102521 City Council Meeting Packet
NEW HOPE CITY COUNCIL
MEETING AGENDA
October 25, 2021
7:00 p.m.
City Hall – Council Chambers
4401 Xylon Avenue North
Mayor Kathi Hemken
Council Member John Elder
Council Member Andy Hoffe
Council Member Michael Isenberg
Council Member Jonathan London
The City Council wants and encourages citizen participation at Council Meetings. Your input and
opinions count and are valuable. You are encouraged to bring forth your comments and issues at
the appropriate point on the agenda.
A 15‐minute maximum Open Forum is held at the beginning of each Council Meeting. At this time
any person may address the Council on any subject pertaining to City business not listed on this
agenda or scheduled as a future agenda item. The Council requests that you limit your presentation
to 3 minutes. Anyone wishing to address the City Council on a particular item should raise their
hand and be recognized by the Mayor. Approach the podium and speak into the microphone by
first stating your name and address. Also, please record your name on the roster at the table near
the door so that your name will be spelled correctly in the minutes.
Individuals should not expect the Mayor or Council to respond to their comments tonight; Council
may refer the matter to staff for handling or for consideration at a future meeting. You are welcome
to contact the city clerk at 763‐531‐5117 after the council meeting.
COUNCIL MEETING BROADCASTS AND STREAMING
Government Access channel 16 programming includes live/taped meeting replays
Live on‐line meetings and past meetings on‐demand are available through www.nwsccc.org.
www.newhopemn.gov
New Hope Values and Vision
City Mission
Strong local government that is proactive in responding to the community needs and issues by delivering quality
public service to all city residents, businesses, property owners, and organizations in a prudent and e cient manner.
Values
Excellence and Quality in the Delivery of Services
We believe that service to the public is our reason for being and strive to deliver quality services in a
highly professional and cost-e ective manner.
Fiscal Responsibility
We believe that fi scal responsibility and the prudent stewardship of public funds and city assets is essential if
residents are to have confi dence in government.
Ethics, Integrity and Professionalism
We believe that ethics, integrity, and professionalism are the foundation blocks of public trust and confi dence and
that all meaningful relationships are built on these values.
Respect for the Individual
We believe in the uniqueness of every individual, and welcome, appreciate, and respect diversity and the di ering
of opinions.
Open, Honest, and Respectful Communication
We believe that open, honest, and respectful communication is essential for an informed and involved citizenry
and to foster a positive environment for those interacting with our city.
Cooperation and Teamwork
We believe that the public is best served when all work cooperatively.
Visionary Leadership and Planning
We believe that the very essence of leadership is to be responsive to current goals and needs, and visionary in
planning for the future.
Vision
e city is a great place to grow as a family, individual, or business.
All within our city are safe and secure.
Essential services will be those that promote a safe and healthy environment for all residents.
Essential services and programs will be enhanced and streamlined, and will be provided in an economical manner
and with measurable results.
e city views residents as its greatest asset and seeks their input and participation.
e city will meet the communication needs of citizens, elected o cials, and city sta .
Strategic Goals
e city will maintain and improve its infrastructure (water distribution, storm water, sewer, roads, parks,
lighting, and city facilities).
e city will use frugal spending and resourceful fi nancial management to maintain its fi scal health.
e city will encourage maintenance, redevelopment, and reinvestment of existing properties to improve
or enhance its tax base.
e city will provide core services with a professional sta who are equipped with the necessary tools and
equipment and given necessary direction.
e city will facilitate and improve communications to promote e ective intergovernmental cooperation
between sta , citizens, and Council.
Adopted by the New Hope City Council, August 2006
Reaffirmed by the New Hope City Council, February 2021
CITY COUNCIL MEETING
City Hall, 4401 Xylon Avenue North
Monday, October 25, 2021
7:00 p.m.
Regular Session
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE – October 25, 2021
2. ROLL CALL
3. APPROVAL OF MINUTES:
Council Meeting Minutes – October 11, 2021
4. OPEN FORUM
5. PRESENTATIONS
5.1 Oath of office for Police Officer Marylee Larson
6. CONSENT BUSINESS
6.2 Approval of financial claims through October 25, 2021
6.4 Motion supporting the participation in national settlements regarding opioid claims
6.5 Resolution approving the Sandburg Middle School Facility Use Agreement
6.6 Motion to accept a $7,500 donation in support of the New Hope Police Department’s K9
program
6.7 Motion accepting donations from the Minneapolis Regional Chamber for the New Hope
Crime Prevention Fund and the 2022 Safety Camp
7. PUBLIC HEARING
7.1 Resolution ordering the construction of and preparation of plans and
specifications for the 2022 Infrastructure Project (Improvement Project No. 1074)
8. DEVELOPMENT AND PLANNING
8.1 Resolution awarding contract to West Central Environmental Consultants (WCEC) for
construction of Public Improvement Project No. 1037/1053 (Meadow Lake Drawdown)
and approving cooperative and subgrant agreement with Shingle Creek Watershed
Management Commission (SCWMC).
8.2 Resolution approving agreement between the city of New Hope and Hennepin
County for the 2022 Joint Community Police Partnership (JCPP) to be shared by
the cities of Crystal, New Hope and Robbinsdale, at a cost of $27,000 per city
(total cost $81,000)
9. PETITIONS AND REQUESTS
10. ORDINANCES AND RESOLUTIONS
10.1
Resolution establishing city’s monthly contribution for health benefits program effective
January 1, 2022
11. UNFINISHED AND ORGANIZATIONAL BUSINESS
12. OTHER BUSINESS
12.1 Exchange of communication between members of the city council
13. ADJOURNMENT
Memorandum
To: New Hope City Council
From: Kirk McDonald, City Manager
Date: October 22, 2021
Subject: Agenda Items for Monday, October 25, 2021
Open Forum
Staff is not aware of anyone planning to address the Council for the Open Forum.
Item 5.1
Officer Lee Larson’s probationary period ended October 19, 2021. The police chief will introduce her to
the Council and the city clerk will administer the oath of office.
Item 6.1
There are no new business license requests.
Item 6.2
This item involves routine financial claims.
Item 6.3
There are no new liability claims to report.
Item 6.4
Staff is requesting the Council to pass a motion supporting the participation in the national settlements
regarding opioid claims. The state of Minnesota has elected to participate in two national settlements
and all subdivisions of the state are encouraged to participate to help maximize the amount of
abatement funds being paid in the settlements. The opioid epidemic continues to devastate
communities across the country and settlement funds will be used in efforts to alter opioid addiction. I
recommend approval.
Item 6.5
This item approves a new facility use agreement prepared by ISD 281 for use of Sandburg Middle
School’s Gum D from July 1, 2021 through June 30, 2022 for an annual cost of $18,865.86 plus building
supervisor charges. The city has been using the facility since 2010. The lease rate is a 1.4% increase over
last year and it includes utilities and cleaning. The estimated cost of the building supervisor fees is
$7,200 for a total cost of $26,065.86. Registration revenue from the gymnastics program covers the lease.
It should be noted that the school district did not charge the city for part of 2020 due to COVID‐19.
Funds are contained in the Recreation budget for the expense. Director Rader and I recommend
approval.
Item 6.6
Council is asked to accept a K9 grant of $7,500 from the AKC (American Kennel Club) Reunite non‐
profit organization. The funds will be used to aid in the purchase of a replacement K9 in the spring of
2022. Director Hoyt and I recommend acceptance.
Item 6.7
This item accepts the donations from the Minneapolis Regional Chamber from the annual Crystal/New
Hope Business Council golf outing held at the New Hope Golf Course. The donations include $287.52
for the New Hope Crime Prevention Fund and $575.05 for Safety Camp in 2022. The city is appreciative
of the generous contributions. Director Rader, Director Hoyt, and I recommend acceptance.
Item 7.1
On September 27, Council accepted the feasibility report on the 2022 Infrastructure Improvement Project and
called for a public hearing on October 25 to consider ordering the project which includes directing the city
engineer to prepare the plans and specifications. The streets planned for a reclaim and overlay in the 2022
Pavement Management Plan have street PRI ratings as poor. The 2022 project includes streets in the
Liberty Park area. Liberty Park is the only tax exempt property in the project area. The estimated cost for
the project is $2,050,069.14 which would be funded primarily with street infrastructure and utility funds. A
site visit was held on October 20 for property owners who reside along Independence Avenue North to
answer questions regarding the project. All impacted residents have been invited to the public hearing. After
conducting the public hearing, Director Weber, City Engineer Boyum and I recommend Council authorize
preparation of plans and specifications.
Item 8.1
Council previously approved the Meadow Lake Management Plan that included a drawdown of the lake in
the fall of 2021. Four bids were received for the project, and the low bid (including the additional pumping
after the initial drawdown) was submitted by West Central Environmental Consultants (WCEC) for $59,430
($44,430 base bid plus $15,000 for two extra weeks of drawdown). Per the cooperative and subgrant
agreement, the city will be reimbursed by the Shingle Creek Watershed Management Commission through
grant funds. The DNR recently approved the permit for the drawdown. The DNR will also provide guidance
regarding relocation of the turtle population. Director Weber and I recommend approval of the resolution
awarding the contract and approval of the cooperative and subgrant agreement.
Item 8.2
This item approves a contract between Hennepin County and the city of New Hope for the Joint Community
Police Partnership (JCPP) to be shared by the cities of Crystal, New Hope and Robbinsdale for the year 2022.
The JCPP is a Hennepin County program that works collaboratively to enhance relationships between police
and specifically with immigrants, people of color, indigenous people, and faith communities. Each
participating city tailors their program to meet their specific community’s needs. The council discussed this
program during the March 8 City Council Meeting attended by Commissioner Lunde, who at the time gave
a brief overview of the program. The program was also discussed during the review of the 2022 Police
Department budget at the September 20 council work session. The cost per each of the three cities is $27,000.
The 2022 budget contains funds for the program. Director Hoyt and I recommend approval.
Item 10.1
At the October 18 work session, Director Johnson presented information on premiums through Health
Partners for employee health insurance costs and explained that the city contributions have fallen below the
city’s 12 comparable cities. It is recommended that the city’s contribution amount increase by $95, $155, and
$176 for single, employee plus one, and family health insurance coverage, respectively, effective January 1,
2022. It is necessary to set the contribution amounts prior to the open enrollment period which begins the
end of October. The proposed increase to the city contribution was discussed at the October 18 work session
and the Council was supportive. This expenditure is included in the 2022 budget. Director Johnson and I
recommend approval.
Item 12.1
Mayor Hemken will review upcoming meetings and events.
If you have any questions regarding items in the agenda packet, please call the city clerk or me
before the meeting so that staff can research any issues and be prepared to respond at the meeting.
New Hope City Council October 11, 2021
Page 1
City of New Hope
4401 Xylon Avenue North
New Hope, Minnesota 55428
City Council Minutes October 11, 2021
Regular Meeting City Hall, 7:00 p.m.
CALL TO ORDER The New Hope City Council met in regular session pursuant to due call and notice
thereof; Mayor Hemken called the meeting to order at 7:00 p.m.
PLEDGE OF
ALLEGIANCE
The City Council and all present stood for the Pledge of Allegiance.
ROLL CALL Council present:
Staff present:
Kathi Hemken, Mayor
John Elder, Council Member
Andy Hoffe, Council Member
Michael Isenberg, Council Member
Jonathan London, Council Member
Kirk McDonald, City Manager
Dan Boyum, City Engineer
Valerie Leone, City Clerk
Susan Rader, Director of Parks & Recreation
Bernie Weber, Director of Public Works
Stacy Woods, Assistant City Attorney
APPROVAL OF
MINUTES
Motion was made by Council Member Isenberg, seconded by Council Member
London, to approve the regular meeting minutes of September 27, 2021. Voted in
favor thereof: Hemken, Elder, Hoffe, Isenberg, London; and the following voted
against the same: None; Abstained: None; Absent: None. Motion carried.
OPEN FORUM
Mr. Tom Schmidt, member of the planning commission since 2005, submitted his
letter of resignation as he is moving out of New Hope. He noted it has been an
honor and privilege to serve the city. The City Council thanked Mr. Schmidt for
his 17 years of service.
ROTATING VOTES
Please note that votes taken on each agenda item are called by the secretary on a
rotating basis; however, the written minutes always list the mayor’s name first
followed by the council members’ in alphabetical order.
CONSENT AGENDA Mayor Hemken introduced the consent items as listed for consideration and stated
that all items will be enacted by one motion unless requested that an item be
removed for discussion. Mr. Kirk McDonald, city manager, reviewed the consent
items.
FINANCIAL CLAIMS
Item 6.2
Approval of financial claims through October 11, 2021.
New Hope City Council October 11, 2021
Page 2
RESOLUTION 2021‐92
Item 6.4
Resolution approving final payment of $91,257 to W.L. Hall Company for the
replacement of the skylight at the New Hope Ice Arena (Improvement Project
No. 1058).
MOTION
Consent Items
Motion was made by Council Member Elder, seconded by Council Member Hoffe,
to approve the Consent items. All present voted in favor. Motion carried.
PUBLIC HEARING
DELINQUENT CITY
CHARGES
Item 7.1
Mayor Hemken introduced for discussion Item 7.1, Public hearing and resolution
adopting and confirming assessments for delinquent utility service charges and
administrative citations.
Mr. Kirk McDonald, city manager, explained the public hearing is to adopt the
assessment rolls for delinquent city service charges incurred between June 1, 2020,
and May 31, 2021. He stated all impacted property owners were notified of the
hearing, and staff received only one written objection from the property owner of
4800 Decatur Avenue North regarding administrative citations which will be
entered into the record. He reported the total delinquent utility charges is
$73,751.19; the total delinquent city services (alarm calls) is $1,634.97; and the total
for delinquent administrative citations is $27,370.
Mayor Hemken called for a vote to close the public hearing as there was no one
present desiring to speak at the public hearing.
CLOSE HEARING
Item 7.1
Motion was made by Council Member Elder, seconded by Council Member
London, to close the public hearing. All present voted in favor. Motion carried.
RESOLUTION 2021‐93
Item 7.1
Council Member London introduced the following resolution and moved its
adoption: “PUBLIC HEARING AND RESOLUTION ADOPTING AND
CONFIRMING ASSESSMENTS FOR DELINQUENT UTILITY SERVICE
CHARGES AND ADMINISTRATIVE CITATIONS.” The motion for the
adoption of the foregoing resolution was seconded by Council Member Isenberg,
and upon vote being taken thereon, the following voted in favor thereof: Hemken,
Elder, Hoffe, Isenberg, London; and the following voted against the same: None;
Abstained: None; Absent: None; whereupon the resolution was declared duly
passed and adopted, signed by the mayor which was attested to by the city clerk.
CHANGE ORDER
NO. 2
(IMPROVEMENT
PROJECT NO. 1039)
Item 8.1
Mayor Hemken introduced for discussion Item 8.1, Resolution approving change
order no. 2 for $7,113.73 with Rochon Corporation for the Phase 1 Improvements
at the Public Works Facility and geotechnical services for $7,325 to Independent
Testing Technologies (ITT) (Improvement Project No. 1039).
Mr. Dan Boyum, City Engineer, provided an update on the progress of the public
works facility expansion project by Rochon Corporation. He explained that staff is
requesting approval of change order no. 2 for $7,113.73 with Rochon Corporation
and approval of geotechnical services for $7,325 to Independent Testing
Technologies. He stated the change order includes owner‐removed trees,
elimination of two windows and removal of exhaust fan, spray foam masonry
cells, additional B618 concrete curb and gutter, insulate existing concrete blocks
above window and door openings, and additional fire sprinkler heads. Three of
New Hope City Council October 11, 2021
Page 3
the seven items included in change order no. 2 are credits (tree removal, window
and exhaust fan removal, and exterior draintile).
Mr. Boyum explained that poor soils were discovered during footing excavation
for the soils storage building. He stated it is recommended that soil borings be
obtained to determine the footing design and the need for helical anchors. Borings
are also recommended for the future Phase 2 garage expansion. He stated bids
were obtained from two firms for the soil borings, and the low quote was
submitted by Independent Testing Technologies for $7,320. Mr. Boyum stated
there are adequate funds to pay for the change order and geotechnical services
with project contingency funds. He also pointed out the probable schedule delay
as a result of the poor soils.
Council Member London expressed frustration that items such as the fire sprinkler
heads and the insulation were not identified and included in the original bid.
Mr. Boyum explained that the type of insulation was not known until the concrete
blocks were cut as the insulation type was not identified on the building plans on
file. He stated the fire marshal recommends installing the additional sprinkler
heads at this time although it could be delayed if so desired by Council.
Mr. Boyum stated it is not uncommon to encounter these issues during renovation
projects. He pointed out remodeling projects greatly differ from new construction.
He noted Stantec will strive to prepare more detailed plans in the future.
RESOLUTION 2021‐94
Item 8.1
Council Member Elder introduced the following resolution and moved its
adoption: “RESOLUTION APPROVING CHANGE ORDER NO. 2 FOR
$7,113.73 WITH ROCHON CORPORATION FOR THE PHASE 1
IMPROVEMENTS AT THE PUBLIC WORKS FACILITY AND
GEOTECHNICAL SERVICES FOR $7,325 TO INDEPENDENT TESTING
TECHNOLOGIES (ITT) (IMPROVEMENT PROJECT NO. 1039).” The motion
for the adoption of the foregoing resolution was seconded by Council Member
Hoffe, and upon vote being taken thereon, the following voted in favor thereof:
Hemken, Elder, Hoffe, Isenberg, London; and the following voted against the
same: None; Abstained: None; Absent: None; whereupon the resolution was
declared duly passed and adopted, signed by the mayor which was attested to by
the city clerk.
BOND PROCEEDS
Item 8.2
Mayor Hemken introduced for discussion Item 8.2, Resolution calling for a public
hearing regarding use of proceeds of $18,435,000 General Obligation Capital
Improvement Plan Bonds, series 2017A.
Mr. Kirk McDonald, city manager, explained that staff recommends scheduling a
public hearing on November 8 regarding the use of proceeds of the $18,435,000
general obligation capital improvement plan bonds. He stated the remainder of the
2017 bond proceeds from the city hall/police facility can be redistributed for
financing another public use authorized by law. The estimated balance of the bond
proceeds is between $400,000 to $500,000, after final expenditures for security
measures, audio‐visual improvements, and final payments to contractors and
consultants. He pointed out at the work session of August 16, 2021, Council
New Hope City Council October 11, 2021
Page 4
discussed options for use of the remaining funds and supported utilizing the funds
for the public works facility project. Per bond counsel, the city can apply excess
proceeds to the 2021 public works facility improvements, and Council must adopt
an updated capital improvement plan to include the public works facility project.
He stated the resolution schedules the public hearing for November 8, 2021.
Council Member London inquired of the balance amount.
Mr. McDonald stated the proceeds is estimated around $500,000. He state a few
items are still underway (technological changes in the council chambers and
Northwood Room to allow cablecasting of public meetings while held in a remote
environment, completion of city hall security measures, and final payments). He
stated the actual amount of the bond proceeds will be known on or before the
public hearing in November.
RESOLUTION 2021‐95
Council Member Elder introduced the following resolution and moved its
adoption: “RESOLUTION CALLING FOR A PUBLIC HEARING REGARDING
USE OF PROCEEDS OF $18,435,000 GENERAL OBLIGATION CAPITAL
IMPROVEMENT PLAN BONDS, SERIES 2017A.” The motion for the adoption
of the foregoing resolution was seconded by Council Member Isenberg, and upon
vote being taken thereon, the following voted in favor thereof: Hemken, Elder,
Hoffe, Isenberg, London; and the following voted against the same: None;
Abstained: None; Absent: None; whereupon the resolution was declared duly
passed and adopted, signed by the mayor which was attested to by the city clerk.
PURCHASE OF
EQUIPMENT
Item 10.1
Mayor Hemken introduced for discussion Item 10.1, Resolution authorizing the
purchase of equipment and appropriation of funds in the amount of $32,413.81 for
the purchase of a 2021 Toro Sand Pro 5040 from MTI Distributing.
Ms. Susan Rader, director of parks and recreation, explained staff is
recommending the purchase of a 2021 Toro Sand Pro 5040 to replace a 13‐year old
Toro Workman in the parks department. The vehicle is exclusively used for
ballfield maintenance and levels playing surfaces. The 2021 CIP has $28,414.71 in
the vehicle replacement fund for this equipment. It is recommended that the city
obtain the equipment through the State of Minnesota Cooperative Purchasing
Venture with the contract held by MTI Distributing. The total price of the vehicle
is $32,413.81. MTI Distributing has offered $2,500 trade‐in value for the 2008 Toro
Workman. She stated staff recommends selling the old Toro to the Golf Course for
$2,500, and funding the remaining balance of $1,499.10 by the vehicle replacement
fund.
Council Member Elder inquired of the use of the equipment at the golf course. Ms.
Rader stated the Workman could assist with various golf course projects.
Council Member London asked if it would replace an existing piece of equipment
at the golf course. Ms. Rader stated it will be an additional vehicle at this time.
Mayor Hemken commended staff for repurposing equipment when it’s in the
city’s best interest.
New Hope City Council October 11, 2021
Page 5
RESOLUTION 2021‐96
Item 10.1
Council Member London introduced the following resolution and moved its
adoption: “RESOLUTION AUTHORIZING THE PURCHASE OF EQUIPMENT
AND APPROPRIATION OF FUNDS IN THE AMOUNT OF $32,413.81 FOR
THE PURCHASE OF A 2021 TORO SAND PRO 5040 FROM MTI
DISTRIBUTING.” The motion for the adoption of the foregoing resolution was
seconded by Council Member Hoffe, and upon vote being taken thereon, the
following voted in favor thereof: Hemken, Elder, Hoffe, Isenberg, London; and the
following voted against the same: None; Abstained: None; Absent: None;
whereupon the resolution was declared duly passed and adopted, signed by the
mayor which was attested to by the city clerk.
EXCHANGE OF
COMMUNICATION
Item 12.1
Mayor Hemken introduced for discussion Item 12.1, Exchange of communication
between members of the City Council.
Mayor Hemken reported on upcoming events. Council Member Elder
acknowledged the successful City Day event on October 9, 2021. Mayor Hemken
recognized National Police Week October 13‐17, 2021, and thanked New Hope
police officers for their exceptional service.
ADJOURNMENT
Motion was made by Council Member Isenberg, seconded by Council Member
Elder, to adjourn the meeting, as there was no further business to come before
the Council. All present voted in favor. Motion carried. The New Hope City
Council adjourned at 7:30 p.m.
Respectfully submitted,
Valerie Leone, City Clerk
I:\RFA\City Manager\2021\5.1 Q ‐ Oath of Office Larson 102521.docx
Request for Action
October 25, 2021
Approved by: Kirk McDonald, City Manager
Originating Department: City Manager
By: Kirk McDonald, City Manager
Agenda Title
Oath of office for Police Officer Marylee Larson
Requested Action
Staff is requesting that the Council allow the city clerk to formally administer the oath of office to Officer
Larson.
Policy/Past Practice
Police officers are sworn in at a council meeting after completion of their probationary period. Officers are
recognized as they enter a new phase of their career.
Background
Chief Hoyt will share Officer Larson’s background with the Council and community. Family and friends are
invited to the swearing in ceremony.
Officer Larson officially completed her one‐year probation on October 19, 2021.
Agenda Section
Presentations
Item Number
5.1
G:\City Manager\AGENDA\6.2 R‐Approval of Claims Merge Doc.docx
Request for Action
October 25, 2021
Approved by: Kirk McDonald, City Manager
Originating Department: City Manager
By: Kirk McDonald, City Manager
Agenda Title
Approval of claims through October 25, 2021
Requested Action
Claims for services and commodities purchased through this period are listed on the Check Disbursement
Report
Attachments
Check Disbursement Report
Agenda Section
Consent
Item Number
6.2
I:\RFA\City Manager\2021\Opioid settlement\6.4 Q ‐ opioid settlement participation 10.25.21.docx
Request for Action
October 25, 2021
Approved by: Kirk McDonald, City Manager
Originating Department: Community Development
By: Valerie Leone, City Clerk/Treasurer;
Kirk McDonald, City Manager
Agenda Title
Motion supporting the participation in national settlements regarding opioid claims
Requested Action
Staff requests that the City Council pass a motion supporting the participation in the national settlements
regarding opioid claims. The state of Minnesota will receive a greater amount of abatement funds if there is
a high number of participants. The participation deadline is January 2, 2022.
Policy/Past Practice
The city has pursued settlements that benefit the overall community in the past.
Background
Minnesota has elected to participate in two national settlements regarding opioid claims. All subdivisions of
the state of Minnesota have been contacted and encouraged to participate to help maximize the amount of
abatement funds being paid in the settlements. The opioid epidemic continues to devastate communities
around the country and it is critical that settlement funds be utilized to provide meaningful change to curb
opioid addiction, overdose and death.
Additional information is available at www.nationalopioidsettlement.com or on the Minnesota Attorney
General’s website at www.ag.state.mn.us/opiods. At this time the city is only required to “opt in” to the
settlements by registering on the national settlement website. At a later time the city may be required to
adopt a resolution and execute a Participation Agreement.
The city manager discussed the issue with the city attorney and it is recommended that the city participate
in the settlement.
Recommendation
Staff recommends that the City Council pass a motion supporting the city’s participation in national
settlements regarding opioid claims.
Attachments
Letter from Minnesota Attorney General Keith Ellison’s office
StarTribune newspaper article of October 3, 2021
Agenda Section
Consent
Item Number
6.4
I:\RFA\P&R\MISC\2021\Gymnastics Lease\6.5 Q & R ‐ Gymnastics Lease Agreement.docx
Request for Action
October 25, 2021
Approved by: Kirk McDonald, City Manager
Originating Department: Parks & Recreation
By: Susan Rader, Director
Agenda Title
Resolution approving the Sandburg Middle School Facility Use Agreement
Requested Action
Staff recommends approval of a new facility use agreement prepared by Independent School District 281 for
use of Sandburg Middle School’s Gym D from July 1, 2021 – June 30, 2022 at a yearly rate of $18,865.86, plus
building supervisor charges. Sandburg Middle School is located at 2400 Sandburg Lane in Golden Valley. The
previous agreement, which was for one year, expired on June 30, 2021.
Background
For many years, the Parks and Recreation‐sponsored Gymnastics program was held at Hosterman School in
the stage gym. In 2010, the school was sold to School District 287 and torn down to build a new school in its
place. At that time, staff began the search for a new space for the gymnastics program which included
approximately 3‐4,000 square feet of space and a ceiling height of at least 18 feet. Storage was a need if
equipment needed to be put up and taken down each day, although a dedicated space was preferred. Space
in commercial and industrial areas was looked at as well as District 281 space.
In September 2010, the city entered into a twenty‐one month agreement with District 281 for the dedicated
use of Sandburg Learning Center, Gym A. In June 2012, the City Council approved a one‐year agreement
with the rights to extend the agreement for five additional one‐year terms. At that time, District 281 staff
indicated that they would be willing to renew on a yearly basis, but they wanted to be able to include a cost
of living increase each year and/or to raise the building supervisor fees if they were increased for other users.
The fifth one‐year addendum was approved by the City Council in May 2017. In 2018, the District began
providing a new agreement each year.
The proposed lease agreement for July 1, 2021‐June 30, 2022 is $18,865.86 per year is an approximate 1.4%
increase and is the standard increase for all groups using Sandburg Middle School, including District 281
programs. The lease continues to cover the utilities and cleaning.
The building supervisor fees are charged separately by Community Education. Since July 1, 2018, the fees
have been $6 per hour during the school year and $15 per hour on Saturdays and during the summer.
Currently, there is no indication that the building supervisor fees will change. Based on scheduled use, staff
estimates the building supervisor fees between July 1, 2021 and June 30, 2022 to be approximately $7,200.
Agenda Section
Consent
Item Number
6.5
Request for Action, Page 2
Agreements and Addendums with District 281:
Dates Covered Agreement Amount Building
Supervisor Fees
Total
Original
Agreement
9/2010‐6/2012 $14,517.00 Included $14,517.00
Agreement 7/2012‐6/2013 $15,393.18 $3,604.82 $18,998.00
Addendum 1 7/2013‐6/2014 $15,858.84 $6,271.94 $22,130.78
Addendum 2 7/2014‐6/2015 $16,324.44 $5,821.76 $22,146.20
Addendum 3 7/2015‐6/2016 $16,817.52 $5,696.01 $22,513.53
Addendum 4 7/2016‐6/2017 $17,310.48 $5,868.89 $23,179.37
Addendum 5 7/2017‐6/2018 $17,010.60* $6,637.05 $23,647.65
Agreement 7/2018‐6/2019 $17,533.20 $7,644.50 $25,177.70
Agreement 7/2019‐6/2020 $12,789.61** $4,698.25** $17,487.86**
Agreement 7/2020‐6/2021 $17,0541.18** $6,861.71** $23,915.89**
Agreement 7/2021‐6/2022 $18,865.86 $7,200 est. $26,065.86 est.
* In September 2017, the facility re‐opened as a middle school. Due to the anticipated needs of the
school, the Gymnastics program was moved from Gym A to Gym D, which was 126 square feet
smaller in size. Gym D is approximately 2,600 square feet.
**In 2020, the lease amount was not charged for the second half of March, April, May, June or
December due to COVID‐19 and building supervisor costs were not incurred during this time. The
original agreement amounts were $18,055.83 (7/2019‐6/2020) and $18,604.56 (7/2020‐6/2021).
Funding
The proposed lease agreement for July 1, 2021‐June 30, 2022 is $18,865.86, which is an increase of $261.30 from
the previous agreement. Registration revenue from the gymnastics program will cover this additional cost
expected for 2022.
Funds have been budgeted in the 2021 and 2022 Recreation budget to cover the lease and building supervisor
fee expenses for the gymnastics program. As in previous years, revenue from program fees will cover all
expenses including lease and building supervisor fees, seasonal staff, supplies, equipment, meet fees, etc.
Enrollment in 2020 totaled 515 class and competition registrations. Fees were increased by $2 for 2021 and an
additional increase will take place in 2022.
Attachments
Resolution
Sandburg Middle School Facility Use Agreement
CITY OF NEW HOPE
Resolution No. 2021‐
Resolution approving the
Sandburg Middle School Facility Use Agreement
WHEREAS, the city of New Hope desires to provide social and recreational activities to area residents; and
WHEREAS, the city of New Hope has offered a youth gymnastics program for many years; and
WHEREAS, the city wishes to continue to offer gymnastics programs in a facility that has dedicated space
available.
NOW, THEREFORE, BE IT RESOLVED, that the city of New Hope will approve a facility use agreement with
Independent School District 281 for the City’s use of Gym D at the Sandburg Middle School.
Adopted by the City Council of the City of New Hope, Hennepin County, Minnesota, this 25th day of October
2021.
____________________________
Mayor
Attest: __________________________
City Clerk
I:\RFA\POLICE\2021\Council Meetings\K9 Grant\6.6 Q ‐ Donation K9 Grant.docx
Request for Action
October 25, 2021
Approved by: Kirk McDonald, City Manager
Originating Department: Police
By: Tim Hoyt, Director of Police
Agenda Title
Motion to accept a $7,500 donation in support of the New Hope Police Department’s K9 program.
Requested Action
Staff requests that the City Council approve a motion to accept this generous donation of $7,500 from the
AKC Reunite program to aid in the purchase of a replacement K9. The funds will aid in the purchase of a
replacement K9.
Policy/Past Practice
It is past practice for the City Council to formally accept donations.
Background
Through Officer Robles’ contacts in the United States Police Canine Association (USPCA), Chief Hoyt applied
for a K9 grant in August of 2021. Chief Hoyt spoke with grant organizers and was informed that the New
Hope Police Department would be the recipient of a $7,500 grant to help with the cost of purchasing a future
K9. The police department plans on purchasing the new K9 in the spring of 2022 and will assign the K9 to
Officer Collier.
A thank you letter has been sent.
Agenda Section
Consent
Item Number
6.6
I:\RFA\P&R\MISC\2021\Mpls Regional Chamber\6.7 Q ‐ Donations from Minneapolis Regional Chamber.docx
Request for Action
October 25, 2021
Approved by: Kirk McDonald, City Manager
Originating Department: Parks & Recreation
and Police
By: Susan Rader, Director of Parks & Recreation
Tim Hoyt, Director of Police
Agenda Title
Motion accepting donations from the Minneapolis Regional Chamber for the New Hope Crime Prevention
Fund and the 2022 Safety Camp
Requested Action
Staff recommends that the City Council accept these donations from the Minneapolis Regional Chamber in the
amount of $287.52 for the New Hope Crime Prevention Fund and $575.05 for the 2022 Safety Camp. These
proceeds were raised through sponsorship and registration fees from the annual Crystal/New Hope Business
Council golf outing held this fall at the New Hope Village Golf Course.
In 2020, the TwinWest Chamber of Commerce merged with the Minneapolis Regional Chamber.
Background
The New Hope Crime Prevention Fund relies on donations for many programs that provide community
outreach and support.
The city departments of Parks and Recreation and Police, as well as West Metro Fire‐Rescue District, together
plan and sponsor the annual Safety Camp. This highly successful program is supported by many community
donations.
Staff extends our thanks to the Minneapolis Regional Chamber for these generous donations. Thank you letters
will be sent.
Agenda Section
Consent
Item Number
6.7
I:\RFA\PUBWORKS\2021\Council\1074 2022 Infrastructure Improvement Project\7.1 Q&R Public Hearing & preparation of plans
Request for Action
October 25, 2021
Approved by: Kirk McDonald, City Manager
Originating Department: Public Works
By: Bernie Weber, Public Works Director
Agenda Title
Resolution ordering the construction of and preparation of plans and specifications for the 2022
Infrastructure Project (Improvement Project No. 1074)
Requested Action
Staff is requesting that the Council conduct a public hearing and receive a presentation by the city
engineer regarding a proposed 2022 infrastructure improvement project. Staff recommends that the
Council pass a resolution ordering 2022 Infrastructure Improvement Project and authorizing Stantec,
the city’s consulting engineer, to prepare the plans and specifications.
Policy/Past Practice
The City Council routinely considers public infrastructure improvement projects to extend the useful life of the
infrastructure and/or improve the level of service. The city’s pavement management plan identifies these areas
in the Street Infrastructure Projects portion of the plan.
Background
The general location of the potential 2022 project includes streets in the neighborhood west of Liberty Park, as
shown on the attached project map. Streets included in the project were recommended based upon pavement
conditions identified in the 2020 pavement management plan as well as underlying utility condition.
The feasibility report was presented and approved on September 27 and identified specific street and utility
improvement strategies. The feasibility report also identified all tax‐exempt properties that will be affected by
this work and provides an estimated assessment rate for these properties. These assessments will be one
funding source for the project.
A notice has been sent to neighbors along the project area to make them aware of the presentation of the
feasibility report on September 27, 2021. Residents from Independence Avenue North were present to ask
questions. Staff has also scheduled a site visit on October 20, 2021 at 4:00 pm with residents along
Independence Avenue North to answer any questions on how the watermain replacement will affect their
property, trees, driveways, curb and gutter replacement, storm sewer improvements, etc. These types of
meetings have worked well in the past to address resident’s questions. Residents may provide additional
comments to the Council and staff at the October 25, 2021 public hearing.
Funding
The total project cost estimate for work proposed in the feasibility report is $2,050,069.14. The majority of the
project will be funded by the city’s street infrastructure and enterprise funds, as well as assessments to tax‐
exempt properties. The tables below reflect the project costs and funding.
Agenda Section
Public Hearing
Item Number
7.1
Request for Action, Page 2
Project Cost Summary
Item Subtotal Contingencies
(10%)
Total
Construction
Indirect
(20%) Project Costs
Mill & Overlay $466,741.85 $46,674.19 $513,416.04 $102,683.21 $616,099.24
Reclaim &
Overlay $131,085.00 $13,108.50 $144,193.50 $28,838.70 $173,032.20
Subtotal ‐ Street $597,826.85 $59,782.69 $657,609.54 $131,521.91 $789,131.44
Water Main $807,735.83 $80,773.58 $888,509.42 $177,701.88 $1,066,211.30
Sanitary Sewer $63,840.00 $6,384.00 $70,224.00 $14,044.80 $84,268.80
Storm Water $83,680.00 $8,368.00 $92,048.00 $18,409.60 $110,457.60
Subtotal ‐
Utilities $955,255.83 $95,525.58 $1,050,781.42 $210,156.28 $1,260,937.70
Total ‐ Street &
Utilities $1,553,082.68 $155,308.27 $1,708,390.95 $341,678.19 $2,050,069.14
Funding Summary
Funding Source Feasibility Report
Estimate
Capital Improvements Plan (CIP)
Budget Amount Difference
Mill and Overlay $616,099.24
$502,971.60 ($286,159.84) Reclaim and Overlay $173,032.20
Subtotal ‐ Street Fund $789,131.44
Water fund $1,066,211.30 $1,376,550.00 $310,338.70
Sanitary Sewer fund $84,268.80 $100,000.00 $15,731.20
Storm Water fund $110,457.60 $100,000.00 ($10,457.60)
Total Project Costs $2,050,069.14 $2,079,521.60 $29,452.46
Attachments
Resolution
Engineer’s Memo
Project Map
Feasibility Report
Water Break History Map
Stantec Consulting Services Inc.
733 Marquette Avenue, Suite 1000
Minneapolis, MN 55402
October 19, 2021
File: 193805342
Attention: Bernie Weber, Director of Public Works
City of New Hope
5500 International Parkway
New Hope, MN 55428
Reference: 2022 Infrastructure Improvements - Presentation of Feasibility Report
City Project No. 1074
Dear Bernie,
A feasibility report and cost estimate were prepared and presented for this project at the
September 27, 2021 Council Meeting in compliance with Chapter 429 requirements. At that
meeting, the Council accepted the feasibility report and called for the public hearing to be held
on October 25, 2021.
The project generally consists of street and utility improvements north of Bass Lake Road in the
Liberty west neighborhood (see location map in the feasibility report).
The estimated total project cost for the street, water main, sanitary sewer, and storm sewer
improvements, including contingencies and indirect costs, is approximately $2.05 million as shown
below.
Project Cost Summary
Item Construction Contingencies (10%)Indirect (20%)Project Costs
Mill and Overlay $466,741.85 $46,674.19 $102,683.21 $616,099.24
Reclaim and Overlay $131,085.00 $13,108.50 $28,838.70 $173,032.20
Subtotal - Street $597,826.85 $59,782.69 $131,521.91 $789,131.44
Water Main $807,735.83 $80,773.58 $177,701.88 $1,066,211.30
Sanitary Sewer $63,840.00 $6,384.00 $14,044.80 $84,268.80
Storm Water $83,680.00 $8,368.00 $18,409.60 $110,457.60
Total $1,553,082.68 $155,308.27 $341,678.19 $2,050,069.14
At the Public Hearing, it is recommended a summary of the project scope be presented along
with the proposed assessment roll. Using cost estimates prepared for the report, assessment
amounts were calculated for assessable properties within the project area (see tax exempt
properties figure drawing). The assessable properties and corresponding estimated assessments
are shown in the table below:
Owner Address Assessment Amount
1 City of New Hope (Liberty Park)9015 60th Avenue North $6,463.88
Total $6,463.88
October 19, 2021
Mr. Bernie Weber
Page 2 of 2
Reference:2022 Infrastructure Improvements – Presentation of Feasibility Report
If Council accepts the information presented and chooses to move forward with this project after
the Public Hearing, we then recommend that the Council approves a resolution ordering the
construction of and preparation of plans and specifications for the 2022 Infrastructure
Improvements at the October 25, 2021 meeting. Bids would be received on or around February
2022, construction work done in 2022, and substantial completion of the project in Fall 2022 with
final completion in Spring/Summer 2023.
If you have any questions or require further information, please call me at (612) 712-2021.
Sincerely,
Stantec Consulting Services Inc.
Dan D. Boyum, P.E.
City Engineer
dan.boyum@stantec.com
Attachments: 2022 Infrastructure Improvement Project Feasibility Report
Cc: Kirk McDonald, Valerie Leone, Andrew Kramer, Dave Lemke, Matt Rowedder – New Hope; Stacy Woods - Jensen Sondrall Persellin & Woods, P.A.;
Lucas Miller, Ann Dienhart – Stantec.
New HopePlymouth
Crystal
Robbinsdale 0 150 300Feet
($$¯
1:3,600 (At original document size of 8.5x11)
Revised: 2021-09-20 By: dmericksonV:\1938\Clients\New_Hope\Projects\2022_Infrastructure_Project\Location_Map.mxd
Disclaimer: Stantec assumes no responsibility for data supplied inelectronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provisionof the data.
Proposed Improvements
Reclaim and Watermain Replacement 2" Mill and OverlayTrenchless Watermain Replacement City Park
New Hope, Minnesota
Location Map and Proposed ImprovementsFigure 1
2022 Infrastructure Improvements Project
Feasibility Report For
2022 Infrastructure Improvements
Prepared for:
City of New Hope, Minnesota
City Project No. 1074
September 2021
Stantec Project No. 193805342
Stantec Consulting Services Inc.
733 Marquette Avenue Suite 1000, Minneapolis, MN 55402-2309
September 27, 2021
Honorable Mayor and Council
City of New Hope
4401 Xylon Avenue North
New Hope, MN 55428-4898
Re:2022 Infrastructure Improvements
Client Project No. 1074
Stantec Project No. 193805342
Dear Mayor and Council Members:
We are pleased to present our Feasibility Report for the 2022 Infrastructure Improvements project.
The general location of the work includes streets located east of TH 169 and north of Bass Lake
Road (CSAH 10) in the Liberty Park West neighborhood.
Streets included in the project were recommended based upon the current condition of the
pavement and underlying utilities.
The improvements identified include utility replacement on Independence Avenue North and
along Bass Lake Road, as well as the continued focus on a more aggressive pavement
management strategy to improve the driving surface of more streets utilizing overlays and
reclamation. This pavement management philosophy will provide for quicker street improvements
and will allow the utility funds to build for future full reconstruction. The new overlays and reclaim
streets will improve the quality of life, increase the aesthetic value, and increase the safety of the
roadways.
The finding of this report will be presented and discussed at the September 27, 2021, Council
meeting.
Respectfully submitted,
STANTEC CONSULTING SERVICES, INC.
Dan D. Boyum, P.E.
I hereby certify that this plan, specification, or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
Dan D. Boyum, P.E.
Date: September 27, 2021 Reg. No. 23451
City of New Hope Stantec Project No: 193805078
2022 Infrastructure Improvements Page 3
CITY OF NEW HOPE – 2022 INFRASTRUCTURE IMPROVEMENT PROJECT
TABLE OF CONTENTS
TABLE OF CONTENTS................................................................................................................................................. 3
INTRODUCTION ......................................................................................................................................................... 5
HISTORY ................................................................................................................................................................... 5
SCOPE OF STUDY ................................................................................................................................................... 5
FIGURE 1 – 2021 LOCATION AND PROPOSED IMPROVEMENTS ................................................................ 6
EXISTING CONDITIONS ............................................................................................................................................. 7
TABLE 1 – PAVEMENT RATING INDEX (PRI) SUMMARY ................................................................................. 7
TABLE 2 – GEOTECHNICAL FINDINGS ............................................................................................................. 8
FIGURE 2 – PAVEMENT RATINGS INDEX .......................................................................................................... 9
FIGURE 3 – BORING AND GPR TESTING........................................................................................................ 10
FIGURE 3B – BORING AND GPR TESTING ..................................................................................................... 11
FIGURE 4 – WATER MAIN BREAK HISTORY .................................................................................................... 12
STREET IMPROVEMENTS .......................................................................................................................................... 13
Full-depth reclamation ...................................................................................................................................... 13
TABLE 3 – FULL-DEPTH RECLAMATION STREETS ............................................................................................ 13
MILL AND OVERLAY ............................................................................................................................................ 14
TABLE 4 – MILL AND OVERLAY STREETS ........................................................................................................ 14
FIGURE 5 – TYPICAL SECTIONS ....................................................................................................................... 15
COMPLETE STREETS.............................................................................................................................................. 16
WATER MAIN IMPROVEMENTS .............................................................................................................................. 17
FIGURE 6 – PROPOSED WATER MAIN IMPROVEMENTS.............................................................................. 18
SANITARY SEWER IMPROVEMENTS ....................................................................................................................... 19
FIGURE 7 – PROPOSED SANITARY SEWER IMPROVEMENTS ....................................................................... 20
STORM SEWER IMPROVEMENTS ............................................................................................................................ 21
MILL AND OVERLAY and full depth reclamation areas .............................................................................. 21
STORMWATER MANAGEMENT .......................................................................................................................... 21
FIGURE 8 – PROPOSED STORM SEWER IMPROVEMENTS ........................................................................... 23
COST ESTIMATES ...................................................................................................................................................... 24
TABLE 5 –PROJECT COST ESTIMATE ............................................................................................................... 24
FINANCING .............................................................................................................................................................. 25
REVENUES ............................................................................................................................................................. 25
ASSESSMENTS ....................................................................................................................................................... 25
TABLE 6 – PROPOSED ASSESSMENT RATES ................................................................................................... 25
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 4
TABLE 7 – ASSESSABLE REVENUE .................................................................................................................... 25
TABLE 8 – FUNDING SOURCE ......................................................................................................................... 26
ALTERNATES DISCUSSION ................................................................................................................................... 26
FIGURE 9 – TAX EXEMPT PROPERTIES – ASSESSMENTS ................................................................................ 27
PROJECT SCHEDULE ............................................................................................................................................... 28
CONCLUSIONS AND RECOMMENDATIONS ....................................................................................................... 29
Appendices
Appendix A – Preliminary Cost Estimate Summary
Appendix B – Preliminary Assessments
Appendix C – Pavement and Geotechnical Evaluation, Braun Intertec
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 5
CITY OF NEW HOPE – 2022 INFRASTRUCTURE IMPROVEMENT PROJECT
INTRODUCTION
The purpose of this report is to investigate the feasibility of performing improvements to
reconstruct/rehabilitate existing local streets and local utilities within the proposed project area
shown on Figure 1.
HISTORY
In order to improve the overall quality of its local infrastructure system, the City of New Hope
continues with a more aggressive pavement management philosophy to improve the existing
driving surface and extend the pavement life of its streets.
As the road conditions and Pavement Rating Index’s (PRI’s) continued to decline, it was apparent
the City was not keeping up with street rehabilitations. The Pavement Management Plan continued
to fall behind, and a more aggressive approach to pavement management was agreed upon by
the City Council in May of 2014.
Interim overlays will be utilized to add structural integrity to the existing street sections. Full
reconstruction of the streets is to be completed with streets showing significant roadway subgrade
and drainage issues, as well as those having a significant amount of utility issues. Utility rehabilitation
on the overlay streets will be limited in efforts to build up water and other utility funds.
The pavement management strategy will improve the driving surface and will provide the ability to
improve more streets. The new overlays will improve the quality of life, increase the aesthetic value,
and increase the safety of the roadways.
SCOPE OF STUDY
The purpose of this report is to provide the feasibility of the utility improvements and a total of
approximately 1.26 miles of mill and overlay and reclaim and overlay street improvements. The type
of improvement required will be determined by the existing condition of the pavement, roadway
subgrade, as well as the condition of the underlying utilities. For each type of improvement, costs
and funding will be evaluated. The report breaks down the project into logical sections to allow for
reduction in scope, if desired, at the time of deciding if the project should move forward into the
design stage.
New HopePlymouth
Crystal
Robbinsdale 0 150 300Feet
($$¯
1:3,600 (At original document size of 8.5x11)
Revised: 2021-09-20 By: dmericksonV:\1938\Clients\New_Hope\Projects\2022_Infrastructure_Project\Location_Map.mxd
Disclaimer: Stantec assumes no responsibility for data supplied inelectronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provisionof the data.
Proposed Improvements
Reclaim and Watermain Replacement2" Mill and OverlayTrenchless Watermain ReplacementCity Parks
New Hope, Minnesota
Location Map and Proposed ImprovementsFigure 1
2022 Infrastructure Improvements Project
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 7
CITY OF NEW HOPE – 2022 INFRASTRUCTURE IMPROVEMENTS PROJECT
EXISTING CONDITIONS
The streets identified in this report were generally constructed in the 1960s.
City records have been reviewed and field inspections were performed on the structures and pipes
to identify warranted storm sewer and sanitary sewer improvement work in the project area.
Overall, the condition of the existing storm and sanitary systems in the mill and overlay segments is
fair. Several deteriorating storm structures and specific sanitary pipe issues have been identified.
The streets in the project area were rated in Fall of 2019 and Spring 2020 based on the City’s
Pavement Ratings Index (PRI). The index ranges from 0-100 and assigns a value to each street
segment based on the visual condition of the pavement. In general, a low PRI indicates a roadway
that is failing structurally, while a higher value indicates a segment in good condition. The table
below is a summary of the PRI ratings for the project area.
TABLE 1 –PAVEMENT RATING INDEX (PRI)SUMMARY
PRI Range Rating Description Length in Feet Length in Miles
0-20 Failing 0 0
21-40 Very Poor 0 0
41-60 Poor 2,000 0.38
61-80 Good 4,675 0.88
81-100 Excellent 0 0
Totals 6,675 1.26
AVERAGE PRI = 67
Figure 2 shows the pavement ratings for each street within this project area.
In addition to the PRI ratings, soil borings and ground penetrating radar have been completed to
assist us in further understanding the existing street section characteristics. Figure 3 identifies the
locations and limits of this field exploration. Final data and the accompanying reports have been
received and generally support the identified street improvements proposed in this report.
Many of the past infrastructure projects identified Petromat material within some of the existing
pavement sections. Petromat is a fabric material that was placed between the layers of bituminous
pavement as an interim improvement to provide strength in the street and reduce cracking. No
Petromat was discovered within the project streets. The Pavement and Geotechnical Evaluation
Report, completed by Braun Intertec dated September 15, 2021 is included in Appendix C of this
report.
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 8
TABLE 2 –GEOTECHNICAL FINDINGS
Street From To
Petromat
Depth (in)
Bituminous
Depth (in)
Recommended
Street
Improvement
59TH AVE N HILLSBORO AVE N GETTYSBURG AVE N -4.50 2" M&O
59TH AVE N INDEPENDENCE AVE HILLSBORO AVE N -2" M&O
60TH AVE N GETTYSBURG AVE N ENSIGN AVE N -6.00 " M&O
60TH AVE N HILLSBORO AVE N GETTYSBURG AVE N 2" M&O
GETTYSBURG AVE N 59TH AVE N 60TH AVE N -4.00 2" M&O
GETTYSBURG AVE N GETTYSBURG CIR N 59TH AVE N -4.00 2" M&O
GETTYSBURG CIR N GETTYSBURG AVE N CUL DE SAC N -4.25 2" M&O
HILLSBORO CIR N HILLSBORO AVE N CUL DE SAC E -4.25 2" M&O
HILLSBORO AVE N 60TH AVE N GETTYSBURG AVE N -4.25 2" M&O
HILLSBORO AVE N HILLSBORO CIR N 60TH AVE N -9.5 2" M&O
HILLSBORO AVE N 59TH AVE N HILLSBORO CIR N 2" M&O
INDEPENDENCE AVE 59TH AVE N WEST END -5.00 RECLAIM
INDEPENDENCE AVE SOUTH END 59TH AVE N RECLAIM
All the water main within this project area is cast iron. As is typical with other existing cast iron water
main in the city, a history of breaks has been confirmed on several of the project streets and are
shown on Figure 4. The water main breaks are especially prevalent on Independence Avenue. The
water main will be replaced in this area; however, only the trench of the water main will be
reconstructed. The remaining streets will be reclaimed and overlaid.
New HopePlymouth
Crystal
RobbinsdalePlymouthNew HopeHIGHWAY 16959th Ave N
Hillsboro Cir
Independence Ave NGettysburg CirEnsign Ave N60th Ave N
Gettysburg Ave NA l l a n C i r
Hillsboro Ave N
61st Cir N 61st Ave N
60 1/2 Ave N
Decatur ve NInternational Pkwy Ensign Ave NB A S S L A K E R D (C S A H 1 0 )
Liberty ParkGettysburg Ave N0 150 300Feet
($$¯
1:3,600 (At original document size of 8.5x11)
Revised: 2021-09-20 By: dmericksonV:\1938\Clients\New_Hope\Projects\2022_Infrastructure_Project\PRI_Ratings_map.mxd
Disclaimer: Stantec assumes no responsibility for data supplied inelectronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provisionof the data.
Pavement Rating Index
0 - 20 Failing21 - 40 Very Poor41 - 60 Poor61 - 80 Good81 - 100 Excellent
New Hope, Minnesota
Pavement Rating Index (PRI)Figure 2
2022 Infrastructure Improvements Project
ST-1
ST-2
C-1
C-2
C-3
C-4
C-5
C-6
C-7
C-8
C-9TH 169BASS LA
K
E
R
D
G
E
T
T
Y
S
BURGAVE NINDEPENDENCE AVE N59TH
A
V
E
NHILLSBORO AVE N60TH AVE NGETTYSBURG AVE NENSIGN AVE NF:\2021\B2107447\CAD\B2107447.dwg,Geotech,9/15/2021 10:15:37 AMbraunintertec.com
952.995.2000
Minneapolis, MN 55438
11001 Hampshire Avenue S
Project No:
B2107447
Drawn By:
Date Drawn:
Checked By:
Last Modified: 9/15/21
Drawing No:
Project Information
Drawing Information
B2107447
JAG
8/23/21
AJG
City of New Hope 2022
Infrastructure
Improvement Project
Various Streets
New Hope, Minnesota
Soil Boring and
Pavement Core
Location Sketch
N
DENOTES APPROXIMATE LOCATION OF
PAVEMENT CORE AND HAND AUGER BORING
0
SCALE:1" = 250'
250'125'
DENOTES APPROXIMATE LOCATION OF
STANDARD PENETRATION TEST BORING
GPR TESTING AREA
FIGURE 3
New HopePlymouth
Crystal
Robbinsdale 0 150 300Feet
($$¯
1:3,600 (At original document size of 8.5x11)
Revised: 2021-09-21 By: dmericksonV:\1938\Clients\New_Hope\Projects\2022_Infrastructure_Project\Existing_Water_Main_and_Break_History_map.mxd
Disclaimer: Stantec assumes no responsibility for data supplied inelectronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provisionof the data.
Legend
!(Watermain BreakReclaim and Watermain Replacement2" Mill and OverlayTrenchless Watermain Replacement
New Hope, Minnesota
Watermain Break HistoryFigure 4
2022 Infrastructure Improvements Project
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 13
CITY OF NEW HOPE – 2022 INFRASTRUCTURE IMPROVEMENT PROJECT
STREET IMPROVEMENTS
Approximately 1.26 miles of streets are proposed to be improved as identified in Figure 1. Two
different potential street improvement methods have been identified for this project. The typical
proposed street sections corresponding to the proposed improvements are shown on Figure 5. The
rehabilitation methods were generally chosen based on the following criteria:
·Full Depth Reclamation
o Poor street and underlying base conditions that cannot be significantly improved by mill
& overlay
o Very poor PRI rating – failing base and wear course pavement
o Limited or lesser amount of water main breaks than full reconstruct streets
o Additional storm sewer required
·Mill and Overlay
o Poor street conditions of which can have an effective benefit with a mill and overlay
o Average PRI rating
o Limited or lesser amount of water breaks than full reconstruct streets
o Minimal utility improvements required
Miscellaneous
Boulevards disturbed by construction in all areas will be graded, shaped, and restored. If driveways
are disturbed during construction, they will be patched to match the existing driveway material. All
traffic signs within the project limits will be replaced, as signs and posts will continue to be updated
to meet current code and sign retro-reflectivity standards. Streetlight replacement or upgrades are
not planned with this project, and costs are not included in this report.
FULL-DEPTH RECLAMATION
Full-depth reclamation (or Reclaim and Overlay) consists of grinding up the entire pavement section
and mixing it with the underlying aggregate base, creating a homogeneous roadway base. This
material is then shaped, compacted, and excess material is hauled away. A new, 3-inch lift of
bituminous wear pavement is then placed over the entire roadway. Curb replacement will be
completed on areas with severe damage or poor drainage prior to paving, and spot patching will
be completed on any areas with soft subgrade soils. There will be some improvements to the
existing storm sewer system as well. Table 3 below summarizes the areas identified to be reclaimed.
TABLE 3 –FULL-DEPTH RECLAMATION STREETS
Street From To Length (FT)
INDEPENDENCE AVE N SOUTH END 59TH AVE N 154.19
INDEPENDENCE AVE N 59TH AVE N WEST END 892.95
Total:1,047.14 feet (0.20 mi)
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 14
MILL AND OVERLAY
The full width mill and overlay consists of milling the upper 2 inches of the existing bituminous surface
across the entire width of the street, followed by an equivalent depth overlay over the entire
bituminous surface. The full width mill and overlay increases structural strength of the road. Curb
replacement will be completed on areas of severely damaged or poorly draining curb prior to
paving. Spot patching will be completed on any severely cracked or failing pavement prior to the
new bituminous overlay. The following streets are recommended to be rehabilitated with a full
width mill and overlay.
TABLE 4 –MILL AND OVERLAY STREETS
Street From To Length (FT)
59TH AVE N HILLSBORO AVE N GETTYSBURG AVE N 498.40
59TH AVE N INDEPENDENCE AVE N HILLSBORO AVE N 291.92
60TH AVE N GETTYSBURG AVE N ENSIGN AVE N 473.33
60TH AVE N HILLSBORO AVE N GETTYSBURG AVE N 311.35
GETTYSBURG CIR N GETTYSBURG AVE N CUL DE SAC N 380.86
GETTYSBURG AVE N 59TH AVE N 60TH AVE N 952.87
GETTYSBURG AVE N GETTYSBURG CIR N 59TH AVE N 358.15
HILLSBORO CIR N HILLSBORO AVE N CUL DE SAC E 182.45
HILLSBORO AVE N 60TH AVE N GETTYSBURG AVE N 1428.86
HILLSBORO AVE N HILLSBORO CIR N 60TH AVE N 417.15
HILLSBORO AVE N 59TH AVE N HILLSBORO CIR N 332.10
Total:5,627.44 feet (1.06 mi)
On past projects, the city has also utilized an edge mill and overlay improvement method. This
technique consists of milling off the upper portion of bituminous on only the outer 6’ of each side of
the roadway and is generally utilized in areas of poor drainage when the existing roadway crown is
too low. Given that there do not appear to be poorly drained areas as a result of a low centerline
crown, as well as some poor overall pavement conditions across the entire width of the roadway, a
full width mill and overlay is recommended on all the identified segments for this project.
LC
EXISTING PROPOSED
VARIES VARIES
FULL DEPTH RECLAIM OF
EXISTING PAVEMENT AND
BASE
SPOT REPAIR EX. CURB AND
GUTTER ONLY AS DIRECTED
BY ENGINEER
3" - WEARING COURSE (SPWEA240B)
FULL DEPTH RECLAIM
NOT TO SCALE
SHAPE EXISTING RECLAIM
MATERIAL/HAUL EXCESS
3%
LC
EXISTING PROPOSED
VARIES VARIES
TACK COAT2" MILL
SPOT REPAIR EX. CURB AND
GUTTER ONLY AS DIRECTED
BY ENGINEER
2" - WEARING COURSE (SPWEA240B)
MILL & OVERLAY
NOT TO SCALE
VARIES
59TH AVE
60TH AVE
GETTYSBURG AVE
GETTYSBURG CIR
HILLSBORO AVE
HILLSBORO CIR
INDEPENDENCE AVE
DATE:PROJ. NO.:PlotDate:09/20/2021-12:08pmDrawingname:V:\1938\active\193805342\Reports\Feasibility\Figures\193805342-Fig5.dwgXrefs:733 S Marquette Ave Unit 1000
Minneapolis, MN 55402
www.stantec.com
TYPICAL SECTIONS
NEW HOPE, MINNESOTA
2022 INFRASTRUCTURE IMPROVEMENTS
SEPTEMBER 2021
FIGURE:5
193805342
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 16
COMPLETE STREETS
In May 2011, the City of New Hope approved a Complete Streets policy. The policy outlined the
city’s commitment to consider the safety and functionality of streets for people of all ages and
abilities, and for various modes of transportation. Examples of modes of transportation include
walking, biking, wheelchairs, public transit, and automotive. In accordance with the policy, a
Complete Streets network has been reviewed with this project.
While streets will be further reviewed during the design phase for all street improvement areas, it is
not anticipated that any trails, sidewalks, bike lanes, or other complete streets elements will be
incorporated into this project area. All the streets are local streets which currently do not have any
of these elements and are not designated to have them within the City’s comprehensive plan.
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 17
CITY OF NEW HOPE – 2022 INFRASTRUCTURE IMPROVEMENT PROJECT
WATER MAIN IMPROVEMENTS
The water main on the street segments identified in this report is made of cast iron pipe (CIP).
Historically, the CIP water main throughout the city has been a significant maintenance issue.
Numerous breaks have occurred over the years, causing considerable inconvenience to residents
and maintenance cost to the city. Figure 4 shows the history of water main breaks throughout the
project area.
Full Depth Reclamation (or Reclaim and Overlay)
These proposed water main improvements can be seen in Figure 6 and are located on
Independence Avenue North between south of 59th Avenue North and then north to the west end
of the road. In this area, the number of consecutive breaks is driving the replacement of the
watermain in this area. Being the street improvement type will remain reclaim & overlay, services
and curb stops will not be replaced. Each service saddle and corporation stop will be replaced at
the new PVC main and reconnect to the service next to the main. Replacement of the watermain
in this area will include new hydrants and gate valves.
Any breaks that may occur in the future will require repair and patching of the roadway. The
primary goal of the reclaim and overlay improvements is to improve underlying base and driving
surface and not spend funds on utility replacement until the scheduled reconstruction of these
streets.
Bass Lake Road (CSAH 10) and Freeway Ramp Area
These proposed water main improvements can be seen in Figure 6 and are located along Bass Lake
Road (CSAH 10) and adjacent to the Freeway Ramp onto Highway 169. The City has experienced
past issues with valves along this line. Due to the age of the line (originally constructed in 1964),
location next to existing utility lines, and difficulty in trying to repair within the county and state right
of way areas, staff is recommending replacement of the line by trenchless methods.
A combination of directional drilling and pipe bursting is being proposed at this time. These
trenchless methods will be further evaluated during design. Pipe bursting was recently done with
the watermain replacement work on Winnetka Avenue North in 2020. Replacement of the
watermain in this area will include new hydrants and gate valves. The services in this area are
commercial lines, and those will be reconnected with the proposed improvements.
New HopePlymouth
Crystal
RobbinsdalePlymouthNew HopeHIGHWAY 169BASS LAKE RD
59th Ave N
Hillsboro Cir
Independence Ave NGettysburg CirEnsign Ave N60th Ave N
Gettysburg Ave NAllan Cir
Hillsboro Ave N
61st Cir N 61st Ave N
60 1/2 Ave N
Decatur ve NInternational Pkwy Ensign Ave NLiberty Park
(CSAH 10)
10
" 8" PVCGettysburg Ave N0 150 300Feet
($$¯
1:3,600 (At original document size of 8.5x11)
Revised: 2021-09-20 By: dmericksonV:\1938\Clients\New_Hope\Projects\2022_Infrastructure_Project\Proposed_Watermain_Improvments.mxd
Disclaimer: Stantec assumes no responsibility for data supplied inelectronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provisionof the data.
Proposed Improvements
Watermain - Remove and ReplaceTrenchless Watermain ReplacementExisting WatermainStudy Area
Figure 6Proposed Watermain Improvements2022 Infrastructure Improvements ProjectNew Hope, Minnesota
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 19
CITY OF NEW HOPE – 2022 INFRASTRUCTURE IMPROVEMENT PROJECT
SANITARY SEWER IMPROVEMENTS
The sanitary sewer mains have been lined in 2020 and 2021 and overall are in satisfactory condition.
No other spot repairs will be required in the mill and overlay or reclaim and overlay areas based on
current televising reports, which will be verified during final design.
All manhole covers within the project area that have open pick holes are proposed to be replaced
with covers with concealed pick holes. This will remove any unnecessary inflow into the sanitary
sewer system through those openings. All existing manholes covers with potential inflow are
identified on Figure 7.
All costs associated to removing inflow and infiltration can be credited to Metropolitan Council I/I
(Inflow/Infiltration) Excess Surcharge amounts.
New HopePlymouth
Crystal
Robbinsdale
!(!(!(!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(!(PlymouthNew HopeHIGHWAY 169B A S S L A K E R D
59th Ave N
Hillsboro Cir
Independence Ave NGettysburg CirEnsign Ave N60th Ave N
Gettysburg Ave NA l l a n C i r
Hillsboro Ave N
61st Cir N 61st Ave N
60 1/2 Ave N
Decatur ve NInternational Pkwy Ensign Ave N(C S A H 1 0 )Gettysburg Ave NLiberty Park
0 140 280Feet
($$¯
1:3,600 (At original document size of 8.5x11)
Revised: 2021-09-20 By: dmericksonV:\1938\Clients\New_Hope\Projects\2022_Infrastructure_Project\Proposed_Sanitary_Sewer_Improvments.mxd
Disclaimer: Stantec assumes no responsibility for data supplied inelectronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provisionof the data.
Proposed Improvements
!(Manhole - Remove and Replace Lid, Frame and RingsExisting ManholeExisting Sanitary SewerCity ParksStudy Area
New Hope, Minnesota
Proposed Sanitary Sewer ImprovementsFigure 7
2022 Infrastructure Improvements Project
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 21
CITY OF NEW HOPE – 2022 INFRASTRUCTURE IMPROVEMENT PROJECT
STORM SEWER IMPROVEMENTS
MILL AND OVERLAY AND FULL DEPTH RECLAMATION AREAS
The storm sewer improvements planned for the streets located east of TH 169 and north of Bass Lake
Road (CSAH 10) in the Liberty Park West neighborhood will be minimal as the number of structures
identified to be in poor condition would exceed designated 2022 budgets.
Some cost has been allocated to remove and replace a few storm sewer casting, frame and rings
for structures that may be in critical structural condition. Further review of storm sewer structure
conditions will be done during design. In addition, existing storm structures at the south and west
ends of Independence Avenue North will be removed and replaced due to past review of their
condition. The impact of these improvements to the surrounding areas is minimal, and it is
recommended to complete these improvements with this project.
During the design phase of this project, additional localized drainage issues may be reviewed to be
completed within this project or added to a future backyard drainage project. Figure 8 identifies
storm sewer structures within the project area with the proposed storm improvements.
STORMWATER MANAGEMENT
This project lies within the Shingle Creek Watershed Management Commission (SCWMC). As a linear
redevelopment project that will not increase impervious surface amounts, storm water quality and
quantity requirements do not apply. Although, as there is no current storm water treatment or
volume control with the existing street conditions, it is planned to incorporate storm water best
management practices such as the iron enhanced sand filter trenches as described below.
Iron Enhanced Sand Filter Trench
Iron enhanced sand filter trenches provide for underground filtration of rainwater prior to entering
the ground or storm water system. Structures within the curb would direct runoff from the roadway
into areas of filtration media that is mixed with iron. The iron removes dissolved constituents,
including phosphate, from the storm water. Drain tile will eventually collect filtered or excess runoff
and direct it to the storm sewer system.
An iron enhanced sand filter trench is proposed to be installed along 60th Avenue North in the
boulevard area behind the curb next to Liberty Park. This potential location is shown on Figure 8.
This location will be finalized during design based on several factors including construction impacts
to the park, existing utilities, and drainage areas.
Rain Gardens
Rain gardens provide for a natural filtration and storage area for rainwater prior to entering the
ground or the storm sewer system. This natural process helps to filter out pollutants that are washed
from streets and lawns with rainwater. Rain gardens also reduce peak flows during storm events.
Potential locations for rain gardens will be identified during the design process. The criteria used in
determining the potential rain garden locations include the following:
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 22
·Catch basin, existing water body, or drain tile near proposed location to allow discharge
from the rain garden drain tile.
·Existing slopes allowing for a rain garden without the need to install a retaining wall.
·Existing space acceptable for a rain garden (some locations may be limited by existing
sidewalks, mature trees, or right of way constraints).
Property owners that indicate a desire to have a rain garden will be contacted, and the area
analyzed to determine if a rain garden option will work at a given location during the design phase.
Storm Sump Structures
Storm Sump structures are storm structures that allow for separation of sediments by having a
reservoir that holds the storm water before out letting to the remainder of the storm system. Sump
structures are planned to be installed in the new structures discussed above along Independence
Avenue North.
There are several requirements set forth in the City of New Hope’s Local Water Management Plan
(LWMP) that this project must adhere to. These include the following:
·Use a 10-year rainfall event as the minimum criteria for all storm water conveyance facility
designs.
·Establish and maintain overflow routes from storm water basins and low areas to provide
relief during storm conditions which exceed design conditions, where possible.
New HopePlymouth
Crystal
Robbinsdale
")
")
")
")
")
")
")
")
")
")
#*#*
#*")
#*#*
#*
#*
#*
#*
#*
#*
")
#*
#*
#*
#*
#*
")
")
#*
#*#*")
#*
#*
")
#*
#*
")
")!(!(
")
")
")
")
")
")
")")
!(
!(
!(
")
")
")
")")
")")
")
")
")
")
#*#*
#*
#*
#*
")
")
!(
!(#*
#*
!(
")
")
")
")
#*
")")")
")
")
")")
")
")
")
")")
")
")")
")
")
")
")")
!(
")!(
!(
")
")
")
")
")
")
")
#*
!(!(
!(
!(
!(
!(
!(!(!(
!(!(
")
")")")")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")")")")
")
#*
!(
")
")
")
")")
")
")
")
")
")
")
!(
!(
")
")")
")
")
")
")PlymouthNew HopeHIGHWAY 169B A S S L A K E R D
59th Ave N
Hillsboro Cir
Independence Ave NGettysburg CirEnsign Ave N60th Ave N
Gettysburg Ave NA l l a n C i r
Hillsboro Ave N
61st Cir N 61st Ave N
60 1/2 Ave N
Decatur ve NInternational Pkwy Ensign Ave NLiberty Park
(C S A H 1 0 )Gettysburg Ave N0 150 300Feet
($$¯
1:3,600 (At original document size of 8.5x11)
Revised: 2021-09-20 By: dmericksonV:\1938\Clients\New_Hope\Projects\2022_Infrastructure_Project\Proposed_Storm_Sewer_Improvments.mxd
Disclaimer: Stantec assumes no responsibility for data supplied inelectronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provisionof the data.
Proposed Storm Sewer Improvements
")Catch Basin – Proposed
")Catch Basin - Existing
#*Flared End Section - Existing
!(Manhole - ExistingStorm Pipe - ExistingPotential Filtration AreaCity ParksStudy Area
New Hope, Minnesota
Proposed Storm Sewer ImprovementsFigure 8
2022 Infrastructure Improvements Project
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 24
CITY OF NEW HOPE – 2022 INFRASTRUCTURE IMPROVEMENT PROJECT
COST ESTIMATES
The total project cost estimate for work proposed to be completed as part of the 2022 Infrastructure
Improvements project is $2,050,069.14.
Detailed cost estimates have been prepared and can be seen in Appendix A. Estimated indirect
costs include engineering, legal, fiscal, and contract administration. Summaries of the estimated
costs are shown below:
TABLE 5 –PROJECT COST ESTIMATE
Item Subtotal Contingencies
(10%)
Total
Construction Indirect (20%) Project Costs
Mill & Overlay $466,741.85 $46,674.19 $513,416.04 $102,683.21 $616,099.24
Reclaim &
Overlay $131,085.00 $13,108.50 $144,193.50 $28,838.70 $173,032.20
Subtotal - Street $597,826.85 $59,782.69 $657,609.54 $131,521.91 $789,131.44
Water Main $807,735.83 $80,773.58 $888,509.42 $177,701.88 $1,066,211.30
Sanitary Sewer $63,840.00 $6,384.00 $70,224.00 $14,044.80 $84,268.80
Storm Water $83,680.00 $8,368.00 $92,048.00 $18,409.60 $110,457.60
Subtotal - Utilities $955,255.83 $95,525.58 $1,050,781.42 $210,156.28 $1,260,937.70
Total - Street &
Utilities $1,553,082.68 $155,308.27 $1,708,390.95 $341,678.19 $2,050,069.14
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 25
CITY OF NEW HOPE – 2022 INFRASTRUCTURE IMPROVEMENT PROJECT
FINANCING
REVENUES
The following are possible sources of funding for the 2022 Infrastructure Improvements project:
·Street Improvement Fund
·Sanitary Sewer Fund
·Sanitary Sewer I/I Fund
·Water Main Fund
·Storm Water Fund
·Assessments
ASSESSMENTS
Benefiting, tax-exempt properties are proposed to be assessed for street improvements as part of
the construction of this project. Figure 9 shows the locations of these properties. Assessments will not
be levied against taxable residential and commercial/ industrial properties in accordance with the
New Hope’s Assessment Policy, nor will any utility improvements be assessed to any benefitting
property. The following tabulates the assessment rates for this project:
TABLE 6 –PROPOSED ASSESSMENT RATES
Improvement Strategy Commercial Rate
per Front Foot
Residential Rate per Front
Foot
Mill and Overlay $117.52 $78.35
The assessable properties with their respective property types and assessments are as follows:
TABLE 7 –ASSESSABLE REVENUE
#Owner Address Improvement
Strategy
Front
Footage Property Type Assessment
Amount
1 City of New Hope
(Liberty Park)9015 60th Ave N Mill and
Overlay 82.5 Residential $6,463.88
Total Assessments $6,463.88
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 26
TABLE 8 –FUNDING SOURCE
Funding
Source/
Improvement
Street Fund Water Fund Sewer Fund
*
Storm Sewer
Fund Assessments Total
Street $782,667.56 $6,463.88 $789,131.44
Water Main $1,066,211.30 $1,066,211.30
Sanitary Sewer $84,268.80 $84,268.80
Storm Sewer $110,457.60 $110,457.60
Totals $782,667.56 $1,066,211.30 $84,268.80 $110,457.60 $6,463.88 $ 2,050,069.14
* Funding for I/I related improvements is estimated at $60,140.00, which can be funded from
separate Capital Improvement Projects within the Sewer Fund.
ALTERNATES DISCUSSION
This report breaks down the project into logical sections to allow for reduction in scope, if desired, at
the time of deciding if the project should move forward into the design stage. As the estimated
costs are higher and lower than the original Capital Improvement Plan 2022 Budget, we will work
with Staff to identify logical adjustments. For example, because there are street restoration costs
tied to the watermain improvements and since watermain costs are coming in under budget at this
time, some of those street restoration costs could be associated with watermain improvements.
TABLE 9 – FEASIBILITY ESTIMATE COST COMPARED TO CIP BUDGET
Funding Source Feasibility Report
Estimate
Capital
Improvements
Plan (CIP)
Budget Amount
Difference
Proposed non-city assessment amount $0.00
$502,971.60 ($286,159.84)Proposed city assessment amount $6,463.88
Street Infrastructure fund $782,667.56
Subtotal - Street Infrastructure fund $789,131.44
Water fund $1,066,211.30 $1,376,550.00 $310,338.70
Sanitary Sewer fund $84,268.80 $100,000.00 $15,731.20
Storm Water fund $110,457.60 $100,000.00 ($10,457.60)
Totals $2,050,069.14 $2,079,521.60 $29,452.46
New HopePlymouth
Crystal
RobbinsdalePlymouthNew HopeHIGHWAY 169BASS LAKE RD
59th Ave N
Hillsboro Cir
Independence Ave NGettysburg CirEnsign Ave N60th Ave N
Gettysburg Ave NAllan Cir
Hillsboro Ave N
61st Cir N 61st Ave N
60 1/2 Ave N
Decatur ve NInternational Pkwy Ensign Ave N0611821240004
Liberty Park
(CSAH 10)Gettysburg Ave N0 150 300Feet
($$¯
1:3,600 (At original document size of 8.5x11)
Revised: 2021-09-20 By: dmericksonV:\1938\Clients\New_Hope\Projects\2022_Infrastructure_Project\Tax_Exempt_Properties.mxd
Disclaimer: Stantec assumes no responsibility for data supplied inelectronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provisionof the data.
Legend
Reclaim and Watermain Replacement 2" Mill and OverlayTrenchless Watermain Replacement City ParkTax Exempt Property
New Hope, Minnesota
Figure 9Tax Exempt Properties *
* Tax Exempt Properties as of May 2021
2022 Infrastructure Improvements Project
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 28
CITY OF NEW HOPE – 2022 INFRASTRUCTURE IMPROVEMENTS PROJECT
PROJECT SCHEDULE
Authorize Feasibility Report June 28, 2021
Receive Report and Authorize Public Hearing September 27, 2021
Hold Public Hearing October 25, 2021
Authorize Plans and Specifications October 25, 2021
Possible Project Walkthrough with Residents November 2021
Approve Plans and Specifications/Authorize Bids January 10, 2022
Receive Bids/Award Contract February 14 or 28, 2022
Start Construction Spring 2022
Substantial Completion Fall 2022
Final Completion/Hold Final Assessment Hearing Spring/Summer 2023
City of New Hope Stantec Project No: 193805342
2022 Infrastructure Improvements Page 29
CITY OF NEW HOPE – 2022 INFRASTRUCTURE IMPROVEMENTS PROJECT
CONCLUSIONS AND RECOMMENDATIONS
It is the finding of this study that the proposed improvements are necessary, feasible, and cost
effective. The following steps are recommended:
·Adopt this report as the guide for development of the proposed improvements
·Hold a Public Improvement Hearing
·Order the preparation of plans and specifications
·Review plans and specifications – authorize bidding
·Provide alternate bid improvement options
·Receive bids
·Install the public utilities and streets, with construction anticipated to be completed in 2022,
and final completion in Spring/Summer of 2023
·Hold an Assessment Hearing after final completion in Spring/Summer 2023
Appendix A – Preliminary Cost Estimate
Summary
Table A-1
Project Cost Summary:
Improvement Type
MILL &
OVERLAY
STREETS
RECLAIM &
OVERLAY
STREET
BLR
TRENCHLESS
W/M
Total
Construction
Cost
10%
Contingencies 20% Indirect
Total Project
Cost
Streets $466,741.85 $131,085.00 $597,826.85 $59,782.69 $131,521.91 $789,131.44
Water Main $4,490.00 $355,898.33 $447,347.50 $807,735.83 $80,773.58 $177,701.88 $1,066,211.30
Sanitary Sewer $54,300.00 $9,540.00 $63,840.00 $6,384.00 $14,044.80 $84,268.80
Storm Sewer $52,900.00 $30,780.00 $83,680.00 $8,368.00 $18,409.60 $110,457.60
Total Construction Cost $578,431.85 $527,303.33 $447,347.50 $1,553,082.68
Contingencies (10%)$57,843.19 $52,730.33 $44,734.75 $155,308.27
Indirect (20%)$127,255.01 $116,006.73 $98,416.45 $341,678.19
Total Project Cost - Base Bid $763,530.04 $696,040.40 $590,498.70 $2,050,069.14 $155,308.27 $341,678.19 $2,050,069.14
September 2021
2022 Infrastructure Improvements
Preliminary Cost Estimate Summary
Appendix A-1
Construction Cost $466,741.85
Contingencies (10%)$46,674.19
Indirect (20%)$102,683.20
Total Cost $616,099.24
Cost Per C/L Foot, Base Improvement 5,627 $109.48
No.Item Units Qty Unit Price Total Price
1 MOBILIZATION LS 1 $17,600.00 $17,600.00
2 TRAFFIC CONTROL LS 1 $8,800.00 $8,800.00
3 MILL BITUMINOUS PAVEMENT - 2" DEPTH SY 18,689 $1.20 $22,426.65
4 REMOVE AND REPLACE CONCRETE CURB &
GUTTER LF 1,700 $40.00 $68,000.00
5 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SF 2,400 $2.00 $4,800.00
6 REMOVE CONCRETE DRIVEWAY PAVEMENT SF 2,400 $3.00 $7,200.00
7 AGGREGATE BASE, CLASS 5 - (SPECIAL)TN 1,400 $30.00 $42,000.00
8 BITUMINOUS PATCHING (SPECIAL) - TYPE SP 12.5
NON-WEARING COURSE MIXTURE(B)
TN 300 $130.00 $39,000.00
9 BITUMINOUS MATERIAL FOR TACK COAT GAL 940 $3.50 $3,290.00
10 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)TN 2,472 $70.00 $173,012.70
11 TYPE SP 9.5 BITUMINOUS MIXTURE FOR
DRIVEWAYS (2,B)
TN 50 $150.00 $7,500.00
12 6" CONCRETE DRIVEWAY SF 2,400 $8.00 $19,200.00
13 MASTIC PRIOR TO WEAR PAVING LF 13,000 $1.10 $14,300.00
14 EROSION CONTROL COMPOST BLANKET -
BLOWN WITH SEED
SY 2,350 $5.75 $13,512.50
15 TOPSOIL BORROW, MNDOT 3877.2B (LV)CY 450 $50.00 $22,500.00
16 STREET SWEEPER WITH PICKUP BROOM HR 20 $180.00 $3,600.00
Subtotal $466,741.85
+ Contingencies (10%)$46,674.19
Subtotal Construction $513,416.04
+ Indirect (20%)$102,683.20
Total Project Cost $616,099.24
Appendix A-2
Preliminary Cost Estimate
2022 Infrastructure Street Improvements
Mill & Overlay Streets
September 2021
Mill & Overlay: 5% Bituminous Patching, 15% Curb Replacement
Street Base Improvement (Mill & Overlay)
Construction Cost $131,085.00
Contingencies (10%)$13,108.50
Indirect (20%)$28,838.70
Total Cost $173,032.20
Cost Per C/L Foot, Base Improvement 1,047 $165.24
No.Item Units Qty Unit Price Total Price
1 MOBILIZATION LS 1 $4,900.00 $4,900.00
2 TRAFFIC CONTROL LS 1 $2,500.00 $2,500.00
3 RECLAIM AND SHAPE BITUMINOUS SY 3,400 $4.50 $15,300.00
4 REMOVE AND REPLACE CONCRETE CURB &
GUTTER LF 500 $40.00 $20,000.00
5 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SF 1,600 $2.00 $3,200.00
6 REMOVE CONCRETE DRIVEWAY PAVEMENT SF 500 $3.00 $1,500.00
7 AGGREGATE BASE, CLASS 5 - (SPECIAL)TN 350 $30.00 $10,500.00
8 MASTIC PRIOR TO WEAR PAVING LF 2,400 $1.10 $2,640.00
9 BITUMINOUS MATERIAL FOR TACK COAT GAL 170 $3.50 $595.00
10 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)TN 680 $70.00 $47,600.00
11 TYPE SP 9.5 BITUMINOUS MIXTURE FOR
DRIVEWAYS (2,B)
TN 40 $150.00 $6,000.00
12 6" CONCRETE DRIVEWAY SF 500 $8.00 $4,000.00
13 INLET PROTECTION EA 2 $300.00 $600.00
14 EROSION CONTROL COMPOST BLANKET -
BLOWN WITH SEED
SY 600 $5.75 $3,450.00
15 TOPSOIL BORROW, MNDOT 3877.2B (LV)CY 130 $50.00 $6,500.00
16 STREET SWEEPER (WITH PICKUP BROOM)HR 10 $180.00 $1,800.00
Subtotal $131,085.00
+ Contingencies (10%)$13,108.50
Subtotal Construction $144,193.50
+ Indirect (20%)$28,838.70
Total Project Cost $173,032.20
Appendix A-3
Preliminary Cost Estimate
2022 Infrastrcuture Street Improvements
Full Depth Reclaim Street
September 2021
Reclaim with 3" Overlay: 15% Curb Replacement
Street Base Improvement (Reclaim)
Water Sanitary Storm Total
Construction Cost $4,490.00 $54,300.00 $52,900.00 $111,690.00
Contingencies (10%)$449.00 $5,430.00 $5,290.00 $11,169.00
Indirect (20%)$987.80 $11,946.00 $11,638.00 $24,571.80
Total Utilities $5,926.80 $71,676.00 $69,828.00 $147,430.80
A.WATER MAIN
No.Item Units Qty Unit Price Total Price
1 MOBILIZATION LS 1 $200.00 $200.00
2 TRAFFIC CONTROL LS 1 $90.00 $90.00
3 REMOVE AND REPLACE WATER GV BOX
SECTION
EA 6 $700.00 $4,200.00
Subtotal $4,490.00
+ Contingencies (10%)$449.00
Subtotal Construction $4,939.00
+ Indirect (20%)$987.80
Total Project Cost $5,926.80
B.SANITARY SEWER
No.Item Units Qty Unit Price Total Price
1 MOBILIZATION LS 1 $2,100.00 $2,100.00
2 TRAFFIC CONTROL LS 1 $1,100.00 $1,100.00
3 INTEGRAL CONCRETE RING LF 35 $340.00 $11,900.00
4 REMOVE AND REPLACE SANITARY SEWER
FRAME AND RINGS
EA 28 $1,400.00 $39,200.00
Subtotal $54,300.00
+ Contingencies (10%)$5,430.00
Subtotal Construction $59,730.00
+ Indirect (20%)$11,946.00
Total Project Cost $71,676.00
C.STORM SEWER
No.Item Units Qty Unit Price Total Price
1 MOBILIZATION LS 1 $2,000.00 $2,000.00
2 TRAFFIC CONTROL LS 1 $1,000.00 $1,000.00
3 REMOVE AND REPLACE STORM SEWER FRAME
AND RINGS WITH CONCRETE RINGS AND
FRAME
EA 3 $1,300.00 $3,900.00
4 CONNECT TO STRUCTURE EA 1 $1,000.00 $1,000.00
5 FILTRATION TRENCH LS 1 $45,000.00 $45,000.00
Subtotal $52,900.00
+ Contingencies (10%)$5,290.00
Subtotal Construction $58,190.00
+ Indirect (20%) $11,638.00
Total Project Cost $69,828.00
Appendix A-4
Preliminary Cost Estimate
2022 Infrastructure Utility Improvements
Utility Costs on Mill & Overlay Streets
September 2021
Water Sanitary Storm Total
Construction Cost $355,898.33 $9,540.00 $30,780.00 $396,218.33
Contingencies (10%)$35,589.83 $954.00 $3,078.00 $39,621.83
Indirect (20%)$78,297.64 $2,098.80 $6,771.60 $87,168.04
Total Utilities $469,785.80 $12,592.80 $40,629.60 $523,008.20
A.WATER MAIN
No.Item Units Qty Unit Price Total Price
1 MOBILIZATION LS 1 $13,500.00 $13,500.00
2 TRAFFIC CONTROL LS 1 $6,720.00 $6,720.00
3 REMOVE BITUMINOUS DRIVEWAY SF 1100 $2.00 $2,200.00
4 REMOVE CONCRETE DRIVEWAY PAVEMENT SF 470 $3.00 $1,410.00
5 REMOVE AND REPLACE CONCRETE CURB &
GUTTER
LF 1050 $40.00 $42,000.00
6 REMOVE TREE EA 6 $1,200.00 $7,200.00
7 REMOVE CIP WATER MAIN LF 1,050 $12.00 $12,600.00
8 REMOVE WATER SERVICE EA 20 $200.00 $4,000.00
9 REMOVE HYDRANT EA 2 $900.00 $1,800.00
10 REMOVE VALVE AND BOX EA 7 $400.00 $2,800.00
11 TEMPORARY WATER SERVICE EA 1 $25,000.00 $25,000.00
12 COMMON EXCAVATION (CV)CY 400 $30.00 $12,000.00
13 AGGREGATE BASE, CLASS 5 TN 760 $30.00 $22,800.00
14 TYPE SP 9.5 BITUMINOUS MIXTURE FOR
DRIVEWAYS (2,B)TN 24 $150.00 $3,600.00
15 6" CONCRETE DRIVEWAY PAVEMENT SF 470 $8.00 $3,760.00
16 TOPSOIL BORROW (LV)CY 120 $50.00 $6,000.00
17 EROSION CONTROL COMPOST BLANKET -SY 1,167 $5.75 $6,708.33
18 CONNECT TO EXISTING WM EA 3 $2,000.00 $6,000.00
19 6" PVC WATER MAIN LF 60 $100.00 $6,000.00
20 8" PVC WATER MAIN LF 1,050 $50.00 $52,500.00
21 6" GATE VALVE AND BOX EA 3 $2,500.00 $7,500.00
22 8" GATE VALVE AND BOX EA 4 $3,000.00 $12,000.00
23 INSTALL HYDRANT EA 4 $6,500.00 $26,000.00
24 DUCTILE IRON FITTINGS LB 600 $9.00 $5,400.00
25 REPAIR CROSSING PIPE EA 8 $2,000.00 $16,000.00
26 INSULATION - 4" THICK SY 5 $70.00 $350.00
27 IMPROVED PIPE FOUNDATION LF 1,050 $5.00 $5,250.00
28 1" CORPORATION STOP AND SADDLE EA 20 $600.00 $12,000.00
29 1" TYPE "K" COPPER PIPE LF 160 $80.00 $12,800.00
30 CONNECT WATER SERVICE EA 20 $1,000.00 $20,000.00
Subtotal $355,898.33
+ Contingencies (10%)$35,589.83
Subtotal Construction $391,488.16
+ Indirect (20%)$78,297.64
Total Project Cost $469,785.80
Appendix A-5
Preliminary Cost Estimate
2022 Infrastructure Utility Improvements
Utility Costs on Reclaim and Overlay Streets
September 2021
B. SANITARY SEWER
No.Item Units Qty Unit Price Total Price
1 MOBILIZATION LS 1 $300.00 $300.00
2 TRAFFIC CONTROL LS 1 $200.00 $200.00
3 INTEGRAL CONCRETE RING LF 6 $340.00 $2,040.00
4 REMOVE AND REPLACE SANITARY SEWER
FRAME AND RINGS
EA 5 $1,400.00 $7,000.00
Subtotal $9,540.00
+ Contingencies (10%)$954.00
Subtotal Construction $10,494.00
+ Indirect (20%)$2,098.80
Total Project Cost $12,592.80
C.STORM SEWER
No.Item Units Qty Unit Price Total Price
1 MOBILIZATION LS 1 $1,200.00 $1,200.00
2 TRAFFIC CONTROL LS 1 $600.00 $600.00
3 REMOVE MH OR CATCH BASIN EA 2 $500.00 $1,000.00
4 REMOVE EXISTING STORM PIPE LF 12 $15.00 $180.00
5 REMOVE TREE EA 3 $1,200.00 $3,600.00
6 REMOVE AND REPLACE GUARDRAIL LF 60 $120.00 $7,200.00
7 12" RCP STORM SEWER, CL 5 LF 12 $100.00 $1,200.00
8 4' DIAMETER STORM SEWER MH OR CBMH
WITH SUMP
EA 2 $5,000.00 $10,000.00
9 CONNECT TO EXISTING STORM SEWER PIPE EA 2 $1,000.00 $2,000.00
10 6" PVC PERFORATED DRAIN TILE, WITH SOCK LF 40 $35.00 $1,400.00
11 CONNECT TO STRUCTURE (DRAINTILE)EA 4 $600.00 $2,400.00
Subtotal $30,780.00
+ Contingencies (10%)$3,078.00
Subtotal Construction $33,858.00
+ Indirect (20%)$6,771.60
Total Project Cost $40,629.60
Construction Cost $447,347.50
Contingencies (10%)$44,734.75
Indirect (20%)$98,416.45
Total $590,498.70
A.WATER MAIN
No.Item Units Qty Unit Price Total Price
1 MOBILIZATION LS 1 $16,900.00 $16,900.00
2 TRAFFIC CONTROL LS 1 $8,450.00 $8,450.00
3 INLET PROTECTION EA 4 $345.00 $1,380.00
4 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)LF 150 $5.75 $862.50
5 REMOVE BITUMINOUS PAVEMENT (FULL DEPTH)SY 150 $13.80 $2,070.00
6 REMOVE CONCRETE CURB & GUTTER LF 130 $23.00 $2,990.00
7 REMOVE GATE VALVE EA 5 $1,150.00 $5,750.00
8 REMOVE HYDRANT AND GATE VALVE EA 1 $460.00 $460.00
9 REMOVE WATERMAIN PIPE LF 275 $23.00 $6,325.00
10 ABANDON EX. WATERMAIN LF 1300 $17.25 $22,425.00
11 TEMPORARY WATER SERVICE LS 1 $26,450.00 $26,450.00
12 4" INSULATION SY 25 $80.50 $2,012.50
13 6" PVC WATERMAIN PIPE LF 100 $115.00 $11,500.00
14 8" PVC WATERMAIN PIPE LF 120 $172.50 $20,700.00
15 10" HDPE, DR 18 - DIRECTIONAL DRILL LF 1300 $120.75 $156,975.00
16 10" HDPE, DR 11 - PIPE BURSTING LF 100 $138.00 $13,800.00
17 CONNECT TO EXISTING WATERMAIN EA 5 $3,795.00 $18,975.00
18 HYDRANT INSTALLATION w/. 6" GATE VALVE AND EA 1 $12,765.00 $12,765.00
19 8" GATE VALVE AND BOX EA 7 $3,450.00 $24,150.00
20 DUCTILE IRON FITTINGS LB 1660 $9.00 $14,940.00
21 REPAIR CROSSING PIPE EA 5 $2,185.00 $10,925.00
22 AGGREGATE BASE, CLASS 5 TN 100 $23.00 $2,300.00
23 BITUMINOUS MATERIAL FOR TACK COAT GAL 8 $10.00 $80.00
24 TYPE SP12.5 BITUMINOUS WEARING COURSE
MIXTURE (4,C)
TN 20 $287.50 $5,750.00
25 TYPE SP12.5 BITUMINOUS NON-WEARING COURSE
MIXTURE (4,C)
TN 40 $258.75 $10,350.00
26 B618 CONCRETE CURB & GUTTER LF 130 $57.50 $7,475.00
27 TOPSOIL BORROW (LV)CY 40 $57.50 $2,300.00
28 SEED WITH HYDROMULCH SY 200 $28.75 $5,750.00
29 BIO-LOG,TYPE WOOD FIBER LF 200 $6.00 $1,200.00
30 EXPLORATORY DIGGING HR 15 $575.00 $8,625.00
31 PROTECT EXISTING BURIED HIGH PRESSURE GAS LS 1 $11,500.00 $11,500.00
32 STORM SEWER INSPECTION EA 5 $862.50 $4,312.50
33 SANITARY SEWER INSPECTION EA 4 $690.00 $2,760.00
34 STREET SWEEPING (WITH PICKUP BROOM)HR 20 $207.00 $4,140.00
Subtotal $447,347.50
+ Contingencies (10%)$44,734.75
Subtotal Construction $492,082.25
+ Indirect (20%)$98,416.45
Total Project Cost $590,498.70
Water Improvements
Appendix A-6
Preliminary Cost Estimate
2022 Infrastructure Utility Improvements
Bass Lake Road Trenchless Watermain Replacement
September 2021
Appendix B – Preliminary Assessments
Commercial FF
Streets Subtotal 170
Total 170
Residential Rate = 2/3*Commercial Rate
Duplex/Zero Lot Line Residential Rate = 65%*Residential Rate
Estimated Cost = (Residential FF)*2/3*(Commercial Rate)+(Commercial FF)*(Commercial Rate)
2/3 x Residential FF +Commercial FF
Mill & Overlay and Reclaim & Overlay Rates
2/3 x 9,818 +170
Commercial Rate =$117.52 per FF
Single Family Residential Rate =$78.35 per FF
Duplex/Zero Lot Line Residential Rate =$50.93 per FF
Commercial Rate =
Estimated Cost
$789,131
Commercial Rate =
9,818
9,818
$789,131.44
$789,131.44
Appendix B-1
Preliminary Assessments
2022 Infrastructure Improvements
September 2021
Total Est Cost Residential FF
Property
Type Street Improvement
Front
Footage
Assessment
Rate
Assessment
Amount
1.
9015 60th Avenue North Residential Mill & Overlay 82.5 $78.35 $6,463.88
PID
Total Assessment $6,463.88
Total Assessment Value $6,463.88
06-118-21-24-0004
Appendix B-2
Preliminary Assessments
2022 Infrastructure Improvements
September 2021
Entity
City of New Hope (Liberty Park)
Street Name From To
Residental
Properties
Residental
Properties
Front Footage
(82.5 LF /lot)
Multi Family
Units
Multi Family
Front Footage
(10.5 LF/Unit)
Commercial
Properties
Commercial
Property
Front
Footage
Total
Residential
Front
Footage
Total
Commercial
Front
Footage
Total
Front
Footage
Mill & Overlay and
Reclaim & Overlay
59TH AVE N INDEPENDENCE AVE GETTYSBURG AVE 15 1,238 1,238 0 1,238
60TH AVE N HILLSBORO AVE ENSIGN AVE 11 908 908 0 908
GETTYSBURG AVE 60TH AVE 59TH AVE 14 1,155 1,155 0 1,155
GETTYSBURG AVE 59TH AVE GETTYSBURG CIR 3 248 1 170 248 170 418
GETTYSBURG CIR GETTYSBURG AVE CDS 8 660 660 0 660
HILLSBORO AVE GETTYSBURG AVE 59TH AVE 42 3,465 3,465 0 3,465
HILLSBORO CIR HILLSBORO AVE CDS 6 495 495 0 495
INDEPENDENCE AVE HAMMERHEAD TURNAROUNDDEAD END 20 1,650 1,650 0 1,650
Mill & Overlay and Reclaim and Overlay Total 119 9,818 0 0 1 170 9,818 170 9,988
Project Totals 119 9,818 0 0 1 170 9,818 170 9,988
Appendix B-3
Preliminary Assessments
2022 Infrastructure Improvements
September 2021
Appendix C – Pavement and Geotechnical
Evaluation Report, Braun Intertec
Pavement and Geotechnical Evaluation
Report
City of New Hope 2022 Infrastructure Improvement Projects
New Hope, Minnesota
Prepared for
City of New Hope
Professional Certification:
I hereby certify that this plan, specification, or report
was prepared by me or under my direct supervision
and that I am a duly licensed Professional Engineer
under the laws of the State of Minnesota.
Amy J. Grothaus, PE
Account Manager, Senior Engineer
License Number: 51327
September 15, 2021
Project B2107447
Braun Intertec Corporation
AA/EOE
Braun Intertec Corporation
1826 Buerkle Road
Saint Paul, MN 55110
Phone: 651.487.3245
Fax: 651.487.1812
Web: braunintertec.com
September 15, 2021 Project B2107447
Mr. Bernie Weber
Director of Public Works
City of New Hope
5500 International Parkway
New Hope, MN 55428
Re: Pavement and Geotechnical Evaluation Report
City of New Hope 2022 Infrastructure Improvement Projects
New Hope, Minnesota
Dear Mr. Weber:
We are pleased to present this Pavement and Geotechnical Evaluation Report for the City of New Hope’s
2022 Infrastructure Improvement Projects.
Thank you for making Braun Intertec your pavement consultant for this project. If you have questions
about this report, or if there are other services that we can provide in support of our work to date, please
contact Amy Grothaus at 651.261.7122 (agrothaus@braunintertec.com).
Sincerely,
BRAUN INTERTEC CORPORATION
Amy J. Grothaus, PE
Account Manager, Senior Engineer
Daniel E. Wegman, PE
Principal Engineer
c: Ms. Ann Dienhart, Stantec
Mr. Dan Boyum, Stantec
Table of Contents
Description Page
A. Introduction ...................................................................................................................................... 1
A.1. Project Description .............................................................................................................. 1
A.2. Purpose ................................................................................................................................ 1
A.3. Background Information and Reference Documents .......................................................... 1
A.4. Scope of Services ................................................................................................................. 2
B. Results .............................................................................................................................................. 2
B.1. GPR Testing ......................................................................................................................... 2
B.2. Pavement Core and Hand Auger Boring Results ................................................................. 3
B.3. Boring Results ...................................................................................................................... 4
B.4. Groundwater ....................................................................................................................... 5
B.5. Laboratory Test Results ....................................................................................................... 5
C. Recommendations ........................................................................................................................... 6
C.1. Mill-and-Overlay .................................................................................................................. 6
C.2. Utilities ................................................................................................................................ 6
C.2.a. Excavation Oversizing ............................................................................................. 6
C.2.b. Subgrade Stabilization ............................................................................................ 6
C.2.c. Excavated Slopes .................................................................................................... 7
C.2.d. Corrosion Potential ................................................................................................ 7
D. Procedures........................................................................................................................................ 7
D.1. Ground Penetrating Radar .................................................................................................. 7
D.1.a. GPR Data Collection ............................................................................................... 7
D.1.b. GPR Analysis ........................................................................................................... 8
D.2. Pavement Coring and Hand Auger Borings ......................................................................... 8
D.3. Penetration Test Borings ..................................................................................................... 8
D.4. Manual Exploration ............................................................................................................. 9
D.4.a. Hand Auger Borings ................................................................................................ 9
D.5. Exploration Logs .................................................................................................................. 9
D.5.a. Log of Boring Sheets ............................................................................................... 9
D.5.b. Geologic Origins ..................................................................................................... 9
D.6. Material Classification and Testing ..................................................................................... 9
D.6.a. Visual and Manual Classification ............................................................................ 9
D.6.b. Laboratory Testing ............................................................................................... 10
D.7. Groundwater Measurements ............................................................................................ 10
E. Qualifications .................................................................................................................................. 10
E.1. Continuity of Professional Responsibility .......................................................................... 10
E.1.a. Plan Review .......................................................................................................... 10
E.1.b. Construction Observations and Testing ............................................................... 10
E.2. Use of Report..................................................................................................................... 11
E.3. Standard of Care ................................................................................................................ 11
Appendix A
Planned Repair Map provided by Stantec, Inc.
Appendix B
Map of GPR Testing, Pavement Coring and Hand Auger Borings
Table of Contents (continued)
Appendix C
GPR Graphical Results
Appendix D
Core Photo Log
Appendix E
Log of Boring Sheets (HAB-1 and ST-2)
Descriptive Terminology
A. Introduction
A.1. Project Description
This Pavement and Geotechnical Evaluation Report addresses the City of New Hope’s 2022 Infrastructure
Improvement Projects. The streets included total approximately 1.3 miles in length and have a
bituminous surface. The project includes 2-inch mill-and-overlays, as well as some watermain
replacement work.
It was requested that we perform Ground Penetrating Radar (GPR), pavement cores and hand auger
borings and two soil borings. Table 1 provides additional project details.
Table 1. Site Aspects and Grading Description
Aspect Description
Pavement type(s) Bituminous
Assumed pavement loads 100,000 ESALs*
Grade changes Given the presence of curb and gutter, we assume
existing grades will be met
*Equivalent 18,000-lb single axle loads based on 20-year design.
A.2. Purpose
The purpose of our pavement and geotechnical evaluation will be to determine in-place pavement layer
thicknesses and characterize subsurface geologic conditions at selected explorations for use in assessing
the planned repairs.
A.3. Background Information and Reference Documents
We reviewed the following information:
▪ Sketch indicating the streets to be tested and recommended exploration locations, as
provided by Stantec.
City of New Hope
Project B2107447
September 15, 2021
Page 2
▪ Aerial Maps available from Google Earth®.
▪ USDA Websoil survey of Hennepin County.
We have described our understanding of the proposed construction and site to the extent others
reported it to us. Depending on the extent of available information, we may have made assumptions
based on our experience with similar projects. If we have not correctly recorded or interpreted the
project details, the project team should notify us. New or changed information could require additional
evaluation, analyses and/or recommendations.
A.4. Scope of Services
We performed our scope of services for the project in accordance with our Proposal QTB143585 to Mr.
Bernie Weber, dated August 2, 2021, and authorized on August 9, 2021. The following list describes the
tasks completed in accordance with our authorized scope of services.
▪ Estimating pavement thickness data on each street in a single direction of travel with an air-
coupled Ground Penetrating Radar (GPR).
▪ Conducting nine bituminous pavement cores and hand auger borings on the streets, noting
their conditions and measuring their thicknesses.
▪ Performing two soil borings in the area near Bass Lake Road and Highway 169.
▪ Preparing this report containing our findings and recommendations for pavement
rehabilitation.
B. Results
B.1. GPR Testing
GPR was used to approximate pavement layer thicknesses along the streets. The data was collected at a
nominal 1-foot interval. Where “ground truth” data (pavement coring and hand auger borings) were
performed, the interpreted layers from the GPR scan were compared directly to the measured
thicknesses to validate the accuracy of the GPR analysis.
City of New Hope
Project B2107447
September 15, 2021
Page 3
Based on our analysis using the RADAN software program, the average pavement layer thicknesses are
provided in the matrix include in Appendix F.
Appendix C provides the GPR data in graphical form. We highly recommend referring to Appendix C to
see how thicknesses vary along each street.
B.2. Pavement Core and Hand Auger Boring Results
On streets planned for mill-and-overlay, we performed a total of nine pavement core and hand auger
borings. All explorations were performed within drive lanes at locations initially recommended by
Stantec. Following analysis of the GPR data, Braun Intertec revised a few of the locations based on the
preliminary GPR results. A final map of exploration locations is provided in Appendix B and photographs
of the pavement cores are provided in Appendix D.
Information from the cores and hand auger borings was used to obtain/validate GPR pavement layer
thicknesses for the bituminous and aggregate base layers, if present, as well as to assess bituminous
material conditions. Results are provided in the matrix provided in Appendix F. It should be noted that
we did not perform gradation analysis on the apparent aggregate base material encountered as part of
the pavement section, in accordance with our scope of work. Therefore, we cannot conclusively
determine if the encountered material satisfies a particular specification.
Bituminous core thicknesses ranged from about 4 to 6 inches, with the exception of Core C-3, which was
performed on Hillsboro Avenue between Hillsboro Circle and 60th Avenue NW. That core, Core C-3,
encountered 9 1/2 inches of bituminous. Multiple layers were visible within the GPR scan for Hillsboro
Avenue and there was a visible layer between about 8 to 9 1/2 inches throughout the scan. To confirm
whether this thicker bituminous section exists along the entire section or was some type of localized
repair, additional explorations would need to be performed. Regardless, it appears there is sufficient
material to perform the planned repair.
As noted in the matrix, none of the pavement cores encountered Petromat™ paving fabric, which has
been placed on some of the City’s streets to help slow the progression of reflective cracking. Also noted
is whether or not stripping was observed within the pavement core. Stripping is the deterioration of the
asphalt/aggregate bond in a bituminous pavement due to the presence of moisture. Stripping often
begins at the bottom of the bituminous layer, where it may be in contact with saturated aggregate or
soil, and proceeds upward.
City of New Hope
Project B2107447
September 15, 2021
Page 4
On Hillsboro Avenue, separation and stripping was observed in Cores C-2 and C-3 near the pavement
surface. Milling to a depth of 2-inches will eliminate this stripping material, however, further testing
would need to be performed to determine the cause.
Low-severity stripping is common in bituminous pavements over time. However, those that have
stripped to moderate to severe degrees would typically not be considered for rehabilitation methods
that may leave any damaged portion of the pavement in place, such as mill-and-overlay.
B.3. Boring Results
Based on our discussion, we understand the City is planning to install new watermain along Bass Lake
Road and Highway 169 entrance ramp, near the locations of Borings HAB-1 and ST-2. To install the
watermain, it is planned that directional drilling will be performed. The intent of the borings was to
determine inplace soils and note depth of groundwater, if encountered, in preparation of the planned
drilling.
Table 2 provides a summary of the soil boring results, in the general order we encountered the strata.
Please refer to the Log of Boring sheets in Appendix E for additional details. The Descriptive Terminology
sheet in Appendix E includes definitions of abbreviations used in Table 2.
It should be noted that the location of ST-2 was not conducive to a truck-mounted drill rig. As such, a
hand auger boring was performed at that location. Given the materials encountered, which were
reasonably stiff clays, we were able to extend that boring manually to a depth of about 7 feet below
ground surface elevations.
As noted on the boring logs and in the table below, below the silty sand fill, both borings encountered
glacial deposits consisting of sandy lean clay with gravel. In additional to gravel, glacially deposited soils
can often cobbles and/or boulders. Although not encountered by our borings, cobbles and boulders can
be detrimental to directional drilling operations. It is possible that these materials may be encountered
during directional drilling.
City of New Hope
Project B2107447
September 15, 2021
Page 5
Table 2. Subsurface Profile Summary
Strata
Soil Type -
ASTM
Classification
Range of
Penetration
Resistances Commentary and Details
Topsoil fill SM
▪ Thicknesses at boring locations varied from about
3/4 foot to 1 foot.
▪ Soils were dark brown in color.
▪ Moisture conditions were moist.
Fill SM
▪ Thicknesses at boring locations varied from about
1 to 4 feet.
▪ Soils were dark brown in color.
▪ Moisture conditions were moist.
Glacial
deposits CL 7 to 16 Blows per
Foot (BPF)
▪ Encountered below the topsoil and fill soils and
extended to the termination depth.
▪ Soils were light brown and brown in color with
rust staining.
▪ Moisture conditions were moist.
For simplicity in this report, we define existing fill to mean existing, uncontrolled or undocumented fill.
B.4. Groundwater
We did not observe groundwater while advancing our borings. Therefore, it appears that groundwater is
below the depths explored. Project planning should anticipate seasonal and annual fluctuations of
groundwater.
B.5. Laboratory Test Results
Table 3 presents the results of our laboratory tests.
Table 3. Laboratory Classification Test Results
Location
Sample Depth
(ft) Classification
Moisture Content
(w, %)
Percent Passing a
#200 Sieve
ST-2 2 1/2 SM 12 26
ST-2 5 SM 14 39
City of New Hope
Project B2107447
September 15, 2021
Page 6
The moisture content of the silty sands varied from approximately 12 to 14 percent, indicating that the
materials tested were near their probable optimum moisture content.
Our mechanical analyses indicated that the soils contained 26 to 39 percent silt and clay by weight.
C. Recommendations
C.1. Mill-and-Overlay
As depicted on the map provided in Appendix A, we understand that the planned repair for the streets
includes a 2-inch mill-and-overlay. Some watermain replacement work will also be performed.
With a mill-and-overlay repair approach, we assume reflective cracking may occur quickly. To slow the
progression of reflective cracking, the City could consider a sealing milled surfaces prior to the placement
of the overlay. Furthermore, where possible, deeper mill depths will provide additional benefit to the
mill-and-overlay approach by helping to prolong reflective cracking.
We recommend a mix consisting of SPWEA240C.
C.2. Utilities
C.2.a. Excavation Oversizing
When removing unsuitable materials below utilities or pavements, we recommend extending the
excavation outward and downward at a slope of 1H:1V (horizontal:vertical) or flatter.
C.2.b. Subgrade Stabilization
We anticipate the soils at typical invert elevations will generally be suitable for utility support. However,
if construction encounters unfavorable conditions such as soft clay, organic soils or perched water at
invert grades, the unsuitable soils may require some additional subcutting and replacement with sand or
crushed rock to prepare a proper subgrade for pipe support. If these unsuitable or unstable soils remain
in place, there is a risk of excessive settlement of the utility pipe or structures due to consolidation of the
underlying soft clay soils. If crushed rock is used as pipe bedding, we recommend wrapping the aggregate
in geotextile fabric to prevent the migration of fine-grained materials into the voids of the aggregate.
City of New Hope
Project B2107447
September 15, 2021
Page 7
We recommend a geotechnical engineer observe all utility trench excavations and subcuts.
C.2.c. Excavated Slopes
The on-site soils mostly appear to consist of soils meeting OSHA Type B requirements. In accordance with
OSHA requirements, we recommend excavation side slopes be constructed to lie back at a slope of 1V:1H
or flatter. However, in organic soils, or where saturated soils are present (including saturated sand
seams), excavation side slopes may need to lie back at slopes of 1V:5H or flatter to prevent sloughing.
All excavations must comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P, “Excavations
and Trenches.” This document states that excavation safety is the responsibility of the contractor.
Reference to these OSHA requirements should be included in the project specifications.
C.2.d. Corrosion Potential
Based on our experience, the soils encountered within the borings are moderately corrosive to metallic
conduits. We recommend specifying non-corrosive materials or providing corrosion protection, unless
project planning chooses to perform additional tests to demonstrate the soils are not corrosive.
D. Procedures
D.1. Ground Penetrating Radar
D.1.a. GPR Data Collection
GPR data was collected on August 25, 2021. GPR collection occurred at posted speed limits and data was
recorded continuously along the streets to a depth of up to 2 feet. Analysis of this data provides a
continuous estimate of layer thickness for identifiable layers.
Scans of the pavement were collected according to GSSI, Inc. (manufacturer) SIR-20 processor settings at
a specified interval of approximately one scan per lineal foot in the outer wheel path in a single travel
direction. A calibration file, required for data post-processing, was collected at the onset of testing.
Distance along the roadway is measured using a Distance Measuring Instrument (DMI).
City of New Hope
Project B2107447
September 15, 2021
Page 8
D.1.b. GPR Analysis
Data collected by the GPR unit was returned to our office and analyzed to estimate the pavement
thickness. Pavement layer interpretation was accomplished using RADAN 7.0, a software package
included with the GSSI RoadScan system.
The software includes tools to aid in delineating pavement layer transitions and automatically calculates
their depths from the pavement surface using the calibration file(s) collected prior to or following testing.
Where “ground-truth” data (pavement cores and hand auger borings) were performed, the interpreted
layers from the GPR scan were compared directly to the measured thicknesses from the pavement cores
and hand auger borings to validate the accuracy of the GPR analysis.
D.2. Pavement Coring and Hand Auger Borings
Pavement coring and hand auger borings were performed on August 28, 2020. Explorations were
conducted within drive lanes using a 4-inch core barrel. The bituminous pavement was repaired with a
cold-mix bituminous patch immediately after coring.
The cores were measured to obtain approximate bituminous thickness and their material conditions
were noted based on visual observation. Images of the cores can be found in the Core Photo Log
attached to this report in Appendix D.
D.3. Penetration Test Borings
We drilled the penetration test borings with a truck-mounted core and auger drill equipped with hollow-
stem auger. We performed the borings in general accordance with ASTM D6151 taking penetration test
samples at 2 1/2-foot intervals in general accordance to ASTM D1586. The boring logs show the actual
sample intervals and corresponding depths. We also collected bulk samples of auger cuttings at selected
locations for laboratory testing.
City of New Hope
Project B2107447
September 15, 2021
Page 9
D.4. Manual Exploration
D.4.a. Hand Auger Borings
As previously noted, a hand auger boring was performed. We were able to extend the hand auger boring
to a depth of about 7 feet below subgrade elevations. We then withdrew the auger from the borehole to
obtain cuttings.
D.5. Exploration Logs
D.5.a. Log of Boring Sheets
The Appendix includes Log of Boring sheets for our penetration test borings. The logs identify and
describe the penetrated geologic materials, and present the results of penetration resistance and other
in-situ tests performed. The logs also present the results of laboratory tests performed on penetration
test samples and groundwater measurements.
We inferred strata boundaries from changes in the penetration test samples and the auger cuttings.
Because we did not perform continuous sampling, the strata boundary depths are only approximate. The
boundary depths likely vary away from the boring locations, and the boundaries themselves may occur as
gradual rather than abrupt transitions.
D.5.b. Geologic Origins
We assigned geologic origins to the materials shown on the logs and referenced within this report, based
on: (1) a review of the background information and reference documents cited above, (2) visual
classification of the various geologic material samples retrieved during the course of our subsurface
exploration, (3) penetration resistance and other in-situ testing performed for the project, (4) laboratory
test results, and (5) available common knowledge of the geologic processes and environments that have
impacted the site and surrounding area in the past.
D.6. Material Classification and Testing
D.6.a. Visual and Manual Classification
We visually and manually classified the geologic materials encountered based on ASTM D2488. When we
performed laboratory classification tests, we used the results to classify the geologic materials in
accordance with ASTM D2487. The Appendix includes a chart explaining the classification system we
used.
City of New Hope
Project B2107447
September 15, 2021
Page 10
D.6.b. Laboratory Testing
The exploration logs in the Appendix note most of the results of the laboratory tests performed on
geologic material samples. The remaining laboratory test results follow the exploration logs. We
performed the tests in general accordance with ASTM or AASHTO procedures.
D.7. Groundwater Measurements
The drillers checked for groundwater while advancing the penetration test borings, and again after auger
withdrawal. We then filled the boreholes, as noted on the boring logs.
E. Qualifications
E.1. Continuity of Professional Responsibility
E.1.a. Plan Review
We based this report on a limited amount of information, and we made a number of assumptions to help
us develop our recommendations. We should be retained to review the geotechnical aspects of the
designs and specifications. This review will allow us to evaluate whether we anticipated the design
correctly, if any design changes affect the validity of our recommendations, and if the design and
specifications correctly interpret and implement our recommendations.
E.1.b. Construction Observations and Testing
We recommend retaining us to perform the required observations and testing during construction as
part of the ongoing geotechnical evaluation. This will allow us to correlate the subsurface conditions
exposed during construction with those encountered by the borings and provide professional continuity
from the design phase to the construction phase. If we do not perform observations and testing during
construction, it becomes the responsibility of others to validate the assumption made during the
preparation of this report and to accept the construction-related geotechnical engineer-of-record
responsibilities.
City of New Hope
Project B2107447
September 15, 2021
Page 11
E.2. Use of Report
This report is for the exclusive use of the addressed parties. Without written approval, we assume no
responsibility to other parties regarding this report. Our evaluation, analyses and recommendations may
not be appropriate for other parties or projects.
E.3. Standard of Care
In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under
similar circumstances by reputable members of its profession currently practicing in the same locality.
No warranty, express or implied, is made.
Appendix A
LEGEND
2" MILL & OVERLAY AND WATERMAIN REPLACEMENT (0.28MI)
2" MILL & OVERLAY (1.00 MI)
PAVEMENT CORE AND HAND AUGER (9)
12' DEPTH SOIL BORING (2)
*ALL STREETS TO RECEIVE GPR
CIR
C I R
CIR.N
BASS LAKE RD (CSAH 10)STATEHIGHWAY169HARLANDRBURGA L L A N
AVEHILLSBOROAVENG
E
TT
Y
S
B
U
R
GGETTYSBURGAVE61ST
59TH AVE N
HILLSBORO
ENSIGNAVEN60TH AVE N
61ST AVE N
601/2 AVE N
GETTYSCIR.AVE N ENSIGNAVENINDEPENDENCEAVENHILLSBORO
DATE PROJ. NO.PlotDate:07/28/2021-9:29amDrawingname:\\Us0291-ppfss01\workgroup\1938\active\193805342\Reports\Geotechnical\RFP\193805342-GeotechFigure.dwgXrefs:,34HORIZON_PLANIMETRICS,34Parcel733 Marquette Avenue, Suite 1000
Minneapolis, MN 55402
www.stantec.com
REQUEST FOR QUOTE: GEOTECHNICAL STUDY AREA
CITY OF NEW HOPE, MINNESOTA
2022 INFRASTRUCTURE IMPROVEMENTS PROJECT
7/27/2021 193805342
Appendix B
ST-1
ST-2
C-1
C-2
C-3
C-4
C-5
C-6
C-7
C-8
C-9TH 169BASS LA
K
E
R
D
G
E
T
T
Y
S
BURG AVE NINDEPENDENCE AVE N59TH
A
V
E
NHILLSBORO AVE N60TH AVE NGETTYSBURG AVE NENSIGN AVE NF:\2021\B2107447\CAD\B2107447.dwg,Geotech,9/15/2021 10:15:37 AMbraunintertec.com
952.995.2000
Minneapolis, MN 55438
11001 Hampshire Avenue S
Project No:
B2107447
Drawn By:
Date Drawn:
Checked By:
Last Modified:9/15/21
Drawing No:
Project Information
Drawing Information
B2107447
JAG
8/23/21
AJG
City of New Hope 2022
Infrastructure
Improvement Project
Various Streets
New Hope, Minnesota
Soil Boring and
Pavement Core
Location Sketch
N
DENOTES APPROXIMATE LOCATION OF
PAVEMENT CORE AND HAND AUGER BORING
0
SCALE:1" = 250'
250'125'
DENOTES APPROXIMATE LOCATION OF
STANDARD PENETRATION TEST BORING
GPR TESTING AREA
Appendix C
City of New Hope 2022 Improvement Projects
59th Ave N
Independence Avenue
Hillsboro Avenue
GPR Results: 59th Ave N - Independence Avenue to Hillsboro Avenue
From
To
B2107447
Location
Project No.
Roadway
0
5
10
15
20
0 50 100 150 200 250 300 350 400 450 500Depth (in.)Station (ft)
59th Ave N (EB)
Bit Depth (in.)Agg Depth (in.)Bit Depth Agg Base Depth
-2030De pth (in.)Station (ft)#REF!Bit Depth (in.)Agg Depth (in.)#REF!#REF!
City of New Hope 2022 Improvement Projects
59th Ave N
Hillsboro Avenue
Gettysburg Avenue
GPR Results: 59th Ave N - Hillsboro Avenue to Gettysburg Avenue
From
To
B2107447
Location
Project No.
Roadway
C-50
5
10
15
20
0 50 100 150 200 250 300 350 400 450 500Depth (in.)Station (ft)
59th Ave N (EB)
Bit Depth (in.)Agg Depth (in.)Bit Depth Agg Base Depth
-2030De pth (in.)Station (ft)#REF!Bit Depth (in.)Agg Depth (in.)#REF!#REF!
City of New Hope 2022 Improvement Projects
60th Avenue
Hillsboro Avenue
Gettysburg Avenue
GPR Results: 60th Avenue - Hillsboro Avenue to Gettysburg Avenue
From
To
B2107447
Location
Project No.
Roadway
0
5
10
15
20
0 50 100 150 200 250 300 350 400 450 500Depth (in.)Station (ft)
60th Avenue (EB)
Bit Depth (in.)Agg Depth (in.)Bit Depth Agg Base Depth
-2030De pth (in.)Station (ft)#REF!Bit Depth (in.)Agg Depth (in.)#REF!#REF!
City of New Hope 2022 Improvement Projects
60th Avenue
Gettysburg Avenue
Ensign Avenue
GPR Results: 60th Avenue - Gettysburg Avenue to Ensign Avenue
From
To
B2107447
Location
Project No.
Roadway
C-60
5
10
15
20
0 50 100 150 200 250 300 350 400 450 500Depth (in.)Station (ft)
60th Avenue (EB)
Bit Depth (in.)Agg Depth (in.)Bit Depth Agg Base Depth
-2030De pth (in.)Station (ft)#REF!Bit Depth (in.)Agg Depth (in.)#REF!#REF!
City of New Hope 2022 Improvement Projects
Gettysburg Avenue
Gettysburg Circle
59th Avenue N
GPR Results: Gettysburg Avenue - Gettysburg Circle to 59th Avenue N
From
To
B2107447
Location
Project No.
Roadway
C-80
5
10
15
20
0 50 100 150 200 250 300 350 400 450 500Depth (in.)Station (ft)
Gettysburg Avenue (NB)
Bit Depth (in.)Agg Depth (in.)Bit Depth Agg Base Depth
-2030De pth (in.)Station (ft)#REF!Bit Depth (in.)Agg Depth (in.)#REF!#REF!
City of New Hope 2022 Improvement Projects
Gettysburg Avenue
59th Avenue N
60th Avenue N
GPR Results: Gettysburg Avenue - 59th Avenue N to 60th Avenue N
From
To
B2107447
Location
Project No.
Roadway
C-70
5
10
15
20
0 100 200 300 400 500 600 700 800 900 1,000Depth (in.)Station (ft)
Gettysburg Avenue (NB)
Bit Depth (in.)Agg Depth (in.)Bit Depth Agg Base Depth
-2030De pth (in.)Station (ft)#REF!Bit Depth (in.)Agg Depth (in.)#REF!#REF!
City of New Hope 2022 Improvement Projects
Gettysburg Circle
Gettysburg Avenue
Cul de sac
GPR Results: Gettysburg Circle - Gettysburg Avenue to Cul de sac
From
To
B2107447
Location
Project No.
Roadway
C-90
5
10
15
20
0 50 100 150 200 250 300 350 400 450 500Depth (in.)Station (ft)
Gettysburg Circle (NB)
Bit Depth (in.)Agg Depth (in.)Bit Depth Agg Base Depth
-2030De pth (in.)Station (ft)#REF!Bit Depth (in.)Agg Depth (in.)#REF!#REF!
City of New Hope 2022 Improvement Projects
Hillsboro Avenue
59th Avenue
Hillsboro Circle
GPR Results: Hillsboro Avenue - 59th Avenue to Hillsboro Circle
From
To
B2107447
Location
Project No.
Roadway
0
5
10
15
20
0 50 100 150 200 250 300 350 400 450 500Depth (in.)Station (ft)
Hillsboro Avenue (NB)
Bit Depth (in.)Agg Depth (in.)Bit Depth Agg Base Depth
-2030De pth (in.)Station (ft)#REF!Bit Depth (in.)Agg Depth (in.)#REF!#REF!
City of New Hope 2022 Improvement Projects
Hillsboro Avenue
Hillsboro Circle
60th Avenue
GPR Results: Hillsboro Avenue - Hillsboro Circle to 60th Avenue
From
To
B2107447
Location
Project No.
Roadway
C-3
0
5
10
15
20
0 50 100 150 200 250 300 350 400 450 500Depth (in.)Station (ft)
Hillsboro Avenue (NB)
Bit Depth (in.)Agg Depth (in.)Bit Depth Agg Base Depth
-2030De pth (in.)Station (ft)#REF!Bit Depth (in.)Agg Depth (in.)#REF!#REF!
City of New Hope 2022 Improvement Projects
Hillsboro Avenue
60th Avenue N
Gettysburg Avenue
GPR Results: Hillsboro Avenue - 60th Avenue N to Gettysburg Avenue
From
To
B2107447
Location
Project No.
Roadway
C-20
5
10
15
20
0 200 400 600 800 1,000 1,200 1,400Depth (in.)Station (ft)
Hillsboro Avenue (NB)
Bit Depth (in.)Agg Depth (in.)Bit Depth Agg Base Depth
-2030De pth (in.)Station (ft)#REF!Bit Depth (in.)Agg Depth (in.)#REF!#REF!
City of New Hope 2022 Improvement Projects
Hillsboro Circle
Hillsboro Avenue
Cul de sac
GPR Results: Hillsboro Circle - Hillsboro Avenue to Cul de sac
From
To
B2107447
Location
Project No.
Roadway
C-40
5
10
15
20
0 50 100 150 200 250 300 350 400 450 500Depth (in.)Station (ft)
Hillsboro Circle (EB)
Bit Depth (in.)Agg Depth (in.)Bit Depth Agg Base Depth
-2030De pth (in.)Station (ft)#REF!Bit Depth (in.)Agg Depth (in.)#REF!#REF!
City of New Hope 2022 Improvement Projects
Independence Avenue
End
59th Ave N
GPR Results: Independence Avenue - End to 59th Ave N
From
To
B2107447
Location
Project No.
Roadway
0
5
10
15
20
0 50 100 150 200 250 300 350 400 450 500Depth (in.)Station (ft)
Independence Avenue (NB)
Bit Depth (in.)Agg Depth (in.)Bit Depth Agg Base Depth
-2030De pth (in.)Station (ft)#REF!Bit Depth (in.)Agg Depth (in.)#REF!#REF!
City of New Hope 2022 Improvement Projects
Independence Avenue
59th Ave N
End
GPR Results: Independence Avenue - 59th Ave N to End
From
To
B2107447
Location
Project No.
Roadway
C-10
5
10
15
20
0 100 200 300 400 500 600 700 800 900 1,000Depth (in.)Station (ft)
Independence Avenue (NB)
Bit Depth (in.)Agg Depth (in.)Bit Depth Agg Base Depth
-2030De pth (in.)Station (ft)#REF!Bit Depth (in.)Agg Depth (in.)#REF!#REF!
Appendix D
Core #: C-1 Project: B2107447
Pavement: 5 inches Agg Base: 5 inches
Location: Independence Avenue N
Date: September 3, 2021
Core #: C-2 Project: B2107447
Pavement: 4 ¼ inches Agg Base: 9 ¾ inches
Location: Hillsboro Avenue
Date: September 3, 2021
Core #: C-3 Project: B2107447
Pavement: 9 ½ inches Agg Base: 1 ½ inches
Location: Hillsboro Avenue
Date: September 3, 2021
Core #: C-4 Project: B2107447
Pavement: 4 ¼ inches Agg Base: 11 ¾ inches
Location: Hillsboro Circle
Date: September 3, 2021
Core #: C-5 Project: B2107447
Pavement: 4 ½ inches Agg Base: 11 ½ inches
Location: 59th Avenue N
Date: September 3, 2021
Core #: C-6 Project: B2107447
Pavement: 6 inches Agg Base: 1 inch
Location: 60th Avenue N
Date: September 3, 2021
Core #: C-7 Project: B2107447
Pavement: 4 inches Agg Base: 3 inches
Location: Gettysburg Avenue N
Date: September 3, 2021
Core #: C-8 Project: B2107447
Pavement: 4 inches Agg Base: 5 inches
Location: Gettysburg Avenue N
Date: September 3, 2021
Core #: C-9 Project: B2107447
Pavement: 4 ¼ inches Agg Base: 6 ¾ inches
Location: Gettysburg Circle
Date: September 3, 2021
Appendix E
Elev./
Depth
ft
899.0
1.0
898.0
2.0
895.0
5.0
891.0
9.0 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SILTY SAND (SM), fine-grained, trace roots,
dark brown, moist (TOPSOIL)
FILL: CLAYEY SAND (SC), fine to medium-
grained, trace Gravel, dark brown
POORLY GRADED SAND with SILT (SP-SM),
fine to medium-grained, trace Gravel, light
brown, moist to wet (GLACIAL TILL)
SANDY LEAN CLAY (CL), with Gravel, brown
becoming gray, wet (GLACIAL TILL)
Becoming gray at 5 1/2 feet
END OF BORING
Boring immediately backfilled
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
qₚ
tsf
MC
%Tests or Remarks
Water observed at 6.0 feet
while drilling.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2107447
Geotechnical Evaluation
City of New Hope 2022 Infrastructure Project
Various City Streets
New Hope, Minnesota
BORING:HAB-1
LOCATION: See attached sketch
NORTHING:197605 EASTING:495958
DRILLER:M. Withuski LOGGED BY:A. Grothaus START DATE:09/13/21 END DATE:09/13/21
SURFACE
ELEVATION:900.0 ft RIG:METHOD:Hand Auger SURFACING:WEATHER:65°, Clear
B2107447 Braun Intertec Corporation Print Date:09/15/2021 HAB-1 page 1 of 1
Elev./
Depth
ft
902.9
1.5
898.9
5.5
889.9
14.5 WaterLevelDescription of Materials
(Soil-ASTM D2488 or 2487; Rock-USACE EM
1110-1-2908)
SILTY SAND (SM), fine to medium-grained,
trace roots, dark brown, moist (TOPSOIL)
FILL: SILTY SAND (SM), fine to medium-
grained, trace Gravel, dark brown, moist
SANDY LEAN CLAY (CL), trace Gravel, light
brown to brown, moist, medium to stiff
(GLACIAL TILL)
Rust staining
END OF BORING
Boring immediately backfilled
5
10
15
20
25
30 SampleBlows
(N-Value)
Recovery
1-2-4
(6)
18"
3-3-4/6"
(REF)
18"
3-3-5
(8)
18"
2-3-5
(8)
18"
4-7-9
(16)
18"
2-5-8/0"
(REF)
16"
qₚ
tsf
MC
%
12
14
Tests or Remarks
P200=26%
P200=39%
Water not observed while
drilling.
LOG OF BORING
See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2107447
Geotechnical Evaluation
City of New Hope 2022 Infrastructure Project
Various City Streets
New Hope, Minnesota
BORING:ST-2
LOCATION: See attached sketch
NORTHING:197355 EASTING:4968714
DRILLER:M. Tatro LOGGED BY:A. Grothaus START DATE:09/03/21 END DATE:09/03/21
SURFACE
ELEVATION:904.4 ft RIG:7519 METHOD:3 1/4" HSA SURFACING:Grass WEATHER:Rain, cloudy
B2107447 Braun Intertec Corporation Print Date:09/15/2021 ST-2 page 1 of 1
Descriptive Terminology of Soil
Based on Standards ASTM D2487/2488
(Unified Soil Classification System)
Group
Symbol Group NameB
Cu ≥ 4 and 1 ≤ Cc ≤ 3D GW Well‐graded gravelE
Cu < 4 and/or (Cc < 1 or Cc > 3)D GP Poorly graded gravelE
Fines classify as ML or MH GM Silty gravelE F G
Fines Classify as CL or CH GC Clayey gravelE F G
Cu ≥ 6 and 1 ≤ Cc ≤ 3D SW Well‐graded sandI
Cu < 6 and/or (Cc < 1 or Cc > 3)D SP Poorly graded sandI
Fines classify as ML or MH SM Silty sandF G I
Fines classify as CL or CH SC Clayey sandF G I
CL Lean clayK L M
PI < 4 or plots below "A" lineJ ML SiltK L M
Organic OL
CH Fat clayK L M
MH Elastic siltK L M
Organic OH
PT Peat
Criteria for Assigning Group Symbols and
Group Names Using Laboratory TestsA
Soil Classification
Coarse‐grained Soils (more than 50% retained on No. 200 sieve)Fine‐grained Soils (50% or more passes the No. 200 sieve) Sands
(50% or more coarse
fraction passes No. 4
sieve)
Clean Gravels
(Less than 5% finesC)
Gravels with Fines
(More than 12% finesC)
Clean Sands
(Less than 5% finesH)
Sands with Fines
(More than 12% finesH)
Gravels
(More than 50% of
coarse fraction
retained on No. 4
sieve)
Highly Organic Soils
Silts and Clays
(Liquid limit less than
50)
Silts and Clays
(Liquid limit 50 or
more)
Primarily organic matter, dark in color, and organic odor
Inorganic
Inorganic
PI > 7 and plots on or above "A" lineJ
PI plots on or above "A" line
PI plots below "A" line
Liquid Limit − oven dried
Liquid Limit − not dried <0.75 Organic clay K L M N
Organic silt K L M O
Liquid Limit − oven dried
Liquid Limit − not dried <0.75 Organic clay K L M P
Organic silt K L M Q
ParticleSize Identification
Boulders.............. over 12"
Cobbles................ 3" to 12"
Gravel
Coarse............. 3/4" to 3" (19.00 mm to 75.00 mm)
Fine................. No. 4 to 3/4" (4.75 mm to 19.00 mm)
Sand
Coarse.............. No. 10 to No. 4 (2.00 mm to 4.75 mm)
Medium........... No. 40 to No. 10 (0.425 mm to 2.00 mm)
Fine.................. No. 200 to No. 40 (0.075 mm to 0.425 mm)
Silt........................ No. 200 (0.075 mm) to .005 mm
Clay...................... < .005 mm
Relative ProportionsL, M
trace............................. 0 to 5%
little.............................. 6 to 14%
with.............................. ≥ 15%
Inclusion Thicknesses
lens............................... 0 to 1/8"
seam............................. 1/8" to 1"
layer.............................. over 1"
Apparent Relative Density of Cohesionless Soils
Very loose ..................... 0 to 4 BPF
Loose ............................ 5 to 10 BPF
Medium dense.............. 11 to 30 BPF
Dense............................ 31 to 50 BPF
Very dense.................... over 50 BPF
A. Based on the material passing the 3‐inch (75‐mm) sieve.
B. If field sample contained cobbles or boulders, or both, add "with cobbles or boulders,
or both" to group name.
C. Gravels with 5 to 12% fines require dual symbols:
GW‐GM well‐graded gravel with silt
GW‐GC well‐graded gravel with clay
GP‐GM poorly graded gravel with silt
GP‐GC poorly graded gravel with clay
D. Cu = D60 / D10 Cc = 𝐷30 2 / ሺ𝐷10 𝑥 𝐷60)
E. If soil contains ≥ 15% sand, add "with sand" to group name.
F. If fines classify as CL‐ML, use dual symbol GC‐GM or SC‐SM.
G. If fines are organic, add "with organic fines" to group name.
H. Sands with 5 to 12% fines require dual symbols:
SW‐SM well‐graded sand with silt
SW‐SC well‐graded sand with clay
SP‐SM poorly graded sand with silt
SP‐SC poorly graded sand with clay
I. If soil contains ≥ 15% gravel, add "with gravel" to group name.
J. If Atterberg limits plot in hatched area, soil is CL‐ML, silty clay.
K. If soil contains 15 to < 30% plus No. 200, add "with sand" or "with gravel", whichever is
predominant.
L. If soil contains ≥ 30% plus No. 200, predominantly sand, add “sandy” to group name.
M. If soil contains ≥ 30% plus No. 200 predominantly gravel, add “gravelly” to group name.
N. PI ≥ 4 and plots on or above “A” line.
O. PI < 4 or plots below “A” line.
P. PI plots on or above “A” line.
Q. PI plots below “A” line.
Laboratory Tests
DD Dry density,pcf OC Organic content, %LL Liquid limit
WD Wet density, pcf qp Pocket penetrometer strength, tsf PL Plastic limit
P200 % Passing #200 sieve MC Moisture content, %PI Plasticity index
qU Unconfined compression test, tsf
Consistency of Blows Approximate Unconfined
Cohesive Soils Per Foot Compressive Strength
Very soft................... 0 to 1 BPF................... < 0.25 tsf
Soft........................... 2 to 4 BPF................... 0.25 to 0.5 tsf
Medium.................... 5to 8 BPF .................. 0.5 to 1 tsf
Stiff........................... 9 to 15 BPF................. 1 to 2 tsf
Very Stiff................... 16 to 30 BPF............... 2 to 4 tsf
Hard.......................... over 30 BPF................ > 4 tsf
Drilling Notes:
Blows/N‐value: Blows indicatethe driving resistance recorded
for each 6‐inch interval. The reported N‐value is the blows per
foot recorded by summing the second and third interval in
accordance with the Standard Penetration Test, ASTM D1586.
PartialPenetration:If the sampler could not be driven
through a full 6‐inch interval, the number of blows for that
partial penetration is shown as #/x" (i.e. 50/2"). The N‐value is
reported as "REF" indicating refusal.
Recovery: Indicates the inches of sample recovered from the
sampled interval. For a standard penetration test, full recovery
is 18", and is 24" for a thinwall/shelby tube sample.
WOH: Indicates the sampler penetrated soil under weight of
hammer and rods alone; driving not required.
WOR: Indicates the sampler penetrated soil under weight of
rods alone; hammer weight and driving not required.
Water Level: Indicates the water level measured by the
drillers either while drilling ( ), at the end of drilling ( ),
or at some time after drilling ( ).
Moisture Content:
Dry:Absence of moisture, dusty, dry to the touch.
Moist: Damp but no visible water.
Wet: Visible free water, usually soil is below water table.
12/2020
Appendix F
Pavement Condition Matrix and Recommendations (sorted alphabetically by street name)
City of New Hope
Braun Intertec Project B2107447
Direction
Avg
Bituminous
Thickness (in.)
Avg
Aggregate
Base
Thickness (in.)Core #
Bituminous
Thickness (in.)
Aggregate Base
Thickness (in)
Petromat
Depth (if
present)Notes
59th Avenue N Independence Avenue N Hillsboro Avenue N Bituminous EB 4.1 3.3
59th Avenue N Hillsboro Avenue N Gettysburg Avenue N Bituminous EB 4.3 5.4 C-5 4.50 11.50 --Good condition
60th Avenue N Hillsboro Avenue N Gettysburg Avenue N Bituminous EB 4.2 3.1
60th Avenue N Gettysburg Avenue N Ensign Avenue N Bituminous EB 5.0 3.5 C-6 6.00 1.00 --
Gettysburg Avenue N Gettysburg Circle 59th Avenue N Bituminous NB 4.4 7.8 C-8 4.00 5.00 --Medium severity stripping throughout pavement core
Gettysburg Avenue N 59th Avenue N 60th Avenue N Bituminous NB 4.4 3.6 C-7 4.00 3.00 --Good condition
Gettysburg Circle Gettysburg Avenue N CDS Bituminous NB 4.5 5.3 C-9 4.25 6.75 --Low-severity stripping near bottom of pavement core
Hillsboro Avenue N 59th Avenue N Hillsboro Circle Bituminous NB 4.2 3.5
Hillsboro Avenue N Hillsboro Circle 60th Avenue N Bituminous NB 8.5 6.8 C-3 9.50 1.50 --Top of core seperated; low- to medium-severity
stripping throughout pavement core
Hillsboro Avenue N 60th Avenue N Gettysburg Avenue N Bituminous NB 3.9 4.9 C-2 4.25 9.75 --Top of core seperated; medium severity stripping
throughout pavement core
Hillsboro Circle Hillsboro Avenue N CDS Bituminous EB 4.7 12.5 C-4 4.25 11.75 --Low severity stripping throughout pavement core
Independence Avenue N Dead End 59th Avenue N Bituminous NB 4.2 8.3
Independence Avenue N 59th Avenue N West End Bituminous NB 5.3 8.5 C-1 5.00 5.00 --Good condition
Street From To Surface Type
Coring Data GPR Testing
New HopePlymouth
Crystal
Robbinsdale 0 150 300Feet
($$¯
1:3,600 (At original document size of 8.5x11)
Revised: 2021-09-27 By: dmericksonV:\1938\Clients\New_Hope\Projects\2022_Infrastructure_Project\Existing_Water_Main_and_Break_History_map.mxd
Disclaimer: Stantec assumes no responsibility for data supplied inelectronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provisionof the data.
Legend
!(Watermain BreakReclaim and Watermain Replacement2" Mill and OverlayTrenchless Watermain Replacement
New Hope, Minnesota
Watermain Break HistoryFigure 4
2022 Infrastructure Improvements Project
I:\RFA\PUBWORKS\2021\Council\1037‐1053 2021 Meadow Lake Drawdown
Request for Action
October 25, 2021
Approved by: Kirk McDonald, City Manager
Originating Department: Public Works
By: Bernie Weber, Director
Agenda Title
Resolution awarding contract to West Central Environmental Consultants (WCEC) for construction of Public
Improvement Project No. 1037/1053 (Meadow Lake Drawdown) and approving cooperative and subgrant
agreement with Shingle Creek Watershed Management Commission (SCWMC).
Requested Action
Staff recommends that the Council pass a resolution awarding contract to WCEC for construction of the
Public Improvement Project No. 1037/1053 (Meadow Lake Drawdown) including the additional weekly cost
for additional pumping after initial drawdown. Staff also recommends the Council approve the cooperative
and subgrant agreement with SCWMC for this project.
Policy/Past Practice
The city has previously partnered with local watershed organizations for lake and other related projects.
Background
In the spring of 2019 SCWMC engineers met with the Meadow Lake Watershed Association (MLWA) to
discuss the status and health of Meadow Lake, and to see if there was any interest from MWLA in an in‐lake
management project. Over the summer and fall, the Meadow Lake Management Plan was developed by the
watershed engineer. This plan targets reducing the internal phosphorus loading in Meadow Lake and
includes a drawdown in the fall of 2021 and future alum treatment.
The project generally consists of a drawdown of Meadow Lake followed by monitoring, chemical treatment
of invasive plant and fish species, and eventual alum treatment. In addition, the project also includes
drawdown of the golf course pond. When the lake and pond are drawn down, the city plans to get quotes on
maintenance work related to replacement of the outlet pipe connecting the pond and lake.
The SCWMC engineer and city staff have been working closely with area residents for over a two‐year period
on this project. During that period, the Meadow Lake Management Plan was developed. Also, the city and
Meadow Lake Watershed Association (MLWA) developed the Meadow Lake Community Action Plan. This
plan targets reducing the external phosphorus loading in Meadow Lake. While the city and MLWA have
both worked diligently installing storm water treatment in this watershed, more improvements are still
needed to meet state water quality standards. The Meadow Lake Community Action Plan identifies ways
that both the city and residents can help make improvements to water quality in Meadow Lake.
The drawdown required 75% of lakeshore property owners to sign off on the drawdown procedure, and this
sign off was obtained in 2020. The DNR recently approved the permit for the drawdown. The DNR will also
provide guidance related to turtle relocation that has been discussed with the MLWA. Training date for this
activity will be in late October/early November.
Agenda Section
Development &
Planning
Item Number
8.1
Bids were received on October 5, 2021 by the SCWMC for the Meadow Lake Drawdown Project (Public
Improvement Project No. 1037/1053). Four bids were submitted and reviewed. Below is a summary of the
bid results.
Contractor Base Bid Additional Weekly Cost
Iron Eagle $38,222.00 $12,017.00
West Central Environmental Consultants (WCEC) $44,430.00 $7,500.00
Rain For Rent $56,762.16 $24,308.00
Northern Dewatering $68,110.00 $17,027.50
The lowest base bid was Iron Eagle at $38,222.00. However, due to the potential for additional pumping after
the initial drawdown, the SCWMC engineers assumed two extra weeks of drawdown will be necessary to
keep water levels down to ensure successful drawdown status through the project duration. Because of this,
WCEC would result in lower overall cost for the duration of the project as shown below:
Contractor Base Bid Weekly Pumping Costs for Two Weeks Total
WCEC $44,430.00 $15,000.00 $59,430.00
Iron Eagle $38,222.00 $24,034.00 $62,256.00
Northern Dewatering $68,110.00 $34,055.00 $102,165.00
Rain For Rent $56,762.16 $48,616.00 $105,378.16
The city and SCWMC approved a memorandum of understanding to address costs associated with the
drawdown. Based on grants obtained this past year, a cooperative and subgrant agreement has been
prepared to reflect the latest cost allocations.
Funding
The Meadow Lake Management Plan is fully funded by the Shingle Creek Watershed Management
Commission. The commission successfully received a board of water and soil resources grant and a clean
water fund grant, which resulted in a fully funded project. The city paid for initial work on this project in
2020 and 2021 while the commission waited to receive grant funds. The city will fully be reimbursed by the
end of 2021 by the commission from these grant funds.
The Meadow Lake Community Action Plan has been prepared by the MLWA and the storm water specialist.
Each year, there is $100,000 available in the CIP for storm water projects, and any projects eventually planned
in the Meadow Lake area would be funded through this fund. However, the majority of the plan is based in
education and outreach which would be performed by the storm water specialist during normal working
hours. This fund will also be used for the culvert replacement project discussed previously. Action on that
project will be brought to a future council meeting after quotes are received.
Attachments
Resolution
Wenck/Stantec Memo on Bids
SCWMC and city of New Hope cooperative and subgrant agreement
City of New Hope
Resolution No. 21‐
Resolution awarding contract to West Central Environmental Consultants (WCEC) for
construction of Public Improvement Project No. 1037/1053 (Meadow Lake Drawdown) and approving
cooperative and subgrant agreement with Shingle Creek Watershed Management Commission (SCWMC)
WHEREAS, city and watershed staff has identified the need for infrastructure improvements specified in
the Meadow Lake Management Plan; and
WHEREAS, plans and specifications for the Meadow Lake Drawdown Project No. 1037/1053 have been
prepared by watershed consultant engineers, Wenck/Stantec, and approved by SCWMC;
and
WHEREAS, the SCWMC has received acceptable bids and the Council does hereby determine to proceed
with the Meadow Lake Drawdown; and
WHEREAS, the adjusted total base bid of $59,430.00 from WCEC that includes the base bid plus weekly
pumping costs for two weeks is the lowest responsible bid submitted; and
WHEREAS, funding is available from the SCWMC and the city is being reimbursed in accordance with a
cooperative agreement between the two agencies; and
WHEREAS, A cooperative and subgrant agreement between the SCWMC and the city has been prepared to
address grant funding received for the project; and
NOW, THEREFORE, BE IT RESOLVED,
1. That the contract of Public Improvement Project No. 1037/1053, the Meadow Lake
Drawdown, is awarded to WCEC.
2. That the mayor and city manager are authorized and directed to sign the same.
3. That the City Council of the city of New Hope hereby adopts the cooperative and
subgrant agreement.
Adopted by the City Council of the City of New Hope, Hennepin County, Minnesota, this 25th day of
October, 2021.
Mayor
Attest:
City Clerk
Memo
To: Bernie Weber, City of New Hope
From: Ed Matthiesen, PE, Stantec
Erik Megow, PE, Stantec
Date: October 12, 2021
Reference: City Project 1037/1053, Meadow Lake Drawdown
Bids were received by October 5, 2021 virtually for the Meadow Lake Drawdown Project (City Project
1037/1053). Four bids were submitted and reviewed. Below is a summary of the bid results. There are no
math errors in the bids.
Contractor Base Bid Additional Weekly Cost
Northern Dewatering $68,110.00 $17,027.50
Iron Eagle $38,222.00 $12,017.00
Rain For Rent $56,762.16 $24,308.00
West Central Environmental
Consultants (WCEC) $44,430.00 $7,500.00
The lowest base bid was Iron Eagle at $38,222.00. However, due to the potential for additional pumping
after the initial drawdown, we assumed two extra weeks of drawdown will be necessary to keep water
levels down to ensure successful drawdown status through the project duration. Because of this, WCEC
would result in lower overall cost for the duration of the project.
WCEC can perform the work and confirmed that they were comfortable with their bid. If the City elects to
proceed with this project, we recommend the project be awarded to West Central Environmental
Consultants.
If you have any questions, please contact me at 763-252-6851.
Stantec Consulting Services Inc.
Ed Matthiesen, PE
Principal, Senior Civil Engineer
Phone: 763 252-6851
Edward.matthiesen@stantec.com
Cc: Ann Ackerson, Stantec
Dan Boyum, Stantec
1
COOPERATIVE AND SUBGRANT AGREEMENT
FOR
MEADOW LAKE MANAGEMENT PLAN
This Cooperative and Subgrant Agreement (“Agreement”) is made as of this ___ day of
______________ 2021 by and between the Shingle Creek Watershed Management Commission, a
joint powers watershed management organization, (“Commission”) and the City of New Hope, a
Minnesota municipal corporation, (“City”). The Commission and the City may hereinafter be
referred to individually as a “party” and collectively as the “parties.”
RECITALS
A. On April 11, 2013, the Commission and the West Mississippi Watershed Management Commission
jointly adopted the Shingle Creek and West Mississippi Third Generation Watershed Management
Plan (“Plan”), a watershed management plan within the meaning of Minn. Stat. § 103B.231.
B. The Plan includes a capital improvement program (“CIP”) that lists a number of water quality
project capital improvements.
C. The water quality projects identified in the CIP include the Meadow Lake Management Plan,
which includes a whole lake drawdown and alum treatments to address lake internal loading
(“Project”), which is more fully described in the attached Attachment One.
D. The Plan specifies that projects in the CIP will be partially or fully funded by a County tax levy
under Minn. Stat. § 103B.251.
E. The Commission entered into a grant agreement related to the Project with the Minnesota
Board of Water and Soil Resources (“BWSR”) effective as of May 25, 2021, a copy of which is
attached hereto as Attachment Two (“BWSR Grant Agreement 1”).
F. The BWSR Grant Agreement 1 provides that BWSR will grant the Commission a sum not to
exceed One Hundred Fifty‐three Thousand Five Hundred Ten and No/100 Dollars
($153,510.00), which funds are to be used for the Project to perform the duties and tasks
specified in the BWSR Grant Agreement 1.
G. The Commission entered into a grant agreement related to the Project with the Minnesota
Board of Water and Soil Resources (“BWSR”) effective as of April 16, 2021, a copy of which is
attached hereto as Attachment Three (“BWSR Grant Agreement 2”).
H. The BWSR Grant Agreement 2 provides that MPCA will grant the Commission a sum not to
exceed Forty Thousand and No/100 Dollars ($40,000.00), which funds are to be used for the
Project to perform the duties and tasks specified in the BWSR Grant Agreement 2.
2
I. On September 10, 2020 the Commission adopted a resolution ordering the Project, directing
that it be constructed by the City and that the Commission’s share of the Project costs be
funded from any grant proceeds and a levy previously certified to Hennepin County (“County”)
in accordance with Minn. Stat. § 103B.251.
J. The Commission and City have agreed for the City to assume, as subgrantee, certain duties and
responsibilities of the Commission, as grantee, under the BWSR Grant Agreements in
consideration of receiving a portion of the funds provided for in those grant agreements and
subject to the terms, conditions, and limitations set forth therein.
K. The City is willing to construct the Project and to perform the duties as a subgrantee in
accordance with the terms and conditions of this Agreement.
AGREEMENT
In consideration of the mutual covenants and agreements hereinafter set forth, and
intending to be legally bound, the parties hereby agree as follows:
1. Project. The Project will consist of the work required to construct the improvements in the
City as more fully described in Attachment One. The Project will be constructed on land
owned by the City or within easement areas held by the City.
2. Contract Administration. The City will obtain bids and award the contract for the Project in
accordance with the requirements of law. The City will award the contract and supervise and
administer the construction of the Project to ensure that it is completed in accordance with
the scope of the Project identified in Attachment One. The City will require the contractor to
name the Commission as additional insured on all liability policies required by the City of the
contractor and the Commission shall be given the same notification of cancellation or non‐
renewal as is given to the City. The City will require that the contractor defend, indemnify,
protect and hold harmless the Commission and the City, their agents, officers, and employees,
from all claims or actions arising from performance of the work of the Project conducted by
the contractor. The City will supervise the work of the contractor. However, the Commission
may observe and review the work of the Project until it is completed.
3. Contract Payments. The City will pay the contractor and all other expenses related to the
construction of the Project and keep and maintain complete records of such costs incurred.
4. Commission Reimbursement. Reimbursement to the City will be made as soon as funds are
available provided a request for payment has been received from the City providing such
detailed information as may be requested by the Commission to substantiate costs and
expenses.
3
5. Limits on Reimbursement. The total reimbursement paid by the Commission to the City for
the Project will not exceed the cost of the drawdown, alum treatment and professional
services contracts, estimated to be One Hundred Eighty Thousand Dollars ($180,000).
Reimbursement will not exceed the costs and expenses incurred by the City for the Project,
less any amounts the City receives for the Project as grants from other sources. All costs of the
Project incurred by the City in excess of such reimbursement, including all costs incurred in
excess of estimated project costs due to unforeseen conditions or any other cause, shall be
borne by the City or secured by the City from other sources unless otherwise agreed by both
parties.
6. Grant Agreement. The Commission agrees to forward to the City the funds the Commission
receives from the BWSR Grant Agreements for the Project based upon approved
reimbursement requests received from the City and conditioned on City’s continuing
compliance with its obligations under this Agreement.
7. City Obligations as Subgrantee. The City will perform and satisfy certain obligations of the
Commission under the Grant Agreements. Specifically, but without limiting the foregoing, the
City will perform all of the following with respect to the Project and in satisfaction of the
obligations of the Grant Agreements:
(a) The City will perform, or participate in, all elements of the Project as described or
otherwise identified in the Grant Agreements, as they may be amended, and will properly
document expenses, including time and materials, in the manner expressed in the Grant
Agreements and will provide information to the Commission to aid in accurate grant
reporting as required in the Grant Agreements. Any amendments made to the Grant
Agreements, including its exhibits, are incorporated in and made part of this Agreement by
reference.
(b) The City will comply with all requirements and conditions of the Grant Agreements
applicable to the Project that, by their nature, must be performed by City rather than
Commission and that are conditions of award of funds under the Grant Agreements.
(c) The times of performance and expiration of City’s obligations under this Agreement shall
be as provided in the Grant Agreements.
(d) The City will provide invoices for reimbursement in accordance with the requirements of
the Grant Agreements.
(e) The City will take all other actions as are needed to ensure compliance with the Grant
Agreements and provide such information and assistance to the Commission as may be
needed to ensure the Commission can comply with the requirements of the Grant
Agreements that, by their nature, must be performed by the Commission rather than the
City.
4
8. Indemnification. The City will defend, indemnify, protect and hold harmless the Commission
and its agents, officers, and employees, from any claims arising out of conducting the Project,
including environmental claims. Nothing herein shall be deemed a waiver of the limitations of
liability in Minnesota Statutes, chapter 466.
9. Audit. All City books, records, documents, and accounting procedures related to the Project
are subject to examination by the Commission and either the State Auditor or the Legislative
Auditor for at least six years after completion of the Project.
10. Data Practices. The City shall retain and make available data related to the letting of contracts
and construction of the Project in accordance with the Minnesota Government Data Practices
Act.
11. Legal Compliance. The City is responsible for complying with all applicable federal, state, and
local laws, rules, regulations, and ordinances and for securing all required permits related to
the Project.
12. Term. This Agreement shall be in effect as of the date first written above and shall continue
until the Project is fully constructed and all obligations under the Grant Agreements have been
completed. The indemnification, data practices, audit, and ongoing maintenance obligations
set out herein shall survive the termination of this Agreement.
13. Entire Agreement. The above recitals and the attachments attached hereto are incorporated
in and made part of this Agreement. This Agreement contains the entire understanding
between the parties regarding this matter and no amendments or other modifications of its
terms are valid unless reduced to writing and signed by both parties.
5
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed by their
duly authorized officers on behalf of the parties as of the day and date first above written.
SHINGLE CREEK WATERSHED
MANAGEMENT COMMISSION
By:__________________________________
Its Chair
And by:______________________________
Its Secretary
CITY OF NEW HOPE
By: _________________________________
Its Mayor
And by: ______________________________
Its City Manager
ATTACHMENT ONE
Meadow Lake Management Plan Project
Overall Project Narrative:
The Meadow Lake Management Plan is a multi‐year, multi‐phase project intended to create the
conditions for improvement water quality and biotic integrity in Meadow Lake.
Phase One‐Lake Drawdown
This phase has two primary activities: establishment of baseline conditions and engineering and
drawdown of the lake. Engineering includes designing, permitting, and construction observation of
the fall drawdown, with pumps estimated to be in place 1‐2 months until freeze over. This
drawdown will include a drawdown of a City pond on the Golf Course to the southeast of Meadow
Lake to allow the City to complete repair or replacement work on the culvert connecting the two
water bodies. This work includes preparatory monitoring including initial aquatic vegetation,
sediment, and biological monitoring as well as the contractual cost of the dewatering.
Phase Two‐Alum Treatment
The alum treatment task is the application of aluminum sulfate (alum) by a qualified contractor to
the Meadow Lake sediments in two doses at least one year apart in an effort to significantly
reduce the release of phosphorus from the sediment in the deeper areas of the lake. This phase
includes the cost of taking and analyzing the initial sediment cores from the lake prior to the alum
treatment to calculate the maximum initial dosage for alum and to establish the treatment area.
This work includes the initial sediment core analysis and construction oversight as well as the cost
of the alum contract.
Commission Direct Costs
The Commission will directly pay for the cost of water quality, and post‐drawdown and alum
treatment aquatic vegetation, fish and other monitoring.
The Commission will directly pay for additional cores and analysis will be taken following the initial
alum dose and results used to make any necessary adjustments to application rates and areas for
the second dose. A final set of cores taken following the second application will be evaluated to
verify that the desired reductions have been achieved.
The Commission will directly pay for the cost of any required fish or aquatic vegetation chemical
treatment necessary following the drawdown to ensure that the project meets its biotic integrity
goals.
The Commission will provide ongoing grant management and reporting.
ATTACHMENT TWO
BWSR Grant Agreement 1
Clean Water Fund Competitive Grants Program
(attached hereto)
ATTACHMENT THREE
BWSR Grant Agreement 2
Watershed‐Based Implementation Funding
(attached hereto)
I:\RFA\POLICE\2021\Council Meetings\Joint Community Police Partnership (JCPP)\8.2 Q & R ‐ JCPP ‐2022.docx
Request for Action
October 25, 2021
Approved by: Kirk McDonald, City Manager
Originating Department: Police
By: Tim Hoyt, Director of Police
Agenda Title
Resolution approving agreement between the city of New Hope and Hennepin County for the 2022 Joint
Community Police Partnership (JCPP) to be shared by the cities of Crystal, New Hope and Robbinsdale, at a
cost of $27,000 per city (total cost of $81,000)
Requested Action
Staff is recommending the Council pass a resolution approving a contract between Hennepin County and the
city of New Hope for the Joint Community Police Partnership (JCPP) to be shared by the cities of Crystal,
New Hope and Robbinsdale for the year 2022.
Policy/Past Practice
The Joint Community Police Partnership (JCPP) is a collaborative effort between Hennepin County and the
cities of New Hope, Crystal and Robbinsdale. The mission is to enhance communication and understanding
between law enforcement and multicultural residents of these cities. By building trust and communication
between the police and community members, we will ultimately improve the safety and livability of our
communities. Together, we are working to build safer communities.
Background
The Joint Community Police Partnership (JCPP) is a Hennepin County program that works collaboratively to
enhance relationships between police and specifically with immigrants, people of color, indigenous people,
and faith communities. Each city, which participates, tailors their programs to meet their specific
community’s needs. The council discussed this program during the March 8 city council meeting attended by
Commissioner Lunde, who at the time gave a brief overview of the program. The program was also
discussed during the review of the 2022 Police Department budget at the September 20 council work session.
Funding
The 2022 cost is $27,000. Funds were allocated in the 2022 police budget.
Attachment
Resolution
Agenda Section
Development &
Planning
Item Number
8.2
City of New Hope
Resolution No. 21‐
Resolution approving agreement
between the city of New Hope and Hennepin County
for the 2022 Joint Community Police Partnership for $27,000
WHEREAS, the city of New Hope is committed to serving its residents through Human Services
programs; and
WHEREAS, the city of New Hope is committed to collaboration with other agencies and the
opportunity to enter into the Joint Community Police Partnership with other agencies
furthers this commitment; and
WHEREAS, partnership with the joint agencies and members of those communities will enhance
communication and understanding to those serving and those being served, and
reducing the number of future emergency police contacts: and
WHEREAS, the project is evaluated each year and funds have been appropriated in the 2022
budget for this project.
NOW, THEREFORE BE IT RESOLVED that the City Council of the city of New Hope approve the
agreement with Hennepin County 2022 and authorize the payment of $27,000 for the
Joint Community Police Partnership, and authorize the Mayor and City Manager to sign
the agreement.
Adopted by the City Council of the city of New Hope, Hennepin County, Minnesota, this 25th day of
October, 2021.
___________________________
Mayor
Attest: ________________________
City Clerk
I:\RFA\HR & Admin Svcs\Human Resources\2021\Council Meetings\10252021 Council Meeting\10.1 Q&R City Contribution 2022.docx
Request for Action
October 25, 2021
Approved by: Kirk McDonald, City Manager
Originating Department: HR & Admin Services
By: Rich Johnson, Director
Agenda Title
Resolution establishing city’s monthly contribution for health benefits programs effective January 1, 2022
Requested Action
Staff recommends the Council adopt a resolution regarding the city contribution for health benefits programs
for 2022 increasing the monthly amounts are as follows:
• $95.00 per month increase towards the purchase of single health insurance coverage
• $155.00 per month per employee towards the purchase of employee +1 health insurance coverage
• $176.00 per month towards the purchase of family health insurance coverage
Policy/Past Practice
Past practice has been to adjust the city’s contribution based upon the cost of the premiums. Historically, the
city has split the increase in premium with the employee. In 2019 and 2020, the city provided additional
increases in the city contribution due to the city being below the average contribution provided by the city’s
twelve comparable cities. Increases have ranged from $0 (2005, 2012 & 2013) up to $175 (2010) per month.
Background
HealthPartners has been the city’s health insurance provider since 2009, and 18 of the past 22 years.
In 2019 and 2020, the City Council agreed to provide employees with the “typical” increase of ½ of the mid-
range plan’s premium plus an additional amount which was equal to one-half of the amount the city’s
contribution towards health insurance had fallen below that of its 12 comparable cities. One-half of the
shortfall was implemented each year to reduce the impact on each of the annual budgets. One-half of this
“catch-up” was provided in 2020 even though staff was able to negotiate a 14.7% decrease in health insurance
premiums for 2020. The city has again fallen below its comparable cities contribution, so for 2022 the city
contribution will be increased by one-half of the amount behind our comparable cities and the projected 4.5%
increase to premiums included in the preliminary budget, even though staff has negotiated a 0% increase to
health insurance premiums for 2022. In making this adjustment in 2022, New Hope will be move closer to the
level of its comparable cities’ contributions which should result in a smaller increase being needed for 2023.
The 2021 and 2022 current and proposed city contribution amounts are as follows:
2021
Contribution
2022 Increase in
Contribution
2022 Total
Contribution
Single $921.00 per month $95.00 per month $1,016.00 per month
Emp. +1 $1,226.00 per month $155.00 per month $1,381.00 per month
Family $1,366.00 per month $176.00 per month $1,542.00 per month
Agenda Section Ordinances & Resolutions
Item Number
10.1
In negotiating with HealthPartners, the city was able to secure a three-year agreement (2022 – 2024) with no
increase in healthcare premiums in 2022 along with 9% caps for 2023 and 2024. It is important to note that if
the required increase is less than 9% in 2023 or 2024, the increase would be less than the 9% cap.
The proposed increase to the city contribution was presented to the city council at the October 18, 2021 work
session where council indicated its support.
Please see the attached 2021 to 2022 plans and premiums spreadsheet for more details.
Funding
The cost to implement these changes is included in the proposed 2022 budget.
Attachments
• Resolution
• City of New Hope Health Insurance Premium Rates 2021
• City of New Hope Health Insurance Premium Rates 2022 (tentative)
City of New Hope
Resolution No. 21 -
Resolution establishing city’s monthly contribution for
health benefits programs effective January 1, 2022
WHEREAS, the city currently contributes $921.00 per month for each regular full-time employee taking
single health insurance, $1,226.00 per month for each regular full-time employee taking
employee plus one health insurance, and $1,366.00 per month for each regular full-time
employee taking family health insurance benefits; and
WHEREAS, the City will continue to pay for the basic employee life, short-term disability (for employees on
the city’s personal leave plan), and long-term disability insurance benefits in addition to the
monthly insurance contribution.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of New Hope, Minnesota, hereby
approves increasing the city’s monthly contribution to $1,016 for each employee electing single
health coverage, $1,381 for each employee electing employee plus one health coverage, and
$1,542 for each employee electing family health coverage towards health insurance benefit
programs effective January 1, 2022. Employees hired prior to November 1, 2009 who waive
health coverage, meet certain requirements, and provide proof of coverage will receive $729 per
month in 2022.
Adopted by the City Council of the City of New Hope, Hennepin County, Minnesota this 11th day of October,
2021.
Mayor
Attest:_____________________________
City Clerk
C:\Users\rjohnson\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\M3EVK52B\2021 Insurance Rates Revised Formatting 8/11/2021 10:22 AM
24 pay periods
Annual
Single
Coverage
Employee + 1
Coverage
Family
Coverage
Single
Coverage
Employee + 1
Coverage
Family
Coverage
City Contribution $921.00 $1,226.00 $1,366.00 $460.50 $613.00 $683.00
High Deductible A (Non-embedded & Creditable) - CG 349 $1,500/$3,000 $651.20 $1,465.16 $1,699.27 $325.60 $732.58 $849.64
High Deductible B (Embedded & Creditable) - CG 347 $2,800/$5,600 $580.02 $1,304.99 $1,513.50 $290.01 $652.50 $756.75
High Deductible C (Embedded & Creditable) - CG 348 $4,000/$8,000 $526.92 $1,185.53 $1,374.96 $263.46 $592.77 $687.48
HealthPartners Dental Insurance
Distinctions 6 $38.35 $76.69 $115.04 $19.18 $38.35 $57.52
$750.00 $62.50 $31.25
$1,400.00 $116.67 $58.33
$2,000.00 $166.67 $83.33
Single* - Total Contribution Maximum is $3,600 $2,850.00 $237.50 $118.75
Family or 1+1*$7,200.00 $600.00 $600.00 $300.00 $300.00
*Age 55+ add $1,000 to annual HSA maximum = $4,500 single; $8,000 1+1 or family
Flex & Deferred Comp Maximums Same for all coverages Same for all coverages
Flex Medical $2,750.00 $229.17 $114.58
Flex Limited (Dental and Vision Only) $2,750.00 $229.17 $114.58
Dependent Care $5,000.00 $416.67 $208.33
Deferred Comp $19,500.00 $1,625.00 $812.50
Deferred Comp Age 50+ $26,000.00 $2,166.67 $1,083.33
HSA Additional Contribution Maximums
HSA City Contribution with Single Coverage
HSA cont. from city cont. for FTVS & FTPL11 single coverage is half of
single medical deductible ($1,500=$750; $2,800=$1,400; $4,000=$2,000)
City of New Hope Health Insurance Premium Rates
PREMIUM per MONTH PREMIUM per PAY PERIOD
HealthPartners Medical Insurance (Group 10734)
Waive (FT Emp on PL hired prior to 11/2009) = Month $658.00; PPP $329.00
Effective January 1, 2021
G:\City Manager\Human Resources\INS\2022 Renewals\Open Enrollment for 2022\2022 Insurance Rates with WATERMARK 10/14/2021 6:42 AM
24 pay periods
Annual
Single
Coverage
Employee + 1
Coverage
Family
Coverage
Single
Coverage
Employee + 1
Coverage
Family
Coverage
City Contribution $1,016.00 $1,381.00 $1,542.00 $508.00 $690.50 $771.00
High Deductible A (Non-embedded & Creditable) - CG 349 $1,500/$3,000 $651.20 $1,465.16 $1,699.27 $325.60 $732.58 $849.64
High Deductible B (Embedded & Creditable) - CG 347 $2,800/$5,600 $580.02 $1,304.99 $1,513.50 $290.01 $652.50 $756.75
High Deductible C (Embedded & Creditable) - CG 348 $4,000/$8,000 $526.92 $1,185.53 $1,374.96 $263.46 $592.77 $687.48
HealthPartners Dental Insurance
Distinctions 6 $39.69 $79.37 $119.07 $19.85 $39.69 $59.54
$750.00 $62.50 $31.25
$1,400.00 $116.67 $58.33
$2,000.00 $166.67 $83.33
Single* - Total Contribution Maximum is $3,650 $2,900.00 $241.67 $120.83
Family or 1+1*$7,300.00 $608.33 $608.33 $304.17 $304.17
*Age 55+ add $1,000 to annual HSA maximum = $4,650 single; $8,300 1+1 or family
Flex & Deferred Comp Maximums Same for all coverages Same for all coverages
Flex Medical $2,850.00 $237.50 $118.75
Flex Limited (Dental and Vision Only) $2,850.00 $237.50 $118.75
Dependent Care $5,000.00 $416.67 $208.33
Deferred Comp $20,500.00 $1,708.33 $854.17
Deferred Comp Age 50+ $27,000.00 $2,250.00 $1,125.00
HSA Additional Contribution Maximums
HSA City Contribution with Single Coverage
HSA cont. from city cont. for FTVS & FTPL11 single coverage is half of
single medical deductible ($1,500=$750; $2,800=$1,400; $4,000=$2,000)
City of New Hope Health Insurance Premium Rates
PREMIUM per MONTH PREMIUM per PAY PERIOD
HealthPartners Medical Insurance (Group 10734)
Waive (FT Emp on PL hired prior to 11/2009) = Month $753.00; PPP $376.50
Effective January 1, 2022
S:\October 25, 2021 Council Meeting\12.1 Q ‐ Upcoming Events.docx
Request for Action
October 25, 2021
Approved by: Kirk McDonald, City Manager
Originating Department: City Manager
By: Kirk McDonald, City Manager
Agenda Title
Exchange of communication between members of the city council
Upcoming meetings and events:
Oct. 27 6:30 p.m. – Joint Council/Fire Board Work Session Meeting at Station #3, 4251 Xylon
Avenue North
Nov. 1 4 p.m. – Blue Line Coalition Meeting (Virtual)
7 p.m. – Human Rights Commission Meeting
Nov. 2 7 p.m. – Planning Commission Meeting
Nov. 3 1:30 p.m. – Joint Water Commission Meeting (In‐person or Virtual)
2 p.m. – Business Networking Group Meeting, hosted by Kate Nojd of The Residence at
North Ridge
Nov. 4 12:45 p.m. – Shingle Creek Watershed Management Commission Meeting (Virtual)
Nov. 8 7 p.m. – City Council Meeting
Agenda Section
Other Business
Item Number
12.1