures. 1.04 DEFINITIONS A. Remove: To take away or eliminate from the Site by any method selected by the Contractor, including disposal of material. B. Salvage: To dismantle, disassemble, or remove carefully without damage so the item can be re- assembled, replaced, or reused in a workable condition equal to that existing before removal. C. Abandon: To fill, bulkhead, or close off pipes and structures so that no settlement or flow can occur. 1.05 REGULATORY REQUIREMENTS A. Conform to MnDOT Spec. 21043C, with the following modifications: 1. Dispose of all materials designated for removal outside the Site at locations selected by Contractor. 2. Stockpile or temporarily store materials designated for salvage at locations provided by Contractor. 000034 - 09216 -0 02225 -1 CC) 2009 Bonestroo REMOVALS 1.06 SCHEDULING A. Prior to starting Work, submit for review by the Engineer and approval by the Owner, a schedule showing the commencement, order, and completion dates of the various parts of this Work. B. Fill holes or depressions resulting from removal or salvage immediately. C. Provide temporary surface restoration for traffic continuity where removal or salvage operations are completed within streets, driveways, or parking lots. PART 2 PRODUCTS Not Used. PART 3 EXECUTION 3.01 GENERAL A. Dispose of all items removed, except for those items identified to be salvaged or recycled. Said disposal shall be in accordance with all laws, regulations, statutes, etc. B. Perform removal work without damage to adjacent retained work. Where such Work is damaged, the Contractor shall patch, repair, or otherwise restore same to its original condition at no expense to the Owner. C. Remove debris from the work area as often as necessary, but not less than at least once at the end of each workday. Debris shall be placed in approved containers to prevent the spread of dust and dirt. D. Execute the Work in a careful and orderly manner with the least possible disturbance to the public and occupants of buildings. E. Fill holes resulting from removals consistent with Section 02315. 3.02 EXAMINATION A. Meet with owners of signs to determine requirements for salvage, storage, and replacement. 3.03 PROTECTION A. Take all necessary precautions to adequately protect personnel and public and private property in the areas of Work. 000034 - 09216 -0 02225 -2 Cc3 2009 Bonestroo REMOVALS B. All street signs, traffic control signs, guy wires, mailboxes, posts, wood fence, etc. which may interfere with construction shall be removed, stored safely, and replaced. C. Approved barriers or warning signs shall be provided as necessary. D. Provide and maintain temporary protection of existing structures designated to remain where removal work is being done, connections made, materials handled, or equipment moved. E. Do not close or obstruct walkways or roadways. Do not store or place materials in passageways or other means of egress. Conduct operations with minimum traffic interference. F. Take reasonable precautions to limit damage to existing turf. G. Holes or depressions created by removals shall not be left open for more than 1 day. Any hole within 10 feet of sidewalks shall be filled, suitably marked, or covered immediately. H. Avoid disturbance to any material beyond the limits required for new construction. 3.04 SAWING PAVEMENT A. Bituminous Pavement: Saw along the removal line to a minimum depth of 3 inches prior to breaking off the pavement. 3.05 REMOVE BITUMINOUS DRIVEWAY A. Remove in accordance with MnDOT Spec. 2104.313, except as modified below. B. Sawcut bituminous pavement at the removal limits prior to that removal, unless otherwise approved by the Engineer. C. Prior to restoring trench areas, the edges of the trench shall be trimmed back to a vertical face on a straight line which is parallel with the centerline of the trench. 3.06 REMOVE RETAINING WALL A. Avoid damage to sections of wall to remain. B. Dispose of materials off Site at a predetermined location. C. Remove wall in its entirety, including footings and tiebacks. 000034 - 09216 -0 02225 -3 �(D 2009 Bonestroo REMOVALS 3.07 SALVAGE AND REINSTALL A. Signs: 1. In no case shall a traffic sign or street sign be removed or disturbed by Contractor without prior notification being given to Engineer and then only after satisfactory arrangements have been made for a temporary installation or its disposition: a. Street identification signage shall be maintained at all times due to its importance to the 911 Emergency Response System. 2. Remove and salvage all posts, A -Frame angle brackets, stringers, as well as the nuts, bolts, and washers. 3. Exercise reasonable care against damage to in -place signs during storage and installation. 4. Remove signs damaged during construction and replace with new signs. B. Mailboxes: 1. Remove and salvage existing mailboxes that interfere with the Work or whose access is restricted by the construction activities (Incidental). 2. Place at temporary locations as directed by Post Office if required. 3. Mailboxes, posts, and appurtenances damaged during construction shall be replaced with new at no charge to Owner. C. Fences: 1. Salvage and store fence and post material where they are in conflict with the Work. 2. After completion of Work, reinstall fence to the condition existing prior to removal. 3. Install temporary snow fence or similar barrier at the end of the working day while the permanent fence is removed. 3.08 FIELD QUALITY CONTROL A. Salvaged items to be reinstalled shall be of the same shape, dimension, location, and quality of the original item prior to construction. 000034 - 09216 -0 02225 -4 G 2009 Bonestroo REMOVALS B. Items damaged during removal or salvaging operations shall be replaced with new material of equal type and quality of the damaged item when it was new. 3.09 DISPOSING OF MATERIAL A. Dispose of all materials outside of the Site at disposal location selected by Contractor in compliance with state and local regulations. Burying of material and debris is not allowed within the Site. 3.10 MEASUREMENT AND PAYMENT A. Bid Items have been provided for removal items. Payment at the Bid Unit Price will be considered compensation in full for all Work necessary to complete the Bid Item in full, including removal, salvage, storage, disposal, and reinstallation. B. Measurement will be based upon the units as listed below for items removed, abandoned, or salvaged complete as specified. No measurement will be made of any removals that are not required. The actual quantity removed multiplied by the appropriate Bid Unit Price will be compensation in full for all Work and costs of the following Bid Items: 1. Sawing Bituminous Pavement: Per lineal foot along the saw cut line as staked. 2. Remove Bituminous Driveway Pavement: Per square yard without regard to thickness. 3. Remove Retaining Wall: Per square foot. Measurement for the retaining wall will be made from a vertical plane at the face of wall including the area below grade. 4. Relocate Satellite Dish: Per each. Bid Item includes the installation of a 6 inch by 6 inch treated timber post, aggregate base, and concrete footing as specified on the Drawings and includes all miscellaneous materials required to reconnect the satellite dish. 5. Salvage and Reinstall Chain Link Fence: Per lineal foot. C. All other Work and costs of this Section shall be incidental to the Project and included in the TOTAL BASE BID. END OF SECTION 000034 - 09216 -0 02225 -5 i) 2009 Bonestroo REMOVALS This Page Left Blank Intentionally SECTION 02230 SITE CLEARING PART 1 GENERAL 1.01 SECTION INCLUDES A. Removal and trimming of vegetation and trees, and stripping and stockpiling of sod and topsoil. 1.02 RELATED SECTIONS A. Section 02315 — Excavation and Fill. 1.03 REFERENCES A. Minnesota Department of Transportation "Standard Specifications for Construction," 2005 Edition (MnDOT Spec.): 1. 2101 — Clearing and Grubbing. 1.04 DEFINITIONS A. Brush: All bushes, shrubs, and other vegetation that can be cut with a brush scythe or mowing machine, including small isolated trees having a diameter of 4 inches or less at a point 2 feet above the ground surface. B. Clearing: Cutting, removing, and disposing of trees, shrubs, bushes, windfalls, and other vegetation in the designated areas. C. Grubbing: Removing and disposing of stumps, roots, and other remains in the designated areas. D. Tree Trimming /Pruning: Cutting broken, damaged, or obstructing branches and installing wound dressing. 1.05 QUALITY ASSURANCE A. Burning: Not allowed. 1.06 SITE CONDITIONS A. The Drawings do not specifically show all trees to be removed. Tree removals will be on a tree -by -tree basis. The quantity shown on the Bid Form is an estimate only. The actual quantity to be removed will not be determined prior to the start of construction. 000034 - 09216 -0 02230 -1 U�' 2009 Bonestroo SITE CLEARING B. Protect specimen trees close to Work that are designated to remain but may be damaged by Work. 1.07 SEQUENCING AND SCHEDULING A. Complete before or sufficiently ahead of on -going rough grading, excavation, backfill, and compacting for utilities. PART 2 PRODUCTS 2.01 WOUND DRESSING A. Asphalt base tree paint. B. Other acceptable materials per Engineer's approval. PART 3 EXECUTION 3.01 GENERAL A. Review removals in the field with the Engineer prior to doing Work. Trees to be removed will be clearly marked by the Engineer. B. Assume multiple mobilizations for the Work of this Section. C. The Bid Unit Price will not be adjusted due to a change in the Bid Quantity. D. Stockpile soil to eliminate contamination with other on Site materials. 3.02 CLEARING AND GRUBBING A. Clearing Trees: Cut off, remove, and dispose of trees and brush in the areas designated as a clearing operation. When grubbing is not required, the point of cut off shall be 6 inches above the ground. B. Clearing Brush: Cut even with the ground surface. C. Grubbing: Remove brush, stumps, roots, and other remains to a minimum depth of 6 inches below subgrade for all proposed sections. D. All depressions resulting from the grubbing operations shall be backfilled in accordance with Section 02315. 000034 - 09216 -0 02230 -2 Cc 2009 Bonestroo SITE CLEARING 3.03 TRIMMING AND PRUNING A. As directed by the Engineer, trim trees that are to be saved but interfere with the proposed construction. A. After clearing and grubbing have been completed, strip sod and topsoil to a line 2 feet outside of areas to be occupied by structures, walks, roadways, areas to be excavated or filled, and other areas shown. B. Stockpile sufficient topsoil to re- spread at a uniform depth of 4 inches to all disturbed areas identified for seeding or sodding: 1. Do not strip within the drip line (branch spread) of trees identified to remain. 3.05 DISPOSAL A. Dispose of all cleared and grubbed material and debris outside the right -of -way at a location selected by the Contractor. B. Disposal site should be a properly designated landfill area as determined by appropriate governmental agencies or lands under direct control of the Contractor. C. Stripped materials not used for embankments shall be disposed off Site. D. On Site burial of any debris is not permitted. E. Burning: Not allowed. 3.06 PROTECTION A. Conduct operations so as not to damage surrounding private property. B. Protect trees intended to be saved from injury or defacement during operations. C. Exercise care to keep salvaged material as clean as possible during operations. D. Install temporary fencing at the construction limits and drip lines of trees to be protected prior to any construction activities in order to protect vegetation. 3.07 MEASUREMENT AND PAYMENT A. A Bid Item has been provided for Clearing. Measurement will be by physical count of each tree cleared having a diameter of more than 4 inches at a point 24 inches above the ground surface. Payment will constitute compensation in full for all removal, disposal, and costs. 000034 - 09216 -0 02230 -3 V, 2009 Bonestroo SITE CLEARING B. A Bid Item has been provided for Grubbing. Measurement will be by physical count of each tree or stump grubbed. Payment will constitute compensation in full for all removal, disposal, and costs. C. Brush Removal: This Work shall be incidental to the Project. D. Sod Removal: This Work is considered incidental to the other Work of the Contract. E. Windfall/Deadfall Removal: This Work shall be incidental to the Project with no direct compensation. F. Stripping and Stockpiling of Soil: This Work shall be considered incidental to other Work in the Contract. G. All other Work and costs of this Section shall be incidental to the Project and included in the TOTAL BASE BID. END OF SECTION 000034 - 09216 -0 02230 -4 Ou 2009 Bonestroo SITE CLEARING SECTION 02280 ADJUST MISCELLANEOUS STRUCTURES PART 1 GENERAL 1.01 SECTION INCLUDES A. Adjustment of utility structures. 1.02 REFERENCES A. American Society of Testing and Materials (ASTM): 1. A48 — Specification for Gray Iron Casting. 2. C6 — Specification for Normal Finishing Hydrating Lime (Mortar). 3. C 141 — Specification for Hydraulic Hydrated Lime for Structural Purposes (Mortar). 4. C 150 — Specification for Portland Cement (Concrete Rings /Mortar). B. Minnesota Department of Transportation "Standard Specifications for Construction," 2005 Edition (MnDOT Spec.). 1.03 DEFINITIONS A. Adjust Frame and Ring Casting: A change in rim elevation accomplished for manholes or catch basins through the addition or removal of adjustment rings only. Adjustment does not include the addition or removal of sections from the structure. B. Adjust Curb Box: A change in elevation of the top of the curb box accomplished through the raising or lowering of the existing top section of the curb box only. Adjustment does not include the addition or removal of sections from the curb box. 1.04 SEQUENCING AND SCHEDULING A. Contractor, Engineer, and Owner shall inspect all existing structures prior to beginning construction. B. Contractor is responsible for removing any foreign material that enters the structures during construction. 000034 - 09216 -0 02280 -1 0 2009 Bonestroo ADJUST MISCELLANEOUS STRUCTURES PART 2 PRODUCTS 2.01 ADJUSTING RING A. Concrete: 1. Size to match cone or opening in top slab. 2. Concrete Compressive Strength: Minimum 3,000 psi. 3. Reinforcing: Single hoop 8 -gauge steel wire. 4. Thickness: Minimum 2 inches, maximum 4 inches. 2.02 ADHESION MATERIALS A. Ram -Nek material, or approved equal. B. Mortar: 1. Standard Portland Cement: Type I, ASTM C 150. 2. Normal Finishing Hydrated Lime: ASTM C6. 3. Hydraulic Hydrated Lime for Structural Purposes: ASTM C141. 4. Mix Proportions: 1 -part cement to 3 -parts mortar sand; lime maybe added to mixture: maximum amount 15 percent by volume. 2.03 CASTINGS A. Manhole, Catch Basin Frames, and Covers: 1. Requirement: ASTM A48. 2. Material: Class 35 cast iron. Best grade. Free from injurious defects and flaws. 3. Finish Preparation: Sandblast. 4. Machine cover and frame contact surface for non - rocking protection. 5. Type and Style: a. NEENAH R1642, Type `B" Lid, or approved equal, for sanitary and storm sewer manholes. 000034 - 09216 -0 2009 Bonestroo 02280 -2 ADJUST MISCELLANEOUS STRUCTURES PART 3 EXECUTION 3.01 GENERAL A. The necessary vertical alignment will be determined by the Engineer and generally as indicated on the schedule of adjustments. B. Where existing frame is within 0.10 feet of grade, no adjustment is to be made. C. The frame shall be raised or lowered to match the street or gutter. D. Protect existing structures from damage. E. Prevent sand, concrete, or any other debris from entering the structures. 3.02 PREPARATION A. Call utility owners to field mark their utility locations. B. Contractor to verify exact location of existing utilities. 3.03 ADJUST FRAME AND RING CASTING A. Remove all dirt, debris, dust, and other deleterious material from surface prior to placement of first adjusting ring. B. Concrete Adjusting Ring: 1. Mortar on top and bottom surfaces of all concrete adjusting rings; between surface of top slab or cone and bottom ring; between surface of top ring and casting; on entire surface of area of ring with no gaps: a. Mortar Thickness: 1/4 to 1/2 inch. 2. No shims of any material allowed. 3. Required cross slope of casting to be achieved by varying thickness of mortar. 4. Do not plaster the inside surface of rings. 5. Wipe clean all excess mortar from the joints inside all rings and frame. 6. Remove all mortar spills from the structure. 7. Minimum of 2, maximum of 5 adjusting rings allowed. 000034 - 09216 -0 02280 -3 Cc' 2009 Bonestroo ADJUST MISCELLANEOUS STRUCTURES 8. Use a 6 -inch ring where applicable. :•. A. Adjust box by screwing top section up or down. B. Prevent sand, chunks of concrete, or any other debris from entering the curb box: 1. Short sections inserted inside the existing top section are not allowed to perform adjustment, unless specified. C. Install approved sections as needed. 3.05 FIELD QUALITY CONTROL A. For adjustments made within bituminous surfaced areas, any settlements of the bituminous surface greater than 3/8 inch below the rim of the adjustment structure will require removal and replacement of the bituminous surfacing at the Contractor's expense. B. Secure manholes and structures immediately after completion or before suspension of operations at the end of working day with castings or suitable alternative device. C. Adjust Manholes and Catch Basin Frames 1/8 inch to 3/8 inch below grade prior to placing the final wear course. Thorough tamping of the material around manhole and catch basin frames is required. Where existing frame is within 0.10 feet of grade, no adjustment is to be made. In such cases the crown or gutter shall be either lowered or raised, as the case may be, to put the street and frame at the same grade. D. Adjust frame upward with standard concrete adjustment rings of the same size as the cone or slab opening. Place each adjustment ring and frame in a full mortar bed. Adjusting rings needed to raise the casting to grade shall be incidental to the adjustment pay item. E. Adjust frame downward by removing the necessary number of adjustment rings from the structure and resetting the frame in a full mortar bed to grade. F. Regardless of the direction of adjustment, no shims of any material will be allowed. The minimum thickness of all mortar joints shall be at least 1/4 inch with a maximum allowable thickness of 1/2 inch. All excess mortar from the joint shall be wiped clean from the inside of all rings and frame. All manhole castings must be replaced prior to the placing of the final wear course. G. Adjust curb boxes to 1/8 inch to 3/8 inch below grade. Thorough tamping of the material around the valve box is required. 000034 - 09216 -0 02280 -4 V 2009 Bonestroo ADJUST MISCELLANEOUS STRUCTURES 3.06 MEASUREMENT AND PAYMENT A. Bid Items have been provided for various adjustments. Payment at the Bid Unit Price for all items is considered compensation in full for all materials and Work required to furnish and install the Bid Item in place. B. Adjust Curb Box: A Bid Item has been provided for Adjust Curb Box. Measurement will be by each curb box adjusted. C. All other Work and costs of this Section shall be incidental to the Project and included in the TOTAL BASE BID. END OF SECTION 000034 - 09216 -0 02280 -5 2009 Bonestroo ADJUST MISCELLANEOUS STRUCTURES This Page Left Blank Intentionally SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SECTION INCLUDES A. Excavation and fill for roadways, boulevards, and other areas. 1.02 RELATED SECTIONS A. Section 02225 - Removals. B. Section 02230 - Site Clearing. C. Section 02830 — Segmental Retaining Wall Systems. 1.03 REFERENCES A. Minnesota Department of Transportation "Standard Specifications for Construction," 2005 Edition (MnDOT Spec.): 1. 2105 - Excavation and Embankment. 2. 3149 - Granular Material. 1.04 SUBMITTALS A. Submit the following items consistent with Section 01330: 1. Gradation tests for borrow materials. 1.05 DEFINITIONS A. The definitions of the different classifications of excavation and borrow material shall conform to MnDOT Spec. 2105.2, or as modified herein: 1. Grading Grade: Bottom of the aggregate base as shown on the Drawings. 2. Common Excavation: Will include all excavation below the grading grade. Other excavations directed by Engineer, such as subgrade excavation, shall be included as common excavation. 000034 - 09216 -0 If, 2009 Bonestroo 02315 -1 EXCAVATION AND FILL 1.06 QUALITY ASSURANCE A. Assist testing laboratory by excavating for density tests. Assist testing laboratory with obtaining material samples. 1.07 SEQUENCING AND SCHEDULING A. Backfill retaining walls within 3 calendar days after completion of wall. B. Complete finish grading of turf areas within 5 calendar days after backfill. PART 2 PRODUCTS Not Used. PART 3 EXECUTION 3.01 GENERAL A. Conform to MnDOT Spec. 2105.3A, or modified herein: I . Establish traffic control prior to excavations. 2. Establish the specified erosion control devices prior to all excavations. 3. Notify utility companies of progress schedule so they can accomplish relocations, removals, and holding of lines. 4. Perform removals consistent with Section 02225. 5. Strip topsoil consistent with Section 02230. 3.02 PREPARATION OF EMBANKMENT A. Conform to MnDOT Spec. 2105.313, or as modified herein: 1. Engineer's approval is required of all areas where preparation work has been performed prior to the placement of the embankment of fill material. 2. Where embankment is to be constructed over swamp, marsh, or other locations, where the foundation material is unstable, the foundation shall be excavated to remove all or part of the unstable material. 000034 - 09216 -0 Oc 2009 Bonestroo 02315 -2 EXCAVATION AND FILL 3.03 EXCAVATION OPERATIONS A. Conform to MnDOT Spec. 21053C, or as modified herein: 1. Perform excavations to the alignment, cross section, and grade as shown on the Drawings and staked by the Engineer. 2. Excavation of unstable material below grade shall be done under the direction of the Engineer as the subsurface conditions are disclosed. 3. Notify Engineer immediately of any large boulders or ledge rocks encountered so proper measurement or profile can be made for pay quantities. 4. No solid rock will be allowed within 12 inches of the subgrade. 5. Provide and maintain temporary drainage facilities until permanent facilities are completed. 6. After the excavation is complete and prior to backfilling operations, notify the Engineer 24 hours in advance so all excavation areas can be cross - sectioned to determine quantities. 7. Cut, fill, and grade Site to elevations shown on the Drawings with allowances for topsoil and structures. 3.04 DISPOSITION OF EXCAVATED MATERIAL A. Conform to MnDOT Spec. 2105.31), or as modified herein: 1. Strip topsoil consistent with Section 02230. 2. No disposition of bituminous millings will be permitted, unless thoroughly mixed with other on Site materials. 3.05 PLACING EMBANKMENTS A. Conform to MnDOT Spec. 2105.3E, or as modified herein: 1. Topsoil placement shall conform to Section 02920. 3.06 COMPACTING EMBANKMENTS A. Conform to MnDOT Spec. 2105.31 or as modified herein: 1. Compaction required for embankment materials shall conform to the Specified Density Method with the testing location and rates being determined by the Engineer. 000034 - 09216 -0 C 2009 Bonestroo 02315 -3 EXCAVATION AND FILL 3.07 FINISH OPERATIONS A. Conform to MnDOT Spec. 21053G, or as modified herein: 1. Finish grading of subgrade prior to placement of an aggregate base course shall conform to the following tolerances: a. Not vary by more than 0.05 feet above or below the prescribed elevation at any point where a measurement is made. 2. Grading of the soils beneath the proposed topsoil shall be reviewed and approved by the Engineer prior to the start of the topsoil placement. 3.08 MEASUREMENT AND PAYMENT A. Bid Items have been provided for various excavation materials. Measurement and Payment shall be at the Bid Unit Price consistent with MnDOT Spec. 2105.4 and 5, except as modified in the following. B. A Bid Item has been provided for Common Excavation. Measurement will be by volume of material (cubic yard) in its original position. Measurement will be made by truck count. Payment includes removing, hauling, disposal, and all other costs associated with this Bid Item. MnDOT's conversion on 1.3 LV = 1 CV will be used to convert the truck quantities from loose volume to compacted volume. Coordinate hauling operation with Engineer prior to starting excavation and hauling. Payment will not be made for material hauled if Engineer is not given sufficient time to arrange for monitoring of hauling operations. C. All other Work and costs of this Section shall be incidental to the Project and included in the TOTAL BASE BID. END OF SECTION 000034 - 09216 -0 G 2009 Bonestroo 02315 -4 EXCAVATION AND FILL SECTION 02830 SEGMENTAL RETAINING WALL SYSTEMS '�' Q 1.01 SECTION INCLUDES A. This work shall consist of furnishing and installing a Segmental Retaining Wall (SRW) System in accordance with the following Specifications and in close conformity with the lines, grades, design, and dimensions shown on the Drawings. The Engineer reserves the right to alter the alignment to improve constructability and aesthetics. B. Modification of an existing wall to match into new Segmental Retaining Wall (SRW) System. 1.02 REFERENCES A. Engineering Design: 1. NCMA Design Manual for Segmental Retaining Walls, Second Edition 1997. 2. ASTM 6638 -01 Determination of Connection Strength Between Geosynthetics and Segmental Concrete Units. 3. NCMA SRWU -2 Determination of Shear Strength Between Segmental Concrete Units. B. Segmental Retaining Wall Units: 1. ASTM C140 — Sampling and Testing Concrete Masonry Units. 2. ASTM C1262 — Standard Test Method for Evaluating the Freeze -Thaw Durability of Manufactured Concrete Masonry Units and Related Concrete Units. 3. ASTM C1372 — Standard Specification for Segmental Masonry Retaining Wall Units. C. Geosynthetic Reinforcement: 1. ASTM D4595 — Standard Test Method for Tensile Properties of Geotextiles by the Wide -Width Strip Method. 000034- 09216 -0 SEGMENTAL RETAINING 0 2009 Bonestroo 02830 -1 WALL SYSTEMS 2. ASTM D5262 — Standard Test Method for Evaluating the Unconfined Tension Creep Behavior of Geosynthetics. 3. Geosynthetic Research Institute (GRI): a. GRI — GG4 Determination of Long Term Design Strength of Geogrids. b. GRI — GG5 Determination of Geogrid (soil) Pullout. D. Soils: 1. ASTM 698 — Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort. 2. ASTM 448 — Standard Classification for Sizes of Aggregate for Road and Bridge Construciton. 3. ASTM 422 — Particle Size Analysis. 4. Minnesota Department of Transportation "Standard Specifications for Construction" 2005 Edition (MnDOT Spec.): 1.03 SUBMITTALS A. Submittals shall conform to Section 01330. B. Material Submittals - Submit manufacturers' certifications, prior to the start of Work, stating the SRW units, goesynthetic reinforcement, backfill, and the drainage aggregate meet the requirement of Part 2 — Products. C. Samples — Color of wall units and cap units shall be determined by the Owner prior to design. Submit standard color pallets and facing choices to the Engineer for final selection. Furnish 1 unit in the color and face pattern selected, if requested. Furnish one 12 -inch square or larger piece of the geosynthetic reinforcement to be used on the Project, if requested. D. Design Submittals - Submit detailed design calculations, construction drawings, and shop drawings for approval prior to the beginning of segmental retaining wall construction. It is the Contractor's responsibility to have the wall designed and the detailed drawings prepared by a Professional Engineer, experienced in retaining wall design, who is licensed in the state where the wall is to be built. The design computations and the drawings shall be certified by the Engineer and submitted to the Owner for their permanent record. All plan sheets shall clearly identify the name of the responsible engineering firm and the name of the person certifying the drawing. Each sheet shall be certified. 000034-09216-0 SEGMENTAL RETAINING 0 2009 Bonestroo 02830 -2 WALL SYSTEMS E. The detailed drawings prepared by the Contractor shall contain all the necessary information for the construction of the wall. Included shall be design criteria installation procedures, typical sections detailing excavation limits, geotextile locations, block embedments, leveling pad dimensions, backfill, etc. Include as many sections and other views necessary for the construction and inspection of the wall. F. Submit Surface Sealer manufacturers' data. 1.04 WALL DESIGN CRITERIA A. Retaining walls shall be designed in accordance with recommendations of the NCMA Design Manual for Segmental Retaining Wall, Second Edition 1997 The design provided by the Contractor shall consider the internal stability, including pullout, tensile overstress and internal sliding. The design shall also include external stability of the reinforced soil mass, including base sliding, overturning, and bearing. B. Design Requirements — unless otherwise indicated below, the SRW design shall be performed in strict compliance with Section 1.04 A of this Specification and the following clarifications: 1. Soil Reinforcement Length — The minimum soil reinforcement length shall be as required to achieve a minimum width of structure, measured from the front face of wall to the end of the soil reinforcements, greater than or equal to 70 percent of the total wall height. 2. Reinforced Wall Fill Characteristics — The following soil parameters shall be assumed for the design, unless otherwise shown on the Drawings or specified by the Owner's Engineer: Reinforced Fill: Unit Weight = 125 pcf = 35 ° C=O Retained Backfill: Unit Weight = 125 pcf = 28 ° C=O Foundation Soils: Unit Weight = 125 pcf = 28 ° C = 0 3. Minimum Factors of Safety for Internal Stability — Shall be as outlined in NCMA Design Manual for Segmental Retaining Wall, Second Edition 1997. 4. Minimum Factors of Safety for External Stability — Shall be as outlined in NCMA Design Manual for Segmental Retaining Wall, Second Edition 1997. 000034 - 09216 -0 SEGMENTAL RETAINING O 2009 Bonestroo 02830 -3 WALL SYSTEMS 5. Long Term Allowable Reinforcement Tension — The allowable reinforcement tension, Ta, at the end of the service life shall consider the time - temperature creep characteristics of the reinforcement, environmental degradation, construction induced damage and an overall factor of safety. T shall be evaluated based on a 75 -year design life: Ta = Tult / (RFCR x RFD x RFID x FS) Where: a. T,,It, Short Term Ultimate Tensile Strength T,,lt is based on the minimum average roll values (MARV) b. RFCR, Reduction Factor for Long Term Tension Creep RF shall be determined from 10,000 -hour creep testing performed in accordance with ASTM D5262. C. RF Reduction Factor for Durability RFD shall be determined from polymer specific durability testing covering the range of expected soil environments. d. RF Reduction Factor for Installation Damage RFID shall be determined from product specific construction damage testing performed in accordance with GRI -GG4. Test results shall be provided for each product to be used with Project specific or more severe soil type. RFID = 1.10 minimum. e. FS, Overall Design Factor of Safety FS shall be 1.5 unless otherwise noted for the maximum allowable working stress calculation. f. In no case shall the product of RFCR x RFD x RFID be less than 2.0. 6. Soil Interaction Coefficient, Ci. Ci values shall be determined per GRI: GG5 at a maximum 0.75 -inch displacement. 1.05 DELIVERY, STORAGE, AND PRODUCT HANDLING A. The Contractor shall inspect the material upon delivery to assure that the proper type and grade material has been received. B. The Contractor shall store and handle all materials in accordance with manufacturer's recommendations and in a manner to prevent deterioration or damage due to moisture, temperature changes, contaminants, corrosion, breaking, chipping, or other causes. 000034 - 09216 -0 SEGMENTAL RETAINING Co 2009 Bonestroo 02830 -4 WALL SYSTEMS 1.06 QUALITY ASSURANCE A. Contractor shall submit a list of 5 previously constructed projects of similar size and magnitude by the wall installer where the specific retaining wall system has been constructed successfully. Contact names and telephone numbers shall be listed for each project. B. Contractor shall provide evidence that the design engineer has a minimum of 5 years of experience in the design for reinforced soil structures. C. The Engineer reserves the right to randomly select 8 wall units and 8 cap units at the Site for testing in accordance of ASTM C140. These segmental masonry wall and cap units will be tested for compressive strength (average of 3 units), weight loss, and 24 hour absorption rate and freeze -thaw durability (average of 5 units). All costs of this testing will be paid by the Owner. 1.07 APPROVED SEGMENTAL RETAINING WALL SYSTEMS A. Suppliers of segmental retaining wall systems shall have demonstrated experience in the construction of similar size and types of segmental retaining walls on previous projects. Block used on the project shall meet the special compressive strength and durability requirements specified below in Part 2 - Products. Suppliers currently approved for this work are: 1. 2. PART 2 PRODUCTS Anchor Block Wall Systems. Or an approved equal. 2.01 CONCRETE SEGMENTAL RETAINING WALL UNITS A. Color and face pattern shall be equal in specification and design to Anchor Block, Diamond Pro, Straight Face. B. Retaining wall units shall be approximately 18 inches wide by 8 inches high with a straight face or beveled face and split rock textured surface. C. Cap units shall be compatible with wall units and shall be sloped to shed water. D. The wall and cap units shall conform to ASTM C1372, except that: 1. A minimum 28 -day compressive strength of 5,000 psi for any individual unit and 5,500 psi for the average of 3 units. 000034 - 09216 -0 SEGMENTAL RETAINING 0 2009 Bonestroo 02830 -5 WALL SYSTEMS 2. The freeze -thaw durability of wall units tested in accordance with ASTM C1262 in a 3- percent saline solution shall be the minimum of the following: a. The weight loss of each of 5 test specimens at the conclusion of 90 cycles shall not exceed 1 percent of its initial weight; or b. The weight loss of 4 of 5 test specimens at the conclusion of 100 cycles shall not exceed 1.5 percent of its initial weight with the maximum allowable weight loss for the 5 th specimen to not exceed 10 percent. C. The freeze -thaw durability of cap units tested accordance with ASTM C 1262 in a 3- percent saline solution shall be the minimum of the following: 1) The weight loss of each of 5 test specimens at the conclusion of 40 cycles shall not exceed 1 percent of its initial weight; or 2) The weight loss of 4 of 5 test specimens at the conclusion of 50 cycles shall not exceed 1.5 percent of its initial weight, with the maximum allowable weight loss for the 5 th specimen to not exceed 10 percent. d. ASTM C 1262 test results shall be recorded and reported in 20 cycle intervals. E. Cap units must have a top surface sloped front to back at a minimum of 10 percent or be crowned at the center. 2.02 GEOSYNTHETIC REINFORCEMENTS A. Geosynthetic reinforcement shall consist of geogrids or geotextiles manufactured specifically for soil reinforcement applications. The design properties of the reinforcement shall be determined according to the procedures outlined in the NCMA Design Manual for Segmental Retaining Walls. Detailed test data shall be submitted to the Owner's Engineer and shall include tensile strength (ASTM D4595 or GRI GG -1), creep (ASTM D5262) Site damage and durability (GRI GG -4) and Pullout (GRI GG -5 or GRI GT -6 and connection (ASTM 6638 -01) test data. 2.03 DRAINAGE AGGREGATE A. MnDOT Standard Specifications for Construction: Section 3149 — Granular Backfill. Drainage aggregate material immediately behind retaining wall shall be MnDOT Spec. 3149.2H Course Filter Aggregate. 000034 - 09216 -0 SEGMENTAL RETAINING 0 2009 Bonestroo 02830 -6 WALL SYSTEMS A. MnDOT Standard Specifications for Construction: Section 3149 — Granular Backfill. Drainage aggregate material immediately behind retaining wall shall be MnDOT Spec. 3149.2132 Select Granular Borrow modified to 10 percent or less passing the #200 sieve. Compaction to be in accordance with MnDOT Spec. 2451.3D. B. The maximum aggregate size shall be limited to 3/4 inch unless field tests have been performed to evaluate potential strength reductions to the geogrid design due to damage during construction. C. Material can be site excavated soils where the above requirements can be met and whose soil properties meet the soil design properties. Unsuitable soils for backfill (high plastic clays or organic soils) shall not be used in the backfill or in the reinforced soil mass. D. Contractor shall submit reinforced fill sample and laboratory test results to the Architect /Engineer for approval prior to the use of any proposed reinforced fill material 2.05 LEVELING BASE A. Leveling base material shall consist of a compacted crushed stone base or non - reinforced concrete as shown on the Drawings: 1. Aggregate Base: Crushed stone or granular fill meeting the following tradition as determined in accordance with ASTM D448: Sieve Size Percent Passim 1 inch 100 No. 4 70 to 35 No. 40 35 to 10 No. 200 10 to 3 Base thickness shall be 6 inches (minimum compacted thickness). B. Concrete Base: Nonreinforced lean concrete base: 1. Compressive Strength: 500 psi (maximum). 2. Base thickness shall be 6 inches. 000034 - 09216 -0 SEGMENTAL RETAINING V 2009 Bonestroo 02830 -7 WALL SYSTEMS 2.06 SURFACE SEALER A. Approved surface sealers are: 1. TK Products 1140 West 47 Street Minnetonka, MN 55343 Product Name: TK- 590 -40 TK- 290 -12 TK -290 WB 20 2. ChemRex, Inc. 889 Valley Park Drive Shakopee, MN 55379 Product Name: Hydrozo Enviroseal 40 Hydrozo Enviroseal 20 3. Prosoco 3741 Greenway Circle Lawrence, KS 66046 Product Name: Sure Klean Weather Seal SL40 Sure Klean Weather Seal Siloxane WB 4. Other products approved by the Engineer. 2.07 ADHESIVE A. Adhesive for anchoring cap unit to the course below shall be Sta -Stuck SS400 construction adhesive, or equal. PART 3 EXECUTION 3.01 EXAMINATION A. Examine the areas and conditions under which the retaining wall system is to be erected and notify the Engineer in writing of conditions detrimental to the proper and timely completion of the Work. Do not proceed with the Work until unsatisfactory conditions have been corrected. 000034 - 09216 -0 SEGMENTAL RETAINING G 2009 Bonestroo 02830 -8 WALL SYSTEMS B. Promptly notify the wall design Engineer of Site conditions which may affect wall performance, soil conditions observed other than those assumed, or other condition that may requires a reevaluation of the wall design. C. Verify the location of existing structures and utilities prior to excavation. A. Ensure surrounding structures are protected from the effects of wall excavation. B. Excavation support, if required, is the responsibility of the Contractor, including the stability of the excavation and its influence on adjacent properties and structures. 3.03 EXCAVATION A. Contractor shall excavate to the lines and grades shown on the Construction Drawings. Owner's representative shall inspect the excavation and approve prior to placement of leveling material or fill soils. Proof roll foundation area as directed to determine if remedial work is required. B. All excavations shall be in acordance with OSHA regulations. C. Over - excavation and replacement of unsuitable foundation soils and replacement with approved compacted fill will be compensated as agreed upon with the Owner. 3.04 BASE LEVELING PAD A. Leveling pad material shall be placed to the lines and grades shown on the Construction Drawings, to a minimum thickness of 6 inches and extend laterally a minimum of 6 inches in front and behind the modular wall unit. B. Soil leveling pad materials shall be compacted to 98 percent of maximum density as determined by ASTM D698 — Standard Proctor density. C. Leveling pad shall be prepared to insure full contact to the base surface of the concrete units. 3.05 MODULAR UNIT INSTALLATION A. First course of units shall be placed on the leveling pad at the appropriate line and grade. Alignment and level shall be checked in all directions and insure that all units are in full contact with the base and properly seated. B. Place the front of units side -by -side. Do not leave gaps between adjacent units. Layout of corners and curves shall be in accordance with manufacturer's recommendations. 000034 - 09216 -0 SEGMENTAL RETAINING © 2009 Bonestroo 02830 -9 WALL SYSTEMS C. Install shear /connecting devices per manufacturer's recommendations. D. Place and compact drainage fill within and behind wall units. Place and compact backfill soil behind drainage fill. Follow wall erection and drainage fill closely with structure backfill. E. Maximum stacked vertical height of wall units, prior to unit drainage fill and backfill placement and compaction, shall not exceed 2 courses. 3.06 STANDARD GEOGRID INSTALLATION A. Geogrid shall be oriented with the highest strength axis perpendicular to the wall alignment. B. Geogrid reinforcement shall be placed at the strengths, lengths, and elevations shown on the construction design drawings or as directed by the Wall Design Engineer. Any deviations shall be noted in the field by the Contractor and incorporated into the Construction Design Drawings. C. The geogrid shall be laid horizontally on compacted backfill and attached to the modular wall units. Place the next course of modular concrete units over the geogrid. The geogrid shall be pulled taut, and anchored prior to backfill placement on the geogrid. D. Geogrid reinforcements shall be continuous throughout their embedment lengths and placed side -by -side to provide 100 - percent coverage at each level. Spliced connections between shorter pieces of geogrid or gaps between adjacent pieces of geogrid are not permitted. 3.07 REINFORCED BACKFILL PLACEMENT A. Reinforced backfill shall be placed, spread, and compacted in such a manner that minimizes the development of slack in the geogrid and installation damage. B. Reinforced backfill shall be placed and compacted in lifts not to exceed 6 inches where hand compaction is used or 8 inches where heavy compaction equipment is used. Lift thickness shall be decreased to achieve the required density as required. C. Reinforced backfill shall be compacted to 95 percent of maximum density as determined by ASTM D698 — Standard Proctor density. The moisture content of the backfill material prior to and during compaction shall be uniformly distributed throughout each layer and shall be dry of optimum, +/- 2 percent of optimum. D. Only lightweight hand- operated equipment shall be allowed within 3 feet from the back of the modular concrete unit. 000034 - 09216 -0 SEGMENTAL RETAINING 2009 Bonestroo 02830 -10 WALL SYSTEMS E. Tracked construction equipment shall not be operated directly upon the geogrid reinforcement. A minimum fill thickness of 6 inches is required prior to operation of tracked vehicles over the geogrid. Tracked vehicle turning should be kept to a minimum to prevent tracks from displacing the fill and damaging the geogrid. F. Rubber tired equipment may pass over geogrid reinforcement at slow speeds, less than 10 MPH. Sudden braking and sharp turning shall be avoided. G. At the end of each day's operation, the Contractor shall slope the last lift of reinforced backfill away from the wall units to direct runoff away from wall face. The Contractor shall not allow surface runoff from adjacent areas to enter the wall construction Site. 3.08 CAP INSTALLAION A. Cap units shall be glued to underlying units with an all- weather adhesive . recommended by the manufacturer. 3.09 AS -BUILT CONSTRUCTION TOLERANCES A. Vertical Alignment: ± 1.5 inch over any 10 -foot distance. B. Wall Batter: Within 2 degrees of design batter. C. Horizontal Alignment: ± 1.5 inch over any 10 -foot distance. Corners, bends, curves ± 1 foot to theoretical location. D. Maximum horizontal gap between erected units shall be 1/2 inch. 3.10 PROTECTION AND CLEANING A. B. C. D. Adequately brace Work to prevent damage of any kind. Protect installed material to prevent staining or damage from the elements. At a time near completion of Work, clean all exposed surfaces to provide a uniform appearing job. Apply surface sealer at manufacturer's recommendations. 000034 - 09216 -0 SEGMENTAL RETAINING CC, 2009 Bonestroo 02830 -11 WALL SYSTEMS 3.11 WALL SEALER A. All units shall have their surfaces sealed. B. Surface sealing shall consist of preparation, furnishing and applying the surface sealer to the top, exposed front face, and backside of the upper 3 courses. C. The Contractor shall comply with the manufacturer's written instruction for preparing, handling, and applying the surface sealer. D. The surface to be treated shall receive a light water -blast to the extent that the surface is clean and free of oils. E. Before the surface sealer is applied, the surface to be sealed shall be dry and free of all dust, debris, and frost. F. Surface sealer shall be applied at the heaviest application rate specified by the sealer manufacturer. 3.12 MEASUREMENT AND PAYMENT A. Bid Item has been provided on the Bid Form for Modular Block Retaining Wall. Measurement will be made by the square foot of wall measured from the top of the leveling pad to the top of the wall or wall coping. B. The accepted quantities of Modular Block Retaining Wall will be paid at the Contract Unit Price, which shall be full compensation for design, supply, and installation of the Modular Block Retaining Wall, including excavation, leveling pad, face units, caps, unit drainage fill, drainage pipe, soil reinforcement, reinforced backfill, surface sealer and all materials and equipment necessary for the complete installation as specified in the Contract Documents and shown on the Design Drawings. C. A Bid Item has been provided for Modify Existing Wood Retaining Wall. Measurement will be by square foot of wall and includes materials necessary to modify the wall in place as specified. D. A Bid Item has been provided for Modify Existing Modular Block Retaining Wall. Measurement will be by square foot of wall and includes materials necessary to modify the wall in place as specified. E. All other Work and cost of this Section shall be considered incidental to the Project and included in TOTAL BASE BID END OF SECTION 000034 - 09216 -0 SEGMENTAL RETAINING PC 2009 Bonestroo 02830 -12 WALL SYSTEMS SECTION 02920 LAWNS AND GRASSES PART 1 GENERAL 1.01 SECTION INCLUDES A. Restoration of construction area by installation of topsoil and sod. 1.02 RELATED SECTIONS A. Section 02315 - Excavation and Fill. 1.03 REFERENCES A. Minnesota Department of Transportation "Standard Specifications for Construction," 2005 Edition (MnDOT Spec.). B. Minnesota Department of Transportation Seeding Manual 2007 (MnDOT Seeding Manual). 1.04 SUBMITTALS A. Provide the following submittals consistent with Section 01330. 1.05 PLANT ESTABLISHMENT PERIOD A. The Establishment Period for plants shall begin for immediately after installation, with the approval of the Engineer, and continue until the date that the Engineer performs a final inspection: 1. The establishment period for sod is 60 days. PART 2 PRODUCTS 2.01 TOPSOIL: Select Topsoil Borrow Special conforming to MnDOT Spec. 3877.213, except as modified herein. A. Material must be screened and pulverized. 000034 - 09216 -0 © 2009 Bonestroo 02920 -1 LAWNS AND GRASSES 2.02 FERTILIZER A. Provide plant fertilizer that is commercial grade and uniform in composition and conforms to applicable state and federal regulations. B. Slow release fertilizer. A minimum of 70 percent of the nitrogen component shall be a slow release water insoluble nitrogen. C. Fertilizer shall contain a minimum percentage by weight 10 -10 -10 (NKP) 2.03 SOD: Conform to MnDOT Spec. 3878. PART 3 EXECUTION 3.01 EXAMINATION A. Review restoration areas with the Engineer. Determine locations for sod. Schedule for restoration of areas may be revised to fit field conditions. B. Notify the Engineer at least 3 days in advance of hauling topsoil borrow on Site so the Engineer may visually inspect and sample for testing if deemed necessary. C. Finish grades are to be inspected and approved by the Engineer prior to start of restoration. D. Delivery: 1. Notify the Engineer of the delivery schedule in advance so the plant material may be inspected upon arrival at the Site. Remove unacceptable plant material from the Site immediately. 2. Deliver fertilizer and lime to the Site in the original, unopened containers bearing the manufacturer's guaranteed chemical analysis, name, trade name or trademark, and in conformance to state and federal law. In lieu of containers, fertilizer and lime may be furnished in bulk and a certificate indicating the above information shall accompany each delivery. 3. During Delivery: Protect sod from drying out. E. Storage: I. Sprinkle sod with water and cover with moist burlap, straw, or other approved covering, and protect from exposure to wind and direct sunlight. Covering should permit air circulation to alleviate heat development. 000034 - 09216 -0 CO 2009 Bonestroo 02920 -2 LAWNS AND GRASSES 3.02 PREPARATION A. General: Conform to MnDOT Spec. 2575.3A. B. Soil Preparation: Conform to MnDOT Spec. 2575.313. C. Fertilizers and Conditioners: Conform to MnDOT Spec. 2575.3C: 1. Apply fertilizer at a rate of 400 lbs. per acre (9.2 lbs. /1,000 sq. ft.). 2. Where soil pH is lower than 5.5, apply lime at 3 tons per acre (140 lbs. /1,000 sq. ft.). 3.03 PLACING SOD A. Conform to MnDOT Spec. 2575.3I. 3.04 MAINTENANCE A. Restored areas that have been satisfactorily completed and are disturbed by additional construction activity required by the timing and sequencing of the Work shall be restored over to the same requirements of the original work. B. Any sod that does not show definite growth and establishment 30 days after installation shall be replaced and established at the proper season by the Contractor at his /her expense. C. Watering of sod areas shall be done for a minimum period of 60 days from installation sufficient to ensure establishment of permanent vegetation. 3.05 INSPECTION AND ACCEPTANCE A. Turf work will be inspected for acceptance in parts agreeable to the Engineer, provided work offered for inspection is complete, including maintenance for the portion in question. B. At the conclusion of the establishment period(s), a final inspection of planting(s) will be made to determine the conditions of areas specified for landscaping. C. When inspected landscape work does not comply with requirements, replace rejected Work and continue specified maintenance until re- inspected by Engineer and found to be acceptable. Remove rejected materials from the Site. 000034 - 09216 -0 C 2009 Bonestroo 02920 -3 LAWNS AND GRASSES 3.06 MEASUREMENT AND PAYMENT A. A Bid Item has been provided for Sodding, Type Lawn. Measurement will be based upon units of square yards of sod installed complete in place as specified, including installing topsoil, soil amendments, furnishing and installing sod, preparation of surface maintenance, and all incidental items associated with the Work. The actual quantity multiplied by the appropriate Bid Unit Price will be considered payment in full for all work and costs of this Bid Item. B. A Bid Item has been provided for Select Topsoil Borrow Special (LV) on the Bid Form. Measurement will be upon units of cubic yards of material (loose volume) furnished and placed complete in place as specified. The actual quantity installed multiplied by the Bid Unit Price will be considered payment in full for all work and costs of this Bid Item. C. All other Work and costs of this Section shall be incidental to the Project and included in the TOTAL BASE BID. END OF SECTION 000034 - 09216 -0 K! 2009 Bonestroo 02920 -4 LAWNS AND GRASSES Performance Bond Any singular reference to Contractor Surety Owner or other party shall be considered plural where applicable CONTRACTOR (Name and Address) TMS CONSTRUCTION INC. 5990 MEADOWLARK LANE PRIOR LAKE MN 55372 OWNER (Name and Address) City of New Hope 4401 XVlon Ave No. New Hope, MN 55428 -4898 SURETY (Name and Principal Place of Business) GRANITE RE, INC. 14001 QUAILBROOK DRIVE OKLAHOMA CITY OK 73134 CONTRACT Date: 9/23/2009 Amount: $ 84,164.90 Description (Name and Location): CITY PROJECT NO. 854 - 2009 RETAINING WALL IMPROVEMENTS NEW HOPE MINNESOTA BOND BOND NO, GRMN30124A Date (Not earlier than Construction Contract Date): 9/30/2009 Amount: $ 84,164.90 ( EIGHTY FOUR THOUSAND ONE HUNDRED SIXTY FOUR AND 901100 Modifications to this Bond Form: None Surety and Contractor, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Performance Bond to be duly executed on its behalf by its authorized officer, agent or representative. CONTRACTOR AS PRINCIPAL TMS CONSTRUCTION INC. Company: 'al) Signature. r / Marne and Title SURETY GRANITE RE, INC. Surety's nd Corpora Seal By: Signature a fide: Lisa M. F naour, Attorney- in -Fac (Attach Po er of Attorney) (Space is provided below for signatures of additional parties, if required.) r— Attest: Signature and Title CONTRACTOR AS PRINCIPAL SURETY Company: (Seal) Signature: Name and Title: Surety's name and Corporate Seal By: Signature and Title: (Attach power of attorney) Attest: Signature and Title EJCDC No. C -610 (2002 Edition) Originally prepared through the joint efforts of The Surety Association of America, Engineers' Joint Contract Documents Committee, The Associated General Contractors of America, and the American Institute of Architects. I ,. CONTRACTOR and Surety, jointly and severally, bind themselves their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Contract, which is incorporated herein by reference 2. If CONTRACTOR performs the Contract, Surety and CONTRACTOR have no obligation under this Bond, except to participate in conferences as provided in Subparagraph 3.1. 3- If there is no OWNER Default, Surety 's obligation under this Bond Shall arise after 3.1 OWNER has notified CONTRACTOR and Surety at the address described in Paragraph 10 below, that Owner is con- sidering declaring a CONTRACTOR Default and has requested and at- tempted to arrange a conference with CONTRACTOR and Surety to be held not later than fifteen days after receipt of such notice to discuss methods of performing the Contract. If OWNER, CONTRACTOR and Surety agree, CONTRACTOR shall be allowed a reasonable time to perform the Con- tract, but such an agreement shall not waive the Owner's right, if any, subsequently to declare a CONTRACTOR Default; and 3.2 The OWNER has declared a CONTRACTOR Default and formally ter- minated CONTRACTOR'S right to complete the contract. Such CONTRACTOR Default shall not be declared earlier than twenty days after CONTRACTOR and Surety have received notice as pro- vided in paragraph 3.1; and 3.3 The Owner has agreed to pay the Balance of the Contract Price M 1. The Surety in accordance with the terms of the Contract: 2. Another contractor selected pursuant to paragraph 4.3 to perform the contract 4. When Owner has satisfied the conditions of Paragraph 3, Surety shall promptly and at the Surety's expense take one of the following actions: 4.1 Arrange for Contractor, with consent of Owner, to perform and complete the Contract, or 4.2 Undertake to perform and complete the Contract itself, through its agents or through independent contractors; or 4.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and com- pletion of the Contract, arrange for a contract to be prepared for execution by Owner and the contractor selected with Owner's concurrence to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Contract, and pay to Owner the amount of damages as described in Paragraph 6 in excess of the Balance of the Contract Price incurred by Owner resulting from the Contractor default; or 4.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances; 1. After investigation, determine the amount for which it may be liable to Owner and as soon as practicable after the amount is determined, render payment therefor to Owner, or 2. Deny liability in whole or in part and notify the Owner citing reasons thereof. 5. If Surety does not proceed as provided in Paragraph 4 with reason- able promptness, the Surety shall be deemed to be in default of this Bond 15 days after receipt of an additional written notice from Owner to Surety demanding that the Surety perform its obligation under this Bond, and Owner shall be entitled to enforce any remedy available to Owner. If Surety proceeds as provided in Subparagraph 4.4 and Owner refuses the payment tendered or the Surety has denied liability, in whole or in part, without further notice Owner shall be entitled to enforce any remedy available to Owner. 6. After Owner has terminated Contractor's right to conplete the Contract, and if Surety elects to act under paragraph 4.1, 4.2 or 4.3 above, then the responsibilities of Surety to Owner Shall not be greater than those of the Contractor under the Contract, and the responsibilities of Owner to Surety shall not be Greater than those of Owner under the Contract. To a Limit of the amount of this Bond, but subject to commitment by Owner Of the Balance of the Contract Price to mitigation of costs and damages On the Contract, the Surety is obligated without duplication For: 6.1 The responsibilities of the Contractor for correction of defective work and completion of the Construction Contract. 6.2 Additional legal, design professional and delay costs resulting from the Contractor's Default, and resulting from the actions or failure to act of the Surety under Paragraph 4, and 6.3 Liquidated damages, or ifno liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or nonperformance of Contractor. 7. The Surety shall not be liable to Owner or others for obligations of The Contractor that are unrelated to the Contract, and the Balance of the Contract Price, shall not be reduced or set off on account Of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators, or successors. 8. The Surety hereby waives notice of any change, including changes of time, to Contract or to related subcontracts, purchase orders and other obligations. 9. Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after Contractor Default or within two years after the Contractor ceased working or within two years after Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be liable. 10. Notice to Surety, Owner or Contractor shall be mailed or delivered to the address shown on the signature page. 11. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions con- forming to such statutory or other legal requirement shall be deemed in- corporated herein. The intent is that his Bond shall be construed as a statutory bond and not as a common law bond. 12. Definitions. 12.1 Balance of the Contract Price: The total amount payable by Owner to Contractor under the Contract after all proper adjustments have been made, including allowance to Contractor of any amounts received or to be received by Owner in settlement of insurance or other claims for damages to which Contractor is entitled, reduced by all valid and proper payments made to or on behalf of Contractor under the contract. 12.2 Contract: The agreement between Owner and Contractor identified on the signature page, including all Contract Documents and changes thereto. 12.3 Contractor Default: Failure of Contractor, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Contract. 12.4 Owner Default: Failure of Owner, which has neither been remedied not waived, to pay Contractor as required by the Contract or to perform and complete or comply with the other terms thereof. (FOR INFORMATION ONLY - Name Address and Telephone) Surety Agency or Broker: Pate Bonding, Inc., 1276 South Robert Street, West St. Paul, MN 55118 (651)457 -6842 OWNER'S REPRESENTATIVE (Engineer or other Party): BONESTROO, INC. 00610 -2 State of County of PR INCIPAL ACKNOWLEDGMENT OF (In — ) ) i On this day of in the year , before me personally come(s) , to me known and known to me to be the person(s) who (is) (are) described in and executed the foregoing instrument and acknowledge(s) to me that _ he _ executed the same. Notary Public ACKNOWLE OF PRINCIPAL (Partnership) State of ) County of ) On this day of , in the year , before me personally come(s) a member of the co- partnership of _ to me known and known to me to be the person who is described in and executed the foregoing instrument and acknowledges to me that he executed the same as for the act and deed of the said co- partnership. Notary Public State of ACKNOWLEDGMENT OF PRINCIPAL (Corporation) � � I (� ) County of )) On this day of in the year 1 before me personally come(s) to me known, / who, being duly sworn, deposes and says that he is the (�J'�'.� �l t- t" of the i v � s the corporation described in and which executed the foregoing instrument; that he knows the seal of the said corporation; the seal affixed to the said instrument is such rporate seal; that it was so affixed by the order of the Board of Directors of said corporation, and that he signed his name thereto ,6y like order. LORI A WINTER NOTARY PUBLIC -� M NNESOTA Nota Public +�? ` My Commission Expires Jan. 311, 2011 State of Minnesota ) County of Dakota ) On this 30th day of September , in the year 2009 before me personally come(s) Lisa M. Francour Attorneys) -in -Fact of GRANITE RE, INC. with whom I am personally acquainted, and who, being by me duly sworn, says that he is (are) the Attorney(s) -in- Fact of GRANITE RE, INC. company described in and which executed the within instrumejit.; that he know(s) the corporate seal of such company; and that seal affixed to the within instrument is such corporate seal and that it�was affixed by order Af the and of Directors of said company, and that he signed said instrument as Attorneys) -in -Fact of the said company by like order. i WWANDA LEE FRANZ Notary Pu NOTAY PU6LIC P�INNESOTA e ,y' I y Commission Expires Jan. 31, 2010 PAYMENT BOND BOND NO. GRMN30124A Any singular reference to Contractor, Surety, Owner, or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): TMS CONSTRUCTION INC. 5990 MEADOWLARK LANE PRIOR LAKE MN 55372 OWNER (Name and Address): City of New Hope 4401 Xylon Ave No. New Hope, MN 55428 -4898 CONTRACT SURETY (Name, and Address of Principal Place of Business): GRANITE RE, INC. 14001 OUAILBROOK DRIVE OKLAHOMA CITY OK 73134 Effective Date of Agreement: 9/23/2009 Amount: $ 84,164.90 Description (Name and Location): CITY PROJECT NO. 854 - 2009 RETAINING WALL IMPROVEMENTS NEW HOPE MINNESOTA BOND Bond Number: GRMN30124A Date (Not earlier than Effective Date of Agreement): 9/30/2009 $ 84,164.90 ( EIGHTY FOUR THOUSAND ONE HUNDRED SIXTY FOUR AND Amount: 90/100) Modifications to this Bond Form: None Surety and Contractor, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Payment Bond to be duly executed by an authorized officer, agent, or representative. CONTRACTOR AS PRINCIPAL SURETY GRANITE RE, INC. Surety's Name and Cor orate Seal By. ouz4wk Signature (Attach Power of Attorney) (Seal) Lisa M. Francour D.-; —+ NT--- Title Attest: 1 ILI%, Note: Provide execution by additional parties, such as joint venturers, if necessary. {Mw001504;1} EJCDC C- 615(A) Payment Bond March 2008 Prepared by the Engineers Joint Contract Documents Committee. Page 1 of 3 1. Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to Owner to pay for labor, materials, and equipment furnished by Claimants for use in the performance of the Contract, which is incorporated herein by reference. 2. With respect to Owner, this obligation shall be null and void if Contractor: 2.1 Promptly makes payment, directly or indirectly, for all sums due Claimants, and 2.2 Defends, indemnifies, and holds harmless Owner from all claims, demands, liens, or suits alleging non - payment by Contractor by any person or entity who furnished labor, materials, or equipment for use in the performance of the Contract, provided Owner has promptly notified Contractor and Surety (at the addresses described in Paragraph 12) of any claims, demands, liens, or suits and tendered defense of such claims, demands, liens, or suits to Contractor and Surety, and provided there is no Owner Default. 3. With respect to Claimants, this obligation shall be null and void if Contractor promptly makes payment, directly or indirectly, for all sums due. 4. Surety shall have no obligation to Claimants under this Bond until: 4.1 Claimants who are employed by or have a direct contract with Contractor have given notice to Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to Owner, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim. 4.2 Claimants who do not have a direct contract with Contractor: 1. Have furnished written notice to Contractor and sent a copy, or notice thereof, to Owner, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials or equipment were furnished or supplied, or for whom the labor was done or performed; and 2. Have either received a rejection in whole or in part from Contractor, or not received within 30 days of furnishing the above notice any communication from Contractor by which Contractor had indicated the claim will be paid directly or indirectly; and 3. Not having been paid within the above 30 days, have sent a written notice to Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to Owner, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to Contractor. 5. If a notice by a Claimant required by Paragraph 4 is provided by Owner to Contractor or to Surety, that is sufficient compliance. 6. Reserved. 7. Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by Surety. 8. Amounts owed by Owner to Contractor under the Contract shall be used for the performance of the Contract and to satisfy claims, if any, under any performance bond. By Contractor furnishing and Owner accepting this Bond, they agree that all funds earned by Contractor in the performance of the Contract are dedicated to satisfy obligations of Contractor and Surety under this Bond, subject to Owner's priority to use the funds for the completion of the Work. 9. Surety shall not be liable to Owner, Claimants, or others for obligations of Contractor that are unrelated to the Contract. Owner shall not be liable for payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond. {MW001504;1} EJCDC C- 615(A) Payment Bond March 2008 Prepared by the Engineers Joint Contract Documents Committee. Page 2 of 3 10. Surety hereby waives notice of any change, including changes of time, to the Contract or to related subcontracts, purchase orders, and other obligations. 11. No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the location in which the Work or part of the Work is located or after the expiration of one year from the date (1) on which the Claimant gave the notice required by Paragraph 4.1 or Paragraph 4.2.3, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Contract, whichever of (1) or (2) first occurs. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 12. Notice to Surety, Owner, or Contractor shall be mailed or delivered to the addresses shown on the signature page. Actual receipt of notice by Surety, Owner, or Contractor, however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page. 13. When this Bond has been furnished to comply with a statutory requirement in the location where the Contract was to be performed, any provision in this Bond conflicting with said statutory requirement shall be deemed deleted herefrom and provisions conforming to such statutory requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory Bond and not as a common law bond. 14. Upon request of any person or entity appearing to be a potential beneficiary of this Bond, Contractor shall promptly furnish a copy of this Bond or shall permit a copy to be made. 15. Definitions 15.1 Claimant: An individual or entity having a direct contract with Contractor, or with a first -tier subcontractor of Contractor, to furnish labor, materials, or equipment for use in the performance of the Contract. The intent of this Bond shall be to include without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service, or rental equipment used in the Contract, architectural and engineering services required for performance of the Work of Contractor and Contractor's subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials, or equipment were furnished. 15.2 Contract: The agreement between Owner and Contractor identified on the signature page, including all Contract Documents and changes thereto. 15.3 Owner Default: Failure of Owner, which has neither been remedied nor waived, to pay Contractor as required by the Contract, or to perform and complete or otherwise comply with the other terms thereof. FOR INFORMATION ONLY — (Name, Address, and Telephone) Surety Agency or Broker: Pate Bonding, Inc., 1276 South Robert Street, West St. Paul, MN 55118 (651)457 -6842 Owner's Representative (Engineer or other): BONESTROO, INC. {MW001504;1) EJCDC C- 615(A) Payment Bond March 2008 Prepared by the Engineers Joint Contract Documents Committee. Page 3 of 3 ACKNOWLEDGMENT OF PRINCIPAL (Individual) State of ) County of On this day of in the year , before me personally come(s) to me known and known to me to be the person(s) who (is) (are) described in and executed the foregoing instrument and acknowledge(s) to me that _ he _ executed the same. Notary Public A CKNOWLE D G M E N T OF PRINCIPAL (Partnership) State of ) County of ) On this day of in the year , before me personally come(s) a member of the co- partnership of to me known and known to me to be the person who is described in and executed the foregoing instrument and acknowledges to me that he executed the same as for the act and deed of the said co- partnership. Notary Public ACKNOWLEDGMENT OF PRINCIPAL (Corporation) State of W N , ) County of )) On this day of in the year before me personally come(s) - ro says that he is the , to me known, who, being duly sworn, deposes and of the - rh' 1 S C&) , h C�/ b the corporation described in and which executed the foregoing instrument; that he knows the seal of the said corporation; the seal affixed to the said instrument is such corporate seal; that it was so affixed by the order of the Board of Directors of said corporation, and that he signed his name Were by e order. —L *MEJN OWLEDGMENT INTER N a f ublic PUBLIC ry O TA lresJan.3 NOWLEDGMENT OF SURETY State of Minnesota ) County of Dakota ) On this 30th day of September , in the year 2009 before me personally come(s) Lisa M. Francour Attorney(s) -in -Fact of GRANITE RE, INC. with whom I am personally acquainted, and who, being by me duly sworn, says that he is (are) the Attorney(s) -in- Fact of GRANITE RE, INC. company described in and which executed the within instrume ' that he know(s) the corporate seal of such company; and that seal affixed to the within instrument is such corporate seal and that it was affixed by or er of th Board of Directors of said company, and that he signed said instrument as Attorney(s) -in -Fact of the said co pany by like order. Notary Pu WAN L E FRANZ , } PUBLIC - MINNESOTA ssion Ex pires Jan. 31, 2010 Date: 1 0/5/2009 Time: 0!30 AM TO: Todd Q 9952-226-6301 erson Agency Page: 001 ACOR4 CERTIFICATE OF LIABILITY INSURANCE PROUVCF;R (612)331-371 FAX (612)378-0419 THIS CERTIFICATE IS ISSUED AS A MAT' Anderson Insurance & Investment Agency ONLY AND CONFERS NO RIGHTS UPON 312 Central Ave, S, E. HOLDER. THIS CERTIFICATE DOES NOT Suite 392 ALTER THE COVERAGE AFFORDED 13y Minneapolis. MN 55414 INSURERS AFFORDING COVERAGE T-6 — Construction" -- Inc. M0 . .1RCRA, Western National 5990 MeadoiWilark Lane TISI JRrR III Prior Lake, MN 55372 IN.13 3?Sr? r.' --- INSURER iNSt iRrR r COVERAGES Twrz D^t And k-rr (MWOD"YM . 0/05/2009 RMATION ICATE 'END OR S BELOW, NAIL # 15377 - - ---. - - — —' -- - — -- I .... � 1� Jnr 1(4sUINCU NAIVILLIABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR 01 DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS S(J$JFCTTOALL ISSUED OR THE TERMS, POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIM$, EXCLUSIONS AND CONDITIONS OF SUCH INSR ADD'L LTR N&nt TYPE OF INSURANCE= POLICY NUMBER OPAOTLI51EM GENERAL LtABILrfY CP30000763302 02/03/2009 02/()3/2010 X COMMERCIAL GENERAL LIABILITY 7MMut- IQ R— 1,000,000 — 7 CVVK� MA U , ; r 11HEM r6I,. -S J!�q 100.00( A mLu XF one perwo PLWLWI,!� u. IL INJURY S 11000100C OEt AGGREGATE 000, DO C;EqL AG GREGATE F)q0 REGATE LUT I AkIF PLN, PRODUCTS .?�, 2, 000, DOC JI;cl F1 LOC -(57 AUTOMOBILE LIABILITY CA30000814605 2/03/2009 2 X ANYAUIU SINGLE LIMIT 11000.000 ALL OWNED AUTOS DODILY INJURY (r wqonl A 411*0 AUTOS NON-OWNED AUTOS IPar accioant) Pp.f.A-Ickly L {Per armoen GARAGE LIABILITY AUTO ONLY - EA ACCIDENT ANY Al ITO EA ACC %11T10r-%T,1LMy AGG 9XCE92 I UMSReLLA LIABILMY CU300002967 02/03/2OD9 02/03/2010 cACrj IacctpprNcr 6,000,000 OCCUR EOLAMS MADC A DEDUCTIBLE R=NTION I 20,000 WOR KERS COMPENSATIoN AND FMPI.0YFft&'0AnIJ.ITY YIN W300003731 02/ /03/2010 X TORY LIM1Ta ER A ANY rf?Orr?IE'n)PIrAPTNr=r?,IEXECJ.ITIVE 8FFICEWMIEMBER EXCLUDED? C.L. EArl I As:C1Dr-NT 1,000,066 L L UJULAUL - LA Lhff-LUYLL 1,00(3,000 (Mandetory m NH) It as, cl-cnba mdar v E L DISEASE - rOLICY LIMIT S 1,000,000 r .tA, PROVINONS br.ln* 6ii;w T DESCRIPTION OF QP5RA'nON% I LOCATIONS I VEHICLES t EXCLUSIONS ADDED MY ENDORSEMENT I SPECIAL PROVISIONS Project: 2009 Retaining Wall Improvements - New Hope, MN 'Certificate Holder is an additional insured as respect to the above project. City of New Hope 4401 Xylon Avenue North Nei Hope, MN 55428 25 (2009/01) FAX: 763.531,5136 SHOULD ANY OF THE A5QYM Qr;VQRIaED POLICIES 81; CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER HALL ENDEAVOR TO MAIL 30 nAys wRrrTEN NOTICE TO THE CERTIFICATE MOLDER NAMED TO THE LEFT, BUT FAILURE TO 00 90 SMALL IMPOSE NO OBLIGATION OR LKNILffY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES, IUTFIORIZED REPRESENTATIVE 1 * - litch Loewen/VICKI 7utartl^ L The ACORD namo and logo are registered marks of ACORD 2 a6 *J 2GTS26t729) : 01 :wOJJ lt7;T2 6002-20-cj3S G RAN IT E RE INC. Surety Bonds f., Contractors July 14, 2010 City of New Hope 4401 Xylon Avenue N. New Hope, MN 55428 RE: TMS Construction, Inc. Bond# GRMN3O124A Dear Sir or Madam: q As you recognize, Granite Re, Inc. executed a contractor's surety bond naming TMS Construction, Inc. as bond principal in connection with the above referenced project. Granite Re has discharged its payment bond obligations by payment to the following entity in the following amount: Rochester Concrete Products, LLC - $14,487.35 In the aggregate Granite Re has incurred losses to date of $14,487.35 as performing contract surety. Under law Granite Re is entitled to remaining contract balances to the extent of its losses, and its interest are accorded priority against claims of all other parties, including the bond principal /general contractor. Accordingly, we do hereby demand release of contract funds in the amount of $14,487.35 to Granite Re, Inc. We continue to reserve rights regarding claims to additional funds in the event further subcontractor and supplier payment bond claims arise and need to be discharged by Granite Re. We appreciate your cooperation and look forward to receipt of contract funds in the near future. 14001 Quailbrook Drive - Oklahoma City, Oklahoma 73134 - 405/752 -2600 • Fax 405/749 -6800 - 800/440 -5953 Website: www.granitere.com