RESOLUTION AWARDING CONTRACT FOR PLAY AREA EQUIPMENT AT ELM GROVE
AND SUNNYSIDE PARKS (IMPROVEMENT PROJECT NO. 503),, TO SUNRAM
CONSTRUCTION INC
Staff and the City Engineer have evaluated bids opened on June 8th
for Sunnyside and Elm Grove parks (Improvement Project 503). Plans
and specifications were approved at the May 24th Council meeting.
There is $89,717 in CIP for this project. Staff recommends that
another $11,181.80 be transferred to this project from other 1993
CIP park projects for this purchase.
Total bids were received on June 8, 1993 and Sunram Construction
Inc. was the low bidder at $100,898.80.
u• ♦� : N BY
TO:
Review:
Administration:
Finance:
RFA -001
CITY OF NEW HOPE
RESOLUTION NO. 93-79
RESOLUTION AWARDING CONTRACT FOR
PLAY AREA EQUIPMENT AT ELM GROVE AND
SUNNYSIDE PARKS (IMPROVEMENT PROJECT NO. 503)
TO SUNRAM CONSTRUCTION INC.
WHEREAS, pursuant to advertisement for bids for playground
equipment for Sunnyside/Elm Grove parks, bids were
received, opened and tabulated according to law, and
the following bids were received complying with the
advertisement:
Contractors
Sunram Construction Inc
Talberg Lawn & Landscape Inc
Arrigoni Brothers Company
Socon Construction
Driveway Design Inc
Total Base Bid
$100,898.80
$106,401.20
$109,282.50
$110,660.00
$114,121.00
WHEREAS, it appears that Sunram Construction Inc is the lowest
responsible bidder.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
New Hope, Minnesota:
1. the Mayor and City Manager are hereby authorized
and directed to enter into the attached contract
with Sunram Construction Inc. in the name of t h e
City of New Hope for Sunnyside/Elm Grove Playground
Equipment Improvements according to the plans and
specifications (for a total base ' bid of
$100,898.80) therefore approved by the City Council
and on file in the office of the City Clerk.
2. The City Clerk is hereby authorized and directed to
return forthwith to all bidders the deposits made
with their bids, except that the deposits of the
successful bidder and the next lowest bidder shall
be retained until a contract has been signed.
Adopted by the City Council of the City of New Hope, Hennepin
County, Minnesota, this 14th day of ,Tune, 1993.
��� � Mayor
y Clerk
June 14, 1993
City of New Hope
4401 Xylon Avenue N.
New Hope, MN 55428
Attention: Mr. Daniel Donahue
Re: Sunnyside/Elm Grove Park
Project No. 503, File 34154
Dear Dan:
Mark D Wal;is, PE.
Mies B. Jensen, PE.
L Pnr,p Gravel III, PE,
Karen L Wemeri, PE,
Gary O Knstotitz. PE
F TWJ Foster, PE.
Kean R Yapp. PE.
Douglas J Benoit, PE
Shawn D Gustation, PE
Ceouo Oliver. PE.
Cnanes A. Erickson
Leo M Pawelsky
Hanan M. Olson
Jaynes F Engelhardt
Bids were received for the above project on June 11, 1993. The low bid of the five (5) bids
submitted is from Sunram Construction, Inc. for $100,898.80. Alternate bids for playground
equipment were also submitted. Shari and I have reviewed the alternate equipment with
the revised layouts and are recommending the contract be awarded based on the base bid
(Game Time Equipment).
We will continue to work with the contractor and supplier to evaluate additional cost
savings. Therefore, it's our recommendation the contract be awarded to Sunram
Construction, Inc based on the base bid ($100,898.80).
If you have any questions please contact me at this office.
Yours very truly,
BONESTROO, R NE, ANDERLIK & ASSOCIATES, INC.
Mark Hanson
MAH:lk
cc: Shari French
2335 West Highway 36 • St. Paul, MN 55113 • 612- 636 -4600
Otto G. Bonestroo, PE.
Howard A. Santora. PE.
Michael P Rau. PE.
tr
l� �e�tt 0�
V
V
Robert W Rosene, PE.`
Joseph C. Anderl.K. PE.
Keith A. Gordon. PE,
Rooea R. Ptettene, PE.
Philip J Pyne. PE .
Agnes M. Ring. A.I CP
- a.T
..—. -,
„ ®S e i4
Marvin L Sorvata. PE
Richard E. Turner. PE.
k,cnard W Foster. PE
Oev1d O. Loskota. PE
Thomas W Peterson, PE
Michael C. Lynch. PE.
■ A
Ar�derli K &
Glenn R Cook, PE
Thomas E Noyes. PE
Robert C. RusseK. A.I A
Jerry A. Bourdon. PE
Jaynes R Maland. PE .
Jerry D Pertzscn. PE
A ssociates
Robert G. Schun.chi, PE.
Susan M. Eberhn, CPA
Mark A. Hanson, PE.
Michael T Rauimann, PE
Kenneth P Anderson. PE
Mark R Roils, PE,
Senior Consultant
Ted K Held, PE.
Mark A Se.p, PE
Engineers & Architects
Thomas R. Anderson. A.LA
Donato C Burgardt. P.E
Gary W Monen. PE
Damel J Edgerton. PE
Thomas E. Angus, PE.
Allan Rick Schmidt PE.
Ismael Martinez. PE.
Philip J Caswell. PE
June 14, 1993
City of New Hope
4401 Xylon Avenue N.
New Hope, MN 55428
Attention: Mr. Daniel Donahue
Re: Sunnyside/Elm Grove Park
Project No. 503, File 34154
Dear Dan:
Mark D Wal;is, PE.
Mies B. Jensen, PE.
L Pnr,p Gravel III, PE,
Karen L Wemeri, PE,
Gary O Knstotitz. PE
F TWJ Foster, PE.
Kean R Yapp. PE.
Douglas J Benoit, PE
Shawn D Gustation, PE
Ceouo Oliver. PE.
Cnanes A. Erickson
Leo M Pawelsky
Hanan M. Olson
Jaynes F Engelhardt
Bids were received for the above project on June 11, 1993. The low bid of the five (5) bids
submitted is from Sunram Construction, Inc. for $100,898.80. Alternate bids for playground
equipment were also submitted. Shari and I have reviewed the alternate equipment with
the revised layouts and are recommending the contract be awarded based on the base bid
(Game Time Equipment).
We will continue to work with the contractor and supplier to evaluate additional cost
savings. Therefore, it's our recommendation the contract be awarded to Sunram
Construction, Inc based on the base bid ($100,898.80).
If you have any questions please contact me at this office.
Yours very truly,
BONESTROO, R NE, ANDERLIK & ASSOCIATES, INC.
Mark Hanson
MAH:lk
cc: Shari French
2335 West Highway 36 • St. Paul, MN 55113 • 612- 636 -4600
Sonestroo
Project Name Sunnyside Park & Elm Grove Park Playground Equipment & Site Improvements
Rosene
project No. 503 File No. 34154
Anderrk &
Associates
E.0— S Ar<Mt—
U. Paul, Mlnnoota
Bid Opening 11:30 a.m., C.D.S.T., Tuesday, June 8, 1993 Owner New Hope, MN
No. Item
Part 1 - Sunnyside Park
1 Site grading and final shaping
LS
2 Remove existing play area equipment
LS
3 Furnish and install playground structure
'Landscape, Inc.
with handicap access ramp
LS
4 Furnish and install tire swing
EA
5 Furnish and install space arch climber
EA
B11D TABULATION
Tabulation • • , Bids of Received
Bid No. 1
Bid No. 2
Sunram
Talberg Lawn &
Construction, Inc.
'Landscape, Inc.
B rothers Compa
S o c on C
unit
unit
Price Total
Price
Total
I hereby certify that this is an exact
reproduc °on of bids r ived.
Mark ALHansn, P.E.
Reg. No. 14260
Bid No. 3
Bid No. 4
Bid No. 5
Arrigoni
2,000.00
Driveway
B rothers Compa
S o c on C
Design, Inc.
3,500.00
1 1,000.00
1,000.00
unit
unit
unit
Price Total
Price Total
Price
Total
1 2,000.00
2,000.00
1,675.00
1,675.00
2,000.00
2,000.00
3,067.00
3,067.00
3,500.00
3,500.00
1 1,000.00
1,000.00
750.00
750.00
1,000.00
1,000.00
1,415.00
1,415.00
1,575.00
1,575.00
1 16,850.00
16,850.00
18,914.00
18,914.00
18,700.00
18,700.00
19,500.00
19,500.00
19,480.00
19,480.00
1 1,200.00
1,200.00
1,370.00
1,370.00
1,130.00
1,130.00
1,363.00
1,363.00
1,155.00
1,155.00
1 620.00
620.00
691.80
691.80
650.00
650.00
712.00
712.00
735.00
735.00
34154.TAB
BT -1
Bid No. 1
Sunram
Construction, Inc.
Total
No. Item
unit
unit Q�t Price
6
Furnish and install 3 leg swing -
1,550.00
1,820.00
2 sections w/2 seats /section (2
1,600.00
1,600.00
enclosed tot seat) 10' high
EA
7
Furnish and install airplane
EA
8
Furnish and install parallel bars
EA
9
Furnish and install "S" climber
EA
10
Furnish and install track ride
EA
11
Furnish and install trapeze rings
EA
12
Furnish and install double crunch bar
EA
13
Sand cover and spread existing sand
CY
14
C1.5 100% crushed aggreg. base for trail
TN
15
Type 41 mod. bit. wear course (2" thick)
TN
16
Remove concrete curb and gutter
LF
Bid No. 2
Talberg Lawn &
Landscape, Inc.
unit
price Total
Bid No. 3 Bid No. 4
Arrigoni
Brothers Compa Socon Construction
unit unit
price Total Price Total
Bid No. 5
Driveway
Design, Inc.
unit
Price Total
1
1,550.00
1,550.00
1,820.00
1,820.00
1,600.00
1,600.00
1,874.00
1,874.00
1,745.00
1,745.00
1
560.00
560.00
623.00
623.00
600.00
600.00
640.00
640.00
630.00
630.00
1
550.00
550.00
579.00
579.00
370.00
370.00
595.00
595.00
465.00
465.00
1
1,625.00
1,625.00
1,817.00
1,817.00
2,050.00
2,050.00
1,870.00
1,870.00
1,650.00
1,650.00
1
1,400.00
1,400.00
1,565.00
1,565.00
1,500.00
1,500.00
1,612.00
1,612.00
1,500.00
1,500.00
1
1,575.00
1,575.00
1,745.00
1,745.00
1,500.00
1,500.00
1,795.00
1,795.00
1,525.00
1,525.00
1
475.00
475.00
497.00
497.00
400.00
400.00
555.00
555.00
505.00
505.00
200
7.50
1,500.00
10.50
2,100.00
15.00
3,000.00
3.00
600.00
10.00
2,000.00
100
16.40
1,640.00
11.75
1,175.00
17.40
1,740.00
15.50
1,550.00
15.00
1,500.00
35
46.70
1,634.50
53.00
1,855.00
17.40
609.00
46.00
1,610.00
75.00
2,625.00
15
15.00
225.00
10.00
150.00
10.00
150.00
15.00
225.00
10.00
150.00
34154.TAB
BT -2
Bid No. 1
Bid No. 2
Bid No. 3
Bid No. 4
Bid No. 5
Sunram
Talberg Lawn &
Arrigoni
30.00
Driveway
Construction, Inc
Landscape, Inc.
Brothers Co
Socon Construction
Design, Inc.
Unit
Unit
Unit
Unit
Unit
No. Item Unit QtV Price Total
Price Total
Price Total
Price Total
Price Total
17
Concrete curb and gutter in place
LF
15
20.00
300.00
20.00
300.00
30.00
450.00
30.00
450.00
15.00
225.00
18
Timber curbing in place
LF
440
5.25
2,310.00
7.50
3,300.00
8.50
3,740.00
3.45
1,518.00
5.75
2,530.00
19
Topsoil borrow
CY
15
10.00
150.00
12.00
180.00
10.00
150.00
14.00
210.00
9.00
135.00
20
Sod
SY
360
2.00
720.00
2.40
864.00
2.50
900.00
1.95
702.00
1.85
666.00
Total Part 1 - Sunnyside Park
$37,884.50
$41,970.80
$42,239.00
$41,863.00
$44,296.00
Part 2 - Elm Grove Park
21
Remove existing concrete curb & gutter
LF
15
15.00
225.00
10.00
150.00
10.00
150.00
15.00
225.00
10.00
150.00
22
Remove existing basketball court and
sand play area
LS
1
900.00
900.00
800.00
800.00
500.00
500.00
1,410.00
1,410.00
500.00
500.00
23
Remove existing bituminous trail
LS
1
360.00
360.00
500.00
500.00
200.00
200.00
540.00
540.00
650.00
650.00
24
Remove existing playground equipment
LS
1
1,000.00
1,000.00
600.00
600.00
500.00
500.00
1,210.00
1,210.00
1,575.00
1,575.00
25
Site grading and final shaping
LS
1
2,500.00
2,500.00
2,250.00
2,250.00
4,000.00
4
3,966.00
3,966.00
4,600.00
4,600.00
34154.TAB
BT -3
Bid No. 1
Sunram
Construction, Inc.
40
25.00
1,000.00
57
22.00
1,254.00
1
300.00
300.00
15
20.00
300.00
440
13.50
5,940.00
200
14.50
2,900.00
25
39.20
980.00
No. Item
Unit
Unit Qty Price Total
26
6" PVC perforated drain pipe with
Bid No. 5
Arrigoni
geotextile fabric Type I and course
Driveway
Brothers Company
filter aggregate
LF
27
8" PVC storm sewer
LF
28
Bends, reducer and tee for drain pipe
LS
29
Concrete curb and gutter in place
LF
30
Modular block retaining wall (beige)
SF
31
Class 5 100% crushed aggregate base
TN
32
Type 31 bituminous base for Bball ct.
TN
33
Type 41 modified bituminous wear course
(2" thick on trails, 1 -112" thick on ct.)
TN
34
4" concrete slab for Bball court
SF
Bid No. 2
Talberg Lawn &
Landscape, Inc.
Unit
Price Total
Bid No. 3
Bid No. 4
Bid No. 5
Arrigoni
18.95
Driveway
Brothers Company
Socon C onstruction
Design, Inc.
Unit
Unit
Unit
Price Total
Price Total
Price Total
15.75
630.00
5.00
200.00
18.95
1,080.15
12.00
684.00
80.00
80.00
200.00
200.00
20.00
300.00
30.00
450.00
13.75
6,050.00
14.00
6,160.00
11.75
2,350.00
17.40
3,480.00
48.00
1,200.00
50.00
1,250.00
18.00
720.00
25.00
1,000.00
12.00
684.00
18.00
1,026.00
90.00
90.00
200.00
200.00
14.00
210.00
15.00
225.00
15.50
6,820.00
12.10
5,324.00
14.00
2,800.00
15.00
3,000.00
36.00
900.00
65.00
1,625.00
58 46.60
2,702.80
53.00
3,074.00
49.00
2,842.00
41.00
2,378.00
65.00
3,770.00
45 3.00
135.00
3.50
157.50
3.00
135.00
4.00
180.00
6.50
292.50
34154.TAB BT -4
Bid No. 1
Sunram
Construction, Inc.
No. Item
35 Furnish and install basketball post,
Unit
Unit Qty Price
Total
Bid No. 2 Bid No. 3
Talberg Lawn & Arrigoni
Landscape, Inc. Brothers Company
Unit Unit
Price Total Price Total
Bid No. 4
back board, and goal
LS
36
Furnish and install 6' bench w/back
EA
37
Furnish and install playground structure
Price Total
price Total
with handicap access ramp
LS
38
Furnish and install tire swing
EA
39
Furnish and install space arch climber
EA
40
Geotextile fabric, Type V
SY
41
Furnish and install 3 leg swing -
620.00
620.00
2 sections w/2 seats /section (2
714.00
650.00
enclosed tot seat) 10' high
EA
42
Furnish and install police car
EA
43
Furnish and install backhoe digger
EA
Total
Bid No. 2 Bid No. 3
Talberg Lawn & Arrigoni
Landscape, Inc. Brothers Company
Unit Unit
Price Total Price Total
Bid No. 4
Bid No. 5
1,347.00
Driveway
Socon Construction
Design, Inc.
Unit
Unit
Price Total
price Total
1 1,200.00
1,200.00
1,347.00
1,347.00
1,000.00
1,000.00
1,320.00
1,320.00
1,260.00
1,260.00
2 375.00
750.00
433.00
866.00
270.00
540.00
420.00
840.00
365.00
730.00
1
23,900.00
23,900.00
24,075.00
24,075.00
24,500.00
24,500.00
24,305.00
24,305.00
25,675.00
25,675.00
1
1,200.00
1,200.00
1,378.00
1,378.00
1,130.00
1,130.00
1,363.00
1,363.00
1,155.00
1,155.00
1
620.00
620.00
714.00
714.00
650.00
650.00
712.00
712.00
735.00
735.00
625
1.50
937.50
1.15
718.75
1.30
812.50
2.00
1,250.00
1.90
1,187.50
1 1,650.00
1,650.00
1,890.00
1,890.00
1,600.00
1,600.00
1,873.00
1,873.00
1,745.00
1,745.00
1 700.00
700.00
793.00
793.00
760.00
760.00
796.00
796.00
815.00
815.00
1 420.00
420.00
922.00
922.00
400.00
400.00
477.00
477.00
525.00
525.00
34154.TAB
BT -5
No. Item
Unit Qt
Bid No. 1
Bid No. 2
Sunram
Talberg Lawn &
Construction, Inc
Lands cape, Inc.
Unit
Unit
Price Total
Price
Bid No. 3
Arrigoni
Bro Company
Unit
Total Price Total
Bid No. 4
Bid No. 5
CY
Driveway
Socon Co
D e si gn, Inc.
unit
Unit
Price Total
Price
Total
44
Sand cover
CY
180
8.00
1,440.00
10.50
1,890.00
15.00
2,700.00
8.00
1,440.00
10.00
1,800.00
45
4' high Colorado Spruce in place
EA
6
150.00
900.00
145.00
870.00
300.00
1,800.00
133.00
798.00
155.00
930.00
46
Topsoil borrow
CY
300
3.00
900.00
9.75
2,925.00
10.00
3,000.00
14.00
4,200.00
9.00
2,700.00
47
Sod
SY
1,200
3.00
3,600.00
1.65
1,980.00
2.00
2,400.00
1.95
2,340.00
1.85
2,220.00
Total Part 2 - Elm Grove Park
$58,714.30
$59,590.40
$62,043.50
$63,847.00
$65,415.00
Part 3 - Liberty Park
48 Furnish and install Lexan Spiral slide
including all necessary connections EA
1 4,300.00 4,300.00 4,840.00 4,840.00 5,000.00 5,000.00 4,950.00 4,950.00 4,410.00 4,410.00
Total Part 3 - Liberty Park
$4,300.00 $4,840.00 $5,000.00 $4,950.00 $4,410.00
34154.TAB
BT -6
Bid No. 1 Bid No. 2
Sunram Talberg Lawn &
Construction, Inc. Landscape, Inc.
No. Item
Unit Unit
Unit Q_yt Price Total Price Total
Bid No. 3
Bid No. 4
Bid No. 5
Arrigoni
41,863.00
Driveway
Brothers Company
Socon Construction
Design, Inc.
62,043.50
63,847.00
Unit
Unit
Unit
Price Total
Price Total
Price Total
Total Part 1 - Sunnyside Park
37,884.50
41,970.80
42,239.00
41,863.00
44,296.00
Total Part 2 - Elm Grove Park
58,714.30
59,590.40
62,043.50
63,847.00
65,415.00
Total Part 3 - Liberty Park
4,300.00
4,840.00
5,000.00
4,950.00
4,410.00
Total Base Bid
$100,898.80
$106,401.20
$109,282.50
$110,660.00
$114,121.00
Alternate Playground Equipment @
Sunnyside Park
1 Playworld Systems Nos. 3 -12
2 Iron Mountain Forge Nos. 3 -12
3 Gametime Durascape No. 3
4 Premier Polysteel Playgrounds No. 3
(3,905.00)
(3,405.00)
4
(4,200.00)
(4,500.00)
(6,400.00)
(6,500.00)
(3,200.00)
(300.00)
(1,400.00)
34154.TAB BT -7
Bid No. 1
Sunram
Construction, Inc.
No. Item
Unit
Unit QtV Price Total
Bid No. 2 Bid No. 3
Talberg Lawn & Arrigoni
Landsca Inc. Brothers Comp
Unit Unit
Price Total Price Total
Bid No. 4
Bid No. 5
Driveway
Socon Cons
Design, Inc.
Unit
Unit
Price Total
Price Total
Elm Grove Park
5 Playworld Systems Nos. 35 -39 & 41 -43 (3,485.00) (5,400.00)
6 Iron Mountain Forge Nos. 35 -39 & 41 -43 (4,820.00) (4,300.00) (5,500.00)
7 Gametime Durascape No. 37 (4,600.00) (4,400.00) (1,900.00)
8 Premier Polysteel Playgrounds No. 37 2,400.00
34154.TAB
BT -8
Bid No. 1 Bid No. 2 Bid No. 3 Bid No. 4 Bid No. 5
Bid Bond,
5% Bid Bond
5% Bid Bond
5% Bid Bond
5% Bid Bond
Cert. check,
Certified Check ($5,300)
Cash deposit
Firm
Sunram
Talberg Lawn &
Arrigoni
Driveway
Construction, Inc.
Landscape, Inc.
Brothers Company
Socon Construction
Design, Inc.
By
Lee W. Sunram
Mark Talberg
Dennis Arrigoni
Ronald Swanson
Randall M. Johnson
Tine
President
President
President
President
President
Address
7675 Troy Lane
100 Wilshire Drive
817 Vandalia Street
9901 Xylite Street NE
4810 W Medicine Lake Dr
City, state,
Maple Grove, MN
Minnetonka, MN
St. Paul, MN
Minneapolis, MN
Plymouth, MN
Zip Code
55311
55305
55114
55449
55442
Telephone
(612) 420 -2140
(612) 541 -0194
(612) 645 -9321
(612) 784 -6910
(612) 559 -9004
Fax No.
(612) 494 -3951
(612) 546 -4954
(612) 645 -9323
(612) 784 -2423
(612) 550 -1165
34154.TAB BT -9
June 15, 1993
Sunram Construction, Inc.
7675 Troy Lane
Maple Grove, MN 55311
Otto G. Bonestroo, PE.
Robert W. Rosene, P.E.*
Joseph C. Anderlik, P.E.
Marvin L. Sorvala, P.E.
Richard E. Turner, P.E.
Glenn R. Cook, P.E.
Thomas E. Noyes, P.E.
Robert G. Schunicht, P.E.
Susan M. Eberlin, C.PA.
*Senior Consultant
Re: Sunnyside Park and Elm Grove Park
Playground Equipment and Site Improvements
New Hope, MN
Our File No. 34154
Gentlemen:
Michael P. Rau, P.E.
Philip J. Pyne, P.E.
Agnes M. Ring, A.LC.P.
Thomas W. Peterson, P.E.
Michael C. Lynch, P.E.
James R. Maland, P.E.
Jerr> D. Pertzsch, P.E.
Kenneth P. Anderson, P.E.
Mark R. Rolfs, P.E.
Mark A. Seip, P.E.
Gary W. Morien, P.E.
Daniel J. Edgerton, PE,
Allan Rick Schmidt, P.E.
Philip J. Caswell, P.E.
Mark D. Wallis, P.E.
Miles B. Jensen, PE.
L. Phillip Gravel III, P.E.
Karen L. Wiemeri, P.E.
Gary D. Kristofitz, P.E.
F Todd Foster, P.E.
Keith R. Yapp, PE,
Douglas J. Benoit, P.E.
Shawn D. Gustafson, P.E.
Cecilio Olivier, P.E.
Charles A. Erickson
Leo M. Pawelsky
Harlan M. Olson
James F. Engelhardt
Enclosed are five (5) copies of the contract documents between you and the City of New Hope
covering the above referenced project.
Please have your bonding company complete pages 51 through 61 of the Conditions of the Contract.
The insurance and indemnity requirements of pages 13, 14, 15, & 16 shall be provided.
After the bonding company has completed the documents, forward them to Steven A. Sondrall,
Attorney -at -Law, 8525 Edinbrook Crossing - #203, Brooklyn Park, MN 55443 , who will review
them for the City of New Hope.
After the necessary City officials have signed the contracts you will be sent two copies, one for your
file and one for your bonding company. One copy will be retained by the City for their file, one by
the attorney, and one will be sent to us for our file.
Upon receipt of a signed contract and a filed Certificate of Insurance, approved by the City
Attorney, a pre- construction conference will be scheduled with you and the City to review the
project. After the pre - construction conference, you will be issued a notice to proceed with the work
as outlined in the plans and specifications.
Yours very truly,
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
Mark A. Hanson
•'l' • •
Enclosures: 5
cc: City of New Hope
Steven A. Sondrall, Attorney
Howard A. Sanford, P.E.
Keith A. Gordon, P.E.
Robert R. Pfefferle, PE,
Richard W. Foster, P.E.
David O. Loskota, P.E.
Robert C. Russek, A.I.A.
Jerry A. Bourdon, PE.
Mark A. Hanson, P.E.
Michael T Rautmann, P.E.
Ted K. Field, P.E.
Thomas R. Anderson, A.I.A.
Donald C. Burgardt. P.E.
Thomas E. Angus, PE.
Ismael Martinez, P.E.
2335 West Highway 36 * St. Paul, MN 55113 * 00
4401 Xylon Avenue North Telephone: 612 -531 -5100 City Hall Fax: #612- 531 -513E
New Hope, Minnesota 55428 -4898 TDD Line: 612- 531 -5109 Police Fax: #612- 531 -5174
Public Works Fax: #612- 533 -7656
July 12, 1993
Sunram Construction, Inc.
7675 Troy Lane
Maple Grove, MN 55311
SUBJECT: PROJECT 503 (PLAY AREA EQUIPMENT AT ELM GROVE AND SUNNYSIDE PARKS)
Enclosed are two fully executed copies of the contract documents for New Hope
Project No. 503. One copy is for your records and the second copy should be
transmitted to your bonding company. Also enclosed is return of your bid bond.
A copy of the contract documents is on file with our City Engineer.
Also enclosed is a "Withholding Affidavit for Contractors" (IC -134 form). We
cannot make final payment to contractors until this is approved by the Minnesota
Department of Revenue and submitted to our office (Minnesota Statute 290.97).
The form contains instructions for completion.
Sincerely,
Valerie Leone, MCMC
City Clerk
enc.
cc: City Engineer
City Attorney
Shari French
Family Styled City For Family Living
JA Eonestroo
Bidder Total Base Bid
® Rosene
Address Telephone No.
Anderlik &
Associates
M
a "" "
E g" `"' " A
& "°
City, State, Zip Fax. No.
ADDENDUM NO. 1
SUNNYSIDE AND ELM GROVE PARK PLAYGROUND EQUIPMENT
PROJECT NO. 503
FILE NO. 34154
NEW HOPE, MINNESOTA
June 3, 1993
Opening Time: 11:30 A.M., C.D.S.T.
Opening Date: Tuesday, June 8, 1993
• 1� 1 •
Proposal /Special Provisions
16) The attached Proposal has been revised to include a location to provide an
Alternate Bid for playground equipment (Page P -4). Section 0231.3 Materials
for Recreational Facilities (Section 0231) states playground equipment shall be
manufactured by Game Time, Inc., Landscape Structure/Mexico Forge or equal.
To eliminate confusion as to what equipment the Contractor is including in his
base bid, the Contractor shall include in his base bid playground equipment
manufactured by Game Time, Inc. based on the layouts presented on Plan Sheets
No. 1 and 2. The Contractor may submit an Alternate Bid for playground
equipment not manufactured by Game Time, Inc. based on the layouts presented
on Plan Sheets No. 1 and 2. The add or deduct bid shall be presented on Page
4 of the proposal listing the Item No., the Item, the Manufacturer and the Add
or Deduct amount from the base bid for that Item. The Contractor may also
provide alternate playground equipment bids based on different layouts from
those presented on Plan Sheets No. 1 and 2 provided the layout includes similar
features. The alternate bids will be considered by the City after the bids are
received on June 8, 1993 and before the City Council considers contract award
at their June 14, 1993 Council Meeting.
34154.ADD A -1
17) The attached Proposal includes a lump sum bid for a new basketball post,
backboard, and goal at Elm Grove Park which was omitted in the original
proposal. The lump sum bid shall include the following items as manufactured
by Game Time, Inc.
Post (Game Time No. 460)
Backboard (Game Time No. 854 - Aluminum)
Goal (Game Time No. BA39U -BA50)
The Contractor may also provide an alternate equipment bid in the spaced
provided on Page 4 of the proposal.
18) The previous proposal included two line items for "Furnish and install space arch
climber" at Sunnyside Park. The attached proposal has removed one of those
line items.
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
2335 WEST TRUNK HIGHWAY 36
ST. PAUL, MINNESOTA 55113
34154.ADD A -2
Bonesxroo
Bidder Sunram Construction, Inc. Total Base Bid $100,898.80
Rosene
An
Assoociatciat es s
Address 7675 Troy Lane Telephone No. 420 -2140
En Paul, 1 A ArC ta
St.F 11 I MaMeectf
A
City, State, 'Lip Maple Grove, MN _55311 Fax. No. 494 -3951
REVISED
PROPOSAL
SUNNYSIDE PARK AND ELM GROVE PARK
PLAYGROUND EQUIPMENT AND SITE IMPROVEMENTS
PROJECT NO. 503
FILE NO. 34154
NEW HOPE, MINNESOTA
1993
Opening Time:
Opening Date:
Honorable City Council
City of New Hope
4401 Xylon Avenue North
Minneapolis, Minnesota 55428
Dear Council Members:
11:30 A.M ., C.D.S.T.
Tuesday, June 8, 1993
The undersigned, being familiar with your local conditions, having made the field
inspections and investigations deemed necessary, having studied the plans and specifications
for the work including Addenda Nos. 1 and being familiar with all factors and other
conditions affecting the work and cost thereof, hereby proposes to furnish all labor, tools,
materials, skills, equipment and all else necessary to completely construct the project in
accordance with the plans and specifications on file with your Clerk and Bonestroo, Rosene,
Anderlik & Associates, Inc., 2335 W.Trunk Highway 36, St. Paul, Minnesota 55113, as
follows:
No. Item
Part I - Sunnyside Park
I Site grading and final shaping
2 Remove existing play area equipment
3 Furnish and install playground structure
with handicap access ramp
4 Furnish and install tire swing
5 Furnish and install space arch climber
Unit Qty
Unit Price
Total Price
LS 1
$ 2,000.00
$ 2,000.00
LS 1
1,000.00
1,000.00
LS 1
16,850.00
16,850.00
EA 1
1,200.00
1,200.00
EA 1
620.00
620.00
34154TRO P -1
No. Item
Unit
Qty
Unit Price
Total Price
6 Furnish and install 3 leg swing -
2 sections w/2 seats /section (2
enclosed tot seat) 10' high
EA
1
$ 1,550.00
$ 1,550.00
7 Furnish and install airplane
EA
1
560.00
560.00
8 Furnish and install parallel bars
EA
1
550.00
550.00
9 Furnish and install "S" climber
EA
1
1,625.00
1.625.00
10 Furnish and install track ride
EA
1
1,400.00
1,400.00
11 Furnish and install trapeze rings
EA
1
1,575.00
1,575.00
12 Furnish and install double crunch bar
EA
1
475.00
475.00
13 Sand cover and spread existing sand
CY
200
7.50
1,500.00
14 C1.5 100% crushed aggreg. base for trail
TN
100
16.40
1,640.00
15 Type 41 mod. bit, wear course (2" thick)
TN
35
46.70
1,634.50
16 Remove concrete curb and gutter
LF
15
15.00
225.00
17 Concrete curb and gutter in place
LF
15
20.00
300.00
18 'Timber curbing in place
LF
440
5.2.5
2,310.00
19 "Topsoil borrow
CY
15
10.00
150.00
20 Sod
SY
360
2.00
720.00
Total Part I - Sunnyside Park
$37,884.50
Part 2 - Elm Grove Park
21 Remove existing concrete curb & gutter
LF
15
$ 15.00
$ 225.00
22 Remove existing basketball court and
sand play area
LS
1
900.00
900.00
23 Remove existing bituminous trail
LS
1
360.00
360.00
24 Remove existing playground equipment
LS
1
1,000.00
1.000.00
25 Site grading and final shaping
LS
1
2,500.00
2,500.00
34154.I1Rt7 P -2
No. Item
Unit
Qty
Unit Price
Total Price
26 6" PVC perforated drain pipe with
geotextile fabric Type I and course
filter aggregate
LF
40
$ 25.00
$ 1,000.00
27 8" PVC storm sewer
1-1
57
22.00
1,254.00
28 Bends, reducer and tee for drain pipe
LS
1
300.00
300.00
29 Concrete curb and gutter in place
LF
15
20.00
300.00
30 Modular block retaining wall (beige)
SF
440
13.50
5,940.00
31 Class 5 100% crushed aggregate base
TN
200
14.50
2,900.00
32 Type 31 bituminous base for Bball et.
TN
25
39.20
980.00
33 Type 41 modified bituminous wear course
(2" thick on trails, 1 -1/2" thick on ct.)
TN
58
46.60
2,702.80
34 4" concrete slab for Bball court
SF
45
3.00
135.00
35 Furnish and install basketball post,
back board, and goal
LS
1
1,200.00
1,200.00
36 Furnish and install 6' bench w/back
EA
2
375.00
750.00
37 Furnish and install playground structure
with handicap access ramp
LS
1
23,900.00
23,900.00
38 Furnish and install tire swing
EA
1
1,200.00
1,200.00
39 Furnish and install space arch climber
EA
1
620.00
620.00
40 Geotextile fabric, Type V
SY
62.5
1.50
937.50
41 Furnish and install 3 leg swing -
2 sections w/2 seats /section (2
enclosed tot seat) 10' high
EA
1
1,650.00
1,650.00
42 Furnish and install police car
EA
1
700.00
700.00
43 Furnish and install backhoe digger
EA
1
420.00
420.00
44 Sand cover
CY
180
8.00
1,440.00
45 4' high Colorado Spruce in place
EA
6
150.00
900.00
34154.PRO P -3
No. Item Unit Qty Unit Price Total Price
46 Topsoil borrow CY 300 $ 3.00 $ 900.00
47 Sod SY 1,200 3.00 3,600.00
Total Part 2 - Elm Grove Park $58,714.30
Part 3 - Liberty Park
48 Furnish and install Lexan Spiral slide
including all necessary connections EA 1 $ 4,300.00 $ A300.00
Total Part 3 - Liberty Park $4,300.00
Total Part I - Sunnyside Park $ 37.884.50
Total Part 2 - Elm Grove Park $ 58,714.30
Total Part 3 - Liberty Park $ 4,300.00
Total Base Bid $100,898.80
Altern ate_Play>;round Equipment Bid
No. Manufacturer
Sunnyside Park 3 -12 Playworld Systems
Elm Grove 35- 39/41 -43 Playworld Systems
Suunyside Park 3 -12 Iron Mountain Forge
Elm Grove Park 35- 39/41 -43 Iron Mountain Forge
Add or Deduct
($3,905.00)
($3,485.00)
($3,405.00)
($4,820.00)
NOTE: Must use same manufacturer for both parks.
34154.PRO P -4
SUNNYSIDE AND ELM GROVE PARK PLAYGROUND EQUIPMENT
PROJECT NO. 503
FILE NO. 34154
NEW HOPE, MINNESOTA
1993
Table of Contents
Advertisement for Bids
Information to Bidders
Proposal
Special Provisions
0231. Recreational Facilities - Specific & General Requirements
2104. Removing Miscellaneous Structures - Specific & Gen'l. Requirements
2105. Excavation and Embankment - Specific & General Requirements
2211. Aggregate Base - Specific & General Requirements
2331. Plant Mixed Bituminous Pavement Specific & General Requirements
0411. Modular Block Retaining Wall - Specific & General Requirements
2521. Walks - Specific & General Requirements
2575. Turf Establishment - Specific & General Requirements
24,000. Sewers - Specific & General Requirements
Figure 1 - Location Plan
Figure 2 - Tree Planting Detail
Conditions of the Contract
Plan Sheet 1 of 2 - Sunnyside Park
Plan Sheet 2 of 2 - Elm Grove Park
I hereby certify that this plan and specification was
prepared by me or under my direct supervision
and that I am a duly Registered Professional
Engineer under t e laws of the State of
Min/ 0
ta./
Mark A. Hanson, P.E.
Date: Mav 27. 1993 Reg. No. 14260
34154
0 .0". I'M
Sealed bids will be received by the City of New Hope, Minnesota in the City Hall at 4401
Xylon Avenue until 11:30 A.M., C.D.S.T. on Tuesday, June 8, 1993, at which time they will
be publicly opened and read aloud for the furnishing of all labor and materials and all else
necessary for the following:
LUMP SUM Furnish and Install Playground Equipment with
Miscellaneous Site Imrovements and Correlated
Appurtenances.
Plans and specifications, proposal forms and contract documents may be seen at the office
of the City Clerk, New Hope Minnesota, ,i iO t the office of Bonestroo, Rosene, Anderlik
& Associates, Inc., Consulting Engineers, 2335 W. Trunk Highway 36, St. Paul, MN 55113,
(612) 636-4600.
Each bid shall be accompanied by a bidder's bond naming the City of New Hope as obligee,
certified check payable to the Clerk of the City of New Hope or a cash deposit equal to at
least five percent (5%) of the amount of the bid, which shall be forfeited to the City in the
event that the bidder fails to enter into a contract,
The City Council reserves the right to retain the deposits of the three lowest bidders for a
period not to exceed 45 days after the date and time set for the opening of bids. No bids
may be withdrawn for a period of forty-five (45) days after the date and time set for the
opening of bids.
Payment for the work will be by cash or check.
Contractors desiring a copy of the plans and specifications and proposal forms may obtain
them from the office of Bonestroo, Rosene, Anderlik & Associates, Inc., upon payment of
a deposit of $25.00. See "Information to Bidders" for plan/specification deposit refund
Policy.
The City Council reserves the right to reject any and all bids, to waive irregularities and
informalities therein and further reserves the right to award the contract to the best
interests of the City.
gwl
34154ad
1. BID PROCEDURE: Each planholder has been furnished a specification, plan set and
two extra proposals. Bids shall be submitted on the sepaiate Proposal Form designated
'BID COPY' and not i n the specification book, The Proposal containing the bid shall be
submitted in a sealed envelope.
2. DEPOSIT AND REFUND: Plans and specifications may be obtained for the deposit
amount stipulated in the Advertisement for Bids. Planholders may obtain more than one
set of plans and specifications for the stipulated amount, however, refunds will not be given
for these additional sets.
Refunds of deposit will be made to all bidders, subcontractors, and suppliers who return
plans and specifications, in good condition, within 15 days of the bid date provided they:
a) Were a prime bidder who submitted a bona-fide bid to the Owner, •
b) Submitted quotes to at least two prime bidders which are identified with the
returned plans and specifications.
The following planholders need not return plans and specifications to receive a refund of
deposit:
a) Low prime bidder, d7.1
b) Successful low subcontractors and suppliers who notify the receptionist within 15
days of the bid.
Refunds of deposit will also be made, for one set of plans and specifications only, to those
planholders who return plans and specifications at least 48 hours before the bid-letting hour.
3. INDIVIDUAL DRAWINGS AND SPECIFICATION SLEETS: Individual drawings and
specifications sheets may be purchased at the rate of Five Dollars ($5.00) per sheet of
drawings and Twenty-five cents ($0.25) per sheet of specifications for which no refund will
be made.
1989
General
RESEARCH CTR
.SEARCH CTR. ,..,r....,�..w .............:
WEST
...
'
E
Pue�
U RKS
RAGE
�i. Z
-M
�. z
�>
r
k
.,�...,,.^..� ... .....
.. .. „�... ..v.„„
?t
�k
i
t� S LJV
s
1 @ :
j
.. e
a
E S�
`z §
• a
s
....................
�kF
�rv..., ...............
..� wme
....... :.ri
$ . _..a �.:�.
........,..L.> r
r
•
•
it
s
k S
i?
5 ... .
3
.f
2
y
i
r 4
k
r
tx
,... „.,.. $.... $ 3 .......
# d
Z11 1-
. . .........
3A #
T
..
42NW AVE N
T
S j Q i ygC
HOPE
CITY
HALL
.,w:�
)CA CJN
AVE
w �w..,. n.w ..
Eiiri
GROVE
Q. PARK
w. 55TH J AVE N
i to
11. .
Y)
Y
in
i�
w
AR
F 1`
pppppp E
0 500 9000
Scale in feet
L: \34 \34154 \34154LOC MAY 1993 COMM. 34154
........
f ✓;.i
j
# R
S j Q i ygC
HOPE
CITY
HALL
.,w:�
)CA CJN
AVE
w �w..,. n.w ..
Eiiri
GROVE
Q. PARK
w. 55TH J AVE N
i to
11. .
Y)
Y
in
i�
w
AR
F 1`
pppppp E
0 500 9000
Scale in feet
L: \34 \34154 \34154LOC MAY 1993 COMM. 34154
Provide and install plant
materials that meet specifications
and are of the size type
and species given in plant
schedule or shown on the plans.
Remove dead or damaged
branches. Retain the natural
form of the shrub.
Place weed barrier.
Place 4" layer (After
settlement) of shredded
hardwood bark mulch or
as specified otherwise.
Place mulch to form
saucer to hold water.
Remove top 1/3 of
burlap from rootball.
Dig plant hole 1'--0"
min. larger than ball,
all sides.
Backfill with planting
soil.
Scarify bottom of
planting hole.
6 ,. I, •
� •
11
Twisted double stranded
14 Gauge wire.
8' Steel fence post
notched or drilled to
retain guy wires.
H OPE , TREE PLANTING DEIAIL
NEW i_
P N PROJ. No i
L- \34 \34GEN\34TREDET MAY 1993 COMM. 34154
Power of Attorney
KNOW ALL MEN BY THESE PRESENTS That ALLIED Mutual Insurance Company, a corporation organized
under the laws of the State of Iowa, with its principal office in the City of Des Moines, Iowa, hereinafter called 'Company',
does hereby make, constitute and appoint J. PETERS CORNETT RAMONA E. MEIER
MINNETONKA, MN
each in his individual capacity, its true and lawful Attorney -In -Fact with full power and authority to sign, seat, and execute
in its behalf any and all bonds and undertakings and other obligatory instruments of similar nature (except bonds guaran-
teeing the payment of orincipal and interest of notes, mortgage bonds and mortgages) in penalties not exceeding the sum of
ONE HUNDRED TWENTY —FIVE THOUSAND AND N01100 ($125,000.00) for bond number Bd 78999,
dated 6/23/93 with Sunram Construction as Principal and the City of New Hope, MN
ang to bmi Company thereby, as fully and to the same extent as if such instruments were signed by the duly authorized
officers of the Company; and all acts of said Attorney pursuant to the authority hereby given are hereby ratified and con-
firmed.
This Power of Attorney is made and executed pursuant to and by authority of the following By -Laws duly adopted by the
Board of Directors of the Company.
ARTICLE IX - EXECUTION OF CONTRACTS
'Section 2. Bonds, undertakings, and other obligatory instruments of similar nature, other than policies and endorsements, issued
by the Corporation shall be validly executed and binding on the Corporation when signed by the President, or a Vice President, or by
Attorneys )-In -Fact appointed by the President, or by a Vice President.'
'Section 3. The President, or a Vice President, shall have the power to appoint agents of the Corporation, or other persons, as
Attomey(s )-In -Fact to act on behalf of the Corporation in the execution of bonds, undertakings, and other obligatory instruments of similar
nature, other than policies and endorsements with full power to bind the Corporation by their signature and execution of any such instru-
ment. The appointment of such Attorney(s )-In -Fact shall be accomplished by Powers of Attorney signed by the President, or a Vice Pres-
ident.
This Power of Attorney is signed and sealed by facsimile under and by the following By-Laws duly adopted by the Board
of Directors of the Company.
ARTICLE IX - EXECUTION OF CONTRACTS
'Section 4. The Secretary, or an Assistant Secretary, is authorized to certify that any such Power of Attorney so signed shall be
validly executed and binding on the Corporation; and to certify that any bond, undertaking, or obligatory instrument of similar nature, other
than policies and endorsements, to which this Power of Attorney is attached is and shall continue to be a valid and binding obligation of the
Corporation, according to its terms, when executed by Attorney(s )-In -Fact appointed by the President or a Vice President.'
"Section 5. It shall not be necessary to the valid execution and binding effect of the Corporation of any bond, undertaking, or
obligatory instrument of similar nature, other than policies and endorsements, signed on behalf of the Corporation by the President, or a
Vice President, or Attorney(s)-in-Fact appointed by the President, or a Vice President, or any Power of Attorney executed on behalf of the
Corporation appointing Attorney(s)-In-Fact to act for the Corporation, or of any certificate to be executed by the Secretary, or an Assistant
Secretary, as hereinabove in Section 2, 3, and 4 of this Article provided, that the corporate seal be affixed to any such instrument but the
person authorized to sign such instrument may affix the corporate seal, and a facsimile corporate seal affixed to any such instrument shall
be as effective and binding as the original seal.'
'Section 6. A facsimile signature of the President, or of a Vice President, affixed to any bond, undertaking, or obligatory instrument
of similar nature, other than policies and endorsements, or to a Power of Attorney signed by such President, or a Vice President, as herein
in Sections 2 and 3 provided, or a facsimile signature of the Secretary, or of an Assistant Secretary to any certificate as herein in Section 4
provided, shall be effective and binding upon the Corporation with the same force and effect as the original signatures of any such officers.'
'Section 7. A facsimile signature of a former officer shall be of the same validity as that of an existing officer, when affixed to any
policy or endorsement, any bond or undertaking, any Power of Attorney or certificate, as herein in Section 1, 2, 3 and 4 provided.'
IN WITNESS WHEREOF, the Company has caused these presents to be signed by its President and its corporate seal to
be hereunto affixed this 31 day of JULY 1992
ALLIED MUTUAL I SURANCE COMPANY
STATE OF IOWA ®:S By: k �1��, President
COUNTY OF POLK ss e�,��
On this 31 day of JULY , 1992 , be f e e personally came James D. Kirkpatrick, to me known, who, being by me
duly sworn, did depose and say that he is President of ALL D Mutual Insurance Company, the corporation described in and which exe-
cuted the above instrument; that he knows the seal of said corporation, that the seal affixed to said instrument is such corporation seal; that
it was so affixed pursuant to authority given by the Board of Directors of said corporation and tha he has signed his name thereto pursuant
to like authority, and acknowledged the same to be the act and deed of said corporatio
Stacy Koehn��
STACY KOEHN Notary Public in an for a of Iowa
MY COMMISSION EXPIRES
, awe 11 -4 -94 CERTIFICATE
I, the undersigned, Secretary of ALLIED Mutual Insurance Company, a corporation organized under the laws of the
State of Iowa, do hereby certify that the foregoing Power of Attorney is still in force, and further certify that Section 2, 3, 4,
5, 6 and 7 of Article IX of the By -Laws of the Company set forth in said Power of Attorney are still in force.
IN TESTIMONY WHEREOF, I have subscribed my name and affixed the seal of the compan
this 23rd day of June , 19 93
' -`
ex
This Power of Attorney 0
® •`�
e a ••; w. �. Secretary
02386 07/31/95
Bd 1 (06 -92) 00
State of Minnesota )
)ss.
County of Hennepin )
My commission expires Aq �3O 1998
----------------------------------------
ACKNOWLEDGMENT OF CORPORATE SURETY
State of Minnesota )
)ss.
County of Hennepin )
My commission expires Ajj 1#.,1998
AA
�r ® TIF1TE F�:��1
ISSUE DATE (MM/DDIYY) '
SUR NCE
6/29/93
PRODUCER
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND
CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE
DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE
POLICIES BELOW.
FERRIS & PETERS AGENCY
5445 EDEN PR RD
COMPANIES AFFORDING COVERAGE
MINNETONKA MN 55345
COMPANY A
LETTER WESTERN NATIONAL INS
COMPANY B
LETTER WESTERN NATIONAL INS
INSURED
COMPANY C
LETTER
WESTERN NATIONAL INS
SUNRAM CONSTRUCTION INC
7675 TROY LANE
COMPANY
LETTER D WESTERN NATIONAL INS
MAPLE GROVE MN 55311
COMPANY E
LETTER
COVERAGES
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.
JLCTR TYPE
OF INSURANCE
�
POLICY NUMBER
POLICY EFFECTIVE
DATE (MM/DD/YY)
POLICY EXPIRATION
DATE (MM/DD/YY)
LIMITS
GENERAL
LIABILITY
BP 10 4 3 9 5
1/01/93
1/01/94
BODILY INJURY OCC.
$ 5 0 0 0 0 0
BODILY INJURY AGG.
$5 O O O O O
COMPREHENSIVE FORM
PROPERTY DAMAGE OCC.
$20 OOO
PREMISES/OPERATIONS
EXPLOSION COLLAPSE HAZARD
PROPERTY DAMAGE AGG.
$200
BI & PD COMBINED OCC.
$
PRODUCTS/COMPLETED OPER.
CONTRACTUAL
INDEPENDENT CONTRACTORS
BI $ PD COMBINED AGG.
$
PERSONAL INJURY AGG.
$ 5 0 0
BROAD FORM PROPERTY DAMAGE
.000
PERSONAL INJURY
B
AUTOMOBILE
LIABILITY
ANY AUTO
BP 10 4 3 9 5
1/01/93
1/01/94
BODILY INJURY
(Per person)
500,
BODILY INJURY
(Per accident)
$5 0 0, 000
ALL OWNED AUTOS (Priv. pass.)
offw than
ALL OWNED AUTOS ( priv. per
HIRED AUTOS
NON -OWNED AUTOS
PROPERTY DAMAGE
$
200 000
BODILY INJURY &
PROPERTY DAMAGE
COMBINED
$
GARAGE LIABILITY
Cl
EXCESS LIABILITY
B P 3 5 4 3 9 5
1/01/93
1/01/94
EACH OCCURRENCE
$2
UMBRELLA FORM
AGGREGATE
$ 2 0 00,000
OTHER THAN UMBRELLA FORM
WORKER COMPENSATION
BP 3 3 4 3 9 5— 4
1/01/93
1/01/94
STATUTORY LIMITS
AND
EACH ACCIDENT
$100
EMPLOYERS' LIABILITY
DISEASE--POLICY LIMIT
$500,000
DISEASE —EACH EMPLOYEE
$10
OTHER
DESCRIPTION OF OPERATIONS /LOCATIONSNEHICLES/SPECIIL ISMS
PROJECT: SUNNYSIDE PARK AND ELM GROVE PARK
CERTIFICATE HOLDER
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
CITY OF NEW HOPE
4401 XYLON AVENUE NORTH
MINNEAPOLIS MN 55428
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ON11fift6ftoft
MAIL 3 O DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE
LEFT
AUTHOR EPRESENTATIVE
ACORD 25'i (! /90) ?
M
(6AC.ORD CORPORATION 1990
COUNCIL
. , DMIJ 1 •
RESOLUTION APPROVING CHANGE ORDER #1 FOR IMPROVEMENT PROJECT NO.
503 (PLAYGROUND EQUIPMENT - SUNNYSIDE AND ELM GROVE PARKS) IN THE
AMOUNT OF <$9,314.00>
Change Order #1 is a deduct that includes the removal of a backhoe
digger for Elm Grove as the committee decided that they did not
want that piece of equipment, plus a change to "durascape" type
equipment instead of the "powerscape" type that the contractor bid.
The "durascape" equipment is what the City has purchased for other
parks and is quite acceptable for our needs.
The total for change order #1 is <$9,314.00> deduct to the
contract. The contract is now at $91,584.80. Staff recommends
approval of change order #1.
MOTION BY
TO:
Review: Administration: Finance:
' i1
CITY OF NEW HOPE
RESOLUTION NO. 93- 94
RESOLUTION APPROVING CHANGE ORDER #1
-- FOR IMPROVEMENT PROJECT NO. 503
(PLAYGROUND EQUIPMENT - SUNNYSIDE AND ELM GROVE PARKS)
IN THE AMOUNT OF <$9,314.00>
WHEREAS, the City of New Hope authorized on June 14, 1993,
Improvement Project No. 503, for the contractual sum of
$100,898.80; and
WHEREAS, it was decided to reduce a piece of equipment and to
choose "durascape" instead of "powerscape" equipment:
Change order #1:
Eliminate backhoe digger: <$420.00>
Switch from powerscape to powerscape
equipment: <$8,894.00>
Total:
<$9,314.00>
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City
of New Hope approves change order no. 1 to the
contract with Sunram Construction in the amount of
<$9,314.00> as part of Improvement Project No. 503 which
brings the total contract to $91,584.80.
Adopted by the City Council of the City of New Hope, Hennepin
County, Minnesota, this 28th day of June, 1993.
Mayor a
Attest:
City Clerk
Engineers & Architects
2335 West Highway 36
St. Paul, MN 55113
Bus. 612-636-4600
MN Toll Free 1-800-622-6573
F No Exceptions Taken
G. Make Noted Corrections
H. Amend & Resubmit
L
TO: C- 0 V� WE ARE SENDING YOU: ❑ -7 (r-7 ❑ ) Tr-v.�k Ltd' f, Attached ❑ Under separate cover
U Shop drawings ❑ Specifications ❑ Plans
v e, ro�j
El Copy of letter ❑ Samples Change order
1- 5 1 15 ❑
THESE ARE TRANSMITTED (see code)
A. approval
For your use
C. As requested
D. For review and comment
E. For Bids Due
19
BRA-102R
J. Resubmit
K. Submit
L. Return
— copies for review
copies for distribution
corrected prints
COPY TO: r&VL
Aoj/� 61
SIGNED: ,
� A f iwim
June 30, 1993
4401 Xylon Avenue North Telephone: 612 -531 -5100
New Hope, Minnesota 55428 -4898 TDD Line: 612 -531 -5109
Sunram Construction, Inc.
7675 Troy Lane
Maple Grove, MN 55311
SUBJECT: CHANGE ORDER NO. 1 - IMPROVEMENT PROJECT 503
City Hall Fax: #612 - 531 -5136
Police Fax: #612 - 531 -5174
Public Works Fax: #612 -533 -7650
Enclosed are two fully executed copies of the above- referenced Change Order for
your records. Please forward one copy to your bonding company.
The change order was approved on June 28, 1993, by the New Hope City Council.
If you have any questions, please contact me.
Sincerely,
*Vu� Valerie Leone
City Clerk '
enc.
cc: Mark Hanson, City Engineer
Shari French, Director of Parks & Recreation
Family Styled City For Family living
COUNCIL
A • z
Originating Department Approved for Agenda Agenda Section
Consent
Parks and Recreation 7/26/93
Item No.
. Y
I3 Y Shari French B : 6.17
RESOLUTION APPROVING CHANGE ORDER #2 FOR IMPROVEMENT PROJECT NO.
503 (PLAYGROUND EQUIPMENT - SUNNYSIDE AND ELM GROVE PARKS) IN THE
AMOUNT OF $4,026.00
Change Order #2 is for drainpipe and PVC storm sewer for the play
circles at Sunnyside Park. There is no drainage within the play
circle at the park. Because of the high water table and the excess
rains of 1993 water is standing for long periods of time and the
play area becomes unusable. The drainage and storm sewer pipe will
drain the water to Quebec Avenue and keep the play area dry and
usable.
The total for change order #2 is $4,026.00. The contract is now at
$95,610.80. Staff recommends approval of change order #2.
• a
�.
Review: Administration: Finance:
I1 1
CITY OF NEW HOPE
RESOLUTION NO. 93- 109
- RESOLUTION APPROVING CHANGE ORDER #2
FOR IMPROVEMENT PROJECT NO. 503
(PLAYGROUND EQUIPMENT - SUNNYSIDE AND ELM GROVE PARKS)
IN THE AMOUNT OF $4,026.00
WHEREAS, the City of New Hope authorized on June 14, 1993,
Improvement Project No. 503, for the contractual sum of
$100,898.80; and
WHEREAS, the City of New Hope authorized change order #1 on June
28, 1993 in the amount of <$9,314.00 >; and
WHEREAS, it was determined that drainpipe and storm sewer work is
needed at Sunnyside Park at a cost of $4,026.00.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City
of New Hope approves change order no. 2 to the
contract with Sunram Construction in the amount of
$4,026.00 as part of Improvement Project No. 503 which
brings the total contract to $95,610.80.
Adopted by the City Council of the City of New Hope, Hennepin
County, Minnesota, this 26th day of July, 1993.
�J ✓
Mayor
Attest: V A"�O tLt zc
City Clerk
LETTER OF TRANSMITTAL
im
Engineers & Architects i
W.
2335 West Highway 36
St. Paul, MN 55113
Bus. 612-636-4600
MN Toll Free 1-800-622-6573
BRA-102R
DATE
ATTENTION
RE
WE ARE SENDING YOU:
❑ Attached ❑ under separate cover
❑ Shop drawings ❑ Specifications ❑ Plans
❑ Copy of letter ❑ Samples ❑ Change order
F1
THESE ARE TRANSMITTED (see code)
A. For approval F No Exceptions Taken
B. For your use G. Make Noted Corrections
C. As requested H. Amend & Resubmit
D. For review and comment I.
E. For Bids Due
REMARKS: (ra 6
A
COPY TO:
J. Resubmit - copies for review
K. Submit copies for distribution
L. Return corrected prints
G ®' 1
4401 Xylon Avenue North Telephone: 612- 531 -5100
New Hope, Minnesota 55428 -4898 TDD Line: 612 - 531 -5109
August 11, 1993
Sunram Construction, Inc.
7675 Troy Lane
Maple Grove, MN 55311
SUBJECT: CHANGE ORDER NO. 2 - IMPROVEMENT PROJECT 503
City Hall Fax: #612 -531 -5136
Police Fax: #612 - 531 -5174
Public Works Fax: #612- 533 -7656
Enclosed are two fully executed copies of the above - referenced Change Order for
your records. Please forward one copy to your bonding company.
The change order was approved on July 26, 1993, by the New Hope City Council.
If you have any questions, please contact me.
Sincerely,
f
Valerie Leone
City Clerk
enc.
cc: Mark Hanson, City Engineer
Shari French, Director of Parks & Recreation
Family Styled City For Family Living
11�111 � 1 COUNCIL
Originating Department Approved for Agenda Agenda Section
Consent
Parks and Recreation ,
Item No.
By: Shari French I By: �/ 1 6.6
ACCEPTANCE OF PLAYGROUND EQUIPMENT PROJECT 503 - SUNNYSIDE AND ELM
GROVE PARKS AND AUTHORIZE FINAL PAYMENT
The engineers and staf recommend that the Playground Equipment
Project 503 - Sunnyside and Elm Grove parks, be accepted and final
payment be made to the contractor, Sunram Construction, Inc.
The final amount due on the project is $6,898.78. There are minor
differences between estimated quantities and actual quantities used
that amount to 9.33% over the original contract amount. This
includes sod, modular block, bituminous for paths, and the like.
Staff recommends approval and final payment to the contractor.
TO: 0 PF AztlA4 LAU itll T �
Review:
Administration:
Finance:
January 14, 1994
City of New Hope
4401 Xylon Avenue North
Minneapolis, MN 55428
Attn: Mr. Larry Watts
Finance Director
Re: Sunnyside Park & Elm Grove Park
City Project No. 503
File No. 34154
Dear Larry:
Mark O. Wallis. P.E.
Miles B. Jensen., P.E.
L. Phillip Gravel III, P.E.
Karen L. Wiemeri, P.E.
Gary D. Kristofitz. P.E.
F Todd Foster. P.E.
Keith R. Yapp, P.E.
Douglas J. Benoit, PE.
Shawn D. Gustafson, P.E.
Cecilio Olivier, PE.
Charles A. Erickson
Leo M. Pawelsky
Harlan M. Olson
James F Engelhardt
Transmitted herewith are three (3) copies of Request for Payment No. 4 & Final along with
the required, signed Minnesota Withholding Form IC -134 for the above mentioned project.
The work on this project has been satisfactorily completed and we recommend final
payment in the amount of $6,898.78 at this time. The final amount is approximately 12.64%
over the revised contract amount due to minor differences between estimated quantities bid
and actual quantities used.
Should you have any questions regarding this project, please feel free to call.
Yours very truly,
BONESTR O, OSENE, ANDERLIK & ASSOCIATES, INC.
Mar . Hanson, P.E.
MAH:pah: enc
cc: Mr. Kirk McDonald, Comm. Dev. Coordinator
34154.COR
2335 West Highway 36 • St. Paul, MN 55113 • 612 -636 -4600
Otto G. Bonestroo, P.E.
Howard A. Sanford, P.E.
Michael P Rau, P.E.
}�
Robert W. Rosene. RE.*
Keith A. Gordon, P.E.
Philip J. Pyne. P.E.
JA
,es
i ® s i.
Joseph C. Anderlik, P.E.
Robert R. Pfefferle, P.E.
Agnes M. Ring. A.I.C.P.
®sere
Marvin L. Sorvala, P.E.
Richard E. Turner. P.E.
Richard W Foster. P.E.
David O. Loskota. PE.
Thomas W. Peterson, P.E.
Michael C. Lynch, P.E.
M/'�eC'' ■ K
® de
Glenn R. Cook, P.E.
Thomas E. Noyes, P.E.
Robert C. Russek. A.I.A.
Jerry A. Bourdon, P.E.
James R. Maland. P.E.
Jerry D. Pertzsch, P.E.
!�
ss ciates
Robert G. Schunicht. PE.
Susan M. Eberlin, C.P.A.
Mark A. Hanson, P.E.
Michael T Rautmann. P.E.
Kenneth P. Anderson. P.E.
Mark R. Rolls. P.E.
*Senior Consultant
Ted K. Field. P.E.
Mark A. Seip, P.E.
Thomas R. Anderson, A.I.A.
Gary W. Morien. P.E.
Engineers & Arch itects
Donald C. Burgardt, PE.
Daniel J. Edgerton, PE,
Thomas E. Angus. P.E.
Allan Rick Schmidt, P.E.
Ismael Martinez, P.E.
Philip J. Caswell, P.E.
January 14, 1994
City of New Hope
4401 Xylon Avenue North
Minneapolis, MN 55428
Attn: Mr. Larry Watts
Finance Director
Re: Sunnyside Park & Elm Grove Park
City Project No. 503
File No. 34154
Dear Larry:
Mark O. Wallis. P.E.
Miles B. Jensen., P.E.
L. Phillip Gravel III, P.E.
Karen L. Wiemeri, P.E.
Gary D. Kristofitz. P.E.
F Todd Foster. P.E.
Keith R. Yapp, P.E.
Douglas J. Benoit, PE.
Shawn D. Gustafson, P.E.
Cecilio Olivier, PE.
Charles A. Erickson
Leo M. Pawelsky
Harlan M. Olson
James F Engelhardt
Transmitted herewith are three (3) copies of Request for Payment No. 4 & Final along with
the required, signed Minnesota Withholding Form IC -134 for the above mentioned project.
The work on this project has been satisfactorily completed and we recommend final
payment in the amount of $6,898.78 at this time. The final amount is approximately 12.64%
over the revised contract amount due to minor differences between estimated quantities bid
and actual quantities used.
Should you have any questions regarding this project, please feel free to call.
Yours very truly,
BONESTR O, OSENE, ANDERLIK & ASSOCIATES, INC.
Mar . Hanson, P.E.
MAH:pah: enc
cc: Mr. Kirk McDonald, Comm. Dev. Coordinator
34154.COR
2335 West Highway 36 • St. Paul, MN 55113 • 612 -636 -4600
6onestroo
Rosen
Anderlik S
Associates
Owner City of New Hope, 4401 Xylon Av N, Minneapolis, MN 55428 Date December 22, 1993
For Period November 9, 1993 to December 22, 1993 Request No. 4 & Final
Contractor Sunram Construction, Inc., 7675 Troy Lane, Maple Grove, MN 55311
S " 9 '"°. "`°""""
Sr. Pa W. 9. Al e tl
REQUEST FOR PAYMENT
Sunnyside Park And Elm Grove Park
Playground Equipment And Site Improvements
Project No. 503
File No. 34154
SUMMARY
1 Original Contract Amount
2 Change Order - Addition
3 Change Order - Deduction
4 Revised Contract Amount
5 Value Completed to Date
6 Material on Hand
7 Amount Earned
8 Less Retainage
9 Sub -Total
10 Less Amount Paid Previously
11 AMOUNT DUE THIS REQUEST FOR PAYMENT NO.
Recommended for Approval by:
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
9
Approved by Contractor:
SUNRAM CONSTRUCTION, INC.
$ 4,026.00
$ 8,894.00
4 & Final
$ 96,030.80
$ 108,164.55
$ 0.00
$ 108,164.55
$ 0.00
$ 108,164.55
$ 101,265.77
$ 6,898.78
Approved by Owner:
CITY OF NEW HOPE, NIN
Specified Contract Completion Date:
August 27, 1993
Date:
34154.RFP
No. Item
Part 1 - Sunnyside Park
1 Site grading and final shaping
2 Remove existing play area equipment
3 Furnish and install playground structure
with handicap access ramp
4 Furnish and install tire swing
5 Furnish and install space arch climber
6 Furnish and install 3 leg swing -
2 sections w/2 seats /section (2
enclosed tot seat) 10' high
7 Furnish and install airplane
8 Furnish and install parallel bars
9 Furnish and install "S" climber
10 Furnish and install track ride
11 Furnish and install trapeze rings
12 Furnish and install double crunch bar
13 Sand cover and spread existing sand
14 CL5 100% crushed aggreg. base for trail
15 Type 41 mod. bit. wear course (2" thick)
16 Remove concrete curb and gutter
17 Concrete curb and gutter in place
18 Timber curbing in place
19 Topsoil borrow
20 Sod
Total Part 1 - Sunnyside Park
Part 2 - Elm Grove Park
21 Remove existing concrete curb & gutter
22 Remove existing basketball court and
sand play area
23 Remove existing bituminous trail
24 Remove existing playground equipment
25 Site grading and final shaping
26 6" PVC perforated drain pipe with
geotextile fabric Type I and course
filter aggregate
34154.RFP
Contract Unit Quantity Amount
Unit Quantity Price To Date To Date
LS
1
2,000.00
1
2,000.00
LS
1
1,000.00
1
1,000.00
LS
1
16,850.00
1
16,850.00
EA
1
1,200.00
1
1,200.00
EA
1
620.00
1
620.00
EA
1
1,550.00
1
1,550.00
EA
1
560.00
1
560.00
EA
1
550.00
1
550.00
EA
1
1,625.00
1
1,625.00
EA
1
1,400.00
1
1,400.00
EA
1
1,575.00
1
1,575.00
EA
1
475.00
1
475.00
CY
200
7.50
198
1,485.00
TN
100
16.40
100
1,640.00
TN
35
46.70
42.96
2,006.23
LF
15
15.00
20
300.00
LF
15
20.00
20
400.00
LF
440
5.25
496
2,604.00
CY
15
10.00
12
120.00
SY
360
2.00
1,325
2.,650.00
$40,610.23
LF
15
15.00
23
345.00
LS
1
900.00
1
900.00
LS
1
360.00
1
360.00
LS
1
1,000.00
1
1,000.00
LS
1
2,500.00
1
2,500.00
LF
RP -1
40 25.00 40 1,000.00
34154.RFP RP -2
Contract
Unit
Quantity
Amount
No.
Item
Unit
Quantity
Price
To Date
To Date
27
8" PVC storm sewer
LF
57
22.00
57
1,254.00
28
Bends, reducer and tee for drain pipe
LS
1
300.00
1
300.00
29
Concrete curb and gutter in place
LF
15
20.00
23
460.00
30
Modular block retaining wall (beige)
SF
440
13.50
622
8,397.00
31
Class 5 100% crushed aggregate base
TN
200
14.50
248.15
3,598.18
32
Type 31 bituminous base for Bball ct.
TN
25
39.20
14.55
570.36
33
Type 41 modified bituminous wear course
(2" thick on trails, 1 -1/2" thick on ct.)
TN
58
46.60
110.21
5,135.79
34
4" concrete slab for Bball court
SF
45
3.00
57
171.00
35
Furnish and install basketball post,
back board, and goal
LS
1
1,200.00
1
1,200.00
36
Furnish and install 6' bench w/back
EA
2
375.00
2
750.00
37
Furnish and install playground structure
with handicap access ramp
LS
1
23,900.00
100%
23,900.00
38
Furnish and install tire swing
EA
1
1,200.00
- 1
1,200.00
39
Furnish and install space arch climber
EA
1
620.00
1
620.00
40
Geotextile fabric, Type V
SY
625
1.50
300
450.00
41
Furnish and install 3 leg swing -
2 sections w/2 seats /section (2
enclosed tot seat) 10' high
EA
1
1,650.00
1
1,650.00
42
Furnish and install police car
EA
1
700.00
1
700.00
43
Furnish and install backhoe digger
EA
1
420.00
44
Sand cover
CY
180
8.00
198
1,584.00
45
4' high Colorado Spruce in place
EA
6
150.00
46
Topsoil borrow
CY
300
3.00
409
1,227.00
47
Sod
SY
1,200
3.00
2,950
8,850.00
Total Part 2 - Elm Grove Park
$68,122.32
Part 3 - Liberty Park
48
Furnish and install Lexan Spiral slide
including all necessary connections
EA
1
4,300.00
1
4,300.00
Total Part 3 - Liberty Park
$4,300.00
34154.RFP RP -2
34154.RFP RP -3
Contract
Unit
Quantity
Amount
No. Item
Unit
Quantity
Price
To Date
To Date
Change Order No. 1
49 Furnish and install Durascape playground
structure with handicap access ramp in
lieu of Powerscape for Sunnyside Park
LS
1
(3,920.00)
1
(3,920.00)
50 Furnish and install Durascape playground
structure with handicap access ramp in
lieu of Powerscape for Elm Grove Park
LS
1
(4,974.00)
1
(4,974.00)—
Total Change Order No. 1
($8,894.00)
Change Order No. 2
51 6' PVC perforated drainpipe w /geotextile
fabric, Type I & course filter aggregate
LF
108
22.00
108
2,376.00
52 6" PVC storm sewer
LF
110
15.00
110
1,650.00
Total Change Order No. 2
$4,026.00
Total Part 1 - Sunnyside Park
40,610.23
Total Part 2 - Elm Grove Park
68,122.32
Total Part 3 - Liberty Park
4,300.00
Total Change Order No. 1
(8,894.00)
Total Change Order No. 2
4,016-00
Total Work Completed to Date
$108,164.55
34154.RFP RP -3
PROTECT PAYMENT STATUS
Owner
City of New Hope, MN
Project
Sunnyside Park & Elm Grove Park
Project No.
503
File No.
34154
Contractor
Sunram Construction
CHANGE ORDERS
No. Date
1 6 -16 -93 Durascape in lieu of Powerscape equipment for items 3 & 37
2 7 -22 -93 6" PVC drainpipe and storm sewer
3
Total Change Orders - Deduct
PAYMENT SUMMARY
No.
Period
1
Start 9 -9 -93
2
9 -9 -93 10 -5 -93
3
10 -5 -93 11 -9 -93
4
11 -9 -93 12 -22 -93
5
6,898.78
6
108,164.55
7
8
9
10
Total Payment to Date
Retainage, Payment No.
Total Value Completed
Amount
- $8,894.00
$4,026.00
-$4,868.00
Payment
Retainage
Completed
$70,315.89
$3,700.84
$74,016.73
10,219.79
4,238.72
84,774.40
20,730.09
5,329.78
106,595.55
6,898.78
0.00
108,164.55
$108,164.55 Original Contract $100,898.80
4 & Final 0.00 Change Orders (4,868.00)
$108,164.55 Revised Contract $96,030.80
34154.RFP RP -4
Form Minnesota Department of Revenue
IC-1 ,� W ithholding Affidavit for Contractors
This affidavit must be approved by the Minnesota Department of Revenue before the
St o f Minnesota or any of its subdivisions can make f inal payment to c
Company name
Sunram Construction, Inc.
Address
7675 Troy Lane
City State ZLp Code
Maple Grove, MN 55311
Telephone number
( 612) 420 -2140
Did you have employees work on this project? Yes
If none, explain who did the work:
Minnesota ID number
1870470
MontNyear work began
4/93
MonOVyear work ended
10/93
Total contract amount:
$100,598.80
Amount still due:
$6,898.78
Project number: 503
Project location:Sunnyside Park & L
Project owner: Ci ty of Ne ?u Hope
Address A- PI Xy, on N.
W� . , rat 5M
Check the box that describes your Involvement in the project and fill In all information requested In that category:
❑ Sole contractor
❑ Subcontractor If you are a subcontractor, fill in the name and address of the contractor that hired you:
XX Prime Contractor If you subcontracted out any work on this project, all of your subcontractors must file their own
IC -134 affidavits and have them certified by the Department of Revenue before you can file your
affidavit. For each subcontractor you had, fill in the business information below, and attach a copy
of each subcontractor's certified IC -134. (If you need more space, attach a separate sheet.)
Business name Address Owner /Officer
Minnesota PLayground, Inc. P.O. Boer 27328 -Ness Hov?e, MN Ron l c' Iman
Alter Cons t., , Inc. P.O. BoT; 399 - Rogers MN Tim Alter.
1 11 -0111-1111111oll 111.1
I declare that all information I have filled in on this form is true and complete to the best of my knowledge and belief. I authorize
the Department of Revenue to disclose pertinent information relating to this project, including sending copies of this form,
to the prime contractor if 1 am a subcontractor, and to any subcontractors if I am a prime contractor, and to the contracting agency.
Contractor's signature e Title Date
i
For cerification, mail to:
Minnesota Department of Revenue, Business Trust Tax Section
Mail Station 6610, St. Paul, MN 55146 -6610
Certificate of Compliance with Minnesota Income Tax Withholding Law
Based on records of the Minnesota Department of Revenue, I certify that the contractor who has signed this certificate has
fulfilled all the requirements of Minnesota Statutes 290.92 and 290.97 concerning the withholding of Minnesota income tax from
wages paid to employees relating to contract services with the state of Minnesota and/or its subdivisions.
^ � , r4 :,•o did
Form
Form Minnesota Department of Revenue
Rev. 11/90 Withholding Affidavit for Contractors
This affidavit must be approved by the Minnesota Department of Revenue before the
State of Minnesota or any of its subdivisions can make final payment to contractors.
Company name Minnesota to number
Alber Construction Inc. 3296212
Address PO Box 399 Month /year work began
S eptember 1993
City Stat Zip Code Month /year work ended
Rogers NN 55374 i September 1993
Please type or print clearly above. This will be your ! Total contract amount:
mailing label for returning the completed form. 12,115.81
Telephone number6l 2-42,-,752 Amount still due:
715.79
Check the box that describes your involvement in the project and fill in all information requested in that category:
❑ Sole contractor
Subcontractor If you are a subcontractor, fill in the name and address of the contractor that hired you:
Sunram Excavation - 7675 Tro d__( one —= Maple c;rnvP Mn 55311
❑ Prime Contractor If you subcontracted out any work on this project, all of your subcontractors must file their own
IC -134 affidavits and have them certified by the Department of Revenue before you can file your
affidavit. For each subcontractor you had, fill in the business information below, and attach a copy
of each subcontractor's certified IC -134. (If you need more space, attach a separate sheet.)
Business name Address Owner /Officer
I declare that all information I have filled in on this form is true and complete to the best of my knowledge and belief. I authorize
the De . rt n Qf Revenue to disclose pertinent information relating to this project, including sending copies of this form,
'Ith4nri e c ntrtor if I am a subcontractor, and to any subcontractors if I am a prime contractor, and to t c ontra cting agent
uomracior s signa urn.
m Ti mothv Al ber President
/ 4} _
For certification, mail original and one copy to:
Minnesota Department of Revenue, Business Trust Tax Section
Mail Station 6610, St. Paul, MN 55146 -6610
Certificate of Compliance with Minnesota Income Tax Withholding Law
Based on records of the Minnesota Department of Revenue, I certify that the contractor who has signed this certificate has
fulfilled all the requirements of Minnesota Statutes 290.92 and 290.97 concerning the withholding of Minnesota income tax from
wages paid to employees relating to contract s ervices with the state o f Minnesota and /or its subdivisions.
%n aulh(4t u e official IM
L ,...
Stock No. 5000134
Form
IC- 134 Minnesota Department of Revenue
°,�
Rey. peg V ithholding Affidavit for Contractors
This affidavit must be approved by the Minnesota Department of Revenue before the
State of Minnesota or any of its su ' isions can make final payment to contractors.
CORP" name S®�j " "l� @ Q� ,Mlnn9Ws ID number .
Ad es< �=—'�= � - �.c � 5J2 0 �' 2-.-.
R C) X— � a £s Monttyyear work began
cfty 4 a J \ !�,Q
state Z Code 1
Telephone number gG ^}
( (,a Q 1) S ", �- �� O 1
Did you have employees work on this project?
If none, explain who did the work:
MordNyear work ended
Total contract amount:
$49,361.66
Amount still due:
Project number: 503
Project location:
Project owner:
Address
— Elm Grove Park
4401 Xylbn Ave. N. - New Hoge, MN 55428
-- ------------------ --------------- - -----
Check the box that describes your Involvement In the project and fill In all information requested In that category:
❑ Sole contractor
® Subcontractor If you are a subcontractor, fill in the name and address of the contractor that hired you:
Sunram Construction, Inc. - 7675 Troy Lane - Maple Grove, MN 55311
❑ Prime Contractor If you subcontracted out any work on this project, all of your subcontractors must file their own
IC -134 aff idavits and have them certified by the Department of Revenue before you can file your
affidavit. For each subcontractor you had, fill in the business information below, and attach a copy
of each subcontractor's certified I10-134. (If you need more space, attach a separate sheet.)
Business name Address Owner /Officer
I declare that all information I have filled in on this form is true and complete to the best of my knowledge and belief. I authoiii
the Department of F even to disclose pertinent information relating to this project, including sending copies of this form,
to t V _ rO9(contract I � wntractor, and to any subcontractors if I am a txime contractor. and to the contractino soon,
`1-2 V 1'
For certification, mail to:
Minnesota Department of Revenue, Business Trust Tax Section
Mail Station 6610, St. Paul, MN 55146 -6610
Certificate of Compliance with Minnesota Income Tax Withholding Law
Based on records of the Minnesota Department of Revenue, I certify that the contractor who has signed this certificate has
fulfilled all the requirements of Minnesota Statutes 290.92 and 290.97 concerning the withholding of Minnesota income tax from
wages paid to employees relating to contract services with the s tate of Minnesota and/or its subdivisions.
El