IP #994 fiber optic install - Helix SolutionsOrs Request for Action October 22, 2018 Approved by: Rich Johnson, Originating Department: FIR & Admire Services By: Rich Johnson, Director Agenda Section Consent Item Number 6.8 Agenda Title Resolution approving proposal for fiber optic installation services with Helix Solutions for the new police station and city hall (Improvement Project No. 994). Requested Action Staff recommends that the City Council approve the attached resolution approving proposal for fiber optic installation services for the new police station and city hall with Helix Solutions. Policy/Past Practice The city, in conjunction with LOGIS, issued a Request for Proposals on October 1, 2018 to perform low voltage cabling for the new police station and city hall. The following four bids were received: • Comli_nk Midwest $45,329.20 • Castrejon Inc. (CI Utilities) $47,500.00 • Electrical Production Services $48,885.83 • Helix Solutions $41,724.13 As Helix Solutions was the lowest bid, their proposal is being brought forward for approval. Background Helix Solutions is a fairly new company, however Eric Graning, its president/owner has worked in the field for many years at other local firms prior to starting his own company this summer. Since that time, Helix Solutions has worked on several fiber projects with LOGIS and has received high marks. The scope of services will include: • Connecting the new police station/city hall to the city's fiber network • Running new fiber from 42nd and Xylon to 42nd and Winnetka to create a redundant loop • Testing all new fiber connections and providing the results to both the city and LOGIS • Providing documentation upon completion of the project Funding The total cost for these services is $41,724.13 and will be funded from the city hall C1P fund and with bond proceeds. This proposal follows the low voltage cabling proposal which was approved at the October 8, 2018 council meeting. The budgeted amount for both of these items was $275,000, however the low voltage proposal came in at $131,181.54 and this proposal is $41,724.13 for a total of $172,905.67, resulting in a savings of $102,094.33 compared to budget. Attachments • Resolution • Exhibit A, Helix Solutions Proposal dated 10/15/2018 • Cost Analysis developed by Wold dated 8/20/2018 I:\RFA\HR & Admin Svcs\ IT\ Fiber Proposal Info\Q-Low Voltage Proposal for City Hall and PD Station w Helix Solutions 10222018.docx RESOLUTION NO. 18-119 RESOLUTION APPROVING PROPOSAL WITH ALL STATE COMMUNICATIONS, INC. FOR FIBER OPTIC SERVICES FOR NEW POLICE STATION AND CITY HALL INFRASTRUCTURE IMPROVEMENT NO.994 BE IT RESOLVED by the City Council of the City of New Hope as follows: WHEREAS, as a part of the construction of the new Police Station and City Hall which will replace the existing City facilities ("City Hall Project"), Helix Solutions, the firm being considered by the City for the City Hall Project has submitted a bid dated October 15, 2018 for fiber optic services ("Services") at the City's direction; WHEREAS, it is necessary for the City to formally select Helix Solutions as the fiber optic installer for the City Hall Project and to enter into a contract with Helix Solutions for the purpose of performing the Services; and WHEREAS, City staff is hereby seeking approval from the City of the selection of Helix Solutions as the duly qualified firm to perform the Services and approval of the proposal which is attached herto as Exhibit A ("Proposal"); and WHEREAS, City staff and attorney have reviewed the Proposal and are agreeable with the terms, believing them to be in the best interest of the City for Helix Solutions to provide the Services; and WHEREAS, the City Council hereby approves the Proposal attached as Exhibit A, it being in the best interest of the City to engage the Services of Helix Solutions WHEREAS, the total cost of said Services, is $41,724.13. NOW, THEREFORE, BE IT RESOLVED by the City Council in and for the City of New Hope as follows: 1. That the above recitals are incorporated herein by reference. 2. That Helix Solutions is hereby selected as the firm that will provide the fiber optic installation services relating to the City Hall Project. 3. That the Proposal with Helix Solutions, attached hereto as Exhibit A, is hereby approved, is approved subj et to the review and approval by the City Attorney of the final language and exhibits. 4. The Mayor, City Manager and New Hope City staff are authorized and directed to sign the Proposal and all other appropriate documents, and to take whatever additional actions are necessary or desirable, to complete the transactions set forth in the Proposal and engage the services of Helix Solutions. Dated the 22nd day of October, 2018. y Attest: Valerie Leone, City Clerk Z-�� W, -�� Vim'"" Kathi Hem n, Mayor I:\RFA\HR & Admin Svcs\MR-Low Voltage Proposal for City Hall and PD Station w All State Communications 10152018.docx 0) fig- Helix Solutions Superior Services. Proven Results. October 15, 2018 Logis-New Hope Exhibit A Attn: J.J. Freels Project Manager (763)543-2688 RE: City of New Hope Fiber installation for New City Hall Dear Mr. Freels, Helix Solutions would like to thank you for the opportunity to bid on the above mentioned project. The bid is as follows: i Provide and Place (2) 1.25" conduit approx. 1,650' with tracer wire • Provide and Place 3-24"06"x24" hand holes ■ Provide and place approx. 4,000' 48F single mode/single armor • Provide and place 4" conduit from New Hope vault to Zayo vault ■ Provide and place locate wire, ground rods, and grounding materials in hand holes • CAD engineering and permitting ■ Splice 156 fibers total as instructed in RFP with OTDR test results upon completion ■ Provide and place 144F port patch panel ■ Provide CAD asbuild drawings upon completion of project Labor Total: $31,140.13 Material: $10,584.00 Project Total: $41,724.13 Please feel free to give me a call if you have any questions at (763)310-5505. We look forward to the opportunity to work with you. Sincerely, Eric Graning President/Owner Helix Solutions info@helixsolutions.us COST ANALYSIS FUNDING SOURCE New Police/City Hall (net proceeds) Utility - Energy Rebates Generalor Funding Council Chambers Equipment TOTAL FUNDING CONSTRUCTION Bid Pack 01 Building Construction Site Development Change Order 1 Pending Change Order Pending Change Order 3 Construction Contingency Remaining City of New Hope Police & City Hall 8/20/2018 Bid Update Award 12/4/2017 8/20/2018 $18,900,000 $18,900,000 $50,000 $50,000 $235,000 $235,000 $204,000 $2D4,000 $19,389,000 $29,389,000 S 14,792,500 $ 14,792,500 incl incl $ 164,170 $ 90,330 5 $ 500,000 $ 245,500 Subtotal S 15,292,500 $ 15,292,500 Bid Pack a<2 Parking Lot $ 630,000 $ 630,000 Landscaping $ 400,000 S 400,000 Building Demolition S 200,000 S 200,000 Contingency $ 40,000 5 40,000 Subtotal $ 1,270,000 S 1,270,000 SUBTOTAL S 16,562,500 S 16,562,500 FEES. TESTING Architectural Fees S 830,000 $ 830,000 Engineering Fees 5 117,370 $ 155,870 Bond IS]LtanCL Fees and Underwriter's Discount 5 - $ Goolcehnical/Surveying/Wetland Delineation S 20,000 5 Reimbursables 5 50,000 50,000 Metropolitan Council / City SAC (1#1 SAC units) 5 80,000 52,1&5 Abatement $ 25,000 5 800 Abatement Testing 5 2,874 $ 5,216 Trunk Stonn Drainage Fee S S ' Trunk Sanitary Fee S S ' Engineering/City Inspections (Walermain Plan Review and Inspection) S $ - Water Access Charge Fee incl ind Trunk Water Fee ind ind Engincering/City Inspections 5 S ' State or City Building Code Plan Review Fee 5 - 5 - State or City Review/Inspection Fee $ - S - Health Dept. Plumbing Plan Review Fee $ 2,500 S 2,127 Health Dept. Food Service Plan Review Fee 5 5 - City Roads and Services Fees 5 - S - UtilityTransformerFees/Inspection $ 40,000 S 64,389 Bid Advertisement/Prinling S 10,000 $ 2,524 Legal Allowance 5 S Special Structural Inspections S 50,000 $ 67,639 Commissioning S - $ - Moving Costs 5 25,000 S 25,000 Civil Defense Siren Relocation 5 6,700 4 6,700 Private Locales 5 - S 370 Contingency $ 5O,000 S 25AMO SUBTOTAL $ 1,309,444 $ 1,287,820 'FljtNITURF, & EQUIPMENT IlEgHNOLOG Furniture Allowance $ 655,000 $ 655,000 Equipment Allowance $ 100,000 $ W,000 --4Aw:VoltuW(Ls*i0 * , I- .- wDAwo s- 275= Technology Allowance (Council Chambers) $ 225,000 $ 439,500 Furnishing/Consultant Fees $ 39,300 $ 39,300 Technology Consul ling Fees $ 9,900 $ 9,900 Contingency $ 50,000 $ 25,000 SUBTOTAL (FF&E) $ 1,379,200 $ 1,493,700 PROJECT BALANCE $137,856 $44,980 WlDocsrprojeeWpmdesigrimst_analyss_master Commission No. [COMM A] CONTRACT FOR FIBER INSTALLATION & REDUNDANT LOOP FOR NEW POLICE STATION/CITY HALL (Project994) For valuable consideration as set forth below, this contract dated the 29th of October, 2018, is made and signed by the city of New Hope (hereinafter "City') and Helix Solutions, (hereinafter "Contractor"). 1. CONTRACT DOCUMENTS The Contractor hereby promises and agrees to perform and comply with all the provisions of the proposal dated October 15, 2018, this Contract, and specifications, all of which are incorporated hereby by this reference. This Contract shall comprise the total agreement of the parties hereto. No oral order, objection or claim by any party to the other shall affect or modify any of the terms or obligations contained in this Contract. 2. THE WORK The work to be performed by Contractor under this Contract is defined in the proposal dated October 15, 2018 and approved by the New Hope City Council October 22, 2018. 3. CONTRACT PRICE The City agrees to pay the contractor $41,724.13 for labor and materials for the fiber installation and redundant loop for the new police station/city hall facility. 4. COMPLETION DATE Contractor shall complete his performance under this contract by the 30th day of April, 2019 (hereinafter "completion Date"). 5. INSURANCE BOLD Before beginning actual work under this Contract, the Contractor shall submit to the City and obtain the City's approval of a certificate of insurance on Standard Form C.I.C.C.-701 or ACORD 25 forms, showing the following insurance coverage and listing the City as a loss payee under the policies: a. General Contractor Liability: $1,000,000.00 b. Automobile Liability for all Automobiles: $1,000,000.00 c. Workman's Compensation: Statutory Amounts This certificate must provide for the above coverages to be in effect from the date of the Contract until 30 days after the Completion Date and must provide the insurance company will not cancel the insurance coverage without 30 days written notice to the City of intent to cancel. The certificate must further provide that the contractor's insurance coverage is primary coverage notwithstanding any insurance coverage carried by the City that may apply to injury or damage relating to the maintenance or repair of City owned property by either the City or any employee, agent, independent contractor or any other person or entity retained by the City to perform the services described herein All insurance is subject to the review and approval of the New Hope City Attorney. 6. LAWS REGULATIONS AND SAFETY The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations applicable to performance under this Contract. 7. INDEMNIFICATION The Contractor agrees to indemnify, defend and hold the City harmless from any damages, including costs and reasonable attorney's fees, from any claims, demands, actions or causes of action arising out of any act or omission on the part of the Contractor or its agents, servants or employees in the performance of or with relation to any of the work or services performed or furnished by the contractor under this Contract, provided, however, that the Contractor's indemnity obligations shall be comparatively reduced to the extent that the Claim is caused in part by the negligent, grossly negligent or intentional act or omission of the City, any other contactor of the City or any other party indemnified hereunder; and provided further, that the forgoing indemnity will not apply if the claim is caused in whole by the City, any other contractor of the City or any other party indemnified hereunder. 8. ASSIGNMENT The Contractor shall not assign or transfer, whether by an assignment or notation or otherwise, any of its rights, duties, benefits, obligations, liabilities or responsibilities without prior written consent of the City. 9. "NOTICE The address and telephone number of the Contractor for purposes of giving notices and any other purpose under this contract shall be Eric Graning, President/Owner of Helix Solutions at 13254 Jackson Street, Becker, MN 55308 or phone at (763)310-5505. The address and telephone number of the City for purposes of giving notices and any other purpose under this contract shall be 4401 Xylon Avenue North, New Hope, MN 55428. The City's contact person is Valerie Leone, City Clerk, 763-531-5117. IN WITNESS WHEREOF, the parties to this Contract have hereunto set their hands and seals as of the day and year first above written. CITY OF NEW OPE By Its By Its City Manager STATE OF MINNESOTA COUNTY OF HENNEPIN I iJa The foregoing was acknowledged before me this --) t day of, 2018, by Kathi Hemken and Kirk McDonald, the Mayor and City Manager, respectively, of the City of New Hope, a Minnesota municipal corporation, on behalf of said municipal corporation. Notary Public ww+n VALERIE J LEONE Notary Public -Minnesota My Commission Expires Jan 31, 2020 CONTRACTOR — Helix Solutions By , Its Representat' e STATE OF MINNESOTA COUNTY OF HENNEPIN The foregoing was acknowledged before me on this ;19 *"day of J e.— 2018, by Fr-t Crca +z•e of on behalf of Helix Soluti s. 94�- Notary Public VALERIE J LEONE Notary Publl�Minnesota My Commissfon Expires Jan 31, 2020 ,� 4 Helix Solutions Superior Services. Proved Results. October 15, 2018 Logis-New Hope Attn: J.J. Freels Project Manager (763)543-2688 RE: City of New Hope Fiber installation for New City Hall Dear Mr. Freels, Helix Solutions would like to thank you for the opportunity to bid on the above mentioned project. The bid is as follows: • Provide and Place (2) 1.25" conduit approx. 1,650' with tracer wire • Provide and Place 3-24"x36"x24" hand holes • Provide and place approx. 4,000' 48F single mode/single armor • Provide and place 4" conduit from New Hope vault to Zayo vault • Provide and place locate wire, ground rods, and grounding materials in hand holes • CAD engineering and permitting • Splice 156 fibers total as instructed in RFP with OTDR test results upon completion • Provide and place 144F port patch panel • Provide CAD asbuild drawings upon completion of project Labor Total: $31,140.13 Material: $10,584.00 Project Total: $41,724.13 Please feel free to give me a call if you have any questions at (763)310-5505. We look forward to the opportunity to work with you. Sincerely, Eric Graning President/Owner Helix Solutions info@helixsolutions.us