REsowrrON AWARDING CONTRAcr FOR THE CONSTRUcrION OF GOLF COURSE
MAINTENANCE FACILITY (IMPROVEMENT PROJEcr 451)
On Wednesday f October 4 f 1989, bids were opened for the golf course shop
building. Staff is reviewing bids and will make a presentation on Monday
evening.
M:Yl'ION BY
'.ID: IJ /ifc2l-) i-
I
'--h?
Cft(7lc/
\/ij'// P q -. .~) C /
SEa)NJ) BY
(/ (:.-i-h .
. .~ I J \' I..
Review:
Administration
Finance
RFA-OOl
...
CITY OF NEW HOPE
RESOIllI'ION NO. 89-201
RESOIllI'ION AWARDING CONTRAcr
FOR THE CONS'IRUcrrON OF
GOLF COURSE MAINTENANCE FACILITY
(IMPROVEMENT PROJEcr 451)
BE IT RESOLVED by the City Council of the City of New Hope as follows:
1. That bids for the construction of golf course maintenance facility
(Improvement Project 451) were duly opened at the New Hope City
Hall, 4401 Xylon Avenue North, at 11:30 a.m. on the 4th day of
October, 1989, as heretofore authorized by this Council.
2. That advertisement for bids for the construction of said
improvement was published in the New Hope-Go1den Valley Post, the
official newspaper of the City, on the 13th day of September,
1989, and in the Construction Bulletin on the 15th day of
September, 1989.
3. It is hereby found and detennined by this Council that the bid of
Sunshine Construction for the construction of said proj ect in the
amount of $135,180 is the lowest responsible bid submitted for the
construction of said improvement; that vogt Corporation has
recommended to this Council the said low bid for the award of the
contract for the construction to the designated lowest responsible
bidder.
4. The Mayor and Manager are authorized and directed to enter into an
improvement contract for the construction of said improvement in
the name of the City with the lowest responsible bidder, subject
to the said contractor furnishing a public contractor I s surety
bond, conditioned as required by law.
Adopted by the City Council of the City of New Hope, Hennepin County,
Minnesota, this 9th day of October, 1989.
('7 " /
~ '/'""I c;;..,
//., . ,/t/;' .
c -- tU<, clP~-ur r" '
/ Mayor,/
L/n - ~
Attest: {;;o1l!j~jj'_ I . . !.T}~
City Clerk .
THE VOGT CORPORATION
ARCHITECTURE ENGINEERING
OCTOBER 4, 1989
NEW HOPE VILLAGE GOLF COURSE
MAINTENANCE BUILDING
8130 BASS LAKE ROAD
NEW HOPE, MN
BID ADDEND
PRIME BIDDERS SECUR. REC'D BASE BID ALT. #1 ALT. #2 ALT # 3
C.W. Mears x 1,2 133,250 1,540 5,744 880
rec'd 11:40
James Steel Constr. x 1,2 157,800 6,150 6,550 850
Zastrow Nasset 1,2 139,000 5,900 3,650 750
Gladstone Constr. x ? 161,046 4,578 8,154 903
Dean & Assoc. x 1,2 177,400 3,900 5,500 750
W. V. Nelson
Kent Jefferson Constr. x 1,2 145,483 4,658 5,950 860
Maertens Brenny x 1,2 163,000 8,970 6,006 920
C. o. Field Co. x 2 139,190 4,661 5,850 880
Sunshine Constr. x 1,2 122,742 4,963 6,500 975
Falls & Nyhusmoen x 1,2 142,600 4,460 5,800 900
Met Con Metro
Engco Construction Co.
SUITE 260 CARLSON CENTER. ONE CARLSON PARKWAY. MINNEAPOLIS, MN 55447. (612] 475-2826
THE VOGT CORPORATION
ARCHITECTURE ENGINEERING
October 9, 1989
Dan Donahue
City Manager
City of New Hope
4401 Xylon Ave. N.
New Hope, MN 55428
Re: Golf Course Maintenance Building
Low Bidder
Dear Mr. Donahue:
We have received the following reference material regarding Sunshine
Construction Company (copies attached):
a. Contractors Qualification Statement. A.I.A. document 305
b. Reference letter from Independent School District 196
(Rosemount)
c. Reference letter from Edward V. Kuch, Dentist, DMD
d. Professional profile sheet for Duane L. Johnson
We understand that they have forwarded their financial statement to
the city direct.
Sunshine Construction has been in business for 13 years, and has
obviously established a solid presence in the home building market.
The reference letters indicate good performance regarding construction
of temporary classrooms for a School District, and construction of a
dental clinic.
The maintenance building project is a rather simple and straight-
forward project, so we do not view it as a problem that the
contractor's experience has been mostly with houses. We have heard
nothing negative about this company.
We point out that Sunshine Construction has been in business for 13
years. For a project of this size, we feel that this length of time
in business, plus their ability to provide the performance bond or
equivalent financial guarantee of performance, are ample confidence
factors to support a decision to award them the construction contract.
EJV /wgj
Yours truly,
THE VOGT CORPORATION~ ;f
//~
iJ ~LJ 9 ?~ix0
Edward J. Vogt, A.I:A.
SUITE 260 CARLSON CENTER. ONE CARLSON PARKWAY. MINNEAPOLIS, MN 55447. (612] 475-2826
01;.T Ok"' 6 C1C:'_ TII'_I
.::. : 3!5 CO U ~4 C; I I I ~4 ceo H ,::; T r-:~ U I::: T I 0 ~4
r. . ~:!i:::::
THE AMERICAN INSTITUTE OF ARCHITECTS
AlA Document A305
Contractor's Qualification Statement
1979 EDITION
This (orm is approved iJtld r~commendcd by The American Institute of Architects (AlA) and The
Am,ci<itcd Cener>J/ Contr;J<;tc~ cl AmcdCQ (ACQ far US(! in ltv/JllJilting the qualificatiollS r.;f con-
tractors. No ~ndorsemenl 0/ the 5ubmillinS party or verification of the informalion is made by th~
AlA or ACe.
The Undersigned certifies under oath the truth and correctness of all statements and of all answers
to questions made hereinafter.
SU8MITTED TO:
ADDRESS:
SUBMliTED BY: DONALD JOHNSON
NAME: Sun s h i nee 0 n s t rue t ion Com pan y, I n c .
ADDRESS: 2 1 2 1 eLl F F DR I V E, # 2 2. 4
PRINCIPAL OFFICE: EA G AN, H N 551 22
Corporation
Partnership
Individual
Joint Venture
Other
911
CJ
CI
CJ
o
1.0 How many years hilS your orsaniZ<llion been in businl?Ss as a GenerDI Contractor?
13 Years
2.0 How many Yc;)Zlrs has your org('Jniz~tion been in business under its present business name?
:.u Under wh~t other' Or (orrn~r nllmC$ h1:ls your org<lnl7.<Ition operntcdf
13 Years
'"" .
.., ~,.,~
",' ,~.
Copyright 1~64, HIC.~, I;l 1919 by !hI! ^~rtca" InSlllull.' of ^/cll!l~~ 113S New YllIk Avenue N
~l.'lifQ(/o(\J~;oun 01 ~}hSO tMIl:/IM h~/cl" Of ll,lli'j!(\nti,ll qllo!.lIiQn of 11~ t:>fO~ISlon$ I'<1ln01l1 Ix.'fmlsslon '0(' ;~., ^~.:ll~;~:r:t ,'f/~' '~I ,L'
~W$ Il1e n lw t.ll~ ~nd \V1Il be $lJbj~ 10 It~~1 prol~'tu:lon, e. "'0 I;Ol)Y.!>nl
AlA DOCUMENT A.'30S · CONTRACTOR'S QUALIr-Ic\
~~~~D .PRT~~1~E~ICf.~Bk~Jk~UYJll~F ARCHITeCTS, 17~fr7l!ffY~k~~NJENuE,~~~w~l~r~8f6~~ D.C. ~
A30S-1979 1
"::.:.::-.:, ,-',....~
._~:....~~_.. -:-:- .--,-
12.0 Todd A. Mons9n
Todd A, Monson has been in charge of operating procedures
for jobs on the encloi$ed list.. He has 12 years experience i.n
commorcial construction working dlrectly wi.th architects and
owners putting quality first ond taking time tables, scheduling
and budgeting very seriously.
Duane L. Jph.flson
n~ab~ L. J~h~$~~ i~ ~e~~~~sibl~ f~~ ~~~~ii~ati~i ~i~ii~~,
estimating, and contracting activities for construction in
the Twin Cities area. With seventeen years of progressive
experience Duane's record of accomplishments include project
management and estimating for 1.5 million square feet of office
space as well as over 2,500 apartment units and many custom
single family homes completed in Dallas, Texas, Prior to
coming to Sunshine Construction Company, he held similar
positions with Sullivan Development and Suburban American
Development in Dallas, Texas, Dueni has a Bachelor of Science
Degree in Construction Management from the University of
Wisconsin-Stout,
~ - --- --- - --- --- - - - - -- - - -" -- --- ----
- - - - - -- -- -- ---. -. -. -- ------
-------------------------
OCT- 5-8:9 THU
9:37 SUNSHINE CONSTRUCTION
P.12I3
13.0 Trade References:
LYMAN LUMBER
7180 Northland
Minneapolis, MN
(612) 533-7007
55428
ABC Millwork
18800 W 78th Street
Chanhassen, MN 55317
(612) 937-9060
Sedgwick Heating
8910 Wentworth Ave. So.
Minneapolis, MN 55420
(612) 881-9000
14.0 Bank References:
Valley National Bank
Howard Weldon, President,
Apple Valley Commons
7300 West 147th Street
Apple Valley, MN 55124
(612) 431-4700
First Federal of Hastings
Thomas Ries - Vice President
County Road 42 & Cedar Avenue So.
Apple Valley, MN 55124
(612) 432-6840
15.0 Name of Bonding Comp<lny l1nd name and address of agent:
(Agent) Ross Nesbitt Agencies, Inc.
Ross Nesbitt-Agent
14180 West 78th Street
Suite 104
Eden Prairie, MN 55344
(Surety) Les Mack Enterprises LTD
3224 Century Avenue North
White Bear Lake, MN 55110
,
AI;" DO<:\JM~NT A3DG · CONTRACroWS Q1.1AUI'ICAT1QN STATeMeNT . MAkCll 1'J"~ WnlQN · AlAfI
~1!l79 · THE AMEl\ICAN INSTITUTe OF ARCHITCC'I'S, 1735 NEW YOlo:!< I\VENU~, N.W., WASHINGTON, D.C. :/0006
A30S.1979 4
-~------------
OCT- 5-8'::;' THU
.LtiiltIr - .~
9:3~ SUNSHINE CONSTRUCTION
P.12I4
16.0 Attach a financial statement, audited if <1vailablc, including Contractor's latest balance sheet and
income statement showing the following items:
SEE ATTACHED
A. Current Assets (e.g., ellsh, joi~t venture accounts, accounts receivable, notes receivable, accrued
income, deposits, materials inventory nno prepnid exponses):
B. Net Fixed Assets: See A t tee hed
C. Other Assets: See At tac'hed
O. Current Liabilities (e.g., <lccounts payable, notes payable, accrued e:xpen"sos, provision for income
ti:lxes, advances, accrued salaries, and nccrued payroll ti:lxes):
See Attached
E. Other Liabilities (e.g., capital, capital stock, Oluthori:ted llnd outstanding shares pCl.r values, earned
surplus, and retained Garnings);
See Attached
Nome of firm prcp<l.ring fin<l.ndnl st\itcment nnd clnte thcraof:
Ri~hard E. Reiss & Co. I LTD.
Certified Public Accountants
8030 Cedar Avenu~ South, Suite 200
Minneapolis, MN S5425
Is this financial statement for the identical organization nilmcd on pilge one? Yes
" If hot, explain thlt rcl41lionship i:\nd financ::ii:\l rosponsibility of the organization whoso financial stntc-
ment is provided (e.g., parent-subsidiary).
Will this organization act as guarantor of the contract for construction?
Yes
AlA DOCl.lM~NT A305 ' CONTRACTOR'S QUA~Ir-ICArION STATEMENT · MARCH 1971> IlOITION · AW~
lP'979' THE AMERICAN INSTITUTE Of ARCHITECTS, oms NEW YOR~ AVENue, N.W., WASHINOTON, D.C:. 20006
A30S.1979 S
- - -~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --
j~L J -
5-:=:9
I
THU
9:39
SUNSH I ~'~E
CO~'~STRUCT I ON
P.i215
17.0 Dated at
this
4th
day OT
August
19 89
Nama of Organization:
SUNSHINE CONSTRUCTION COMPANY, INC.
By: Don a 1 d J 0 h n son
Title: President
18.0
Mr. Donald Johnson 0~ U-- being duly sworn doposes and snys
thathe/shQislhc President cfiiv~~ ofSl.lnshine Construction Co. I .Inc.
Contractor(s), and that answers to the foregoing quostions <lnd all statoments therein contained ;'Iro
true nnd correct.
Subscriboclnnd sworn before me this 4 t h
Not"ry Public: ~L"~~ 1;- -
. . \. \
tS!\lOn 'x I res:
6~~ .
. .' I' jdQnl1~ c::IJ1. :)0/'/140/7
~~" I'lOfA.V 'illttc: ... MINNESOtA
,. OMOTA COUN1Y
L..j~! ~~~nl:n f:P~~ AltrU12, 1'91 ;
-.-~
day of August
1989
AlA DOCUMENT A30S · CONTRACTOIl.'S QUALIFICATION STATEMENT · MARCH 1979 EOITION · AlAe
~1979 · THn ^M~RICAN INSTITUTa OF ARCHITECTS, ,ns NCW YORK AveNUE, N.W., WASHINCTON, D.C. 20006
A30S.1979 G
-~. - - - - ... - - . -...... - .. - -- -.. -- - .. -
OCT- 5-89 THU 14:48 SUNSHINE CONSTRUCTION
P.iZt7
OCT 05 J 8'3 15: ~e CLJf'lE:O
P.2
~
A"~I..!l: V....Ll.E'!' PROPll:SSlIQNAI. ElUll.ClNG
7.&SJ.:lI wii:S" t4'7'l'H STRll:E:'r
APPLE VAt.!..!:V: MINNE:SOT... ~1S124
Ust21 4:3;Z.aOgo
tJwal'J 1). J(uc4> ::D. 111.;:0., m..~;]).
\ 'i' NQI'lTt;E:ASi SIl:c:.O/llC) STREE:'l'
1''''''W:rAUI.,". MINNE:SOr.... 5$02\
(~Q71 :;132'U:i1l
July 9, 1989
To whom it may ooncern:
Working with Todd Munson and Sunshine Co~struotio~ during the
planing and construction phases of my dental building in A~ple
Valley was a pleasant experience.
We broke ground the last ~art of October and I was moved in and
doing business by the end of February.
I WQS impressed by three things: the grade of material they used
including the framing material; the suboontractors that were
employed on my building; and the close attentiOn Todd gave to the
projee~, just as if it were his own buildin~.
After working in the building for four months now there hasn't been
anything! would ohange. If I were to do it again I wculdntt
hesitate to hire Sunshine Construction and Todd Munson again.
Sincerely yourst
~~/~~
Edward V. Kuch D.M.D.. M.S.D.
>.
~tt
-.-:v----------- .-.-- '--".
- .. - ... - - - - - - ,. - - ... ~ ~ ... - -.. -... - - - - - - -
; ;;..; : ;.... U L. r I W r'>l
P.12I2
INDEPENDENT SCHOOL DISTRICT 1516
14446 OIAMONO PATH
ROSEMOUNT. MINNESOTA 55066
6t 2-423-9402
I
.STe;.VE HANSEN
CIRe:CTOR OF BUlL-CliNGS ANO G~OUNCS
August 21, 1989
Board of Education
Milaca School District 912
500 $.W. 4th St.
Miluca, MN 56353
Dear Board Members:
Rosemount School District has had 24 portable clnssrooms built since 1982.
Sunshine Construction stuff have been, instrumental in the construction of
several of these units over the years and are presently working on the
construction of a portable classtoom at Woodland Elementary School.
When working 'with contr~\ctors, I look for companies that 4lre attentive to the.
needs of the district. Dependability, quality and a fair price are attributes that I
associate with' Sunshine Construction.
I recommend Sunshine Construction for the construction of your portable
classrooms based on their perfonmmce with our school district.
s~~_
Steve Hansen
Director of Buildings and Grounds
mac/B&O/dicS.21/1
,- -s.c - - - - - - - - _ _ _ _ _ _ __
- - ----------
JOHNSON, DUANE
Sunshine
Construction Company
. 1IlSCIiI_IfIJll..BII
Commercial Division
nUll
~lfl IIltiJi1i.
Professional Profile:
DUANE L. JOHNSON
Construction Management Estimator
Accomplishments
"Lear l?etrolcum Inct~ 45,000 square feet of office space, $900,000
-Sullivan Development COt, Inc., 14,050 square feet oroffice space, $511,000
-Journey House: Tra.vel, 5,020 sqUilre feet of office space
'Weber Ener;y Inc., a,S66 square feet of office space
.Ratc:1ifTlnvcstments, 3,872 square feet of office space
'Suite #120 ltepublican 'Party Lease, renovation and repaint office space
· Mi1c::.ho Investments, rcnowtion and repaint office Space
-Tower Office Mart, 1,471 square feet of office space
Utilizing over 17 ye:ars of progressive: academic::. and
profcssionall'csonsibilitics, Duane Johnson demonstr':ltes his
effcctjvene.~ for Sunshine Commercia.l c:lients on a daily
basis.
He is among those rare individuals who combines his
Interpersonal skills) creativity, planning) resourc:efUlness and
research & a.nalysis into one positive direc:tion: to maximize
the capabilities and availabilities of people and materials on
every project, and to minimize ~onstl'Uction expenditures.
Duane ]ohnsonl...onc more SOLID reason to choose
Sunshine Construction Comp;my.Commcrdal Division for
your noxt project.
----~
THE VOGT CORPORATION
ARCHITECTURE ENGINEERING
October 13, 1989
David Kraft
Sunshine Construction Company, Inc.
2121 Cliff Drive, Suite 224
Eagan, MN 55122
Re: New Hope
Maintenance Bldg.
LETTER
o F
INTENT
Dear Mr. Kraft:
On behalf of our client, the City of New Hope, we are
writing to confirm that the City awarded the construc-
tion contract to Sunshine Construction Company, Inc. at
its meeting on October 9, 1989. This confirms that the
City has full intent to execute the specified contract
form in the near future.
You are encouraged to submit your list of proposed
subcontractors and suppliers promptly, and get long-
lead items on order soon after approval of list.
No work is to be started at the actual project site until
your certificates of insurance and required bonds are
submitted and accepted.
As soon as required insurance and bond items are in
place, please call regarding scheduling a pre-
construction meeting.
Yours truly,
THE VOGT CORPORATION
Edward J. Vogt, A.I.A.
EJV / dj
CC: Dan Donahue, city Mgr.
Shari French'
Steve Sondrall
Dick DeSplinter
SUITE 260 CARLSON CENTER. ONE CARLSON PARKWAY. MINNEAPOLIS, MN 55447. (612] 475-2826
THE
AMERICAN
INSTITUTE
o F
ARC HIT E C T S
AlA Document AlGI
S,tandard Form of Agreenlent:Between
Owner and Contractor
where the basis of payment is a
STIPULATED SUA1
1987 EDfTION
THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH
AN ATTORNEY IS ENCOURAGED V;?ITH RESPECT TO 17:') COMPLETION OR MODIFICATION.
Tbe 1987 Edition of A/A Document A201, General Conditions of tbe Contract for Construction, is adojJted
in tbis document by reference. Do not use witb (JIbeI' general conditions unless tbis document is modified.
This clocumeI1l has beell approved and endorsed by The Associated Gelleral Contractors of America.
AGREEMENT
made as of the Ninth day of
Nineteen Hundred and Eighty Nine
BETWEEN the Owner: City of New Hope
(Name and address) 4401 Xylon Avenue N.
New Hope, Minnesota
October
in the year of
ane! the Contractor:
Sunshine Construction Company, Inc.
2121 Cliff Drive #224
Eagan, Minnesota 55122
(N(/II/I' (/lId tlddress)
The Project is;
(Name and lucatiun)
Maintenance Building
for the
New Hope Village Golf Course
The Architect is:
The Vogt Corporation
One Carlson Parkway #260
Minneapolis, Minnesota 55447
(Name and address)
The Owner ane! Contractor agree as set forth below.
Copyright 1915, ]918,1925,1'):\7,1')51,1')58,1')61,196:\,1')67.1')74,1')77, @1<)S7 by The American Institute of Archi.
tects, ] 7:\5 New York Avenue, 1\.\'\'.. Washington. D.C. 2ouo6. Heproducrion of the material herein or substantial quotation
of its provisions without written permission of the AlA violates the cO[1yright laws of the I ,nited States and will he suhjecllo
legal prosecution.
AlA DOCUMENT A101 . OWNEH,CONTRACTOI{ AGHEEMENT . TWELFTH EDlTtON . AlA" . @1<)H7
TIlE AMEHICAN INSTITUTE OF AHCIlITECTS. 17:15 NE\V YOt{K AVENUE, N,W,: WASllINGTON, D,C. 20006
A101.1987 1
ARTICLE 1
THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions),
Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and
Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached
to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and
supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents,
other than Modifications, appears in Article 9.
ARTICLE 2
THE WORK OF THIS CONTRACT
The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in
the Contract Documents to be the responsibility of other~,~K*~)!!R':X;;:
ARTICLE 3
DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 is measured, and shall be the date of
this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be flxed in a notice
to proceed issued by the Owner. .
(Insert (be date of commencement, if it ,II/fers from {be dale of Ibis Agreement or, if applicable, state lbat tbe dale lvil! be /t~\.ed in a notice to proceed.}
Date of commencement is to be the date fully executed copy of
this agreement is returned to Contractor.
Unless the date of commencement is established by a notice to proceed issued by the Owner, the Contractor shall notify the
Owner in writing not less than five days before commencing the \Xrork to permit the limeiy filing of mortgages, mechanic's liens
and other security interests,
3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than
(Insert (be calendar date or number of calendar days after tbe dale of commencement. Also insert ClU)' requirements for earlier Substantial Completion 0/ cer~
lain portions oj tbe \Vork, If not stated ehWIl'ben' ill /be (.(Jfl/rClc/ Documents.)
ninety days following date of commencement, but in no case later
than March 1, 1990 (except for bituminous paving work) .
Bituminous paving work to be completed during Spring of 1990 no
later than 30 days following start of appropriate weather.
, 'subject to adjustments uf this Commct Time as provided in the COf1[ract Documents.
(l11ser( pnJl'isiullS. If ClilY. for liquidated damages relating (() failure to complete on time.)
No liquidated damages
AlA DOCUMENT A101 . OWNER-CONTRACTOR AGREEMENT. TWELFTH EDITION. AIA@ . @1987
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006
A101.1987 2
ARTiCLE 4
CONTRACT SUM
4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of
One Hundred and Thirty Five Thousand, One Hundred and Eighty Dollars
($ 135,180. 00 ), subject to additions and deductions as provided in the Con-
tract Documents.
4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are
hereby accepted by the Owner:
(Slale tbe numbers ur (Jlber iden/ificll/i(Jll oj acn'pted allenlllles. II deci.',;i(JIlS Oil (Jlber alterNates are to he made 1;1' [be OU'ller subsequent 10 tbe executiON of
tbis llgreemenl, attacb a scbedule oj sllcb (Jlber alternates S!J(Jll'iIlR tbe amotal! for each (lilt' tbe dale /l1J/il (['bleb lbat amount is ualid.)
Base Bid Sum
$
122,742.00
Alternate #1, accepted, add
(second sewage ejector)
4,963.00
Alternate #2, accepted,
(bituminous drive)
add
6,500.00
Alternate #3, accepted,
(paint 'structural
and joists)
add
deck
975.00
Total Contract Sum:
$
135,180.00
4.3 Unit prices, if any, are as follows:
None
AlA DOCUMENT A 101 . OWNEH.CONTHACTOH A(;llEEMENT . TWEI.FTII EDITION' AlA" . @1\lS]
TilE AMEHICAN INSTITUTE OF ARClIITECTS. 17.1'; NEW YOllK AVENt iE. N.\V,. WASIIIN(iT< IN. I),C. 2001le,
A101~1987 3
ARTICLE 5
PROGRESS PAYMENTS
5.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the
Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and
elsewhere in the Contract Documents.
5.2 The period covered by each Application for Payment shall be one calendar month eo
~:
5.3 Provided an Application for Payment is received by the Architect not later than the
fifteenth day of a month, the Owner shall make payment to the Contractor not later than
30 days after recei viner application from Archi teet. If an Application for Payment is received by the
Architect alter the application date fixeaaoove, payment shall be made by the Owner not later than
30 days after receiving application from Architect.
5.4 Each Application for Payment shall be based upon the Schedule of Values submitted by the Contractor in accordance with
the Contract Documents. The Schedule of Values shall allocate the entire Contract Sum among the various portions of the Work
and be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This Schedule,
unless objected to by the Architect, shall be used as a b;L'iis for reviewing the Contractor's Applications for Payment.
5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period
covered by the Application for Payment.
5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows:
5.6.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage
completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the
Sche~Cj of Values, less retainage of ten percent
( 'X,). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be
included as provided in Subparagraph 7.3.7 of the General Conditions even though the Contract Sum has not yet been adjusted by
Change Order;
5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the
site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the
site at a 10catiQJ1 agreed upon in writing), less retainage often
percent (.10 %);
5.6.3 Subtract the aggregate of previous payments made by the O\vner; and
5.6.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certil1cate for Payment as provided in Para.
graph 9.5 of the General Conditions.
5.7 The progress payment amount determined in accordance with Paragraph 5.6 shall be further modified under the following
circumstances:
5.7.1 Add, upon Substantial Complet12I} oi,the Work, a sum sufficient to increase the total pavments to
nmel..y-tJ.ve percent (95 %) of the Contract
Sum, less such amounts as the Architect shall determine for incomplete Work and unsettled claims; and
5.7.2 Add, if I1nal completion of the Work is thereafter materially delayed through no fault of the Contractor, ;my additional
amounts payable in accordance with Subparagraph 9.10.3 of the General Conditions,
5.8 Reduction or limitation of retainage, if any, shall be as follows: (none)
(1f it is in/ended. prior to ~)'u!Jstalltial CU/Jlp/elio1l uJ lbe entire W'urk. to reduce or limit [be re/alnage resultillgJrolll tbe percen/ages inserted in SuhparaM
f.!,rapbs 5.6.1 and 5.6.2 ahm'e, and tbis is not explained e/.",'l!I.JTbere ill the COJllrad !Jocumen/s. insert bere pnn'isionsfor such reduq!iCJll or Iimi/ation.)
. 5.9 Application for payment to be on printed A. I .A. form G-702 and G-703
AlA DOCUMENT A101 . OWNER,CONTRACTOl( AGREEMENT. TWEI.FTH EDITtON . AlA'" . @19H7
THE AMERICAN INSTITUTE OF ARCHITECTS, t 735 NE\V YORK AVENUE, N,W., WASHtNGTON, t),c. 20006
A101-1987 4
.ARTICLE 6
FINAL PAYMENT
Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1)
the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming
Work as provided in Subparagraph 12.2.2 of the General Conditions and to satisfy other requirements, iLmy, which necessarily
survive fmal payment; and (2) a final Certificate for Payment has been issued by the Architect; such fmal payment shall be made by
the Owner not more than 30 days after the issuance of the Architect's final Certificate for Payment. l>nXOClO:RlXvs:
ARTiCLE 7
MISCELLANEOUS PROVISIONS
7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the ref-
erence refers to that provision as amcnded or supplementcd by othcr provisions of the Contract Documents.
7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in
the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located.
(Insert rate oj interest Cl!{reed UfWll, II any.)
(USll1:V lall's and requirements under the Federal Trutb in Lendill!!. itel, similar slate and lucal CONsumer credit fall'S and olber regulations ell Ib€! (Ju'ner's Clnd
ContracIor's prillci/}{ll places {II business. th(' lucatiun uI (be Pn~iecl und elsf!Il'bere may aJlce! tbe l'alidity of Ibis p1"ol'isi()1I. LegllI ac/z'ic!! sbuul" be oh/ain!!d
zl'itb re.\'!wct [n ride/ioNs OJ' m(JdificatiuNs, tlut! also regardinp, requiremcJ/ts sllcb as fl'rill(!!l disclosures ur ({'ail'ers.)
"7.3 Other provisions:
(None)
ARTICLE 8
TERMINATiON OR SUSPENSION
8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions.
8.2 The Work may be suspended by the (hvncr as provided in Article 14 of the General Conditions.
AlA DOCUMENT A10f . O\VNEH,CO,YrRACTOR AGREEMENT. TWELFTII EDITION. AlA" . @1<JH7
TI IE AMERICAN INSTITUTE OF ARCHITECTS. 17.15 NEW YORK AVENUE. N.W" WASIIINGTON, D,C. 2()(I06
A101-1987 (5
ARTICLE 9
ENUMERATION OF CONTRACT DOCUMENTS
9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows:
9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AlA Document AlO1, 1987
Edition.
9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201, 1987 Edition.
9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated
August 31, 1989 ' and are as follows:
Document
Title
Pages
Complete contents of Division 0 and Division 1 of the
Project Manual as issued for bidding, dated August 31,
1989, including related items in Addenda 1 and 2.
9.1.4 The Specifications are those contain~d in the Project ,Manual dated as in Subparagraph 9.1.3, and are as follows:
{Hitber lisl !be S'pecIJica/i()Jls bere or refer /0 (UJ e.\"hiiJit (if/ached In Ibis i1.~r(,(,11leJlI.)
Section *
Title *
Pages * *
Complete contents of all Divisions of Project Manual as
issued for bidding, dated August 31, 1989, including
Addenda 1 and 2.
*
Sections as itemized in Project Manual Table of Contents pages 1
and 2 and addenda 1 and 2.
**
Pages as numbered per each manual section.
AlA DOCUMENT A101 . OWNER.CONTRACTOH AGREEMENT. TWELFTH EDITION. AIA@ . <01987
TIlE M\iIERICAN INSTITUTE OF ARCHITECTS, 1755 NEW YOHK AVENUE, N.W., WASHINGTON, D.C. 20006
A101-1987 6
9.1.5 The Drawings are as follows, and are dated August 31, 1989
(Hi/be,. list/be /Jrall'ill).:.\ bere or 1'('11.'1' lu an ('xbiIJit atlacbl'cI tu tbis /l.r.:r(,(,l1l(,l1/)
unless a different date is shown below:
Number
Title
Date
Drawings as listed on Index to Sheets on sheet A-I,
including sheets A-I through A-4 and M-1 and E-l.
9.1.6 The Addenda, if any, are as follows:
Number
1
Date
Sept. 25, 1989
Pages
1-7
Number
2
Date
Sept. 29, 1989
Pages 1-3
Portions of Addenda relating to bidding requirements are nOl part of the Contract Documents unless the bidding requirements are
also enumerated in this Article 9.
AlA DOCUMENT A101 . OWNER-CONTRACTOR AGHEEMENT . TWELFTH EDITION. AlA" . @19H7
TilE AMERICAN INSTITUTE OF ARCHITECTS, 1755 NEW YORK AVENUE, N,W., WASIllNGTON, l),c. 20006
A101-1987 7
9.1.7 Other documents, if any, forming part of the Contract Documents are as follows:
(Lisl bere any addilional dOClt1llell/S wbicb are inlellded 10 form pari of Ibe COn/relCI Documenls, Tbe General Contiilions provide Ibm biddi1lg requiremen/s slIcb
as advertisenlent or itwitalion to bid, Instructions to Bidders, sample /omzs and tbe Contractor's bid are not part of the Contract Documents unless enumerated
ill Ibis Agreemenl. Tbey sbould be lisled bere ollly if in/e1lded 10 be pari of Ibe COlllrelCI DocumelllS.)
Contractors bid, as submitted October 4, 1989
This Agreement is entered into as of the day and year first written above and is executed in at least three original copies of which
one is to he delivered to the Contractor, one to the Architect for use in the administration of the Contract, and the remainder to the
Owner.
OWNER
City of New Hope
CONTRACTOR Sunshine Construction Company, Inc.
(Signature)
(Signature)
(Printed nall/e and til/e)
(Prinled name and iiI/e)
AlA DOCUMENT A101 . OWNER-CONTRACTOR AGREEMENT' TWELFTH EDITION. AlA'" . @1987
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006
A101.1987 8
ADDENDUM TO CONTRACT DOCUMENTS,
DATE:
September 25, 1989
ADDENDUM NO. :
ONE
PROJECT:
MAINTENANCE BUILDING
FOR THE
NEW HOPE VILLAGE GOLF COURSE
OWNER:
CITY OF NEW HOPE
MINNESOTA
The items contained in this addendum are hereby to become part of
the project requirements. corresponding items in the project
documents of previous date are to be superceded or modified by
these provisions.
BID SUBMITTAL DATA:
Original Bid Closing Date:
11:30 a.m., October 4. 1989
New Bid Closing Date:
No change
Page 1 of 7
SPECIFICATION ITEMS:
SECTION 00001
TABLE OF CONTENTS
Division 7 Moisture Protection
Add:
07600 Sheet Metal Flashing, Fascias, and Plastic
Flashing
Division 8 Doors and Windows
Revise: 08700 Finish Hardware
Section number should be 08710, instead of 08700
SECTION 00120
INSTRUCTION TO BIDDERS
1. 01 B. to read: "Apply to Dick DeSplinter, c/o New Hope
Village Golf, 8130 Bass Lake Rd., New Hope, MN for access
for visits by bidders."
1.04 B. to read: "Address outer envelope to: City Clerk,
c/o City of New Hope, 4401 Xylon Ave., No., New Hope, MN.
55428"
SECTION 00501
FORM OF AGREEMENT
1.01 Add:
B. Owner reserves right to enter modifications to
Standard Agreement Form A101.
SECTION 00710
GENERAL CONDITIONS OF THE CONTRACT
1. 01 Add:
B. Owner reserves right to enter modifications to
standard General Conditions Form A2 01. "
Page 2 of 7
SECTION 04220
UNIT MASONRY
2.01 Concrete Masonry Units
A. Add:
5. Score joints in exterior block to be
concave rounded profile. Submit sample for
approval.
SECTION 04220
UNIT MASONRY
Add:
2.05 Loose Fill Insulation
Insulation for masonry loose pour fill to be
polystyrene bead insulation. K maximum: 0.31/inch
SECTION 05500
MISCELLANEOUS METALS
Add:
1.06 Crane Rail
Provide rail for crane as detailed on 15/A3
Add:
SECTION 07600
SHEET METAL FLASHING, FASCIAS, AND PLASTIC FLASHING
2.01 Products
A. Sheet metal flashing, fascias, coping pieces,
cants, downspouts, etc., to be 24 gauge pre-
finished steel sheet equal to "Colorklad" or
"Pac-Clad". Color to be selected from
manufacturer's standard colors. Shop drawing
required for fascias and downspouts.
B. Plastic underlayment to be 20 mil polyvinyl
chloride sheeting.
C. Plastic flashing at lintels to be equal to
"Nervastral".
Page 3 of 7
SECTION 07900
CAULKING AND SEALANTS
Add:
1.05 Extent of caulking and sealants
A. Caulk at all interior control joints and around
perimeter of all exterior metal door and window
frames (on interior side).
B. Sealant at all locations noted and/or all exterior
locations noted for caulking. Sealant at all
exterior control joints and around perimeter of
all exterior openings (at exterior side).
SECTION 08111
METAL DOORS AND FRAMES
Delete 1.05, A. (There is no alternate pertaining to this
section. )
2.02 Frames
Delete reference to 18 gauge. All frames to be 16
gauge.
SECTION 08360
SECTIONAL OVERHEAD DOORS
1.01 Overhead Doors
A. Delete "Doors to have one row of lites, each
door." Doors to have no windows.
2.03 Hardware
Add: C. Provide cylinder locks.
Page 4 of 7
SECTION 08710
FINISH HARDWARE
Add:
2.05 Hardware Groups
Group 1 - Door 104B Exterior Access
Lockset with deadbolt cylinder, weather tight,
sill, closer, butt hinges.
Group 2 - Doors lOlA, 102A Room Entry
Passage locksets, wall stops, butt hinges
Group 3 - Door 103A Toilet Room Door
Passage lockset with ,thumb-turn, sill, wall stop,
butt hinges
Group 4 - Door 100B Chemical storage
Lockset, closer, sill, smoke gasket, butt hinges
Add:
SECTION 09300
TILE
2.01 Products
A. Where scheduled, tile for floors and wainscots is
to be ceramic tile equal to "Dal-Tile" unglazed
2"x2" tile. Thin set in accordance with
recommendations of Tile Council Assoc. of America
handbook. Include sanitary cove base units and
two-course accent color stripe at top of
wainscots.
SECTION 09900
PAINTING
Add:
2.0 Spray Glaze
Where scheduled, spray glaze coating to be equal to
"Desco" or Glidden "Glid-Tile". Application by roller
permitted if in accord with manufacturer's
recommendations.
Page 5 of 7
SECTION 15000
MECHANICAL
Item 6.
Revise to read: "Waste pipe below grade to be schedule
40 PVC."
Item 7. Revise to read: "Waste and vent piping above grade to
be schedule 40 PVC".
Add:
Item 24. Drinking fountain to be Elkay simulated semi-recessed
model No. EDFP-19-C.
Add:
Item 25. Slop sink to be Fiat MSB 36" x 26" x 10" high, Chicago
faucet #897, hose bracket.#832-AA.
DRAWING ITEMS
1. Detail 21/A3: Change note, "24 ga. stl. cap flashing
(paint)" to read, "pre-finished cap with standing
seams (typ.)"
2. Detail 22/A3: Change note, "24 ga. paintable sheet met.
downspout field paint" to read, "pre-finished downspout
(typ.)"
3. Detail 3/A2: Add 8-1/2" x II" drawing
4. Sheet AI: Add 8-1/2" x II" drawing. Detail 3/A2 to index to
sheets.
PRODUCT APPROVALS
Subject to meeting specification requirements, the following
manufacturer's are accepted:
SECTION 07200 - Raylite
Certifoam
Amofoam
SECTION 08700 - Dorrna (closers)
SECTION 07500 - Styroflex
Page 6 of 7
\.\
-- '\J --
STO~e./L..L!N~~
?-r'l, ,It' I
~Ir-,E:. .AND
IN'C71~C.~ ~p cS1tJ7
,AT THJc;, l~rl"""
Q r-o,]
U ---
101L.t.;
~ It'b
!2-Mlt'2.
M~ J ~E:.,.J,A,..JC..f
!2-M l"ir
!:'R.,OVIOf:, ~O IN'OirO-L.L
_ . ~l~ F"UN1~IN AT iMlp
, I
APPE-NOUI1 11.- l.. N~w ~0f'E, vll...tA.::"e (~'-f H,AINT~N~"""e. I='!...~'
~T}orJ ~I~ . 'Sl.PI;:J Sl~i'- I DP-.lrJ"'l~ fouNT,b.Ij,.J
[~~II I Ii
\& /1 ::.1'0
P. 7 of 7
-75/
ADDENDUM TO CONTRACT DOCUMENTS
DATE:
September 29, 1989
ADDENDUM NO.:
~~/
\ . -----/
PROJECT:
MAINTENANCE BUILDING
FOR THE
NEW HOPE VILLAGE GOLF COURSE
OWNER:
CITY OF NEW HOPE
MINNESOTA
The items contained in this addendum are hereby to become part of
the project requirements. Corresponding items in the project
documents of previous date are to be superceded or modified by
these provisions.
BID SUBMITTAL DATA:
Original Bid Closing Date:
11:30 a.m., October 4. 1989
New Bid Closing Date:
No change
Page 1 of 3
SPECIFICATION ITEMS:
SECTION 00300
FORM OF BID
Page 1 of 2, add:
Alternate Number.Three
(painting of underside of roof deck and structural steel
joists)
Add
dollars ($
SECTION 01010
SUMMARY OF WORK
Add:
1.03 Project is to be complete and ready for use by Owner no
later than March 1, 1990, except for bituminous paving.
The paving is to be completed as shortly thereafter as
weather permits. Number of calender days stated for
completion on Form of Bid, page 2 of 2, shall indicate
ability to complete before March 1, 1990, except for
exterior paving.
SECTI.QN 04220
UNIT MASONRY
Add:
2.05
Splash blocks
Provide precast concrete splash blocks at each
downspout location.
SECTION 07200
BUILDING INSULATION
2.01
Delete paragraph "B" (Phenolic boardstock)
Page 2 of 3
SECTION 09900
PAINTING
2.03
Paint Materials
Add the following paragraphs:
G. Exterior concrete block is to receive one coat
acrylic block filler and two coats of acrylic
masonry paint.
H. Interior concrete block is to receive two coats
acrylic masonry paint.
I. Underside of roof deck and structural steel joists
are to receive one coat dry fog (dry fallout)
high solvent, spray on. Note - deck and joist
painting to be bid alternate #3.
SHEET A-2
At inside surfaces of exterior walls at rooms 102 and 103,
walls are to be furred with furring strips and 1-1/2" molded
polystyrene insulation board plus polyethylene vapor barrier
and 1/2" gypsum board. This is to extend up to roof deck.
Where ceramic tile is scheduled, tile is to be installed
over the gypsum board and insulation noted above.
DRAWING SHEETS
SHEET E-1
At note for CCT #17, delete reference to overhead wlrlng to
gas pump location. Wiring to gas pump location to be
underground in 2" diam. PVC conduit (overssized for future
control wiring).
Page 3 of 3
COUNCIL
REQUEST FOR ACTION
Originating Department
Approved for Agenda
Agenda Section
Consent
Parks and Recreation
2/12/90
By:
Item No.
By:
Shari French
6.5
RESOLUTION APPROVING CHANGE ORDER # 1 AND CHANGE ORDER # 2 FOR
IMPROVEMENT PROJECT NO. 451 (GOLF COURSE MAINTENANCE FACILITY)
Two change orders are necessary related to the project.
Change Order #1
Addl. sewer pipe to existing clubhouse
Rock for bedding for sewer pipe installation
on unstable soil (75 ft.)
Contractor's markup
$420.00
1,725.00
222.50
Total:
$2,367.50
Change Order #2
Provide larger manhole and addl. piping in
manhole
Total:
$1,828.08
$1,828.08
Staff recommends approval.
MOTION BY '>9 )/} ~.lc-
TO: (} ilU vf /t .J!/j.
I
SECOND BY
/().. / r
rJ0LL0if /
Cj() -
-2/)
)//\
Review:
Administration:
Finance:
RFA-OOl
CITY OF NEW HOPE
RESOLUTION NO. 90- 32
RESOLUTION APPROVING CHANGE ORDER #1 AND #2
FOR IMPROVEMENT PROJECT NO. 451
(GOLF COURSE MAINTENANCE FACILITY)
IN THE AMOUNT OF $4,195.58
WHEREAS, the City of New Hope authorized on October 9, 1989,
Improvement Project No. 451, for the contractual sum
of $135,180.00; and
WHEREAS, it has become necessary to include additional work for
the project which consists of:
Change Order #1:
Addl. sewer pipe to existing clubhouse
Rock for bedding for sewer pipe installa-
tion on unstable soil (75')
Contractor mark-up
$ 420.00
1725.00
Total:
222.50
$2,367.50
Change Order #2:
Larger manhole & addl. piping in manhole
$1,828.08
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City
of New Hope approves change order no. 1 and change
order no. 2 to the contract with Sunshine Construction
in the amount of $4,195.58 as part of Improvement
Project No. 451 which bring the total contract to
$139,375.58.
Adopted by the City Council of the City of New Hope, Hennepin
County, Minnesota, this 12th day of February, 1990.
~~~
ayor
\....
Atte t. I / i ( " , l
s. / _ _l c. ,\..
City Clerk
"'-- 1
-
./ (i
/ i I
~; .'- '.....
:I. :2 _ S ':;' T LI E :1.:1.: 4- e:1 :::: U to.! S H 1: N E c: 'J t-i:::; I i"<~ W '- I .... '-' ,.~
MECHANICAl.
. GARDNER STONE COMPANY
CONTRACTORS
P.O. BOX 4453..
St. poul. Minnesota 55104
612/649.'\433
December 2, 1989
Sunshine Construction Company
2121 Cliff Drive '
Egan, MN 55122
Attention: James Ryan
Dear James:
RE: New Hope. Village Golf Course
CO tf2
Add for Larger Manhole and Additional Pipe
Per the above, we h~ve been asked by the City of New Hope to
furnish and install a larger manhole that was u;lspecified'~ '!he
Architect, Ed Vogt, has requested that we proceed with the
installation. The cost is listed below.
1. 18" Barrel Add..... .$726.84
2. Intrical Base Add....470.2'.
3. Top Slab...., , . , . . . .. 98.03
4.2' additional Pipe 48".......140.08
5. Larger Steel inside plate". 393.00
The total for the above is 1828.08. This is the price that was
given to the architect. We did not marl,""Up any of the cost. '.this
is the cost we inccur. If you have any <:l'uestions or need ad.ditional
information, please let us know.
Sincerely,
GARDm:R S'I:ONE COMJ?.AN:C
~4
~
Stanley A. Gardner
co: #90124
An Equal Opportunity Employer
" ._" w .. . .. .. .. .. ...
----~------------_.._-_._... ...-' .
^
.../\.....1'
\ \J
'\ij
'I........
/
\ I.>}
\( ,
transmittal
THE VOGT CORPORATION
ARCHITECTURE ENGINEERING
SUITE 260 CARLSON CENTER
ONE CARLSON PARKWAY N.. MINNEAPOliS. MN 55447
TELEPHONE (612] 475-2826
~~~$4
8(60~~U.
j\J1JJJ ~ t~. 654Vb
Date: ~b1^ g\ \ 1fl.1o
Project:
NwJ ~-pL \JiHIAf' b4
;JlAlJ ~, ~ 9
WE ARE SENDING HEREWITH THE FOLLOWING ITEMS:
o Prints
o Specifications
o Contract
.Ilia Change order
o Shop drawings
o Addendum
o
COPIES
DESCRIPTION & DATE
~
~
fILf11A,
~
I
9-
PURPOSEI ACTION
~ For your use
o As requested
~ For review & return
o For your records
o Approved as noted
o Resubmit
4~:~~{w~~~~~
BV: M~dJ~
CHANGE
ORDER
AlA DOCUMENT G701
OWNER
ARCHITECT
CONTRACTOR
rIELD
OTHER
KJ
~
o
THE VCGT CCRPCRATIOr
ARCHITECTURE ENGINEERINi
SUITE 260 CARLSON CENTER
ONE CARLSON PARKWAY MINNEAPOLIS. MN 554,
Course
PROJECT: Maintenanc7 Building
New Hope V~llage Golf
(name, address) 8130 Bass Lake Rd.
New Hope, MN
TO (Contractor)
ISunshine Construction
2121 Cliff Drive #224
Eagan, MN 55122
CHANGE ORDER NUMBER: One
:Dhc~RCHITECT'S PROJECT NO: 2141-1
CONTRACT FOR:
General Construction
Co. ,
L
~ CONTRACT DATE: October 9, 1989
You are directed to make the following changes in this Contract:
1.
Provide additional sewer pipe to existing
clubhouse per verbal agreement.
2.
Provide rock for a secure bedding for
sewer pipe installation on unstable soil
75 ft. at $23.00jft.
3.
Sunshine Construction mark-up.
add $
420.00
add $ 1,725.00
add $
222.50
Total add $ 2,367.50
The original Contract Sum was . . . . . . . . . . . . . . . . . . .
Net change by previous Change Orders . . . . . . . . . . . . . . . .
The Contract Sum prior to this Change Order was. . . . . . . . . . . . .
The Contract Sum will be (increased) (~~~dP@R6Pfcjft~d) by this Change Order.
The new Contract Sum including this Change Order will be . . .. ....
The Contract Time will be ati~9~~~dPf~~~tl) (unchanged) by
The Date of Completion as of the date of this Change Order therefore is unchanged
. $ 135,180.00
-0-
. $
. $ 135,180.00
. $+ 2,367.50
. $ 137,547.50
-0-
(
) Days.
Sunshine Construction Co. city of New Hope
c2>1l2RtCC9.Riff Drive #224 o~ Xylon Ave. No.
The Vogt Corporation
fflt~IT~rlson Parkway #260
Aqd rcss
Minneapolis, MN
~- '.~'
- ./ 1,//" A oj
BY C c1 (/1./1</(/ I .
DATE Ja~uary 26',
Eagan, MN
~~/~f ~/ ;;;~. 0/-::
2///1 //. .' ~ =:::?
BY ~.---.{..;::>/_";.,-, ....//v .// L.--.. e,...".,/ ;"':--- t.,~?/;fc.",L:/.;L ;:}:.-' .:.5
(/
55,447..
/ .--I--
(Jr3 J
1990
DATE 1/2-7/7;;'
i /
Address
New Hope, MN
B~'FL' <<-
DATE .2 -/ C-/ - 7c-
AlA DOCUMENT G701 . CHANGE ORDER. APRIL 1970 EDITION . AIA@ . @ 1970 . THE
AMERICAN INSTITUTE OF ARCHITECTS, 173S NEW YORK AVE., NW, WASHINGTON, D.C. 20006
ONE PAGF
CHANGE
ORDER
AlA DOCUMENT G701
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER
lXJ
~
o
THE VOGT CORPORATIOr,
ARCHITECTURE ENGINEERINf
SUITE 260 CARLSON CENTER
ONE CARLSON PARKWAY MINNEAPOLIS. MN 554/
PROJECT: Maintenanc7 Building
(name address) New Hope VJ.llage Golf
, 8130 Bass Lake Rd.
New Hope, MN
TO (Contractor)
r-sunshine Construction
2121 Cliff Drive #224
Eagan, MN 55122
Course
CHANGE ORDER NUMBER: Two
Co. ,
I ARCHITECT'S PROJECT NO: 2141-1
Ihc.
CONTRACT FOR:
General Construction
L
~ CONTRACT DATE:
October 9, 1989
You are directed to make the following changes in this Contract:
1.
Provide larger manhole and additional
piping in manhole. (See attachment)
Add + $ 1, 828 . 08
The original Contract Sum was. . . . . . . . . . . . . . . . . " $ 135,180.00
Net change by previous Change Orders . . . . . . . . . . . . . . " $ + 2 , 367 . 50
The Contract Sum prior to this Change Order was. . . . . . . . . . . " $ 137,547.50
The Contract Sum will be (increased) (~~~~~d) by this Change Order. . $ + 1,828.08
The new Contract Sum including this Change Order will be . . .. .... . $ 139,375.58
The Contract Time will be (~~~~€f~) (unchanged) by ( -0- ) Days.
The Date of Completion as of the date of this Change Order therefore is unchanged
~hA Vngt Corporation
ARCHITECT
One Carlson Parkway #260
Address
M~;OliS,'.~ Z!41--
BY c.....rl tli ~L/L..c~ J' . J)
DATE January 26, 1990
Sunshine Construction Co. City of New Hope
c2~~1CTefiff Drive #224 oW~~l Xylon Ave. No.
Address
L::-", ~,~-
Address
N2ope. MN
BY ,A-J ~
./ ty
DATE ;:<. /7".... ?CJ
BY
DATE 1/2.7/f/2o
/ /
AlA DOCUMENT G701 . CHANGE ORDER . APRil 1970 EDITION . AIA@ . @) 1970 . THE
AMERICAN INSTITUTE OF ARCHITECTS, 173S NEW YORK AVE., NW, WASHINGTON, D.C. 20006
ONE PAGE
1 .
:I. :;;: _ S '9 T U E :1.:1.: 4 e :::; U t-l S H I NEe Li t...:::; I r-~ '-' '- , ... '-' .-:
MECHANICAL
. GARDNER STONE COMPANY
eONtRACTO~S
P.O. BOX 4453:
St. Paul, MInnesota 55104
612/649.-\433
December 2, 1989
Sunshine Construction Company
2121 Cliff Driv~ '
Egan, MN 5512Z
Attention: James Ryan
Dear James:
RE: New Hope Village Golf Course
CO 112
Add for Larger Manhole and Additional Pipe
Per the above, we h~ve been asked by the City of New Hope to
furnish and install a larger manhole that was l.l;lspecified'.. T.he
Architect, Ed Vogt, has requested that we proceed with the
installation. The cost is listed below.
1. 18" Barrel Add......$726.84
2. Intrical Base Add....470.2t
3. !op Slab......",.... 98.03
4.2' a.dditional Pipe 48".......140.08
5. Larger Steel inside plate... 393.00
The total for the above is 1828.08. This is the price tha.t was
given to the architect. We did not mark...-up any of the cost~ 'this
is the cost we inccur. If you have any questions or need additional
information, please let us know.
'./ .... "-
-'
\,
\",:
Sincerely,
GARDW!:R STONE COMP.ANY
~~~
~
StanleyA. Gardner
cc: #90124
An Equal Opportunity Employer
____0./__________________ ...- ... -,
. .-....... -.... -..-
4401 Xylon Avenue North New Hope, Minnesota 55428 Phone: 533-1521
February 16, 1990
The vogt Corporation
SUite 260 Carlson Center
One Carlson Parkway N.
Minneapolis, MN 55447
SUBJEcr: aIANGE ORDERS #1 AND #2
IMPROVElw1ENT PROJECI' 451, GOLF cx:xJRSE MAINTENANCE FACILITY
'The New Hope City Council at its February 12, 1990, meeting" approved the
fore-mentioned change orders.
Enclosed are two fully executed copies of each change order for your records.
Please forward one copy to SUnshine Construction.
If you have any questions, please contact TIle.
sincerely,
/ c. "-.~, '( f, "-
" J
I
jll( C~' L '--
Valerie leone
City Clerk
enc.
cc: Shari French
Family Styled City~ For Family living
cj ='7 I
m
~~~
~~ ~O~
-
COUNCIL
REQUEST FOR ACTION
Originating Department
Approved for Agenda
Agenda Section
Consent
Parks and Recreation
By:
Shari French
2/26/90
By: l}
Item No.
6.7
!
RESOLUTION APPROVING CHANGE ORDER #3 AND #4 FOR IMPROVEMENT
PROJECT NO. 451 (GOLF COURSE MAINTENANCE FACILITY)
Change Order #3 is for sealing of the concrete floor for a total
of $350.00.
Change Order #4 is for an increase in capacity of sewage lift
station, as per recommendations of the Engineer, Mark Hanson and
Public Works Director, Roger Paulson. This is to provide for
reduction in long term maintenance costs for this new lift
station at the golf course. The cost is $6,966.30.
Staff recommends approval of both change orders.
MOTION BY
,f; itii/(/ (lC[t/-t-
SECOND BY
I .
/'/ -) i/~ /
i / / /,.-/~
TO:
fi ~{{IU)( /11'/].
i/
----
"" cj"
/ .>' I J . >i'-,
L'II/_ '-"
Review:
Administration:
Finance:
RFA-OOl
C J.//-::It-J be
o,-r..../?c,l'(_
#3
~
Sunshine
Construction
Company
DESlGNER5&.BullDERS
Change Order
(Please use ballpoint pen.)
CASH EXTRAS - REQUEST FOR CHANGE
Buyer
/Vl.5l.....1
i-J.,,, "-
1/
V 'I....L""" I:'" ~7
(j;,0(.../::- Date
l/rl/'1Q
Address
"f--I 3 ,?
'2),::'S.5.
L.AK-c 70_;--'
Project
1-'??/-"o,..r7C'".--Jcc
\;J?.) .',....Ii?,/../ to
rJ.3v
) -I""d?<:"
t7
yv1....1
Lot No.
Job No.
Model
Sales
Description of Change
Price
(.s a. ;Co. 7' ?--=. .I4<-,p
~O'P~7
(;?c.a.. t-~ 77ctZ.. )
.If' c:> ,~;
f&, 03 Z.
/
&PiZ O,-JCCL S .7",,~...c
/VJ ,t;> '" <.r /-:>,..., " ,/?
rc,::: ~.,t.. Sp<.:~r..v/s":.J.
30/
Q2
G>~'" .{..,'?
/o;?;
3-::>
C:.3..s -
-;::::;r~ ~~
~,.-.., 0,- tJA'?.f./(...".':) ;;/--;"..I.J
Si.J-'S/f/..JC <::..;;).....:.;;;<..-<.;;:-"..1 C,S
?I 2',1 <:..'-/~/'"- t::>.IZ.I./~
S.',7c 'Z i? 7'
Change Order Fee
I TOT A L
~ 5' ~~ 3,;2.
All requests for change, after Construction has commenced, must be approved by the Builder's
office before being considered accepted. Approval is contingent upon extent of change and status of home. The
change may effect the possession date. This change will be paid for in the following manner:
Date
Approved and Accepted by AZ.:i.J17cc..7
. ,r / ./; / //~ -
Date signed J./:..7\v-, If
4AJ?,,/
"
(~
<:> '-.J...... .
/ lif'/.i" ,'/.r'
" , . .I"
(~
0'-1,
White Office Copy . Yellow Service Department Copy. Pink Owners Copy
CHANGE
ORDER
AlA DOCUMENT G701
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER
~
o
THE VOGT CORPORATIOr
ARCHITECTURE ENGINEERINI
SUITE 260 CARLSON CENTER
ONE CARLSON PARKWAY MINNEAPOLIS. MN 554,
PROJECT: Maintenance Building
(name, address) New Hope Village Golf
8130 Bass Lake Road,
TO (Contractor)
r-sunshine Construction
2121 Cliff Drive #224
Eagan, MN 55122
CHANGE ORDER NUMBER: Four
Course
New Hope, MN
I ARCHITECT'S PROJECT NO: 2141-1
CONTRACT ,FOR:
General Construction
L
-1 CONTRACT DATE:
October 9, 1989
You are directed to make the following changes in this Contract:
1.
Increase in capacity of sewage lift station,
as per recommendations of City's consultant
engineer, to provide for reduction in long
term maintenance costs. (See attachment)
$6,966.30
The original Contract Sum was . . . . . . . . . . . . . . . . . .. . $ 135,180.00
Net change by previous Change Orders . . . . . . . . . . . . . . .. . $ 4 , 545 . 58
The Contract Sum prior to this Change Order was. . . . . . . . . . . " . $ 139,725.58
The Contract Sum will be (increased) (~J{~) by this Change Order. . $ 6 , 9 6 6 . 30
The new Contract Sum including this Change Order will be . . .. .... . $ 14 6 , 691 . 88
The Contract Time will be (~~) (unchanged) by ( -0- .) Days.
The Date of Completion as of the date of this Change Order therefore is unchanged.
The Vogt Corporation
~~T~rlson Parkway,
Address
M~nH.. ~~=1
BY ~fiA/t/. [ . /
DATE February 6, 1990
Sunshine Construction Co. city of New Hope
#260 c~~~cr~iff Drive #224 OW~~l Xylon Ave. No.
Address
Eagan, MN
-
55122
Address
New Hope, MN 55428
~~</
DATE ;; /.c"
BY
DATE
AlA DOCUMENT C701 . CHANCE ORDER . APRIL 1970 EDITION . AIAO!> . @ 1970 . THE
AMERICAN INSTITUTE OF ARCHITECTS, 173S NEW YORK AVE., NW, WASHINCTON, D.C. 20006
ONE PAGE
CITY OF NEW HOPE
RESOLUTION NO. 90-45
RESOLUTION APPROVING CHANGE ORDER #3 AND #4
FOR IMPROVEMENT PROJECT NO. 451
(GOLF COURSE MAINTENANCE FACILITY)
IN THE AMOUNT OF $7,316.30
WHEREAS, the City of New Hope authorized on October 9, 1989,
Improvement Project No. 451, for the contractual sum
of $135,180.00; and
WHEREAS, it has become necessary to include additional work for
the project which consists of:
Change Order #3:
Seal concrete floor.
$350.00
Change Order #4: $6,966.30
Increase in capacity of sewage lift station,
as per recommendations of City's consultant
engineer, to provide for reduction in long
term maintenance costs.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City
of New Hope approves change order no. 3 and 4 to the
contract with Sunshine Construction in the amount of
$350.00 and $6,966.30 as part of Improvement Project
No. 451 which brings the total contract to
$146,691.88.
Adopted by the City Council of the City of New Hope, Hennepin
County, Minnesota, this 26th day of February, 1990.
~~~_<~k.r./
-11ayor
i
!
/
Attest: I ,.? ( t( j
City'Clerk
!
~
'Y../ j I
fttl
~~4t
~If ~o~
-
COUNCIL
REQUEST FOR ACTION
Originating Department
Approved for Agenda
Agenda Section
Consent
Parks and Recreation
By:
Shari French
4/9/90
/7
Item No.
By:
6.8
RESOLUTION APPROVING CHANGE ORDER #5 FOR IMPROVEMENT PROJECT NO.
451 (GOLF COURSE MAINTENANCE FACILITY)
Change Order #5 is for an increase in wire gauge size to lift
station from #8 wire gauge to #4, to permit tandem operation of
pumps as well as alternate (stand-by) operation. The cost is
$550.00.
Staff recommends approval.
MOTION BY
~v," J
{./,. .it. J:'C"
SECOND BY '7/;7774.L'//C,-,
TO:
(1, .J ).~ -i_,
. / Ii f-'-t') ,{
- !
/> ~L.:(,)
0(\ - '7.:2
, '--' )
Review:
Administration:
Finance:
RFA-OOl
CITY OF NEW HOPE
RESOLUTION NO. 90-73
RESOLUTION APPROVING CHANGE ORDER #5
FOR IMPROVEMENT PROJECT NO. 451
(GOLF COURSE MAINTENANCE FACILITY)
IN THE AMOUNT OF $550.00
WHEREAS, the City of New Hope authorized on October 9, 1989,
Improvement Project No. 451, for the contractual sum
of $135,180.00; and
WHEREAS, it has become necessary to include additional work for
the project which consists of:
Change Order #5:
Increase wire gauge size in lift station
$550.00
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City
of New Hope approves change order no. 5 to the
contract with Sunshine Construction in the amount of
$550.00 as part of Improvement Project No. 451 which
brings the total contract to $147,241.88.
Adopted by the City Council of the City of New Hope, Hennepin
County, Minnesota, this 9th day of April, 1990.
~~r:~
/Mayor ,
Attest: L/aL!A_~1 ~i~LL
City Clerk
4401 Xylon Avenue North New Hope, Minnesota 55428 Phone: 533-1521
April 12, 1990
Vogt corporation
suite 260 Carlson Center
one Carlson Parkway N.
Minneapolis, MN 55447
SUBJEcr: QiANGE ORDER #5 - IMPROVEMENT PROJECI' 451
GOLF a:x.JRSE MAINIENANCE FACILITY
Enclosed are two fully executed copies of the above-reference::1 C1ange order for
your records. Please fo:rward one copy to sunshine Construction.
We still need. cha.r'qe orders #4 a.rrl #5 for our records. Please sign a.rrl return
ASAP (copies enclosed).
If you have any questions, please contact me.
sincerely,
" Ie'
If I C
f;i,.L-
Valerie Leone
City Clerk
enc.
cc: City En;Jineer
Family Styled City" For Family Living
CHANGE
ORDER
AlA DOCUMENT G701
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER
00
o
THE VOGT CORPORATIOf\
ARCHITECTURE ENGINEERINC
SUITE 260 CARLSON CENTER
ONE CARLSON PARKWAY MINNEAPOLIS, MN 5544
PROJECT: Maintenance Building
(name address) New Hope village Golf
J 8130 Bass Lake Road
New Hope, MN
TO (Contractor)
r-sunshine Construction
2121 Cliff Drive #224
Eagan, MN 55122
Five
Course
CHANGE ORDER NUMBER:
I ARCHITECrS PROJECT NO: 2141-1
CONTRACT FOR:
General Construction
L
.-J CONTRACT DATE:
You are directed to make the following changes in this Contract:
10/9/89
1. Increase in wire gauge size to lift station from #8 wire
gauge to #4, to permit tandem operation of pumps as well
as alternate (stand-by) operation. (See attached).
Add + $
550.00
The original Contract Sum was . . . . . . .
Net change by previous Change Orders . . . .
The Contract Sum prior to this Change Order was.
The Contract Sum will be (increased) (cMN;ea~~ma~d) by this Change Order.
The new Contract Sum including this Change Order will be . . .. ....
The Contract Time will be (~e'r~~~*~) (unchanged) by
The Date of Completion as of the date of this Change Order therefore is unchanged
The Vogt corporation
~~~T~~rlson Parkway #260
Address
Minn~~rnl;~, MN ~~447
Sunshine Const. Co.
C2~~c~iff Dr. #224
Address
Eagan. MN 55122
~/// ~
BY ~-4L/ ./G'-1f/[;.
,3/;{?/'jO
o/- 9f'uL./';>'770~
v
BY
DATI March 15, 1990
DATE
$ 135,180.00
$ 11,511. 88
$ 146,691. 88
. $ 550.00
. $ 147,241.88
( 0
) Days.
City of New Hope
o}t'41~l Xylon Ave. N.
Address
B~)=4~8
DATE "SI- / ~ #.7 <:>
AlA DOCUMENT G701 . CHANGE ORDER . APRIL 1970 EDITION . AIA@ . @ 1970 . THE
AMERICAN INSTITUTE OF ARCHITECTS, 173S NEW YORK AVE., NW, WASHINGTON, D.C. 20006
ONE PAGE
(Please use ballpoint pen.)
~
Sunshine
Construction
Company
DESlGNERS8J3ullDERS
Change Order
CASH EXTRAS - REQUEST FOR CHANGE
Buyer
<:::i 77
/
81,:' ..;;
Or
Alci-J )-h4?c...
v
Date
3/G/j'c
,
Address
'6,C>S" t..Ao,.c. "-
I?o/-=>??
Project
/Vc;<-../ j.../<'>/f?c
(/
t"'?...J ,
Lot No.
Job No.
Model
J"YJ';o'/S-l 7c:=.-Jc:. 6
6'--u ~
Sales
Description of Change
Price
ADO
1-=-..;:Jc1....
G/-iA-' b/~G
~ p </ ~//Zco,
IJ
L-i cV
Or-
/f 8' tp<!.'L
y~c.
4
~o
0';"'-
pc:...5o
p 7:>f)
)='v"L_
-r"";:7 /-I<>::>/Ly
01';
wr?
..5 70 P;,,"";
Lo.f7/Z-,cot:.,7.q-l.- ~ .; 0
'-0 -
~~~~
6~'7 01'- ;d,~ 'l-A-'1//uj
,:/
3'/~A:'~
/
Change Order Fee
I TOTAl
I - I
~ 0-
15So
o~
All requests for change, after Construction has commenced, must be approved by the Builder's
office before being considered accepted. Approval is contingent upon extent of change and status of home. The
change may effect the possession date. This change will be paid for in the following manner:
Date "$
Approved and Accepted by
Date signed
(Buyer)
(Buyer)
White Office Copy. Yellow Service Department Copy. Pink Owners Copy
2002
;lJl f V <:;/ CrJlLh1u:>f
-PiJJ
-
c,m\1'Y O.c- 1
1). ~
~tf \'\o~
-
COUNCIL
REQUEST FOR ACTION
Originating Department
Approved for Agenda
Agenda Section
Parks and Recreation
Consent
By:
10/8/90
BY:[)
(
RESOLUTION APPROVING CHANGE ORDER #6 FOR IMPROVEMENT PROJECT NO.
451 (GOLF COURSE MAINTENANCE FACILITY) IN THE AMOUNT OF $1,881.00
Item No.
Shari French
6.9
Change order # 6 is for:
1. Install additional 10' width of bituminous due to
additional excavation for installation of crushed
rock to replace unsuitable existing soil. ($1410)
2. Install approx. 200 S.F. of new bituminous to
raise N.E. corner of parking lot for improved drainage
($171)
3. Replace approx. 32 L.F. of concrete curbing in area
of new water line to hydrant. ($300)
Staff recommends approval.
MOTION BY CZ{J..r flULLlllUJ/Y)G
TO: t?./lli-jJJ-/ !'l..b:} Cj{).~ / k:P
SECOND BY
rUfLt0
Review:
Administration:
Finance:
RFA-OOl
CITY OF NEW HOPE
RESOLUTION NO. 90-188
RESOLUTION APPROVING CHANGE ORDER #6
FOR IMPROVEMENT PROJECT NO. 451
(GOLF COURSE MAINTENANCE FACILITY)
IN THE AMOUNT OF $1,881.00
WHEREAS, the City of New Hope authorized on October 9, 1989,
Improvement Project No. 451, for the contractual sum
of $135,180.00; and
WHEREAS, it has become necessary to include additional work for
the project which consists of change order #6 and
includes:
1. Install additional 10' width of bituminous due to
additional excavation for installation of crushed rock
to replace unsuitable existing soil - $1,410
2. Install approx. 200 S.F. of new bituminous to raise
N.E. corner of parking lot for improved drainage - $171
3. Replace approx. 32 L.F. of concrete curbing in area
of new water line to hydrant - $300
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City
of New Hope approves change order No. 6 to the contract
with Sunshine Construction in the amount of $1881.00 as
part of Improvement Project No. 451 which brings the
total contract to $149,122.08.
Adopted by the City council of the City of New Hope, Hennepin,
County, Minnesota, this 8th day of October, 1990.
~~~~~j
/ Mayor
Attest: ~~
City Clerk
CHANGE
ORDER
AlA DOCU,vlENT G701
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER
THE VOGT CORPORATIOI'\I
B ARCHITECTURE ENGINEERING
o SUITE 260 CARLSON CENTER
o ONE CARLSON PARKWAY MINNEAPOLIS. MN 5544/
PROJECT: Maintenance Building
(name, address) New Hope Village Golf Course
8130 Bass Lake Rd.
New Hope, MN
TO (Contractor)
I Sunshine Construction I
2121 Cliff Dr. #224
Eagan, MN 55122
CHANGE ORDER NUMBER: SIX
ARCHITECT'S PROJECT NO: 2141-1
CONTRACT FOR:
General Construction
L
~ CONTRACT DATE:
10/9/89
You are directed to make the following changes in this Contract:
1. Install additional 10' width of bituminous due
to additional excavation for installation of
crushed rock to replace unsuitable existing soil. Add $1410.00
2. Install approx. 200 S.F. of new bituminous to
raise N.E. corner of parking lot for improved
drainage.
Add
171. 00
3. Replace approx. 32 L.F. of concrete curbing in
area of new water line to hydrant.
Add
300.00
$1881.00
The original Contract Sum was . . . . . . .
Net change by previous Change Orders . . . .
The Contract Sum prior to this Change Order was.
The Contract Sum will be (increased) (d~~~~~~~~) by this Change Order.
The new Contract Sum including this Change Order will be . . .. ....
The Contract Time will be (i~~~~~~:H) (unchanged) by
The Date of Completion as of the date of this Change Order therefore is
$ 135,180.00
$ 12,061.88
$ 147,241.88
. $ 1,881.00
. $ 149,122.88
( 0
) Days,
unchanged
~hp- Vogr Cnrpor~rion
ARCHITECT
One Carlson Parkway #260
Address
Sllnshjne Construction Co. City of New Hope
C~~~lCT85..iff Dr. #224 O~~~l Xylon Ave. N.
Address
Address
MinnpapoJi!=;
. '
MN
,,).,,)44~
J / ~
/,/ ,v1
v i)/J
-Eag~n. MN. 55122
B~~
BY
;'. . /
DATE ~ /~.z, / t': C
~..:, .,:. j /, l
BY {/-: .../( vel /Vf..".:f"l,
!l
AlA DOCUMENT G701 . CHANGE ORDER . APRIL 1970 EDITION . AIA@ . @ 1970 . THE
A\\ERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006
ONE PAGE
4401 Xylon Avenue North' New Hope, Minnesota 55428 Phone: 533-1521
October 9, 1990
Sunshine Construction
2121 Cliff Drive, #224
Eagan, MN 55122
SUBJECT:
CHANGE ORDER #6 - IMPROVEMENT PROJECT 451
GOLF COURSE MAINTENANCE FACILITY
Enclosed are two fully executed copies of the above-referenced Change Order for
your records. Please forward one copy to your bonding company.
If you have any questions, please contact me.
Sincerely, ~
;~f tlimL J!thLL
Valerie Leone
City Cl erk
ene.
cc: Vogt Corporation
family Styied City e for family living
transmittal
THE VOGT CORPORATION
ARCHITECTURE ENGINEERING
SUITE 260 CARLSON CENTER
ONE CARLSON PARKWAY N" MINNEAPOLIS, MN 55447
TELEPHONE (612] 475-2826
To:
r;HAtz.l frZ-~ Date: ~1CPr 2ft? ,qQO
pre. oF -:PA1Z.~S ~ ~~ Project:
N~N HoPE t,\1\ \1A.LL qOl..f COU~':>~
4-40\ X\'L6N N. ~\~~ ~9'
~~~~E mf6d\!G~t~Ejf.t1H~ FOLLOWING ITEMS:
o Prints
o Specifications
o Contract
o Change order
o Shop drawings
o Addendum
~ ~ be;b.J
COPIES DESCRIPTION & DATE
S flt-.)~ ~E&~ 'Foe. ,o.lv.. A"'-;;"
. . ,. I
3 ~~e- ~e:e. ~ I..t?
PURPOSE I ACTION
)ii FOI' your use
o As requested
o For review & return
g For your records
o Approved as noted
o Resubmit
,gJ Approved
o
REMARKS:
BV:
cfL-y~ ~
"'- -
4401 Xylon Avenue North New Hope, Minnesota 55428 Phone: 533-1521
August 21, 1989
Mr. Edward Vogt
The vogt Corporation
suite 260 carlson Center
One carlson Parkway
Minneapolis, MN 55447
Dear Mr. Vogt:
The New Hope City Council at its meeting of August 14, 1989, approved the
agreement with your corporation for architectural services - improvements at the
New Hope Golf Course - $126,300.
Enclosed is an executed contract for your files.
si1)cerely,
Lj/{jJUtLC t417U-
./
Valerie J. Leone
City Clerk
enc.
Family Styled City 6 For Family living
THE VOGT CORPORATION
ARCHITECTURE ENGINEERING
August 10, 1989
Daniel Donahue
City Manager/Acting city Clerk
City of New Hope
4402 Xylon Avenue N.
New Hope, MN 55428
Re: New Hope Village Golf Course
ATTACHMENT #2 TO ARCHITECTURAL AGREEMENT
(original agreement dated 3/27/89)
(This attachment #2 to supersede and nullify
first attachment dated June 23, 1989)
Dear Mr. Donahue:
This attachment is to serve as confirmation of authorization to
continue with the Construction Plans phase of services, and to
clarify the current scope of the budget to be the basis of the
architectural fee.
The scope of the work for which construction plans are authorized
is as follows:
1.
New Maintenance Building
General construction
Mechanical systems
Electrical systems
site work
$ 77,400
8,350
3,750
3.500
$ 93,000
$ 93,000.00
2. Water service from new hydrant
6,500.00
3. Sewer and lift station
15,300.00
4. New drive and turn-around
11. 500.00
Phase I Total $126,300.00
The architectural fee budget for the above work is:
8 1/2% x $126,300 = $10,735.50.
Page 1 of 2
SUITE 260 CARLSON CENTER. ONE CARLSON PARKWAY. MINNEAPOLIS, MN 55447. (612] 475-2826
The total not-to-exceed fee limit authorized to date is
therefore:
Master Planning & Preliminary Design
$ 3,750.00
Construction Plans, Bid and Construction
Phase Services
10,735.50
Total professional fee authorization to date
$ 14,485.50
In addition to the above fees, the following costs will be passed
through to the City as reimbursable expenses at the rates
entered:
Blueprints: .85 per 24" x 36" print, or commercial
cost x 1.15
Specification booklet printing: commercial cost x 1.15
Messenger services: commercial cost x 1.15
* Additional Services Proposal for future clubhouse schematic
design, space program, and construction budget. If the city
chooses to have these services, we would provide them for a
professional fee of $4,500.00.
It has been a pleasure to work for the City through the project
thus far. We look forward to moving the project ahead further.
Yours respectfully,
,,~)
I'
THE VOGT CORPORATION
Edward J.
Authorization Confirmed:
Title/J
{/
Date
* Additional services proposal for clubhouse accepted:
not accepted:
Page 2 of 2
~ - - }. - -. - - - -.,,-
COUNCIL
RBJ1lEST :mR. 1'Cl'.ICti
By: Shari French
By:
6-26-89
Agenda section
Org. Business
Item No.
11 . 1
Originating Department
Approved for Agenda
Park & Recreation
APPROVAL OF PRELIMINARY PLANS AND AUTHORIZATION FOR THE VOGT CORPORATION 'ID
PROCEED WI'IH PHASE I OF GOLF COURSE IMPROVEMEf:\ITS
Attached is a report from the vogt Corporation for three phases of
improvements to the Golf Course. Phase I is estimated to cost $106, 700.
There is $80,000 in 1989 CIP for this and $30,000 in the proposed 1990 CIP.
Staff is recommending that we proceed with Phase I and authorize the vogt
corporation to prepare specifications.
M:JTION BY .., i/)PtLlLj~
'.ID: /1 h l. n - f'jl )J (I
/ '. ...f,. "F ZJ.. ,./ ):v '--
/ I
SECnND BY
j/r " /,
i\'.~
\../'- v___.;{...
Review:
Administration
Finance
RFA-OO 1
/
THE VOGT CORPORATION
ARCHITECTURE ENGINEERING
June 15, 1989
NEW HOPE VILLAGE GOLF COURSE
PROPOSED IMPROVEMENT BUDGETS
PHASE I'IMPROVEMENTS (1989)
The scope of proposed Phase I improvements and
preliminary cost estimates are as follows:
1. New Maintenance Building
General construction
Mechanical systems
Electrical systems
site work
Sewer
2. Clubhouse foundation extension
3. Move existing log building
4. Roof patching & misc.
Phase I Total
PHASE II IMPROVEMENTS (1990)
$ 77,400
8,350
3,750
3,500
6,000
99,000
The scope of proposed Phase II improvements and
preliminary cost estimates are as follows:
1. Additional windows for main room
in clubhouse
2. Clubhouse seating booths & tables
3. Carpet and misc. interior finishes
Page 1 of 2
$ 99,000
3,700
2,250
1,750
$106,700
$ 14,500
8,400
3,950
SUITE 260 CARLSON CENTER. ONE CARLSON PARKWAY. MINNEAPOLIS, MN 55447. (612] 475-2826
4. Foundation repair at vestibule and
replace front door.
3,750
5. Pro Shop interior finishes
6,000
6. Pro Shop lighting & power
7. Pro Shop heating
2,250
2,750
8. Exterior walks and patios
(including gazebo floor)
24,750
9. Clubhouse sewer improvement &
lift station
12,500
10. Contingency for unforseen
5,000
Phase II Total
$ 83,850
PHASE III Improvements (1991)
The scope of proposed Phase III improvements and
projected costs are as follows:
1. Shelter Building
(gazebo, 600 sq. ft.)
$ 21,000
2. New sign (near driveway)
6,500
Phase III Total
$ 27,500
Notes:
The above outline of costs does not include finish lawn
work or shrubs, trees and flowers, since it is
understood this work will be done by the owner. The
costs budgeted are for the costs of construction.
Architectural and engineering fee budgets are not
included.
Page 2 of 2
THE VOGT CORPORATION
ARCHITECTURE ENGINEERING
June 23, 1989
Daniel Donahue
City Manager/Acting City Clerk
city of New Hope
4402 Xylon Avenue N.
New Hope, MN 55428
Re: New Hope Village Golf Course
ATTACHMENT TO ARCHITECTURAL AGREEMENT
(original agreement dated 3/27/89)
Dear Mr. Donahue:
This attachment is to serve as confirmation of authorization to
proceed into the Construction Plans phase of services,
and to clarify the scope of the budget to be the basis of the
architectural fee.
The scope of the work for which construction plans are authorized
is as follows:
1. New Maintenance Building
site work
$ 77,400
8,350
3,750
3,500
6,000
99,000
$ 99,000
General construction
Mechanical systems
Electrical systems
Sewer
2. Clubhouse foundation extension
3,700
3. Move existing log building
2,250
4. Roof patching & misc.
1.750
Phase I Total
$106,700
SUITE 260 CARLSON CENTER. ONE CARLSON PARKWAY. MINNEAPOLIS, MN 55447. (612] 475-2826
The architectural fee budget for the above work is:
8 1/2% x $106,700 = $9,069.50.
The total not-to-exceed fee limit authorized to date is
therefore:
Master Planning & Preliminary Design
$ 3,750.00
Construction Plans, Bid and Construction
Phase Services
9,069.50
Total professional fee authorization to date
$ 12,819.50
In addition to the above fees, the following costs will be passed
through to the City as reimbursable expenses at the rates
entered:
Blueprints: .85 per 24" x 36" print, or commercial
cost x 1.15
Specification booklet printing: commercial cost x 1.15
Messenger services: commercial cost x 1.15
It has been a pleasure to work for the City through the master
planning and preliminary phase. We look forward to moving the
project ahead.
Yours respectfully,
THE VOGT
(
Edward J. Vogt, A.I.A.
Authorization Confirmed:
f , //;/ II
! ,,' 'jl ill
~/vbj ..~
s~gnature
/-l! /1 ..l
/ .../. - ///.i !)
~// . w~. .~i /A'1:'i '.. /ff .:J /' '/
/ / //..(.~ /0/// /4/ 4:h' /..
/ y.- '1>/ f'W.,tYv/7'=;7/ c/ c
,I TlMe
Date
4401 Xylon Avenue North
New Hope, Minnesota 55428 Phone: 533-1521
June 28, 1989
Mr. Edward Vogt
'!he vogt corporation
suite 260 Carlson Center
One Carlson Parkway
Minneapolis, MN 55447
Dear Mr. Vogt:
The New Hope City Council at its June 26, 1989, meeting
authorized your corporation to proceed with Phase I preparing
specifications of the golf course improvements.
Enclosed is a fully executed copy of the I attachment to
architectural agreement I .
sincerely,
I '/"\
\.....-.-..1 /.r, J' ,
t {L1J!.JU......C
Valerie Leone
City Clerk
/
1I, r--.-;
l/~i' / LL
Family Styled City~ For Family Living
AG:~~IU.8
ISSUE DATE (MMIDD/YY)
5/11/89
PRODUCER
H. Robert Anderson & Associates, Inc.
6110 Blue Circle Drive
Suite 200
Mlm1etonka, MN 55343
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS
NO RIGHTS UPON THE CERTIFICATE HOLDER, THIS CERTIFICATE DOES NOT AMEND,
EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW
COMPANIES AFFORDING COVERAGE
f~~~NY A
Security of Hartford
CODE
SUB-CODE
INSURED
f~~NY B
The Vogt Corporation
One Carlson Pk:vJy. No. Suite 260
Minneapolis, MN 55441
f~~NY C
e~~NY D
f~~NY E
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS,
CO
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFFECTIVE POLICY EXPIRATION
DATE (MM/DD/YY) DATE (MM/DDIYY)
ALL LIMITS IN THOUSANDS
GENERAL LIABILITY
COMMERCIAL GENERAL LIABILITY
GENERAL AGGREGATE
S
CLAIMS MADE
OCCUR.
PRODUCTS-COMP/OPS AGGREGATE S
PERSONAL & ADVERTISING INJURY $
OWNER'S & CONTRACTOR'S PROT,
EACH OCCURRENCE
$
AUTOMOBILE LIABILITY
ANY AUTO
ALL OWi'JED AUTOS
SCHEDULED AUTOS
FIRE DAMAGE (Anyone fire) $
MEDICAL EXPENSE (Anyone person) $
COMBINED
SINGLE
LIMIT
$
HIRED AUTOS
BODILY
INJURY
(Per
BODILY
INJURY
(Per
S
S
NON,OWNED AUTOS
GARAGE LIABILITY
PROPERTY
DAMAGE
S
EXCESS LIABILITY
EACH AGGREGATE
OCCURRENCE
S S
OTHER THAN UMBRELLA FORM
WORKER'S COMPENSATION
STATUTORY
EMPLOYERS' LIABILITY
S
S
(EACH ACCIDENT)
(DISEASE-POLICY LIMIT)
(DISEASE-EACH
$
AND
OTHER
A Professional
Liability
PL 445086
3/20/89
3/20/90
$250 each claim
& annual aggregate
$5 deductible
DESCRIPTION OF O?ERATIONS/LOCATIONSIVEHICLES/RESTRICTIONS/SPECIAL ITEMS
Project: Golf Course
CERT1F!CJHE HOLDER
City of New Hope
Attn: Dan Donahue, City Manager
4401 Xylon Ave No.
New Hope, MN 55428
SHOULD ,tiNY OF THE ABOVE DESCRIBED POLICiES BE C/'.tlCELLED BEFORE TI IE
EXPIRATIOi'-J DATE TrlEREOF, THE ISSUING COMP;\NY V'JiLL ~r5X)fXi
IV;i\IL ~ DAYS V'iRITTEN ;\lOT!CE TO THE CERTIFiCATE i-!OLDER hlPd'jlED TO T:-IE
LEFT, ~~SOCXiXf~~~~X
AUTHORIZED REPRESENTATIVE
/L
ACORD 25-S
'"-.",.
'0\\ Y o)~"
m\\~.
D~
J
. :f,. \ I.i.J -
,,~it-: oq, 1
.~~ \-\ ~
_rP
4401 Xylon Avenue North New Hope, Minnesota 55428 Phone: 533-1521
May 17, 1989
steve Sondrall
3811 West Broadway
Robbinsdale, MN 55422
Dear steve:
Enclosed for your review is a copy of a certificate of insurance
relating to the golf course.
If you have questions, please call.
Sincerely,
/i
; ; /
~~~j/ L2
/? 'r.-LJ
M./J"eannine Dunn
Administrative Assistant
lb
Enclosure
Family Styled City~ For Family living
"
THE VOGT CORPORATION
ARCHITECTURE ENGINEERING
August 10, 1989
Daniel Donahue
City Manager/Acting City Clerk
City of New Hope
4402 Xylon Avenue N.
New Hope, MN 55428
Re: New Hope Village Golf Course
ATTACHMENT #2 TO ARCHITECTURAL AGREEMENT
(Original agreement dated 3/27/89)
(This attachment #2 to supersede and nullify
first attachment dated June 23, 1989)
Dear Mr. Donahue:
This attachment is to serve as confirmation of authorization to
continue with the Construction Plans phase of services, and to
clarify the current scope of the budget to be the basis of the
architectural fee.
The scope of the work for which construction plans are authorized
is as follows:
1.
New Maintenance Building
General construction
Mechanical systems
Electrical systems
Site work
$ 77,400
8,350
3,750
3,500
$ 93,000
$ 93,000.00
2. Water service from new hydrant
6,500.00
3. Sewer and lift station
15,300.00
4. New drive and turn-around
11,500.00
Phase I Total $126,300.00
The architectural fee budget for the above work is:
8 1/2% x $126,300 = $10,735.50.
Page 1 of 2
SUITE 260 CARLSON CENTER. ONE CARLSON PARKWAY. MINNEAPOLIS. MN 55447. (812) 475-2826
"
The total not-to-exceed fee limit authorized to date is
therefore:
Master Planning & Preliminary Design
$ 3,750.00
Construction Plans, Bid and Construction
Phase Services
10,735.50
Total professional fee authorization to date
$ 14,485.50
In addition to the above fees, the following costs will be passed
through to the City as reimbursable expenses at the rates
entered:
Blueprints: .85 per 24" x 36" print, or commercial
cost x 1.15
Specification booklet printing: commercial cost x 1.15
Messenger services: commercial cost x 1.15
* Additional Services Proposal for future clubhouse schematic
design, space program, and construction budget. If the city
chooses to have these services, we would provide them for a
professional fee of $4,500.00.
It has been a pleasure to work for the City through the project
thus far. We look forward to moving the project ahead further.
Yours respectfully,
T::;GT CORPORATION /_ /
7,(J~u(9. loi J
Edward J. Vogt, A.I.A.
Authorization Confirmed:
Signature
Title
Date
* Additional services proposal for clubhouse accepted:
not accepted:
Page 2 of 2
ADDENDUM TO CONTRACT DOCUMENTS
DATE:
September 29, 1989
ADDENDUM NO. :
TWO
PROJECT:
MAINTENANCE BUILDING
FOR THE
NEW HOPE VILLAGE GOLF COURSE
OWNER:
CITY OF NEW HOPE
MINNESOTA
The items contained in this addendum are hereby to become part of
the project requirements. corresponding items in the project
documents of previous date are to be superceded or modified by
these provisions.
BID SUBMITTAL DATA:
original Bid Closing Date:
11:30 a.m., October 4. 1989
New Bid Closing Date:
No change
Page 1 of 3
SPECIFICATION ITEMS:
SECTION 00300
FORM OF BID
Page 1 of 2, add:
Alternate Number Three
(painting of underside of roof deck and structural steel
joists)
Add
dollars ($
SECTION 01010
SUMMARY OF WORK
Add:
1. 03
Project is to be complete and ready for use by Owner no
later than March 1, 1990, except for bituminous paving.
The paving is to be completed as shortly thereafter as
weather permits. Number of calender days stated for
completion on Form of Bid, page 2 of 2, shall indicate
ability to complete before March 1, 1990, except for
exterior paving.
SECTION 04220
UNIT MASONRY
Add:
2.05
Splash blocks
Provide precast concrete splash blocks at each
downspout location.
SECTION 07200
BUILDING INSULATION
2.01
Delete paragraph "B" (Phenolic boardstock)
Page 2 of 3
SECTION 09900
PAINTING
2.03
Paint Materials
Add the following paragraphs:
G. Exterior concrete block is to receive one coat
acrylic block filler and two coats of acrylic
masonry paint.
H. Interior concrete block is to receive two coats
acrylic masonry paint.,
I. Underside of roof deck and structural steel joists
are to receive one coat dry fog (dry fallout)
high solvent, spray on. Note - deck and joist
painting to be bid alternate #3.
SHEET A-2
At inside surfaces of exterior walls at rooms 102 and 103,
walls are to be furred with furring strips and 1-1/2" molded
polystyrene insulation board plus polyethylene vapor barrier
and 1/2" gypsum board. This is to extend up to roof deck.
Where ceramic tile is scheduled, tile is to be installed
over the gypsum board and insulation noted above.
DRAWING SHEETS
SHEET E-1
At note for CCT #17, delete reference to overhead wlrlng to
gas pump location. Wiring to gas pump location to be
underground in 2" diam. PVC conduit (overssized for future
control wiring) .
Page 3 of 3
THE VOGT CORPORATION
ARCHITeCTURe ENGINeeRING
November 10, 1989
Dan Donahue
City Manager
City of New Hope
4401 Xylon Avenue N.
New Hope, MN 55428
Re: Architectural fee limit for
Golf Course Maintenance
Building
Dear Mr. Donahue:
The not-to-exceed limit on our professional fee construction
documents and bid and construction phase services was established
as 8-1/2% of a pre-bid budget of $126,300.00. This established
a limit of $10,735.00 for these services.
We structured the bid package with alternates so that the project
could go ahead for $126,300 or less.
since the city elected to go ahead with accepted alternates
resulting in a contract sum totalling $135,180.00, we request
that this figure also be the basis used to figure our 8-1/2% not-
to-exceed limit. The difference between $135,180.00 and
$l26,300.00 is $8,880.00. This times 8-1/2% equals $755.00.
Adding $755.00 to our fee limit would result in the fee limit for
construction plans and site visits to be $11,490.00 and the
overall fee authorization for the project to be $15,240.50.
Thank you for consideration of the above. If the above revision
is agreeable, please return a copy of this signed, or initialed,
for our records.
Yours truly,
THE VOGT CORPORATION
c::::::: . ~ +--
? t:( tv,t. lC( '], (/n /
Edward J. Vogt, A.I.A.
Date
/ / hcyi?
EJV /wgj
cc: Dick DeSplinter
Shari French
SUITE 260 CARLSON CENTER. ONE CARLSON PARKWAY. MINNEAPOLIS, MN 55447. (612] 475-2826