Imp. Proj. #636OWNER CITY OF NEW HOPE
PROJ. NAME: NEW HOPE ICE ARENA ADDITION
PROJ. LOC. NEW HOPE, MIN
TITLE CONTRACT CLOSE-OUT LOG
DATE
PROJ.#
FILE#
29-Jan-99
9647
LOG-CLOS
BID
DIV.
CONTRACTOR
CLOSEOUT
MEMO
MAILED
MIGHTYICERT
DUCK
ADDENDU M
SU B COMPIL I
IC-134
CONSENT I
OF
SURETY
RECORD
DRAWINGS
O&M
MANUALS
WARRANTY
FINAL ICHANGE1
LIEN
WAIVER
ORDERS
SIGNED
PUNCHLIST I
COMPLETE
FINAL
P AYMENT�
SENT
1
DENNIS FEHN EXCAVATING
01-Dec-96
26-Feb-97
05-Mar-97
05-Mar-97
N/A
N/A
N/A
26-Feb-97
YES
NOT YET
2
HARDRIVES, INC.
01 - Dec -96
19-Sep-96
10-Jan-97
10-Jan-97
10-Jan-97
N/A
N/A
NIA
06-Mar-97
YES
YES
06-Mar-97
3
CURB MASTERS, INC.
01-Dec-96
18-Sep-96
20-Dec-96
30-Dec-96
30-Dec-96
N/A
N/A
NIA
20-Dec-96
YES
YES
28-Oct-98
4
TOWN COUNTRY FENCE
01-Dec-96
30-Dec-96
20-Dec-96
30-Dec-96
20-Dec-961
N/A
N/A
N/A
14-Jul-97
YES
N/A
14-Jul-97
5
HELMIN LANDSCAPING
01-Dec-96
19-Sep-96
16-Dec-96
02-Jan-97
16-Dec-96
25-Aug-97
25-Aug-97
Received
16-Dec-96
N/A
YES
28- Oct -98
6
NORTHLAND CONCRETE & MASONRY
01-Dec-96
19-Jan-98
19-Feb-97
25-Feb-97
21-Feb-97
N/A
N/A
N/A
22-Dec-97
YES
YES
26-Jan-98
7
SPANCRETE MIDWEST
01-Dec-96
23-Sep-96
Received
16-Dec-96
11 - Dec -96
29-Feb-96
N/A
11-Dec-96
_
YES
YES
24-Jul-97
8
HINES & SONS, INC.
01-Dec-96
12-Sep-96
1 0- Dec -96
16-Dec-96,
20-Dec-96
N/A
N/A
N/A
18-Mar-97
YES
YES
27-Jun-97
9
LISTUL, INC.
01 - Dec -96
04-Apr-97
04-Apr-97
1 1- Mar -97
04-Apr-97
N/A
N/A
N/A
07-Apr-97
YES
YES
09-Apr-97
10
JORGENSON INC.
01-Dec-961
25-Sep-96
11 - Dec -96
29-Jan-97
11 - Dec -96
NIA
06-Dec-96
06-Dec-96,
29-Jan-97
YES
YES
08-May-97
11
TOP-ALL ROOFING, INC.
01 - Dec -96
02-Jan-97
19-Mar-97
02-Jan-97
02-Jan-97
N/A
24-Jul-97
24-Jul-97
19-Mar-97
YES
YES
27-Aug-97
12
W. L. HALL COMPANY
01-Dec-96
13-Sep-96
16-Dec-96
16-Dec-96
16-Dec-96
Shop Drwgs
10-Dec-96
N/A
16-Dec-96
N/A
N/A
06-Mar-97
13
PRECISION METALS, INC.
01-Dec-96
N/A
12-Dec-96
N/A
16-Dec-96
N/A
20-Mar-98
N/A
15-Dec-97
YES
YES
20-Mar-98
14
MULCAHY, INC.
01-Dec-96
09-Jan-97
22-Jan-97
17-Dec-96
22-Jan-97
Shop Drwgs
27-Jan-97
27-Jan-97
22-Jan-97
YES
YES
06-Mar-97
15
OLYMPIC WALL SYSTEMS, INC.
01-Dec-96
18-Sep-96
04-Feb-97
04-Feb-97
04-Feb-97
N/A
N/A
NIA
24-Feb-97
YES
YES
08-Dec-97
16
ST. PAUL LINOLEUM & CARPET
01-Dec-96
27-Oct-97
09-Jan-97
09-Jan-97
09-Jan-97
N/A
N/A
N/A
09-Jan-97
YES
YES
27-Oct-97,
17
ARCHITECTURAL SALES OF MN
01-Dec-96
24-Sep-96
27-Mar-97
11 - Apr -97
03-Apr-97
N/A
I NIA
N/A
27-Mar-97
YES
YES
15-Apr-971
18
VALUE RECREATION
01-Dec-96
21-Jan-97
20-Mar-97
18-Apr-97
Received
N/A
NIA
N/A
03-Oct-97
YES
YES
29-May-98
19
RAINBOW, INC.
01-Dec-96
18-Dec-96
31-Dec-96
31-Dec-96
31 - Dec -96
NIA
N/A
N/A
26-Jan-98
YES
YES
26-Jan-98
20
CRYSTAPLEX U.S.A.
01-Dec-96
28-Apr-97
17-Mar-97
28-Apr-97
19-Feb-97
N/A
N/A
19-Feb-97
19-Feb-97
YES
YES
14-Aug-97
21
GARTNER REFRIGERATION, INC.
01-Dec-96
16-Sep-96,
08-Jan-98,
08-Jan-98
08-Jan-98
N/A
Received
Received
03-Oct-97
YES
YES
26-Jan-98
22
ARROW SPRINKLER, INC.
01-Dec-96
07-Aug-971
07-Aug-97
07-Aug-971
: 07-Aug-971
07-Aug-97
07-Aug-97
07-Aug-97
16-Jan-98
YES
YES
03-Feb-98
23
GENERAL SHEET METAL CORP.
01-Dec-96
30-Dec-961
31-Dec-93
21-Mar-971
30-Dec-961
03-Feb-97
05-Mar-97
Received
17-Jul-97
YES
YES
08-Sep-97
I
General Sheet Metal: Test and Balancing Report Submitted on 1/27197
-
I 24
ABEL ELECTRIC CONTRACTORS, INC.
I 01-Dec-961 10-Ap,971 10-Ap,971 20-Dec-96 1 0- Apr -97 21-Mar-97
21-Mar-971
21-Mar-97,
10-Apr-97,
YES
YES
10-Jul-97
C = Mailed to Contractor
A = Mailed to Architect
0 = Mailed to Owner
Originating Department
Parks and Recreation
B Shari French
A
Agenda Section
Consent
Item No.
6.13
ACCEPTANCE OF ICE ARENA DASHERBOARD REPLACEMENT PROJECT (IMPROVEMENT
PROJECT NO. 636) AND AUTHORIZE FINAL PAYMENT
The engineers and staff recommend that the Ice Arena Dasherboard Replacement project
(Improvement Project 636) be accepted and final payment be made to the contractor, Becker
Arena Products, Inc.
All necessary documents to close out the project have been submitted to the City by the
contractor. The final cost is $109,879.00 which is the bid price. The project was completed on
time. Staff recommends approval.
s .
TO: 1
August 17, 1998
Ms. Shari French
City of New Hope
4401 Xylon Avenue North
New Hope, MN 55428
Re: Ice Arena Dasherboard Replacement
BRA File No. 34 -98 -223
Dear Shari:
Attached are the documents needed to close out the above referenced project, including:
• Five copies of the Second and Final Request for Payment. The amount requested is
$5,493.95.
• Form IC -134 —Withholding Affidavit for Contractors.
• Document G 707 - Consent of Surety Company to Final Payment.
• Operation and Maintenance Manual — Including Record Drawings.
The contractor has satisfactorily completed the project, including all punchlist work. We
therefore recommend that this project be closed out and final payment issued as requested.
Sincerely,
4 BO ESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
lam.
G' Kristofitz, P.E.
GDK:cv
Enclosures
cc: MAH, VTV
2335 West Highway 36 ■ St. Paul, Mill 55113 w 612-636 -4600 Pax: 612 - 1311
Bonestroo, Rosene, Anderlik and Associates, Inc. is an Affirmative Action /Equal Opportunity Employer
JA
Bonestroo Principals:
Otto G. Bonestroo, PE. • Joseph C. Anderlik, RE. • Marvin L. Sorvala, RE. -
Richard E. Turner, P.E. • Glenn R. Cook, FE. • Robert G. Schunicht, P.E. • Jerry A. Bourdon, RE.
Rosene Robert
W Rosene, P.E. and Susan M. Eberlin, C.P.A., Senior Consultants
^nd erfil k &
Associate Principals: Howard A. Sanford, PE. • Keith A. Gordon, P.E. • Robert R. Pfefferle, PE.
Richard W. Foster, P.E. • David O. Loskota, P.E. • Robert C. Russek, A.I.A. • Mark A. Hanson, P.E.
Michael T. Rautmann, PE. • Ted K.Field, P.E. • Kenneth P. Anderson, P.E. • Mark R. Rolfs, RE,
S C't�tes
W illia m son, EE., L.S. • Robert F. Kotsmith • Agnes M. Ring • Michael P Rau, RE.
Sid Rick
Engineers & Architects
Offices. St. Paul, Rochester, Willmar and St. Cloud, MN • Milwaukee, WI
Website: www.bonestroo.com
August 17, 1998
Ms. Shari French
City of New Hope
4401 Xylon Avenue North
New Hope, MN 55428
Re: Ice Arena Dasherboard Replacement
BRA File No. 34 -98 -223
Dear Shari:
Attached are the documents needed to close out the above referenced project, including:
• Five copies of the Second and Final Request for Payment. The amount requested is
$5,493.95.
• Form IC -134 —Withholding Affidavit for Contractors.
• Document G 707 - Consent of Surety Company to Final Payment.
• Operation and Maintenance Manual — Including Record Drawings.
The contractor has satisfactorily completed the project, including all punchlist work. We
therefore recommend that this project be closed out and final payment issued as requested.
Sincerely,
4 BO ESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
lam.
G' Kristofitz, P.E.
GDK:cv
Enclosures
cc: MAH, VTV
2335 West Highway 36 ■ St. Paul, Mill 55113 w 612-636 -4600 Pax: 612 - 1311
t'ol m
IC 34
Rev. 9/89
Minnesota Department of Revenue
Withholding Affidavit for Contractors
This affidavit must be approved by the Minnesota Department of Revenue before the
Check the box that describes your involvement in the project and fill in all information requested in that category:
❑ Sole contractor
Subcontractor If you are a subcontractor, fill in the name and address of the contractor that hired you:
Prime Contractor If you subcontracted out any work on this project, all of your subcontractors must file their own
IC -134 affidavits and have them certified by the Department of Revenue before you can file your
affidavit. For each subcontractor you had, fill in the business information below, and attach a copy
of each subcontractor's certified IC -134. (If you need more space, attach a separate sheet.)
Business name Address Owner /Officer
I de c are that all in on I have filled in on this form is true and complete to the best of my knowledge and belief. I authorize
tt2paent of Revehue to disclose pertinent information relating to this project, including sending copies of this form,
to th hme coritraetor if I am a subcontractor, and to any subcontractors if I am a prime contractor, and to the contracting agenc
For certification, mail to:
Minnesota Department of Revenue, Business Trust Tax Section
Mail Station 6610, St. Paul, MN 55146 -6610
Certificate of Compliance with Minnesota Income Tax Withholding Law
Based on records of the Minnesota Department of Revenue, I certify that the contractor who has signed this certificate has
fulfilled all the requirements of Minnesota Statutes 290.92 and 290.97 concerning the withholding of Minnesota income tax from
wages paid to employees relating to contract services with the state of Minnesota and /or its subdivisions.
Signature of authorized Department of Revenue official Date
Who should file?
If you are a prime contractor, a contractor, or a subcontractor
who did work on a project for the state of Minnesota or any of
its local government subdivisions — such as a county, city, or
school district — you must file form IC -134 with the Minne-
sota Department of Revenue.
This affidavit must be certified and returned before the state
or any of its subdivisions can make final payment for your
work.
When to file
The IC -134 cannot be processed until you are finished with
the work. Do not send the affidavit in for certification before
the project is completed since it will only be returned to you
unprocessed. If you are a subcontractor or sole contractor,
file form lC -134 when you have completed your part of the
Project.
Minnesota tax identification number
You must fill in your Minnesota tax identification number on
the form. You must have a Minnesota tax ID number if you
have employees who work in Minnesota.
If you need a number, get form MBA, Application for Tax
identification Number, and file it with the Minnesota Depart-
ment of Revenue. To get form MBA, call 296 -3781 from the
Twin Cities area or 1- 800 - 652 -9094 from elsewhere in
Minnesota, or write to Minnesota Tax Forms, Mail Station
7131, St. Paul, MN 55146 -7131.
You do not need a Minnesota identification number if you
have no employees and did all the work yourself. If this is the
case, fill in your Social Security number in the space for
Minnesota ID number and explain who did the work.
Are you a prime contractor and a subcon-
tractor on the same project?
If you are a prime contractor, file form IC -134 when the entire
project is completed and you have received certified affidavits
from all of your subcontractors.
Where to file
Fill out form IC -134 and mail the original and one copy to:
Minnesota Department of Revenue
Business Trust Tax Section
Mail Station 6610
St. Paul, MN 55146 -6610
How to file
If you have fulfilled the requirements of the withholding tax
laws of Minnesota, the Department of Revenue will sign your
affidavit, keep the copy, and return the original to you.
If any withholding payments are due to the state, Minne-
sota law (M.S. 290.97) requires that payment must be
made by only money order, cashiers check, certified
check, or cash.
Take the certified affidavit to your prime contractor or to the
governmental unit for which the work was done in order to
receive your final Payment.
If you are a subcontractor who was hired to do work on a
project and you subcontract all or a part of your portion of the
project to another contractor, you become a prime contractor
as well. If this is the case, fill out both the subcontractor and
prime contractor areas on a single form.
Use of information
The Department of Revenue needs all the information, except
your phone number, to determine whether you have met all
state income tax withholding requirements. If all required
information is not provided, the IC -134 will be returned to you
for completion.
All information on this affidavit is guaranteed private by state
law. It cannot be given to others without your permission,
except to the internal Revenue Service, other states that
guarantee that it will be kept private, and certain state or
county agencies.
If you need help or additional information to fill out this form,
call 296 -6181 in the Twin Cities area. From elsewhere in
Minnesota and from outside the state, call (toll -free) 1 -800-
657 -3777.
- >
�.
Form Minnesota Department of Revenue
IC -1'34
Rev. 9/89 Withholding Aff idavit for Contractors
This affidavit must be approved by the Minnesota Department of Revenue before the
State of Minnesota or any of its subdivisions can make final payment to contractors.
J�, � V 4 V i I f %11 °-,i I i
Total contract amount:
Check the box that describes your involvement in the project and fill in all information requested in that category:
❑ Sole contractor
' Subcontractor If you are a subcontractor, fill in the name and address of the contractor that hired you:
t
Prime Contractor if you subcontracted out any work on this project, all of your subcontractors must i!8 etr own v .
IC -134 affidavits and have them certified by the Department of Revenue before you can file your
affidavit. For each subcontractor you had, fill in the business information below, and attach a copy
of each subcontractor's certified IC -134. (If you need more space, attach a separate sheet.)
Business name Address Owner /Officer
I declare that all information I have filled in on this form is true and complete to the best of my knowledge and belief. I authorize
the Department of Revenue to disclose pertinent information relating to this project, including sending copies of this form,
to the prime contractor if I am a subcontractor, and to any subcontractors if I am a prime contractor, and to the contracting agency,
nnntra neq cinnature n _ Title. Date
For certification, mail to:
Minnesota Department of Revenue, Business Trust Tax Section
Mail Station 6610, St. Paul, MN 55146 -6610
Certificate of Compliance with Minnesota Income Tax Withholding Law
Based on records of the Minnesota Department of Revenue, I certify that the contractor who has signed this certificate has
fulfilled all the requirements of Minnesota Statutes 290.92 and 290.97 concerning the withholding of Minnesota income tax from
wages paid to employees relating to contract services with the state of Minnesota and/or its subdivisions.
Signature of authorized Department of Revenue official Date
Who should file?
If you are a prime contractor, a contractor, or a subcontractor
who did work on a project for the state of Minnesota or any of
its local government subdivisions — such as a county, city, or
school district — you must file form IC -134 with the Minne-
sota Department of Revenue.
This affidavit must be certified and returned before the state
or any of its subdivisions can make final payment for your
work.
Minnesota tax identification number
You must fill in your Minnesota tax identification number on
the form. You must have a Minnesota tax ID number if you
have employees who work in Minnesota.
If you need a number, get form MBA, Application for Tax
Identification Number, and file it with the Minnesota Depart-
ment of Revenue. To get form MBA, call 296 -3781 from the
Twin Cities area or 1- 800 - 652 -9094 from elsewhere in
Minnesota, or write to Minnesota Tax Forms, Mail Station
7131, St. Paul, MN 55146 -7131.
When to file
The IC -134 cannot be processed until you are finished with
the work. Do not send the affidavit in for certification before
the project is completed since it will only be returned to you
unprocessed. If you are a subcontractor or sole contractor,
file form IC -134 when you have completed your part of the
r, nicer*.
If you are a prime contractor, file form 1C -134 when the entire
project is completed and you have received certified affidavits
from all of your subcontractors.
Where to file
Fill out form IC -134 and mail the original and one copy to:
Minnesota Department of Revenue
Business Trust Tax Section
Mail Station 6610
St. Paul, MN 55146 -6610
How to file
If you have fulfilled the requirements of the withholding tax
laws of Minnesota, the Department of Revenue will sign your
affidavit, keep the copy, and return the original to you.
If any withholding payments are due to the state, Minne-
sota law (M.S. 290.97) requires that payment must be
made by only money order, cashiers check, certified
check, or cash.
Take the certified affidavit to your prime contractor or to the
governmental unit for which the work was done in order to
receive your final payment.
You do not need a Minnesota identification number if you
have no employees and did all the work yourself. If this is the
case, fill in your Social Security number in the space for
Minnesota ID number and explain who did the work..
Are you a prime contractor and a subcon-
tractor on the same project?
If you are a subcontractor who was hired to do work on a
project and you subcontract all or a part of your portion of the
project to another contractor, you become a prime contractor
as well. If this is the case, fill out both the subcontractor and
prime contractor areas on a single form.
Use of information
The Department of Revenue needs all the information, except
your phone number, to determine whether you have met all
state income tax withholding requirements. If all required
information is not provided, the IC -134 will be returned to you
for completion.
All information on this affidavit is guaranteed private by state
law. It cannot be given to others without your permission,
except to the Internal Revenue Service, other states that
guarantee that it will be kept private, and certain state or
county agencies.
If you need help or additional information to fill out this form,
call 296 -6181 in the Twin Cities area. From elsewhere in
Minnesota and from outside the state, call (toll -free) 1 -800-
657 -3777,
PROJECT: New Hope Ice Arena
(name, address)
TU (Owner)
— I ARCHITECT'S PROJECT NO:
34223
City of New Hope
CONTRACT FOR: Dasher
Board Replacement
4401 Xylon Ave.
New Hope, MN 55428
CONTRACT DATE: 4/6/98
CONTRACTOR:
Becker Arena Products, Inc.
In accordanc:P with the provisions of the Contract between the Owner and the Contractur
as indicated above, the
ttirrr. 1113#171 ftamr anti adaress of +;xrrty Company)
Capitol Indemnity Corporation
SURETY COMPANY,
P. 0. Box 5900
Madison, WI 53705
on bond of (hr.rC Inmtrt
n.unr and r,,ldrrtss of Cnnlraou')
Becker Arena Products, Inc.
CONTRACTOR,
3270 County Road 42
Burnsville, MN 55337
hereby apprnve s
of the final payment to the Contractor,
and agrees that final payment to
the Contractor shalt not
relieve the Surety
Company of any cif its ubligations tU tha+l'
insert nor,+o and ,ddross of nwnerl
OWNER,
City of New Hope
as set forth in the said Surety Compnnyos bond.
IN WITNESS WHEREOr, day of June 1 ,9 98
the Surety Cnmparty has hereunto set its hand this 26th
Ca pitol Indem Corporati —
Surety Cdtnpany
Signature of Authoriz RertAu ntativc Ralph R. Zehren
Attest: Att orney in F act _
(Seal ): Title _ -- _
M NT OF [)FRTS AND
NOtt: Ihis form j., to be used w..+ +umpaniom tincument to AIA DOCUMENT G706, CONIRACTUR'S AfttuAVIT OF ►AY E
CLAIMS, CUR4nt Mitinn —
_ ONE PACE
AIA DOCUMENT 0707 , CONSENT Ut SURETY COMPANY TO FINAI PAYMtN f APRIL 1970 EDITION
•AIA®
O 1970 • THL AMERICAN INSTITUIE OF A9CHITECTS, 1735 NEW YORK AVE., Nw, WASHINGTON, D.C. 20OU6
Rosen Owner:
Anderti c
A ... .d -- For Period
REQUEST FOR PAYMENT
NEW HOPE ICE ARENA
DASHERBOARD REPLACEMENT
File No. 34 -98 -223
SUN 4ARY
1 Original Contract Amount
2 Change Order - Addition
3 Change Order - Deduction
4 Revised Contract Amount
5 Value Completed to Date
6 Material on Hand
7 Amount Earned
8 Less Retainage 0%
9 Subtotal
10 Less Amount Paid Previously
11 AMOUNT DUE THIS REQUEST FOR PAYMENT NO.
2 & Final
Recommended for Approval by:
BONJESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
Apl# ve by Contractor
Becker rena Prod. nc.
Specified Contract Completion Date:
June 24, 19998
Approved by Owner:
City of New Hope
$ 109,879.00-
$ 109,879.00
$ 109,879.00
$ 0.00
$ 109,879.00
$ 0.00
$ 109,879.00
$ 104,385.05
$ 5,493.95
--
Date:
1:\34\34223 \R EQ U E ST2. W B2
APPLIL_ .f1ON AND CERTIFICATE FO R PAY EK AIA D00JM1iNT 6702 (►t).,timI lot I.SOII I(*VC1,St' ONPOI iMil
TO t WNi ?R:
dew �
FRO CONTRA(.' ) (�
CONT'RAC'T' F(M: RAW ( b 6 6k d
PROJIiCT. WV� la ft� o� o_.._ APPLICAI'ION NO.: 3
�� PIRi()i)
''t6% t �� Z Pit )ii:Cr N3`12 -2
VIA ARC111'1TCT— CON'T'RACT I)A't'I:
At- b� �
I)i,lril)(16011 lo:
Ll
r.1 ARCHFITCT
Oft NI:R
I C( )N i'ItA(; f01(
IJ
CONTRACTOR'S APPLICATION FOR PAYMENT The tmdnd I ) licl C (r cr c k s y ibi is Appii the h( sl i)f the C(,ntrici kh inl )r
utatiou and belief the Work c'ov(-r(-d b y thi ralion for I'aynu•nt llas hero rouipleied
Application is made fur pa)nicnt, as shown hclow, in connection with III(' Contra(' in :Iccortlancc will, tit(- Conmict DocunICIlls, fi all :uuumlt, have hc•cn paid by tilt-
Continuation Sheet, AIA Docunu•nt (;70,1, is attached. fet fCC�,Cuntractur fur Work Im which previous Certiticatcs fur Payment were issued and pay-
1. ORIGINAL CONTRACT SUM ..................$ �1 S auS- n,cnts received fron, the Owner, and that cim ixaymcm shown herein is now (toe.
2. Net change by Change Orders ........... . ... $.__._ -- _- - - - - -- )IN'i' 1
3 . CONTRACT SUM TO DATE (I,ine t t 2) ........ $ -4.1 1 _ +
•i . TOTAL COMPLETED & STORED TO DATE ...... $
(Cohutul G on G703)
5. RETAINAGE:
3. of Completed Work
(CI)Itllltit., U 1 F oil G703)
b. of Stored NLucrial $_
(Colunut 1: oil G70i)
Ti)tal Rvulinage (IJI)c 511 t 5b or
'161al in Culunu) I of (;7U3) ................. $ 6. TOTAL EARNED LESS RETAINAGE ............
(Line t less I.UtC 5 'itual)
7. LESS PREVIOUS CERTIFICATES FOR PAYMENT o [
(Line 6 from prior Certific•a(c) ................. $ "
8 . CURRENT PAYMENT DUE ................. $ 1 ` l ] 0q
9. BALANCE TO FINISH, INCLUDING RETAINAGE
(Line 3 less Line 6) $
CHANGE OR UI:R SI INiNiARY
AI)UITIO
DIDUCT1
'16tal changes .Ippruvcd in
previous months by Owner
'R)tal app� rov ed this Nlonth
NET ( :IIANGI.S by Change Order
It ?•: v rn� �__
stale of iM N
( :()Unly of: ba_4b)ti
Subscribed and sworn to heli)rc
niC this I t-� d.ry of J
Notary I'ublitJ:
kly Conuuissi l Cxp
1ci `i Y..
Date:
,f LAURIE L. PRESTON
NOTARY FUZLl� 14NNESOTA
k Jt,V. My x;s_ -1 ii 31 2OW
III accordance with file Contract Docunu•nts, based on on -site ohscrvations an(i the (Iota
comprising this application, tiic Architect certifies to the Ovvner that to the best of the
Architect's knowledge, information and belief the AVork has progressed as indicated, the
quality of (lie Work is in accordance with the Contract Documents, anti the C:onw.w(or
is entitled to paymem of the AMOUNT CERTIFIED.
AMOUNT CERTIFIED. . ............. ............... $ 93 - 9 5
(Atlacl) explaneltiou i(auuurul Certified di/`/elw fi•oul the au)utolt applied fo): Initial
all figunres oil thic Application true) oil the Cowhotcttiolt Sbeet thot ore clout ged to
a,Nj'orur to the (ouonut c•erti%icd.) TqK WI}5 To 66 fNGt 11 Z�
ARCIiI ,l: IN TO LvAAp 5(/AA 044Et:T 6to-
13y: Date: V_Z-4,/'rt E
This CL-1 if to is not tiai e. The AMOUN'i` CI ?R'ITFIID is Intyable only to the Con-
tractor rut d herein. lssu. nce, payment and accepumcc of p.tynient arc without
prejudice to any rights of the Owner or Contractor tinder this Contract.
AIA DOCUMENT G702 - APPLICATION AND (THFIFICArt: I'OR PAYNIFNT • IvvL 1.1)1'1 'ION - AIA " r1992 • TIIF ANIFRICAN INS'11TUTI; OF AI$:1111T(AS, I'i5 NE )'UNK
AVF1 N \V, \%A,I IIN(;iON, DC. 20t)0652 • WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. G702 - 1992
s'
CA111101'l- `( Imlild ii an „iitiir,al AIA finrini)r.t)1 40( ii hn- 111k r:rrrlinir 1,160-1 iri i ..,I A L ) I Ih:)t , I..uun..
,i, i„ .�I., -, ins .t a•; lriay nr roil � r +„i lnnrril•� nIO mnrn� {n�'rul.
CONTINUATION SHEET AIA DO CUMENT G703 (Insiructions on reverse side)
I' V, I' O 1: PA61's
AIA DOCLIn]enl G702, APPLICA'T'ION AND CH(HFICNFE FOIL PAYN9EN'I', APPLICNHON NO.:
containing Contractor's signed Certification, is attached. APPLICAI'tON 1XIT":
In tahulatioms h(-low, aniounts are stated to the nearest dollar. PERIOD TO:
Use Cbiunu) I on C01111'.1CIS where variable retainage for line items may :apply. ARCHITECT'S PROJECT NO.:
A
If
I'T'EM
NO,
I)ES(;Itll''I'ION O1� WORK
SCIIFUt1L1 ?1>
4ALUli
WORK <;OM
-��— - — —
FROM 1114FV0US
AI'FI.I(:NFIo)N
?'I'I:I>
- —�
THIS PFRIOD
NINITRIAIS
I It1:SIiN "i'LY
S
(NO "I' IN
'I(YI'A1,
COMPi.i?'11?U
AND ST01IFl)
1't) UA'1'1;
(G, ( :)
IIAI.ANCE,
iO
FINIKII
10; I'AINAGI.
(11; VARIAIii.F)
1) (it 1�
UQS, Y, �oar�5
AIA DOCUMENT G703 • CON'HNIINHON SIIFET FOH 6702 • 1992 1 ?I)1'1'IUN • AIA "' • «)1992 • TI 11? AAWRICAN INS 1 *1'I'lITE OF AIWIIr)E(`I;S, 1735 Nb:\t- )'uRii
AVENI IF, N.W., WASI I IN(1'1ON, o.(: 2001)6 5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. 6703-1992
CAUTION: You should use an original AIA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced.
PROJECT PAYMENT STATUS
Owner
City of New Hope
Project No.
34 -98 -223
File No.
34 -98 -223
Contractor
Becker Arena Prod., Inc.
CHANGE ORDERS
Date
1
2
3
PAYMENT SUMMARY
V- Parma Pw ant Ratainaav C'mmnleterl
1
Start
06/12/98
104,385.05
5,493.95
109,879.00
2
06/12/98
07/29/98
5,493.95
Revised Contract
109,879.00
3
4
5
6
7
8
9
10
Material on Hand
Total Payment to Date
$109,879.00
Original Contract
$109,879.00
Retaina e, Payment No. 2 & Final
Change Orders
Total Amount Earned
$109,879.00
Revised Contract
$109,879.00
1 :\34\34223 \R EQU E ST2. W B2
COUNCIL
• ,, • •' •
Originating Department I Approved for Agenda I Agenda Section
Consent
Parks and Recreation 3/23/98 Item No.
B Shari French By: 6.12
RESOLUTION AWARDING CONTRACT TO BECKER ARENA PRODUCTS FOR NEW DASHER
BOARDS AND GLASS AT THE NEW HOPE ICE ARENA - $109,879 (IMPROVEMENT
PROJECT NO. 636)
Bids were received as follows on March 17, 1998 for new dasher boards and glass for the New
Hope Ice Arena, project 636:
Contractor
:.
Becker Arena Products $109,879
R &R Specialties (Crystaplex) $109,900
Rink Systems $127,760
BASSAI (Rec Group) $138,500
The 1997 CIP (Arena and Community Room) contains $121,972. Staff recommends that it be
carried over and used for this project. Staff recommends that the contract be awarded to the low
bidder, Becker Arena Products for $109,897. The work will take place this spring.
MO BY SECOND BY
to
Review: Administration:
Finance:
[ i Q17f I
CITY OF NEW HOPE
RESOLUTION NO. 98- 49
RESOLUTION AWARDING CONTRACT TO BECKER ARENA PRODUCTS FOR NEW
DASHER BOARDS AND GLASS AT THE NEW HOPE ICE ARENA - $109,879
(IMPROVEMENT PROJECT NO. 636)
WHEREAS, pursuant to advertisement for bids for new dasher boards and glass for the New
Hope Ice Arena, bids were received, opened and tabulated according to law, and
the following bids were received complying with the advertisement:
Contractor
:.
Becker Arena Products $109,879
R &R Specialties (Crystaplex) $109,900
Rink Systems $127,760
BASSAI (Rec Group) $138,500
WHEREAS, 1997 CIP contains $121,972 for this disbursement, and
WHEREAS, it appears that Becker Arena Products is the lowest responsible bidder.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of New Hope, Minnesota,
1. the Mayor and City Manager are hereby authorized and directed to enter
into the attached contract with Becker Arena Products in the name of the
City of New Hope for new dasher boards and glass at the New Hope Ice
Arena according to the plans and specifications therefore approved by the
City Council and on file in the office of the City Clerk.
2. The City Clerk is hereby authorized and directed to return forthwith to all
bidders the deposits made with their bids, except that the deposits of the
successful bidder and the next lowest bidder shall be retained until a
contract has been signed.
Adopted by the City Council of the City of New Hope, Hennepin County, Minnesota, this 23` day
of March, 1998.
r
Mayor
Attest:
City Clerk
Eonertrao, Pasene, 1nderlik and Associates, Ac. is 4fl7,fratii_ ActioblEqLr, Oppora: nit. E,ra?o,Eer
Princip als: Otto G. Bonestroo, P.E. - Joseph C. AndLrlik, !`.E. m Mar-in L. Sorval,, RE.
Richard E. Turner, RE. - Glenn R. Cook, P.E. • Robert G. Schunicht, P.E.. Jerry A. Bourdan, RE. >
Robert W. Rosene, R.E. and Susan V1. Eberlin, C.P.A., Senior Consultants
Associate Principals: Ho v_ ?rd A. S,- nford, P.E. - Keith A. Gordon, P.E. A Robert R. Ptefierle, PE
Richard W. Foster, P.E. • David O. Loskota, P.E. - Robert C. ! i s,Jt, A.I.A. - Mark A. Hanson, P.E.
Michael T. Rautmann, RE. - Ted K.Field, P.E. - Kenneth R Arvc,.rson, RE. - Mark R. Rafts, P.E.
Sidney P Williamson, P.E., L.S. - Robert F. Kotsmith
Offices: St. "aui, Rochester, Willmar and St. Cloud, MN • Milwaukee, W1
March 19, 1998
City of New Hope
4401 Xylon Av N
New Hope, MN 55428
Re: New Hope Ice Arena
Dasherboard Replacement
City Project No.
BRA File No. 34223
Dear Ms. Shari French:
Bids were opened for the project stated above on Tuesday, March 17, 1998. Transmitted herewith are
some copies of the bid tabulation for your information and file. Copies will also be distributed to each
bidder.
The following summarizes the results of the four bids received.
Contractor Base Bid
Low Becker Arena Products, Inc. $109,879,00
#2 Crystaplex $109,900.00
#3 Rink Systems, Inc. $127,760.00
#4 Recreational & Entertainment Concepts, Inc. $138,500.00
The low bidder on the project was Becker Arena Products, Inc. with a Base Bid of $109,879.00. This
compares with the engineer's estimate of $105,000. These bids have been reviewed and found to be in
order. Therefore, we recommend that the project be awarded to Becker Arena Products, Inc. for the
Total Base Bid amount of $109,879.00 in addition to the desired alternate deducts.
Should you have any questions, please feel free to call. My direct number is (612) 604 -4877.
Respectfully,
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
�ristofitz, P.E.
GDK:pah:ene
Pc: MAH, VVT
��
Bonestra
Bid No. 1
Becker Arena
Products, Inc.
Bid No. 2
Crystaplex, a Div. of
Laird Plastics, Inc.
project Name New Hope Ice Arena Dasherboard Replacement
Rosene
Owner City of New Hoe File No. 34223
Anderlik
Associate
Total
En ineers &Architects
Bid Opening 10:00 a.m., C.S.T., Tuesday, March 17, 1998
BID TABULATION
Tabulation of Four Low Bids of Four Received
1 hereby certify that this is an exact
reprod tion of bids received.
4 D. Kristo t , .E.
Registration No. 22090
No. Item Unit Qty.
Bid No. 1
Becker Arena
Products, Inc.
Bid No. 2
Crystaplex, a Div. of
Laird Plastics, Inc.
Bid No. 3
Rink
Systems, Inc.
Bid No. 4
Recreational & Entertain
-ment Conce ts, Inc.
Total
Total
Total
Total
Base Bid
1 Furnish all materials and labor for the
construction of the ice rink dasherboards Lump Sum
$109,879.00
$109,900.00
$127,760.00
$138,500.00
Total Base Bid
$109,879.00
$109,900.00
$127,760.00
$138,500.00
Alternate No.1
2 Eliminate the dasherboard sound insulation Lump Sum
($1,258.00)
($500.00)
($4,380.00)
($1,100.00)
Alternate No. 2
3 Eliminate 120 LF of the 3/8" poly backer
panel material from the north and west sides
of the rink Lump Sum
($1,606.00)
($800.00)
($3,865.00)
($1,150.00)
Alternate No. 3
4 Install new S -6" tempered glass shielding on
the east side of the rink in lieu of the 6 -6"
shielding required as part of the Base Bid Lump Sum
($1,096.00)
($1,000.00)
($1,730.00)
($1,200.00
Firm
Becker Arena
Crystaplex, a Div. of
Rink
Recreational & Entertain -
Name
Products, Inc.
Laird Plastics, Inc.
Systems, Inc.
ment Concepts, Inc.
Address
3270 Co Rd 42 W
7100 Torham Rd
1103 Hershey St
3375 N Service Rd
City, State, Zip
Burnsville MN 55337
Mississauga ON L4T 4135
Albert Lea, MN 56007
Burlington, ON, UN 3G2
Phone
612.890.2690
905.673.8072
507.373.9175
800.393.5884
Fax
612.890.2680
905.673.2696
507.377.1060
905.319.6371
By
John Reagan
Robert Snowden
Tim Horde
D.S. Cashen
Title
Vice President
Controller
Estimator /Project Mngr
Managing Director
5% Bid Security
Bid Bond
Bid Bond
Bid Bond
Bid Bond
34223 \BIDTAB.WB2 Page I
fflv �
��l "t' laJ l�3d
March 19, 1998
Honorable City Council
City of New Hope
4401 Xylon Ave. N.
New Hope, MN. 55428
Re: Proposal for Dasher Board Replacement for New Hope Ice Arena
Dear Council Members:
We respectfully request that you consider the following points, as you review and decide on the bid
results for the Replacement Dasher System. ( Bid Date: March 17, 1998)
Crystaplex previously supplied and installed the New Dasher Board System in your 2nd Rink
Addition which was built in 1996.
From all accounts, the Crystaplex Dasher System which was installed in 1996 is performing properly
with No Dasher Board related Problems encountered through the 2nd Ice season of operation.
At the present time, there is a $21.00 difference between the Base Bids of Crystaplex and Becker Arena
Products, for the replacement system for your original rink.
We request that you consider awarding the New Contract to Crystaplex, as the bid which is in,
"the owners best interest" for the following reasons:
1. Interchangeability: The New Crystaplex System would be a duplication of the current dasher
system, which would allow for interchangeability of all items, for ease of spare inventory.
(Dasher Boards do get damaged in Ice Arenas from time to time.)
While the Becker system attempts to duplicate the Crystaplex system, only another Crystaplex
System would be 100% interchangeable.
Some of the items of a significant design difference are the Alum. Shielding Support System,
Shielding Gasketing and Tempered Glass Sizing.
There would be significantly more cost than 21$, in maintaining a duplicate inventory
of Spare Posts, Gaskets, Glass and all other replacement Hdwe items.
Heed Office: 7100 Torbram Road, Mississauga, ON Canada L4T 4B5 Tel: (905) 673 -8072 Fax: (905) 673 -2696 Toll Free 1- 800 - 665 -7494
Arena Supply & Services: "fell Free 1 -800- 576 -1132 Tel (905) 671 -2170 Fax (905) 671 -9519
USAF Manufacturing Facility: 1961 Transit Road, Burt, New York, USA 14028 Tel: (716) 778 -0545 Fax: (716) 778 -0546
2. Performance: It is uncertain whether an alternate designed Support / Glass system will perform
as well as the current system. At the present time there has been no Glass breakage
with the current system.
It is widely known that the Becker Support System lacks the same Gasketing protection of the
Edges of the Tempered Glass, as the Crystaplex System.
3. Maintenance: Each dasher system design will have unique adjustment and maintenance
tendencies. By duplicating the current system, the normal maintenance routines will be
simplified.
4. Service Support: At the present time there is already one established contact for service
support for the current dasher board system.
By choosing Crystaplex a second time, the same support could be utilized, again,
keeping the service and support simplified.
In closing, we ask that you seriously consider these factors before making your final decision.
Recently, on other projects locally, other consultants have mixed and matched suppliers on the same
project, with the premise that they were saving the customer money, by taking the apparent low bid.
We have been told firsthand by these rink owners, that these are short sighted, poor decisions and ones
that they have come to regret, as the rink owners are the ones forced to live with it.
(References are available)
Thank you for your time in advance and please feel free to call with any questions on the above items
or our Dasher Board Systems. I can be reached at ph. 612- 949 -2613.
Sincerely;
Bob Vohnoutka
Western Sales
cc: J. Corbett
Bonestroo
S. French
3 -19 -1998 11 :41AM FROM VOHNOUTCAJCRYSTAPLEX 612 949 2613
To: HONORABLE CITY COUNCIL
Company: CITY OF NEW HOPE
Phone: 531 -5151
Fax: 531 -5136
0
612-949-2613 +
• 4 • ! •
cover page:
3
DEAR HONORABLE CITY COUNCIL:
WE AT CRYSTAPLEX WANTED TO RAISE SOME ISSUES AND
POINTS OF DISCUSSION, AS YOU REVIEW AND DECIDE
ON THE AWARD OF THE DASHER BOARD CONTRACT.
WE ONLY ASK THAT YOU CONSIDER THESE POINTS BEFORE MAKING
YOUR FINAL DECISION.
0
P. 1
THANK YOU FOR YOUR TIME AND PLEASE CALL WITH ANY COMMENTS!
3 -19 -1998 11:41AM FROM VOHNOUTKA /CRYSTAPLEX 612 949 2613 P.2
C MCRYSTAPLEX'
March 19, 1995
Honorable City Council
City of New Hope
4401 Xylon Ave. N.
New Rope, MN. 55425
Re: Proposal for Dasher Board 12eplacemeot for New Dope Ice Arena
Dear Council Members:
we respectfully request that you consider the following points, as you review a lld decide on the bid
results for the Replaccment Dasher System. ( Bid Date: March 17, 1998)
Oystaplex previously supplied and installed the New Dasher Board System in your 2nd Rink
Addition which was built in 1996.
From all accounts, the Crystaplex Dasher System which was installed in 1996 is performing properly
with No Dasher Board related Problems encountered through the 2nd Ice season of operation.
At the present time, there is a $21.00 difference between the Base Bids of Crymplex and Becker Arena
Products, for the replacement system for your original rink
we request that you consider awarding the New Contract to Crystaplex, as the bid which is in,
"the owners best interest" for the following reasons:
1. Interchalageabilityt The New Crystaplex System would be a duplication of the current dasher
system, which would allow for imerchangeability of all items, for ease of spare inventory.
(Dasher Boards do get damaged in Ice As from time to time -)
While the 8wAmr systeto attempts to duplicate the Crystaplex systeM, only another Crystaplex
System would be 100°/9 interchangeable.
Some of the items of a significant design difference arc the ,Alum. Shielding Support System,
Shielding Gasketing and Tempered Class Siring.
There would be sigoficardy more cost than 21$, in maintaining a duplicate inventory
of Spare Post -, Caskets, Class and all other replacement 14dwe items.
Head Office: 7100 Tcrbrum ROW, MiSSiSS3Gg3, ON C3n3Gla I_4T 4135 Tel! (AQ5) 673 -8072 Fax: (905) 673 -2696 roii Free 1 -800 -668 -7494
Arena Supply & Services: Toff Free 1-800 -576 -1132 Tel (905) 671 -2170 Fax (905) 671 -9519
USA Manufacturing Facilitr. 1961 Transit Road, Burt, New York, USA 14028 TNt (716) 778 -0545 Fax: (715) 778 -0546
3 -19 -1998 11 :42AM FROM VOHNOUTKA /ORYSTAPLEX 612 949 2613 P.3
'age 2 - Utter to Ronorable City Coond]
2. Performanec: It is uncertain whether an alternate designed Support t Glass system will perform
as well as the current system. At the present time them has Wco rto glass b Akage
with the current system.
It is widely known that the Becker Support Systont lacks the same Gasketing protection of the
Edges of the Tempered Class, as the Cxystaplex System
3. Nfaintennaw Each dasher system design will have unique adjustment and maintenance
tendencies, By duplicating the current system, the noarr W maintenance routines will be
simplified.
4. Service Support. At the present time there is already one established contaet for service
support for the current dasher board system.
By choosing Crystaplex a second time, the same support ooald be utilized, again,
keeping the service and support simplified.
In closing, we ask that you seriously consider these factors before making your final decision.
Recently, on other projects locally, other consultants have mixed and matched suppliers on the same
project, with the premise that they were saving the customer money, by taking the apparent low bid
We have been told firsthand by these rink owners, that these are short sighted, poor decisions and ones
that they have come to regret, as the rink owners are the ones forced to line with it.
(References are available)
Thank you for your time in advance and please feel flee to call with any questions on the above items
or our Dasher Board Systems. I can be reached at ph. 512- 949 -2513.
Sincerely;
Bob Vohnouft
Wester Sales
cc: J. Corbett
Bonestroo
S. French
STEVEN A. SONDRALL
MICHAEL R. LAFLEUR
MARTIN P. MALECHA
WILLIAM C. STRAIT'*'
*QUALIFIED ADR NEUTRAL
Valerie Leone
City of New Hope
4401 Xylon Avenue North
New Hope, MN 55428
RE: New Hope Ice Arena
Dasherboard Replacement
Our File No. 99.10,000
Dear Valerie:
TELEPHONE (612) 425 -5671
FAX (612) 425 -5867
LEGAL ASSISTANT
SHARON D. DERBY
Enclosed are five copies of the contracts for the above - referenced project, as well as
a fax of the insurance certificate. All are in order from a legal standpoint. You
should be receiving the original of the insurance certificate in the mail in the next few
days. Let me know if it does not arrive within a week. Be sure to note that one of
the copies of the contract is marked on the top of the cover as the "City Copy ". This
is the only copy with an original Power of Attorney for the bonds. Be sure to keep
that as the City's copy.
Thank you. Call me if you have any questions.
Sincerely,
flu
Martin P. Malecha
Assistant City Attorney
cc: Daniel J. Donahue, City Manager
Kirk McDonald, Management Assistant
Tom Schuster, Contract Manager
Mark Hanson, City Engineer
Steven A. Sondrall, City Attorney
CORRICK & SONDRALL, P.A.
ATTORNEYS AT LAW
Edinburgh Executive Office Plaza
8525 Edinbrook Crossing
Suite #203
Brooklyn Park, Minnesota 55443
May 1, 1998
4401 Xylon Avenue North
New Hope, Minnesota 55428 -4898
Becker Arena Products, Inc.
3270 County Road 42 West
Burnsville, MN 55337
City Hall: 612 - 531 -5100
Police: 612.531 -5170
Public Works: 612- 533 -4823
TDD: . 612 - 531 -5109
SUBJECT: ICE ARENA DASHERBOARD REPLACEMENT
(IMPROVEMENT PROJECT NO. 636)
City Hall Fax: 612 -531 -5136
Police Fax. 612 - 531 -5174
Public Works Fax: 612- 533 -7650
Fire Dept. Fax: 612 - 531 -5175
Enclosed are two fully executed copies of the contract documents for New Hope
Project No. 636. One copy is for your records and the second copy should be
transmitted to your bonding company. Contract documents are on file with our City
Engineer and City Attorney.
This contract was awarded by the New Hope City Council on March 23, 1998, for
$109,879.
Enclosed is return of your bid bond. Also enclosed is a "Withholding Affidavit for
Contractors" (IC -134 form). We cannot make final payment to contractors until this
is approved by the Minnesota Department of Revenue and submitted to our office
(Minnesota Statute 290.97). The form contains instructions for completion.
Sincerely,
Valerie Leone
City Clerk, CMC
enc.
cc: City Engineer
City Attorney
Director of Parks & Recreation
Family Styled City w For Family Living
SECTION 00001
I wo .4 a
w,46 - i' - wavroTim 10 400 ' wo
FILE NO. 34223
NEW HOPE, MINNESOTA
1998
CONDITIONS OF THE CONTRACT
00001.
Table of Contents
00002.
Professional Certifications
00030.
Advertisement for Bids
00100.
Information to Bidders
00300.
Proposal
00800.
Supplementary Conditions
DIVISION I - GENERAL REQUIREMENTS
01010.
Summary of Work
01030.
Alternates
01200.
Project Meetings
01300.
Submittals
01400.
Quality Control
01410.
Special Inspections
01500.
Temporary Facilities and Controls
01600.
Material and Equipment
01700.
Contract Closeout
DIVISION 11 - EQUIPMENT
11485. Ice Rink Dasherboards
Drawings
DB-1
Demolition Plan
DB-2
Dasherboard Plan
DB-3
Dasherboard Details
Conditions of the Contract
END OF SECTION
34223
(D 1998 Bonestroo, Rosene,
Anderlik & Associates, Inc.
TABLE OF CONTENTS
SECTION 00002
PROFESSIONAL CERTIFICATIONS
I hereby certify that this report, drawing, or
specification was prepared by me or under my
direct supervision and that I am a duly Registered
Professional Engineer under the laws of the State of
Minnesota.
34223
Oc 1998 Bonestroo, Rosene,
Anderlik & Associates, Inc. PROFESSIONAL CERTIFICATIONS
Date: — March 2, 1998 Reg. No. 22090
Sealed bids will be received by the City of New Hope, Minnesota in the City Hall at 4401 Xylon
Avenue until 10:00 A.M., C.S.T., on Tuesday, March 17, 1998, at which time they will be publicly
opened and read aloud for the furnishing of all labor and materials and all else necessary for the
following:
New Hope Ice Arena — Dasherboard Replacement
This project consists of the furnishing and installation of a complete set of ice rink
dasherboards, including boxes, tempered glass shielding, gates, and accessories. The
dasherboards are to be installed into the existing New Hope Ice Arena located at 4949
Louisiana Avenue North, New Hope, MN 55428
Plans and specifications, proposal forms and contract documents may be seen at the office of the City
Clerk, New Hope Minnesota, and at the office of Bonestroo, Rosene, Anderlik & Associates, Inc.,
Consulting Engineers, 2335 W. Trunk Highway 36, St. Paul, MN 55113, (612) 636-4600.
Each bid shall be accompanied by a bidder's bond naming the City of New Hope as obligee, certified
check payable to the Clerk of the City of New Hope or a cash deposit equal to at least five percent
(5%) of the amount of the bid, which shall be forfeited to the City in the event that the bidder fails
to enter into a contract.
The City Council reserves the right to retain the deposits of the three lowest bidders for a period not
to exceed 45 days after the date and time set for the opening of bids. No bids may be withdrawn for
a period of forty-five (45) days after the date and time set for the opening of bids.
Payment for the work will be by cash or check.
Contractors desiring a copy of the plans and specifications and proposal forms may obtain them from
the office of Bonestroo, Rosene, Anderlik & Associates, Inc., upon payment of a non-refundable
fee of $20.00. See "Information to Bidders" for plan/specification fee policy.
The City Council reserves the right to reject any and all bids, to waive irregularities and informalities
therein and further reserves the right to award the contract to the best interests of the City.
Shari French, Parks Director
City of New Hope, Minnesota
34223ad
I I - MRRJ�* MIN
A. BID PROPOSAL: Each planholder has been furnished a specification, plan set and one extra
proposal. Bids shall be submitted on the separate Proposal Form designated "BID COPY". The
Proposal containing the bid shall be submitted in a sealed envelope.
Reauests for Plans iiiii 1 _LL . - - t ,
Md-
, -dil
F � I
1) Plans and specifications shall only be available on a non-refundable, per plan
basis, with all contractors and vendors being charged the same. Planholders
may obtain more than one set of plans and specifications for the stipulated
amount, however, all are non-refundable.
k;) The amount for the bid package will be stated in the Advertisement for Bids.
C. INDIVIDUAL DRAWINGS AND SPECIFICATION SHEETS: Individual drawings and
specifications sheets may be purchased at the rate of Five Dollars ($5.00) per sheet of drawings and
Twenty-five cents ($0.25) per sheet of specifications for which no refund will be made.
END OF SECTION
I-AbradocAgenemUnfonnation to Bidders
1198
Bonestr
st
Rose
Bidder: Becker Arena Products, Inc. Total Base Bid $109,879.00
Anderlik &
Associate
Address: 3270 County Road 42 West Telephone No. 612.890.2690
ngineers &Archftects
City, State, Zip: Burnsville, MN 55337 Fax No. 612.890.2680
St. Paul - Mil waukee
NEW HOPE ICE ARENA
DASHERBOARD REPLACEMENT
FILE NO. 34233
NEW HOPE, MINNESOTA
1998
Opening Time: 10:00 a.m., C.S.T.
Opening Date: Tuesday, March 17, 1998
Honorable City Council
City of New Hope
4401 Xylon Avenue North
New Hope, MN 55428
Dear Council Members:
The undersigned, being familiar with your local conditions, having made the field inspections and
investigations deemed necessary, having studied the plans and specifications for the work including Addenda
Nos. 0 and being familiar with all factors and other conditions affecting the work and cost thereof,
hereby proposes to furnish all labor, tools, materials, skills, equipment and all else necessary to completely
construct the project in accordance with the plans and specifications on file with you and Bonestroo, Rosene,
Anderlik & Associates, Inc., 2335 West Highway 36, St. Paul, MN 55113, as follows:
No. Item
Base Bid
Unit Qty. Total Price
1 Furnish all materials and labor for the
construction of the ice rink dasherboards
Total Base Bid
Lump Sum $109,879.00
$109,879.00
Alternate No.1
2 Eliminate the dasherboard sound insulation
Lump Sum ($1,258.00)
Alternate No. 2
3 Eliminate 120 LF of the 3/8" poly backer
panel material from the north and west sides
of the rink
Lump Sum ($1,606.00)
34233 BIDTAB.WB2 Page I
Alternate No. 3
4 Install new 5' -6" tempered glass shielding on
the east side of the rink in lieu of the 6' -6"
shielding required as part of the Base Bid Lump Sum ($1,096.00)
The contract is awarded on the Total Base Bid
34233 BIDTAB.WB2 Page 2
The final amount of the contract shall be determined by multiplying the final measured
quantities of the various items actually constructed and installed by the unit prices
therefore, in the manner prescribed in the specifications. However, the low bidder shall
be determined by adding the sums resulting from multiplying the quantities stated by the
unit prices bid therefore.
Accompanying this bid is a bidder's bond certified check, or cash deposit in the amount of
five percent (5 %) of amount bid , which is at least five percent (5 %) of the amount of
my /our bid made payable to the Owner, and the same is subject to forfeiture in the
event of default on the part of the undersigned or failure on the part of the undersigned
to execute the prescribed contract and bond within fifteen (15) days after its submittal
to me /us.
In submitting this bid, it is understood that the Owner retains the right to reject any and
all bids and to waive irregularities and informalities therein and to award the contract to
the best interests of the Owner.
In submitting this bid, it is understood that payment will be by cash or check.
It is understood that bids may not be withdrawn for a period of 45 days after the date and
time set for the opening of bids. It is understood that the Owner reserves the right to
retain the certified check or bond of the three lowest bidders as determined by the Owner
for a period not to exceed 45 days after the date set for the opening of bids.
Respectfully submitted,
(A Corporation)
Becker Arena Products, Inc. (An Individual)
Name (A Partnership)
R "9"
Signer
Vice President
Title
John Reagan
Printed Name of Signer
34233 BIDTAB.WB2 Page 3
SECTION 00800
SUPPLEMENTARY CONDITIONS
f ♦ f M
1.01 SECTION INCLUDES
A. The Supplementary Conditions modify, delete or add to the Conditions of the
Contract.
17:�71If► :� �1�#�17Tf�1`►!fiK ' • . ► :: • qtr II • ►
2.01 AMENDMENT TO ARTICLE 1.14 ENGINEER
A. The term "Engineer" shall be taken to mean "Engineer or Architect ". The
"Engineer /Architect" shall be the authorized representative of the entity named in the
Contract Documents. The terms "Engineer" and "Architect" can be used
interchangeably.
2.02 AMENDMENTS TO ARTICLE 2.2 INTERPRETATION OF QUANTITY ESTIMATES
A. This article shall be deleted. There shall be no Quantity Estimates as part of this
project.
2.03 AMENDMENTS TO ARTICLE 2.10 EVALUATION OF PROPOSALS
A. Delete all references to unit prices and unit price Proposals. There shall be no unit
prices as part of this project.
A. To clarify the Order of Precedence, the Agreement shall have the highest priority
followed by the other documents in the order listed.
2.05 AMENDMENTS TO ARTICLE 6.6 WARNING SIGNS AND BARRICADES
A. Delete references to the need for colored lights and night protection by colored signal
lights.
2.06 AMENDMENTS TO ARTICLE 7.1 ENGINEER'S STATUS AND AUTHORITY
A. Amend paragraph 3 as follows:
1.
Delete references to "resident project representative ". A full -time Resident
Project Representative will not be required on this project.
34223
U 1998 Bonestroo, Rosene, 00800 -1
Anderlik & Associates Inc. SUPPLEMENTARY CONDITIONS
2.07 AMENDMENTS TO ARTICLE 7.4 ASSIGNMENT OF CONTRACT
A. The Contractor shall not be required to "...perform with his own organization, work
amounting to not less than 50 percent of the total original contract price".
2.08 AMENDMENTS TO ARTICLE 8.1 QUALITY OF EQUIPMENT AND MATERIALS
A. Substitutions will only be allowed by prior written approval during the bidding
process or as otherwise noted in Section 01600 Material and Equipment.
2.09 AMENDMENTS TO ARTICLE 9.1 DETAILED BREAKDOWN OF CONTRACT
AMOUNT
A. Delete reference to unit prices.
2.10 AMENDMENTS TO ARTICLE 9.2 REQUEST FOR PAYMENT
A. Delete reference to unit prices.
A. The date of Final Inspection must occur on or before the Substantial Completion Date
specified in the Contract Documents or liquidated damages shall be enforced. All
deficiencies listed during the Engineer/Architect's Final Inspection must be
completed within fourteen (14) days after the date of Final Inspection or liquidated
damages shall be enforced.
awasm cagrol
A. Amend paragraph I as follows:
1. Delete references to unit prices.
2.13 AMENDMENTS TO FORM OF AGREEMENT
A. Amend Article III as follows:
1. Delete reference to unit prices and the schedule of quantities.
34223
Of 1998 Bonastroo, Rosene,
Ander.U- & Associates Inc. 00800-2 SUPPLEWNTARY CONDMONS
B. Amend Article IV as follows:
1. Component parts of Specifications shall be:
a. Bid Documents (Advertisement for Bids, Addenda, Instructions to
Bidders, Bid Forms - Proposal, Bid Bond).
b. Conditions of the Contract.
Supplementary Conditions.
d. Agreement.
e. Performance Bond.
f. Labor and Material Payment Bond.
9- Technical Specifications.
h. Detail Plates and other drawings attached to the Specifications.
END OF SECTION
34223
(0 1998 Bonestroo, Rosene,
Anderlik & Associates Inc. 00800-3 SUPPLEMENTARY CONDITIONS
SECTION 01010
PART 1 - GENERAL
1.01 PROJECT DESCRIPTION
A. Contractor shall supply all labor, materials, transportation, apparatus, equipment and
services required to provide the dasherboard fabrication and installation for the New
Hope Ice Arena, as described in the contract documents.
A. The Owner retains the option of issuing separate contracts for other work in
connection with the project.
1.03 OWNER
A. City of New Hope is designated as the Owner.
A. Bonestroo, Rosene, Anderlik and Associates, Inc., is designated as the Engineer.
1.05 LAYOUT
A. The Dasherboard Contractor shall be responsible to layout the locations of the
dasherboard anchor drill -in inserts and to install the inserts into the concrete
perimeter slab.
B. The Dasherboard Contractor shall field measure the existing ice rink perimeter slab
prior to the manufacture of any components to ensure that the new dasherboards
conform to the existing conditions.
A. Extent of specifications and drawings defining work to be performed under this
project is listed in the Table of Contents and any addenda subsequently issued
amending those sections. It is the bidder's sole responsibility to verify that they have
received all sheets of drawings and specifications. No claim for additional
compensation will be allowed due to lack of complete information at time of bid.
B. It is expected that in the event that any of these specifications are not clear or if there
are any discrepancies, these will be brought to the attention of the Engineer prior to
submission of bids and a decision in writing will be rendered as soon as possible.
34223
1998 Bonestroo, Rosene,
Anderlik & Associates, Inc.
01010 -1
SUMMARY OF WORK
1.07 CONTRACT PERIOD
A. The project completion dates, as defined in the Supplementary Conditions shall be:
1. Substantial Completion: June 10, 1998.
2. Final Completion: June 24, 1998.
B. On the substantial completion date, the project shall be completed to a point where
the Owner can begin to make ice on the rink.
C. The completion dates described are based on a proposed contract award date of
March 23, 1998.
A. Liquidated damages, as specified in the Supplementary Conditions, shall be Five
Hundred Dollars ($500.00) per calendar day. Refer also to Conditions of the
Contract 3.6 contract time and 3.9 liquidated damages.
1.09 SEQUENCE OF WORK/OWNER OCCUPANCY
A. The general sequence of work shall be at the option of the Contractor, subject to the
approval of the Engineer and the Owner. However, work shall be carried on
simultaneously at as many points as will, in the judgement of the Engineer and
Owner, enable the work to be completed within the prescribed time. The Contractor
shall submit a construction schedule for Owners approval.
END OF SECTION
34223
CD 1998 Bonestroo, Rosene,
Anderlik & Associates, Inc.
nuffull
SUMMARY OF WORK
SECTION 01030
IMM
A. This section identifies each alternate by number, and describes the basic changes to
be incorporated into the work as part of that alternate. Refer also to the technical
specifications and drawings for information.
B. Alternates may be accepted by the Owner in any order and may be used to determine
the low bidder.
A. Alternate No. 1. Eliminate the dasherboard sound insulation specified in Section
11485.2.02.0.
B. Alternate No. 2. Eliminate 120 lineal feet of the 3/8" poly backer panel material from
the north and west sides of the rink.
C. Alternate No. 3. Install new 5'-6" height tempered glass shielding on the east side
of the rink, instead of the 6'-6" height shielding required under the base bid.
END OF SECTION
34223
(D 1998 Bonestroo, Rosene,
Anderlik & Associates, Inc.
ALTERNATES
SECTION 01200
am
A. A preconstruction meeting will be scheduled within five days after receipt of signed
contract documents.
B. The Contractor shall provide attendance by authorized representatives of the
Contractor and any major subcontractors.
A. Progress meetings may be scheduled by the Engineer.
B. Persons designated by the Contractor to attend and participate in the project meetings
shall have all required authority to commit the Contractor to solutions agreed upon
in the project meetings.
C. Subcontractors, material suppliers, and others may be invited to attend project
meetings in which their aspects of work are involved.
34223
(D 1998 Bonestroo, Rosene,
Anderlik & Associates, Inc.
PROJECT MEETINGS
SECTION 01300
SUBMITTALS
PART1- GENERAL
1.01 PROGRESS SCHEDULE
A. Prepare and submit an estimated progress schedule for the work prior to the issuance
of the Notice to Proceed.
B. Maintain one copy of the progress schedule at the job site.
C. During construction revise the progress schedule as necessary to conform to the
current status of the work. Submit revised copies of the progress schedule, as
required.
1.02 SUBCONTRACTOR LIST
A. Prepare and submit a complete list of all subcontractors. Include the subcontractors
name, address, telephone number, and contact person.
A. Subrnit five copies of shop drawings and product data required. Three copies will
be retained and two copies will be returned to the contractor. Submit a reproducible
sepia of all drawings larger than 11" x 17 ".
B. Shop drawings and product data shall be submitted with the contractor's stamp of
approval. Shop drawings and product data submitted without this stamp will not be
reviewed and will be returned to the contractor for their approval and resubmission.
C. Shop drawings and product data shall be clearly identified as to project, contractor,
manufacturer, specification section and item submitted. Any substitutions or
deviations from the requirements of the contract documents shall be noted in writing.
D. Make all shop drawings accurately to a scale sufficiently large to show all pertinent
aspects of the item and its method of connection to the work.
E. Clearly mark each copy of product data to identify information being submitted and
delete information which does not apply. Supplement standard information as
necessary. Show dimensions and other selected characteristics.
F. Maintain one copy of approved shop drawings and product data at the site with the
record drawings.
34223
Or 144$ Bonestroo, Rosene,
Anderlik & Associates, Inc. 01300 SUBMITTALS
1.04 SAMPLES
A. Samples shall be clearly identified as to project, contractor, manufacturer,
specification section, product, type, color range, texture, finish and other identifying
data.
B. Samples shall be accompanied by a letter of transmittal with the contractor's approval
and other supporting information.
C. Submit two samples of each item required, unless otherwise specified. The Owner
will retain one approved sample and the Engineer will retain one.
1.05 TEST REPORTS
A. Submit three copies of all inspections, tests and approvals required in the contract
documents.
END OF SECTION
34223
c0 1998 Bonestroo, Rosene,
Anderlik & Associates, Inc. 01300-2 SUBMIrrAM
SECTION 01400
QUALITY CONTROL
I i 1 �:i'� i• '
A. Cooperate with the Owner's selected testing laboratory and all others responsible for
testing and inspecting the work.
B. The Owner will pay for initial testing services.
C. When the initial tests indicate noncompliance with the contract documents, all
subsequent retesting shall be performed by the same testing agency and the costs for
retesting shall be paid by the Contractor.
1.02 SAMPLES
A. Unless otherwise provided in the specifications, the contractor shall provide all
materials, samples, mock -ups or assemblies for all tests specified in various sections
of specifications or as directed by Engineer.
1.03 TESTING STANDARDS
A. Tests shall be provided and accomplished in accordance with the standard used as the
reference for the particular material or product, unless other test methods or criterion
are specified. In the absence of a reference standard, tests shall be accomplished in
accordance with applicable ASTM Standards of Test Methods.
1.04 QUALIFICATION TESTING
A. In addition to tests specified, should the contractor propose a product, material,
method of assembly that is of unknown or questionable quality to the Engineer, the
Engineer may require and order suitable tests to establish a basis for acceptance or
rejection. Such tests will be paid for by the contractor, or by the subcontractor
requesting approval. "Standard" test reports or reports on "similar" material will not
be accepted.
B. The Owner and Engineer reserve the right to require certification or other proof that
the material, assembly, equipment or other product proposed to be furnished for this
project is in compliance with any test or standard called for. The certificate shall be
signed by a representative of the independent testing laboratory or a responsible
official of the firm supplying the product, as acceptable to the Owner and Engineer.
The certificate shall be a sworn statement and shall be notarized.
34223
O 1998 Bonestroo, Rosene,
Anderlik & Associates Inc. 0 - 1 QUALITY CONTROL
C. Any tests required to qualify the contractor or any of their workmen for any phase of
the work, and any test of a method, system or equipment that may be required by
specification or law to qualify the item use, shall be made or taken without cost to the
Owner or Engineer.
1.05 INSPECTIONS
A. Should specifications, Engineer's instructions, laws, ordinances, or any public
authority require any work to be inspected or approved, contractor shall give timely
notice of its readiness for inspection and a reasonable date fixed for such inspection.
If any work should be covered up without approval or consent of approving agency,
or Engineer, it must be uncovered for examination at contractor's expense.
END OF SECTION
34223
O 1998 Bonestroo, Rosene,
Anderlik & Associates, Inc. 01400 -2 QUALITY CONTROL
SECTION 01500
A. Temporary heat as required during construction to protect the work from freezing or
frost damage, and to ensure suitable working conditions, will be furnished by the
Owner. In areas of the building where work is being conducted, the temperature will
be maintained at not less than 50 °F.
A. Temporary light and power for the dasherboard installation work will be furnished
by the Owner. The Owner will pay all costs for electric current used. Power will be
120/208 V, 3 phase, 60 cycle.
1.03 ACCESS TO SITE
A. Access to the site for delivery of construction material or equipment shall be made
only from locations designated by the Owner.
A. The Dasherboard Contractor's installation employees may use the permanent
Restroom Facilities in the existing arena.
34223
Oc 1998 Bonestroo, Rosene,
Anderlik & Associates, Inc.
TEMPORARY FACILITIES AND CONTROLS
SECTION 01600
1.01 SUBSTITUTIONS
A. Whenever materials or equipment are specified or described in the contract
documents by using the name of a proprietary item or the name of a particular
manufacturer, fabricator, supplier, or distributor, the contractor must supply the
product named unless they have written authority from the Engineer to make a
substitution.
B. Substitute items of material and equipment shall be subject to the review and
approval of the Engineer.
C. During the bidding process, no substitution will be considered unless written request
has been submitted to the Engineer for approval at least ten (10) days prior to bid
date.
D. Each request for substitution shall include a complete description of the proposed
substitute, the name of the material or equipment for which it is to be substituted,
drawings, cuts, performance and test data, and any other data or information
necessary for a complete evaluation, along with a completed substitution request
form.
E. If the Engineer approves any proposed substitution, such approval will be set forth
in an Addendum.
E. The Contractor shall not be relieved from the responsibility of furnishing material or
equipment equal in quality, design, and efficiency to those specified.
G. If a substitution is allowed for any reason, the Contractor shall bear full responsibility
for fitting that substitution into the project and shall make any necessary adjustments.
No extra payment shall be made for extra work made necessary by a substitution
requested by the Contractor.
34223 01600 -1
O 1998 Bonestroo, Rosene,
Anderlik & Associates, Inc. MATERIAL AND EQUIPMENT
Substitution Request
AN
SPECIFIED ITEM:
Section Page Paragraph Description
The undersigned request consideration of the following:
Attached data includes product description, specifications, drawings, photographs, performance and
test data adequate for evaluation of the request, applicable portions of the data are clearly identified.
Attached data also includes a description of changes to the Contract Documents that the proposed
substitution will require for its proper installation.
The undersigned certifies that the following paragraphs, unless modified by attachments are correct:
1. The proposed substitution does not affect dimensions shown on Drawings.
2. The undersigned will pay for changes to the building design, including engineering design,
detailing and construction costs caused by the requested substitution.
3. The proposed substitution will have no adverse affect on other trades, the construction
schedule or specified warranty requirements.
4. Maintenance and service parts will be locally available for the proposed substitution.
The undersigned further states that the function, appearance and quality of the proposed substitution
are equivalent or superior to the specified item
Submitted by:
Signature:
Firm:
Address:
Date:
Telephone:
For use by the A/E
❑ Approved ❑ Approved as noted
❑ Not Approved ❑ Received too late
By:
Date:
Remarks:
END OF SECTION
34223 01600-2
4998 Bonestroo, Rosene,
Anderlik & Associates, Inc.
MATERIAL AND EQUIPMENT
SECTION 01700
CONTRACT CLOSEOUT
PART 1-GENERAL
1.01 CLEANING
A. Prior to the inspection for substantial completion of the work, remove waste material
and rubbish from the building and site. Remove protective coatings, barriers, and
other protective devices, temporary work and surplus materials.
B. Wash and polish glass on both surfaces.
C. Maintain the work in a clean condition until the work is substantially complete.
D. After substantial completion, remove waste material and rubbish and clean up dirt
caused by the work.
E. Upon completion of the work, remove tools, construction equipment, machinery and
surplus materials from the building and site.
1.02 PROJECT RECORD DOCUMENTS
A. Maintain a set of drawings and specifications at the job site for documentation of
changes to the contract documents. Identify the documents with the title "RECORD
DOCUMENTS - JOB SET".
B. Throughout the progress of the work, maintain an accurate record of all changes in
the Contract Documents. Clearly describe the change by note and by graphic line.
Date all entries.
C. Dimension the centerline of each item within 1". Clearly identify the item by
accurate note. Show the vertical location of the item.
D. Submit the final Record Documents for review and approval prior to final payment.
A. Prepare and submit Operating and Maintenance Manuals and instruct the Owner's
personnel in the use and maintenance of all operating equipment.
A. Submit warranties and bonds as specified in the Contract Documents.
B. Submit two copies of each submittal, neatly typed and in orderly sequence.
34223
0 1998 Bonestroo, Rosene, 01700-t
Anderlik & Associates, Inc. CONTRACT CLOSEOUT
C. Provide complete information on each item including product item, firm, date of
warranty, bond or service contract, contract requirements, and contractor's name.
1.05 REINSPECTION FEES
A. If the Engineer is required to perform reinspections due to failure of the work to
comply with the claims of status of completion made by the contractor or due to
problems with the methods or materials of construction:
L Owner will compensate Engineer for such additional services.
2. Owner will deduct the amount of such compensation from the final payment
to the Contractor.
1.06 SUBSTANTIAL COMPLETION
A. The work shall be considered substantially complete when the Engineer issues a
Substantial Completion Certificate.
B. The following items shall be completed prior to issuing the certificate:
1. Work shall be clean.
2. The work shall be usable by the Owner for it's intended purpose.
3. A punch list inspection shall be completed.
4. The work shall be completed to a point where the Owner can begin to make
ice on the rink.
I 1• 1
A. Upon completion of the project work and as a condition of final payment, the
contractor shall prepare and submit to the Engineer for transmission to the Owner,
all exhibits required by the Project Manual including:
1. Consent of Surety to Final Payment.
2. Affidavit of Payment of Withholding of Income Taxes Before Final Payment.
3. Guarantees and Warranties.
4. Record Documents - Job Set.
5. Operating and Maintenance Data.
END OF SECTION
34223
V 1998 Bonestroo, Rosene, 01700 -2
Anderlik & Associates, Inc. CONTRACT CLOSEOUT
Form MInnesota Department of Revenue
IC-1 34
, , 190 Withholding Affidavit for Contractors
This affidavit must be approved by the Minnesota Department of Revenue before the
State of Minnesota or !a of its subdivisions can make final payment to contractors.
LL�77-71.
1
-11111111111111111111111 7 15P1111 = :`� . I
Please type or print clearly above. This will be Your Tom contiva immum
mailing label for returning the completed form.
ToWphamo marAW Armum still fta:
7 Subcontractor If you are a subcontractor, fill in the name and address of the contractor that hired you:
Prime Contractor It you subcontracted out any work on this project, all of your subconvactors must Me their own
IC-13-e affidavits and have them certified by the Department of Revenue before you can Me your
atfidavit. For each subcontractor you had, fill in the business information below, and attach a copy
of each subcontractor's certified IC-1 34. (if you need more space, attach a separate sheet)
Business narne Address Owner/Offitw
I dedwe that all inkiormOm I haro-O fftd in on dus form is MA " cwroWe to the b" of my knowWdp ww b". I autionze
ft Depaniniont of Riivww" to disclo" pw*wt irtlamumm rWWOV to this WojeM kvkx*V serocong =p" of this form.
to p&ft convacw it I wn a uftowvacior, and to !a siticantractm it I am a prUm omWactor. and to the conygcft mm.
c4mimcmes Ow"" Tift om
For certification, mail original and one copy to:
Minnesota Department of Revenue, Business Trust Tax Section
Mail Station 6610. St. Paul, MN 55146-6610
Certificate of Compliance with Minnesota Income Tax VAthholding Law
Based on records of the Minnesota Department of Revenue. I certify that the contractor who has signed this certificate has
fulfilled ail the requirements of Minnesota Statutes 290.92 and 290.97 concerning the withholding of Minnesota income tax frc
wages paid to employees relating to contract services with the state of Minnesota and/or its subdivisions.
This affidavit must be certified and
returned before the state or any of its
subdivisions can make final payment for
your work.
N any withholding payments are due
to the state, Minnesota
290.97) requires that payment must
be made by only money order,
cashiers check, certified check, or
cash.
I f W - roi ♦ ♦ S.W.
tM.
IC-I 34 when the entire project is
liamplated and you have recerved
cerIffied affidavits from all of your
subcontractors.
ofigina) and one copy to:
Minnesota Department of Revenue
Business Trust Tax Section
Mail Station 6610
St. Paul, MN 55146-6610
contractor or to the govemnmwentaJ un*
receive your final payment.
SPECTATOR
-
GL55 SNG
HIE LDITEMPERED---------
a�
o S
EXTRUDED ALUMINUM - - L4'-
3/4'0 X 2" LENGTH
STAINLESS STEEL
S HIELD SUPPORT POST
BOLT k WASHER
t' ETHYLENE CAPRAL
2 3/4'
STAP RAIL SUPPORT
" X 4 5/8' X 1/2 "�
AN2' X 2' X 3/16'
STEEL BASE PLATE
1/OLYETHYLENE
2' X 2" X 1/4' —``
FA
STEEL BASE ANGLE
STAPRAL SUPPORT
3 /B' POLYETHYLENE
TU' X I X 3/32'
BACKER
J-L—W-NE
STACING SUPPORT
M2- X 2' X 3/16'
SEE DETAIL F {DB3 FOR
IO1/2" POLYETHYLENE
SHIE LD SUPPORT
KICTE
POST FRYING
SETAIL F /OB3 FOR
NSTA11 DASHER
AN ASSEMBLY
NSUTAT.. AS
BESCRIDEO IN
EX SANG
THE SPECIFICATIONRINOOR
EXISTNG CONCRE
PERIMETER SUB
n D ASHER BOAR D SECTION
scPle h rest
3' -0" HIGH TEMPERED
GLASS SHIELDING
—1" POLYETHYLENE CAPRAL
—1/2' POLYETHYLENE FACING —�,
18' 1 1/2' X 9 1/Y
3/8 R ' POLY BENCH
i a R 1/2' POLY
IS
{ /
10'
1/2" POLY
N-3/8" RUBBER MATTING T-SEE FJO
3J4' FIRE TREATED FlgEW000 FOR ANCHOR
ASSEMBLY
STEEL ANGLE FRAMEWORK
W /ADJUSTABLE BASES
e PLAYER BOX S ECTION _
scPle m r,A1
1' X 1' -8' X 6' -0'
POLY TABLE
STEEL TABLE
BRACXET (3)
1 1/2" X 1 1/2" X 1 /5'
STEEL ANGLE FRNAING
r
3/6' POLYETHYLENE
BACIONG
X ST ELECTRICAL �
BO 1
ACCESSORIES CONDUITS k j 1
ACCESSORIES IMTD EAST
510E OF OFFICML'S BOX i
3/e" RUBBER MATTING SEE F /083
3/4' FIRE TREATED PLYWOOD FOR ANCHOR
STEEL ANGLE FRAMEWORK ASSEMBLY
DJ
w /AUSTABLE BASES
e OFFICIAL' BOX S ECTION
Scale in reef
n DASHER ANCHOR DETAIL
NO SCALE
5 /B "o
BOLT 1
4' X
STEEL
n ANCHOR DETAIL
NO SCALE
3' -0' HIGH TEMPERED
GLASS SINELOINC
—1` POLYETHYLENE CAPRAIL
—t /2` POLYETHYLENE FACING
5'-D'
f PoL ,
2BENCH 1/2
1/2' POLY
1/3' POLY
' IGH TEMPERED
EUDING
POLYETHYLENE
RA L
POLYETHYLENE
ING
1 - 3/8" RUBBER MATRNG L SEE '/D3 SEE G /083J°
�— 3/4' FIRE TREATED FIREWOOD FOR ANCHOR FOR ANCHOR
ASSEMBLY ASSEMBLY
STEEL ANGLE FRAMEWORK
W /ADJUSTABLE BASES
PENALTY BOX SECTION n SECTION
0 0 1
som4 m re4L same vP lect
EXTRUDED ALUMINUM
SHIELD SUPPORT POST
1 1/2* X 2 1/2' X 1/4" -
1" POLYETHYLENE CAPRAL
STEEL BASE ANGL£
STEEL CAPRAL SUPPORT
3/4'0 X 2" LENGTH
STAINLESS STEEL
ANGLE 2'
BOLT k WASHER
1/2" POLYETHYLENE
2 3/4'
3' -0' HIGH TEMPERED
" X 4 5/8' X 1/2 "�
GIASS SHIELDING
STEEL BASE PLATE
TUBE I" X i' X 3/32'
2' X 2" X 1/4' —``
STELL FACING SVPPOftT
STEEL BASE ANGLE
�'1"II'IT'
I' �— .-BE 2' DU. SPEAKHOLE
1' X 1' -8' X 6' -0'
POLY TABLE
STEEL TABLE
BRACXET (3)
1 1/2" X 1 1/2" X 1 /5'
STEEL ANGLE FRNAING
r
3/6' POLYETHYLENE
BACIONG
X ST ELECTRICAL �
BO 1
ACCESSORIES CONDUITS k j 1
ACCESSORIES IMTD EAST
510E OF OFFICML'S BOX i
3/e" RUBBER MATTING SEE F /083
3/4' FIRE TREATED PLYWOOD FOR ANCHOR
STEEL ANGLE FRAMEWORK ASSEMBLY
DJ
w /AUSTABLE BASES
e OFFICIAL' BOX S ECTION
Scale in reef
n DASHER ANCHOR DETAIL
NO SCALE
5 /B "o
BOLT 1
4' X
STEEL
n ANCHOR DETAIL
NO SCALE
3' -0' HIGH TEMPERED
GLASS SINELOINC
—1` POLYETHYLENE CAPRAIL
—t /2` POLYETHYLENE FACING
5'-D'
f PoL ,
2BENCH 1/2
1/2' POLY
1/3' POLY
' IGH TEMPERED
EUDING
POLYETHYLENE
RA L
POLYETHYLENE
ING
1 - 3/8" RUBBER MATRNG L SEE '/D3 SEE G /083J°
�— 3/4' FIRE TREATED FIREWOOD FOR ANCHOR FOR ANCHOR
ASSEMBLY ASSEMBLY
STEEL ANGLE FRAMEWORK
W /ADJUSTABLE BASES
PENALTY BOX SECTION n SECTION
0 0 1
som4 m re4L same vP lect
EXTRUDED ALUMINUM
SHIELD SUPPORT POST
1" POLYETHYLENE CAPRAL
STEEL CAPRAL SUPPORT
ANGLE 2'
1/2" POLYETHYLENE
FACING
STEEL CAPRNL SUPPORT
3 /B' POLYETHYLENE
TUBE I" X i' X 3/32'
BACKER
STELL FACING SVPPOftT
ANGLE 2' X 2' X 3/16'
1' X 2' POLYETHYLENE
10' X 1/2" PDLYETHYLENE
KICNPIATE
CLOSURE PIECE
SEE DETAIL F {DB3 FOR
j
ANCHOR ASSEMBLY
RIINKDFLODR D�
e
/ — 8 EACHERwAK C
H DASHERBOARD SECTION AT BLEACHERS
ScP1e in feet
dmm° a
c way
■ N�
0
z � Y1
w J
: � Z c.. aO
W w
� � K
Q p O
K
dUmw
O
= N O
3 °
w
Z
5* SHIELDING
SALVAGED & 6-6 ALL NEW
NEW MATERIALS SHIELDNG
ELEVATED CONCRETE BLEACHER WALKWAY
RED LINE 1-1 LINE rll RED LANE 11' BLUE LINE
7.2m.
S' SHIELDING
6'-6" ALL NEW SALVAGED &
SHIELDING I NEW MATERIALS
4`0 AC .. S—
'Te
2' RED LINE QA
S..
5' -0- 0 �. X 2!F-6 LONG (.D.)
./27 BENCH (2 THUS)
0
E C
2'-6 CATE (9 THUS)
A'-O' ACCESS
CAT'
r=
M§
Y SHIELDING
S' SHIELDIN
mnc.!s Box
SALVAGE
I'-S* DE COACHES NEW MATERIAL
SALVAGED &
NEW MATERIALS MATERIALS
5'-W D.P. x 6' -0 LONG ll.w
WALX—
W/6* -0' x 1. -S" P my E*)
PENAILT, BOK
5' -D' D.P x 7 LONG 0.)
W/S. -W BENCH (2 THUS)
I. INSTALL DASHER INSULATION ON BOTH RINK ENDS &
ONE HALF THE LENGTH 01 ALL FOUR RADII.
A
- DASHERBOARD PLAN
2, SHIELDING TO CONSIST OF A COMBINATION OF NEW &
SALVAGED MATERIALS SEE SPECIFICATIONS.
3 NO NETDI SHALL BE PROVIDED.
Sc- in feet
ONE OF THESE ACKNOWLEDGEMENTS MUST BE COMPLETED
USE ONLY FOR Acknowledgement of Individual or Partnership Contractor
STATE OF MINNESOTA }
} ss.
County of }
On this day of , 19 , personally came
to me well Down to be the identical person_ described in and who executed the foregoing bond
and he acknowledged the same to be own free act and deed.
(SEAL)
My commission expires .19
USE ONLY FOR Acknowledgement of Corporate Contractor
STATE OF MINNESOTA }
} ss.
County of }
On this day of , 19 , before me personally appeared
to me personally known, who being by me duly sworn, did say that he
i of , a corpora-
tion; that the seal affixed to the foregoing bond is the Corporate Seal of the corporation, and
that said instrument was executed in behalf of the corporation by authority of its Board of
Directors; that he acknowledged said instrument to be the free act and deed of the corporation.
(SEAL)
My commission expires , 19
Acknowledgement of Corporate Surety
(This must be completed)
STATE OF MINNESOTA
County of
HENNEPIN
}
} ss.
}
On this 6TH day of APRIL , 19 , before me personally appeared
, to me
RALPH R. ZEHREN and
personally known, who being by me duly sworn, did say that he is the attorney in fact, of the
CAPITOL INDEMNITY CORPORATION , the corporation whose name is affixed to
the foregoing instrument; that the seal affixed to the foregoing instrument is the corporate seal
of the said corporation; and that said instrument was executed in behalf of said corporation by
authority of its board of directors and said RALPH R. ZEHREN acknowledged
A ora-
that _he attorney in fact as the free act and deed of sai c a rp
tion..` PATRICIA A. MEGER
NOTARY PUBLIC MINNESOTA
(SEAL) , „• MY COMMISSION EXPIRES 1-31-00v 'L / s
Vo&/w I CORPORATION
4610 UNIVERSITY AVENUE, SUITE 1400, MADISON, WISCONSIN 53705 -0900
PLEASE ADDRESS REPLY TO P.O. BOX 5900, MADISON, WI 53705 -0900
PHONE (608) 231 -4450 • FAX (608) 231 -2029
P OWER
Know all men by these Presents, That the CAPI INDEMNITY CORPOR a corporation
of the State of Wisconsin, having its principal offices in the City of Madison, Wisconsin, does make, constitute and appoint
------------- — --------- --- - - - -R. L. YOUNGDAHL, CARL A. BENNETSEN, PATRICIA A. MEGER, ---------------------------
-------------------------------------- ---- -- RALPH R. ZEHREN, MARJEAN BARTHELL ----------------------------------------
its true and lawful Attorneys) -in - fact, to make, execute, seal and deliver for and on its behalf, as surety, and as its act
and deed, any and all bonds, undertakings and contracts of suretyship, provided that no bond or undertaking or contract
of suretyship executed under this authority shall exceed in amount the sum of
— ------ ----------------- ---- ------- — ------------- —NOTTO EXCEED $500, 000. 00 ----------------------- -- --------------------- - - --
This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following
Resolution adopted by the Board of Directors of CAPITOL INDEMNITY CORPORATION at a meeting duly called and
held on the 5th day of May 1960:
"RESOLVED, that the President, and Vice - President, the Secretary or Treasurer, acting individually or otherwise, be and they hereby are granted''
the power and authorization to appoint by a Power of Attorney for the purposes only of executing and attesting bonds and undertakings, and other
writings obligatory in the nature thereof, one or more resident vice - presidents, assistant secretaries and attorney(s) -in -fact, each .appointee to have
the powers and duties usual to such offices to the business' of this company; the signature of such officers and seal of the Company may be affixed
to any such power of attorney or to any certificate relating thereto by facsimile, and any Such power of attorney or certificate bearing such facsimile
signatures or facsimile seal shall be valid and binding upon the Company, and any such power so executed and certified by facsimile signatures and
facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking or other writing obligatory in the
nature thereof to which it is attached. Any such appointment may be revoked, for cause, or without cause, by any of said officers at any time,
IN WITNESS WHEREOF, the CAPITOL INDEMNITY CORPORATION has caused these presents to be signed by
its officer undersigned and its corporate seal to be hereto affixed duly attested by its Secretary, this 1st day of June. 1993.
CAPITOL INDEMNITY CORPORATION
Attest:
\�O� ` `` \\ �� \MNIITIrIIe /J / / 9���i j Geor i
/ t S
o r
Virgifine M. Schulte, Secretary aQ CORPORATE'_'± . Fait, President
SEAL
STATE OF WISCONSIN " /i�iiJlrrnmutn \ \` °`�\!
COUNTY OF DANE
On the 1 st day of June, A.D., 1993, before me personally came George A Fait, to me known, who being by me duly
sworn, did depose and say: that he resides in the County of Dane, State of Wisconsin;. that he is the President of
CAPITOL INDEMNITY CORPORATION, the corporation described in and which executed the above instrument; that
he knows the seal of the said corporation; that the seal affixed to said instrument is such corporate seal; that it was so
affixed by order of the Board of Directors of said corporation and that he signed his name thereto by like order.
\\\\ \OFlllwlis o
STATE OF WISCONSIN PETeR T ,,,
E. COUNTY OF DANE HANS Peter E. Hans
�� Notary Public, Dane Co., WI
o ;'Apyp My Commission is Permanent
/ �/JtlN111111t \ \ \ \\
CERTIFICATE
i, the undersigned, duly elected to the office stated below, now the incumbent in CAPITOL INDEMNITY
CORPORATION, a Wisconsin Corporation, authorized to make this certificate, DO HEREBY CERTIFY that the foregoing
attached Power of Attorney remains in full force and has not been revoked; and furthermore that the Resolution of the
Board of Directors, set forth in the Power of Attorney is now in force.
Signed and sealed at the City of Madison. Dated the 6th day of April 19 98
\J\01 \� \h1N i r y,U//Q /���/
o l
,° v
— 1 — CORPORATE ^ -
SEAL z Paul J. Bre er, Treasurer
a
This power is valid only if the power of attorney number printed in the upper right hand corner appears in red. Photocopies, carbon copies or
other reproductions are not binding on the company. Inquiries concerning this power of attorney may be directed to the Bond Manager at the Home
Office of the Capitol Indemnity Corporation.
ONE OF THESE ACKNOWLEDGEMENTS MUST BE COMPLETED
USE ONLY FOR Acknowledgement of Individual or Partnership Contractor
STATE OF h2I
County of
On this day of , 19 _ , personally came
to me well known to be the identical person_ described in and who executed the foregoing bond
and he acknowledged the same to be own free act and deed.
(SEAL)
My commission expires .19
USE ONLY FOR Acknowledgement of Corporate Contractor
STATE OF MINNESOTA }
)ss.
County of }
On this day of , 19 _ , before me personally appeared
to me personally known, who being by me duly sworn, did say that he
is of , a corpora-
tion; that the seal affixed to the foregoing bond is the Corporate Seal of the corporation, and
that said instrument was executed in behalf of the corporation by authority of its Board of
Directors; that he acknowledged said instrument to be the free act and deed of the corporation.
(SEAL)
My commission expires 19
Acknowledgement of Corporate Surety
(This must be completed)
STATE OF MINNESOTA
County of
HENNEPIN
}
} ss.
}
}
} ss.
}
On this 6TH day of APRIL , 19 . before me personally appeared
RALPH R. ZEHREN and , to me
personally known, who being by me duly sworn, did say that _he is the attorney in fact, of the
CAPITOL INDEMNITY CORPORATION , the corporation whose name is affixed to
the foregoing instrument; that the seal affixed to the foregoing instrument is the corporate seal
of the said corporation; and that said instrument was executed in behalf of said corporation by
authority of its board of directors and said RALPH R . ZEHREN acknowledged
that _he c ec�utd s,,aid e i nstrument as attorney in fact as the free act and deed of said corpora-
tion.
�..;� PATRICIA A. MEGER
NOTARY PUBLIC MINNESOTA
0
(SEAL) ,?
MY COMMISSION EXPIRES 1.31.0
HI K - 25 - 1yy8 08127 HC:LNHIJIH b12 8.50 5048 P. 02102
/�! is ®!l ® r DA ., .......
r e as�'n xca t.••If" " ttp3 { D/T71
l S C ' sR
,n. TM ar
.¢ w... ...�..Y..u.-.:�`.¢. d.i #6 ,e+
PR ODUCER 612-830-3000
DAT
Od/07198 '
`
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ACordia of MinneSOta
7701 York Ave. 5, Ste 200
Minneapolis, MN 55435
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER, THIS CERTIFICATE DOES. NOT AMEND, EXTEt+1D OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES 6Et OW.
COMPANIES AFFORDING COV ERAQE
COMPANY
A St. Pout Fire & Marine Ina Co
muL�D
COMPANY
Becker Arena Products, Inc. B Tremens Fund Ins Co
3270 West County Road 42 COMPANY
Burnsville MN 55337 C State Fund Mutual Insurance CD
COMPANY
D
Y 'J'HF??hV SIf V F! rd T .x,n fYnif Hf ,k 1 '� f
} a .4W * « «r t .i' k 7f Y y,�d. •4 y y "i "P xi y1.. k t.
�. rkii'1t5'4 } {1 �,.� ^,.,.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD '
INDICATED, NOTWiTHSTANCING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WiTH RESPECT TO WHICH THIS '
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORCED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE SEEN'REDUCED BY PAID CLAIMS,
*'
LTA
TYPE OF INSURANCE
E
POLICY NUMBER 1
I
POLICY EFPEc`rrn
DATE iMM,DONYt
POLICY EXPIRATION j
DATE (MMIOarfy) I LIMITS
A
2ENERn1 weILITY
X I COMMERCIAL GENERAL LIA0217Y
1
I 1 CLAIMS MADE L_I OCCUR
CKO8308861
I (
11/14/97
I 11/14198 I GENERAL AGGREGATE I S 2000000
I PRODUCTS • COMPIOP AGG IS 1000000
PERSONAL & ADV INJURY I ; 1000000
f OWNER'S & CONTIACTOR'S PROT
I
EACH OCCURRENCE I S 1000000
'
(
FIRE DAMAGE (Any one rim) 1 5 50000
MEO EXP (Any ens oclsoN 1 6 5000
A
AVTOmOILILE LIABILITY
X ANY AUTO
CK06308e61
11/14/97
11 /14198 I 1
COMSIN °� SINGLE LIMIT $ 1000000
ALL OWNED AUTOS
3CHEOULED,AUTOS
0002Y INJURY
IPe,Perroni ( s
X HIRED AUTOS
X NON�OWNEO AVT05
BODILY INJURY S
(Per accident
(
I PROPERTY DAMAGE (S i
I OARAGE LIASILITY i
I ANY AUTO
i
I I AUTO ONLY - EA ACC10j N7 16 l
CTHER THAN AUTO ONLY:
1
i
EACH ACCIDENT ' S
1
1
7 AGGREGATE 1$
B
Excess LIAMUTY
XSCS3260602 11114197 11/14/98 ! EACH OCCURRENCE I s 5000000
X UMBRELLA FORM
I i iAGGREGATE 5000000
i
t OTHER THAN UMBREL! A FORM
1
C
WORKERS COMPENSATION AND I
EMPLOYERS' LIABILITY i
WC STA
01 0546204 j 1 11/14/98 ? X I TORY LIMIT TU• 0 TH•;
ER
EL EACH ACCIDENT I S 1 00000
(
THE PRCPRIETOR! L ' INCL
PARTNE951EXECJTIVE
OFFICERS ARE: i EXCL !
EL 01$ZASE • POLICY LIMIT S 500000
j ' EL DISEASE - EA EMPLOYES t 100000
I OTHER '
I i
DESCRIPTION OF OP£RAY1ONSrto cnYtONSlVERICLES /sPEC[AL ITEMS
RE. NEW HOPE ICE ARENA DASHERBOARD REPLACEMENT
ADDITIONAL INSURED AS RESPECTS WORK DONE BY THE NAMED INSURED:
CITY OF NEW HOPE
CEf4Tii<ICATB N EYL23ER t �-
CITY OF NEW HOPE
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
]EJ4 MAIL
EXPIRATION OATS THEREOF, THE ISSVINQ COMPANY WILL 2Effi�7SET
4401 XYLON AVE
30 GAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,
iV EW HOPE MN 55428
�xxwr auxcac�ec�+�xcrnc�remcaccz
ORRED RE SENT E
TOTAL P.02